Professional Documents
Culture Documents
Control Panel
Control Panel
SL
DESCRIPTION BME CONSULTANT
NO
Material Receiving Inspections:
a) Quantity, Sizes etc.
1. b) Compliance with specifications and W R /S
approved material submittals.
Site Installations :
a) Correct location as per approved drawing W S
b) Proper mounting and clear/clean cable W S
2. trenches/route
c) Check all wiring as per drawing and W S
proper tags are fixed.
BILT/J-225/ITP/AC-08