Project: Consultancy Services for Preparation of Feasibility and Detailed Project

Report for upgradation to 4 lane of Shimla to Mataur Section (Km. 0.000 to Km.
223.700) of NH-88 in the State of Himachal Pradesh through BOT/Hybrid
Annuity/EPC mode
Sub : Authentication of Drawings and Designs (Draft DPR)-PKG V
In this Package V, there are 4 Major Bridge + 4 Minor Bridges and structures +1 RUB +2
Overpass + 3 Underpass+1 Flyover with total 240 structural drawings for them. 15% of
drawings = 0.15 x 240= 36 and 15% of design of structures = 0.1 x 15 = 1.5 (say 2 Nos.).
Accordingly drawings for 3 no. of Structures and Structures design for 2 nos. have been
checked and authenticated.

Observation on the drawings and design of above bridges and their compliances are as
under.

Sl. Design/ Observation Compliance


No. Drawings No.

Observation on Drawings
1 Major Bridge at
Ch. 168+850

Major Bridge at
2 Ch. 190+309

3 Minor Bridge at
Ch. 164+930

Observation on Design
1
Major Bridge at
Ch. 190+309

Minor Bridge at
2 Ch. 164+930