AS PER APPROVED PLAN

AS BUILT PLAN
CONCERN PLAN CHANGES:

1). As per plan 4” LC-PURLIN IS To be installed


As per Plan 6” LC PURLIN was installed

Fig. 1.0 Fig 1.1


installed Purlin at main roof Installed Purlin at Comfort Room

2). As per plan the PCV gutter at the back should be continues from wall to wall going over
the roof of the CR.

Fig 2.1
As per plan

As per as built the PVC gutter was cut, not covering the top of the roof of the CR.

Fig. 2.2

As per built
3. as per plan there should be no gutter for the Comfort room,

Fig 3.0
as per plan ,no gutter is to be installed at Comfort room

As Per built, Gutter Tube 18"x8' was installed on Comfort room, additional downspout was added

Fig 3.1 Fig 3.2


as per built, downspout as per built Gutter Tube 18"x8' was installed
was installed on roof of the comfort room
4. As per plan 75mm Or 3” PVC PIPE should be installed on Downspout

Fig 4.0
As per plan 75mm or 3” dia. PVC pipe should be installed on downspout

AS per built, 50 mm or 2” dia. PVC Pipe has been installed on 201 units.

Fig 4.1
As per built 50 mm or 2” dia. PVC Pipe was installed