Table of Contents
General Items
General Items
Contractor’s Temporary Site Facilities
Brief Description
ⓒ David H Moloney
General Items
Contractor’s Temporary Site Facilities
ⓒ David H Moloney
General Items
Contractor’s Camp for 8,000 persons
ⓒ David H Moloney
General Items
Sheet Pile Temporary Shaft
Brief Description
ⓒ David H Moloney
General Items
Sheet pile Temporary Shaft
ⓒ David H Moloney
General Items
Dewatering
Brief Description
ⓒ David H Moloney
General Items
Dewatering
ⓒ David H Moloney
General Items
Dewatering by Wellpoints
ⓒ David H Moloney
General Items
Water Pollution Prevention
Brief Description
ⓒ David H Moloney
General Items
Water Pollution Prevention
General Items
Traffic Management
Brief Description
ⓒ David H Moloney
General Items
Traffic Management - Realign Motorway under new Bridges
ⓒ David H Moloney
General Items
Traffic Management - Realign Motorway under new Bridges
ⓒ David H Moloney
General Items
Traffic Management – Divert Live Traffic onto Realigned Carriageway
ⓒ David H Moloney
General Items
Temporary Fence type 1
Brief Description
ⓒ David H Moloney
General Items
Temporary Fence type 1
ⓒ David H Moloney
General Items
Temporary Fence type 2
Brief Description
ⓒ David H Moloney
General Items
Temporary Fence type 2
ⓒ David H Moloney
General Items
Site Hoarding examples
ⓒ David H Moloney
General Items
Falsework
Brief Description
Brief Description
ⓒ David H Moloney
Geotechnical
Vibro Compaction - Sequence, Plant & Methods
Brief Description
ⓒ David H Moloney
Geotechnical
Vibro Compaction - Sequence, Plant & Methods
ⓒ David H Moloney
Geotechnical
Stone Columns ⓒ David H Moloney
Brief Description
ⓒ David H Moloney
Earthworks
Much Shifting
Earthworks
Brief Description
7 km
14 minutes 7 km 14 minutes
3 minutes
Earthworks
Loading & Haulage
Earthworks
Loading & Haulage
Earthworks
Loading & Haulage
Earthworks
Loading & Haulage
Earthworks
Loading & Haulage
Earthworks
Loading & Haulage
Earthworks
Loading & Haulage
Earthworks
Haulage
Earthworks
Tipping
Earthworks
Tipping
Earthworks
Spreading & Compaction
Earthworks
Spreading & Compaction
Rock - Excavability
Earthworks
Brief Description
ⓒ David H Moloney
Earthworks
Rock-breaking
Earthworks
Rock-breaking
Earthworks
Mining
Brief Description
Roadheader
Spray Mortar as Lining
Earthworks
Dredging & Reclamation
Brief Description
Brief Description
Before digging
establish the location
and route of
underground cables.
ⓒ David H Moloney
Concrete
Concrete Batching Plant David H Moloney
Concrete
Brief Description
ⓒ David H Moloney
Concrete Batching Plant
Concrete
ⓒ David H Moloney
Concrete Batching Plant
Concrete
ⓒ David H Moloney
Concrete Batching Plant – Computer Controlled
Concrete
ⓒ David H Moloney
Concrete Batching Plant David H Moloney
Concrete
Brief Description
.
The mixing is computer controlled
and has a dynamic screen display,
showing the process. The material
storage capacity is, to match two
days concrete production.
ⓒ David H Moloney
Concrete Batching Plant on Barge for Marine Piles
Concrete
ⓒ David H Moloney
Quarry & Aggregate Production
Concrete
Brief Description
ⓒ David H Moloney
Quarry & Aggregate Production
Concrete
ⓒ David H Moloney
Aggregate Production
Concrete
ⓒ David H Moloney
Reinforcement Cutting & Bending Yard
Concrete
Brief Description
Reinforcement in 12 m lengths.
Delivery in 3 ton Bundles
ⓒ David H Moloney
Reinforcement Cutting & Bending
Concrete
ⓒ David H Moloney
Reinforcement Cutting & Bending
Concrete
ⓒ David H Moloney
Reinforcement Cutting & Bending Yard David H Moloney
Concrete
Reinforcement in 12 m lengths. Delivery in 3 ton Bundles Reinforcement cut to length by Shearing Machine
Reinforcement Bent to Shape by Bending Machine Reinforcement that is cut and bent is Bundled for delivery to work site
ⓒ David H Moloney
Reinforced Wall Construction Sequence
Concrete
Brief Description
Cycle Time
Pour per Day
ⓒ David H Moloney
Reinforced Wall Construction Sequence
Concrete
ⓒ David H Moloney
Reinforced Structure Construction Sequence
Concrete
Brief Description
ⓒ David H Moloney
Reinforced Structure Construction Sequence
Concrete
ⓒ David H Moloney
Reinforced Construction Tank, Construction Sequence David H Moloney
Concrete
ⓒ David H Moloney
Bridge & Post-tensioning
Concrete
Brief Description
ⓒ David H Moloney
Viaduct
Concrete
Brief Description
Brief Description
Brief Description
Brief Description
Brief Description
Brief Description
Brief Description
Brief Description
Brief Description
Brief Description
Brief Description
Brief Description
NDT
Cut Non Destructive
Testing
Bevel PWHT
Post Weld Heat
Treatment
Fit-up Blasting
Weld Painting
Structural Steel & Miscellaneous
Steel Building Multi-storey
Structural Steel
Brief Description
ⓒ David H Moloney
Steel Building Multi-storey
Structural Steel
ⓒ David H Moloney
Structural Steel Building Multi Storey
Structural Steel
Step 1 Set-out Grid Lines Step 2 Holding Down Bolts Step 3 Erect 1st level use core for stability
Step 4 Complete 1st Level Step 5 Erect following Levels Step 6 Plumb & Align Structure
Brief Description
ⓒ David H Moloney
Steel Building Single Storey
Structural Steel
ⓒ David H Moloney
Structural Steel Building Single Storey
3D images to show Construction Sequence.
Structural Steel
Step 1 Set-out Grid Lines Step 2 Holding Down Bolts Step 3 Erect 1st Bay
ⓒ David H Moloney
Steel Storage Tank
Structural Steel
Brief Description
ⓒ David H Moloney
Steel Storage Tank
Structural Steel
ⓒ David H Moloney
Steel Circular Storage Tank – Construction ⓒ David H Moloney
Structural Steel
Pipe Rack
Structural Steel
Brief Description
ⓒ David H Moloney
Pipe Rack
Structural Steel
ⓒ David H Moloney
Airport Roof Truss
Structural Steel
Brief Description
ⓒ David H Moloney
Airport Roof Truss
Structural Steel
Brief Description
Brief Description
ⓒ David H Moloney
Pile Load Test
Piling
Brief Description
ⓒ David H Moloney
Pile Load Test
Piling
ⓒ David H Moloney
Roads & Pavings
Asphalt Batching Yard
Roads & Pavings
Brief Description
Brief Description
Brief Description
Brief Description
Brief Description
Brief Description
Brief Description
Placing Concrete
Cutting Head Rotates Segments
Start
Tunnel Precast Segments
Tunnels
Brief Description
Brief Description
ⓒ David H Moloney
Miscellaneous Works
Fencing
Miscellaneous
Brief Description
Fencing.
Sequence of construction;
1. Clear and grade the ground.
2. Fix corner and straining posts.
3. Fix intermediate posts.
4. Fix line wire, chain-link and razor wire.
5. Construct concrete ground beam
Miscellaneous
Fencing
Cranes Lift
Miscellaneous
Brief Description
Brief Description
Brief Description
Brief Description
ⓒ David H Moloney
Histogram Charts for Resources & Outputs
Brief Description
Brief Description
Brief Description
Brief Description