Plate Settler System Components
EFFLUENT TROUGHS
SLUDGE COLLECTOR DRIVE FLOW CONTROL DECKS
LEVELING WEIR
3 ft Tubes: Louisville, CO
Square btm trough, submerged orifices
• Vertical impeller mixers: rapid or flash mix for pH adjustment, oxidant and
coagulant addition using high particle collisions
• Hydraulic mixing: reduce hydraulic energy & distribute flow across basin width
Flash Mix Stage One Stage Two Stage Three Stage Four:
Hydraulic Mixer
Rapid Mix
Vertical
Turbine
Paddle
Wheel
Hydraulic
Flocculation
Configuration - Flow Control to Minimize Short Circuiting
Conventional Sedimentation
0.5 gpm/ft2 SOR
80’ x 208’
Plate Settler
0.3 gpm/ft2
40’ x 50’
Lower cost of land, construction & building. Less space to maintain & smaller building size.
HOW
PLATE SETTLERS
WORK
How Plate Settlers Work
Falling particle sees Flow
the “projected area”
of each Plate Distribution
Stable Laminar Flow
Low Reynolds #
&
High Froudes #
3.5"
Fg
Plate settlers provide a “perfect environment”
low velocities and no currents (Laminar flow)
10’ plate length / 0.022 fps (¼”/sec) = 7.57 minutes residence time in plate
Particle must fall 3.5” vertically in 7.57 minutes = 0.46 in/min plate settling rate
15’ deep basin with 2 hr HRT, 180”/120 minutes = 1.5”/min conventional sedimentation basin settling rate
INLET
PORTS
Plate
Cartridge
Flow Control
Decks
Cable-Vac
Sludge Collection
0.0900
0.0800
Orifice width @ 4.5’L & 0.3 gpm/sf
+1/32" = 1" HL
0.0700
0.0600
-1/32" = 3" HL
0.0500
0.0400
0.0300
0.0200
HEADLOSS (Inches)
How Plate Settlers Work
Orifices Insure Even Distribution Across Entire Plate & Basin
PLATE SETTLER
CALCULATIONS
Plate Settler Calculations
Sizing Calculation Example
Calculation for 10 MGD (6,944 GPM):
Choose the specific loading Divide the flow in gpm by the loading rate
rate. For example a standard •
• Flow = 6,944, Loading Rate = 0.3 gpm/ft²
loading rate is 0.3 gpm/ft2
of effective plate area at 6,944 gpm/0.3 gpm/ft² =23,147 ft² projected area
90% efficiency.
Divide the effective • 4.5’W x 10’L plate @ 55o(cos55) x 0.9 = 23.23 ft²
projected settling area by Effective Projected Area Required = 23,147 ft²
the area of each plate to get •
# of plates • 25,719 / 23.23 = 1,107 plates
FABRICATION
&
INSTALLATION
PLATE SETTLER FABRICATION
Frederick MD
INCLINED PLATE
SETTLER
INSTALLATIONS
BENTON HARBOR, MI
MUSKEGON, MI
SOUTH HAVEN, MI
WYOMING, MI
MARINETTE, WI
BENTON HARBOR, MI
BENTON HARBOR, MI
2010
2 Basins
12 MGD
40’L x 30’W x 15’D
0.3 gpm/sf @90%
BENTON HARBOR, MI
15’L x 30’W x 15’WD
40 min@ 6 MGD
1st : 3 HP
2nd: 2 HP
3rd : 1 HP
Horizontal Reels
Ported Floc Baffle
BENTON HARBOR, MI
G-Values, sec-1
1st : 70
2nd : 45
3rd : 20
4th : Hydraulic
3rd Stage
4th Stage
SOUTH HAVEN, MI
78 Plates/Cartridge
4 Cartridges/Basin
312 Plates, 4.5’ x 10’
SOUTH HAVEN, MI
2 Troughs/Basin
18”W x 18”D
2,000 gpm/trough
6 Orifice/plate
SOUTH HAVEN, MI
Hoseless Cable-Vac™ Sludge Collector
¼ HP Reel-to-Reel Cable Drive
WYOMING, MI
Serpentine Flow
Horizontal Reel Flocculators
WYOMING, MI
2010
3 Basins
86’L x 64’W x 16’D
30 MGD/Basin
0.30 gpm/sf @ 80%
WYOMING, MI
2009 - 2010
8 Rows of 4 Cartridges/Row
98 Plates/Cartridge = 3,136 Plates/Basin
8 Troughs/Basin, 22”W x 19”D x 85’L each
2,600 gpm capacity/trough
WYOMING, MI
MARINETTE, WI
2010
2 Basins
37’L x 22’W x 16’D
3.25 MGD/Basin
Expandable to 4.1 MGD
0.30 gpm/sf
8-100 NTU Raw Water
MARINETTE, WI
1st Stage 2nd Stage 3rd Stage
70 sec-1 G, 1.5 HP 45 sec-1 G, 0.75 HP 20 sec-1 G, 0.5 HP
Coagulant: Sumalchlor 50 or AquaHawk 607, Chlorine @ 0.5 ppm average, 3-6 max
MARINETTE, WI
Sludge Collector Cable Drive