Senarai kuantiti bagi projek slab makmal bata FPTV :

BILL NO.1 - PENGUBAHSUAIAN SLAB

Item Description Unit Qty Rate Amount

ELEMENT 1 - DEMOLITION WORKS

A Demolish existing structure including concrete slab, Item


concrete curb and concrete wall as per architect drawing

ELEMENT 2 - FORMWORK

FORMWORK TO SIDES
FORMWORK TO SOFFIT

B Formwork to sides and soffit of concrete slab not


exceeding 100mm as per architect drawing m2 19 19.00

ELEMENT 3 - CONCRETE WORKS

Vibrated reinforced concrete grade 30 as per architect


drawing :

C 150mm thick for concrete slab m3 3 2.88

Approved damn-proof membrance as per architect


drawing

A layer of 0.2mm heavy duty polythene sheet m2 19


D membrance as per architect drawing laid below concrete 19.18

ELEMENT 4 - REINFORCEMENT WORKS

High tensile bar reinforcement as per architect drawing

E 12mm Diameter bar kg 202 202.00

TO COLLECTION RM