You are on page 1of 53

RAIL VIKAS NIGAM LIMITED

DOUBLING OF KOTA - RUTHIYAI (164.206 Km)


SECTION OF BINA - SALPURA - KOTA ROUTE
(PACKAGE - II )

DESIGN OF MAJOR
BRIDGE NO :- 20
( 12 x 5.897 m RCC BOX )

April-13
CONTENTS
PAGE NO
SR NO DESCRIPTION From To

1 SOIL 0 0

2 LOAD CACULATION 1 6

3 STAAD REPORT 7 17

4 RCC DESIGN OF BOX 18 20

5 DESIGN OF WING WALL 21 35

5 DESIGN OF WING WALL 36 50


CENGRS GEOTECHNICA PVT. LTD. Job No. 211191B-I Sheet No. 24
(R1)

Settlement analysis for open foundations has been done using


classical theory, as sum of elastic settlement and consolidation
settlement. Since the cohesive strata (clayey silt/silty clay)
encountered is hard in consistency, consolidation settlement is not
likely to occur.

Reviewing the available borehole data, we recommend the


following values of net allowable bearing pressures for open
foundations at BH-1 location:

Foundation Recommended
Bridge Chainage, Bore- Embedment Net Allowable
No. Km hole No. Depth below Bearing Pressure,
EGL, m T/m2

3.0 (RL 252.8 m) 16


4.0 (RL 251.8 m) 20
20 19.030 BH-1
5.0 (RL 250.8 m) 25
6.0 (RL 249.8 m) 30

The above values include a bearing capacity safety factor of 2.5.


Total settlement of foundations bearing on soil is expected to be about
50 mm. Net bearing pressures for foundations at intermediate depths
may be interpolated linearly between the values given above.

Typical calculations are presented at the end of Appendix-D.

10.0 MINOR BRIDGE NO. 23 AT CHAINAGE 25.700 KM

10.1 Bridge Details

A Minor Bridge No. 23 is planned at Ch: 25.700 Km in between


Sri Kalyanpura and Bhonra railway crossings. One (1) borehole was
drilled at this structure location to about 20 m depth.

The existing bridge at this location is a Box Culvert with span


arrangement of 8 x 4.99 m. The proposed structure details provided to
us, as well as borehole details, are tabulated below:
Br no 20 Load URS

DESIGN OF RCC BOX


INPUT DATA

A BRIDGE NO. 20
PROJECT DOUBLING OF RUTHIYAI-KOTA
PROPOSED SPAN
12 X 5.897 x 6.54
Nos Horz. Vert
SECTION RUTHIYAI-KOTA
PROPOSED F.L 256.216
EXISTING B.L 252.720
PROPOSED TOP OF BOX 256.136 ( 80 mm TH Wearing Course )
HFL 254.936
Standard of Loading 25 t

B PROPERTIES
Grade of Concrete M 35
Grade of Steel Fe 500
Clear Span 5.897 m
Clear Height 3.016 m
Thickness of Vertical Wall 0.712 m
Thickness of Horizontal Slab 0.55 m
Earth Cushion 0.080 m
Ballast Cushion 0.35 m
Nos of Track 1 Nos
Track Centre ( In case of More than one Track ) 5.3 m
Skew Angle 60 Degree
Length of Box 7.17 m
Formation Width 6.850 m

C LOAD
Density of Soil  1.8 t/m3
EDUL
Live Load Surcharge 13.7 t/m2
Dead Load Surcharge 6.2 t/m2
Angle of Internal Friction of Soil  35 Deg = 0.611 radian

RVNL WCR 1
Br no 20 Load URS

Width of Distribution

Width of Distribution at Top = 3.000 + 0x 5.3


= 3.000 m

3.000
2

1
0.080

3.080

Distribution Width as per Cl 2.3.4.2 (b) Bridge Rule for RCC Slab

3.080 + 0.5 x 5.897 = 6.0285 m

Length of Box = 7.17 m

Final Width of Distribution = 6.0285 m

Width of Distribution / Track = 6.0285 / 1 = 6.0285 m

Hence Final Width of Distribution/ Track = 6.0285 m

1 Calculation of Load

1.1 Dead Load

1.1.1 Due to Earth Cusion


Top Width of Formation = 6.850 m

Bottom Width of Formation = 7.17 m

Weight of Soil = 6.850 + 7.17 0.080 x 1.800 = 1.00944 t


2

UDL due to Weight of Soil = 1.00944 / 7.17 = 0.15 t/m

RVNL WCR 2
Br no 20 Load URS

1.1.2 Due to Track Weight

Weight of Track / m Run = 6.2 t

Width of Distribution = 6.0285 m

UDL due to Track Weight = 6.2 / 6.0285 = 1.03 t/m

Final Dead Load UDL = 0.15 + 1.03 = 1.18 t/m

Ultimate Dead Load UDL = 1.18 x 1.4 = 1.652 t/m


= 16.52 kN/m

( Note :- Self Weight will be taken in STAAD with factor 1.4 )

1.2 Live Load

1.2.1 Calculation of CDA

CDA CDA at BOX


Total Span (L) Cusion
Nos of Span 0.15+ (8 / 6 + L) As per Cl 2.4.2.1 Br Rule
1 6.609 0.785 0.430 0.598
2 13.218 0.567 0.430 0.432
3 19.827 0.46 0.430 0.351
4 26.436 0.397 0.430 0.303
5 33.045 0.355 0.430 0.271
6 39.654 0.326 0.430 0.249
7 46.263 0.304 0.430 0.232
8 52.872 0.286 0.430 0.218
9 59.481 0.273 0.430 0.208
10 66.09 0.261 0.430 0.199
11 72.699 0.252 0.430 0.192
12 79.308 0.244 0.430 0.186

1.2.1 Calculation of CDA

Distribution Width = 6.0285 m


Ultimate Factor = 2 As per CBC

CDA LL with LL/m Ultimate UDL /m Width


Live Load ( kN ) Span ( m)
Nos of Span CDA Width ULT FACT kN/m
1 1278 0.598 2041.5 338.6 6.609 2 103
2 2095 0.432 2999.9 497.6 13.218 2 76
3 2923 0.351 3949.0 655.1 19.827 2 67
4 3679 0.303 4793.5 795.1 26.436 2 61
5 4465 0.271 5675.4 941.4 33.045 2 57
6 5266 0.249 6576.6 1090.9 39.654 2 56
7 6037 0.232 7437.6 1233.7 46.263 2 54
8 6828 0.218 8316.5 1379.5 52.872 2 53
9 7613 0.208 9196.8 1525.6 59.481 2 52
10 8398 0.199 10068.8 1670.2 66.09 2 51
11 9184 0.192 10946.8 1815.8 72.699 2 50
12 9969 0.186 11823.1 1961.2 79.308 2 50

RVNL WCR 3
Br no 20 Load URS

1.3 Long Load

Ultimate Factor = 2 As per CBC

Net Long Long l./m Ult. Long L. /m Width


Long Load ( kN ) Width
Nos of Span Dispersion Load ULT FAC kN
1 326.87 0 326.87 54.221 2 108.442
2 618.03 0 618.03 102.518 2 205.037
3 735.46 0 735.46 121.997 2 243.995
4 927.05 0 927.05 153.778 2 307.556
5 980.61 0 980.61 162.662 2 325.325
6 1236.06 0 1236.06 205.036 2 410.073
7 1236.06 0 1236.06 205.036 2 410.073
8 1236.06 0 1236.06 205.036 2 410.073
9 1236.06 0 1236.06 205.036 2 410.073
10 1236.06 0 1236.06 205.036 2 410.073
11 1236.06 0 1236.06 205.036 2 410.073
12 1275.3 0 1275.3 211.545 2 423.091

1.3 ACTIVE EARTH PRESSURE

For Calculating the Active Earth Pressure COULOMB's theory is followed.

Where :-
Ka = Coefficient of Active Earth Pressure
h = Height of Soil
w = Unit Weight of Soil
5.7.1 Sub Str
Cos2( - )
Ka = Sin( - )Sin( - ) 2
Cos2()Cos( + ) 1 +
Cos(+ )Cos ( - )

Following values are taken for calculating the active earth pressure.

Level Int. Chk & TOF


Slope of Wall with Vert. = 0.000 rad
Coeff. of internal friction of Soil = 0.611 rad
Angle of friction bet. Wall & earth = 0.204 rad
Angle of slope of fill with Horz. = 0.000 rad
Ka = 0.251

FL 256.216
Ultimate Load
t/m kN/m
TOB 256.136 0.037 0.0629 0.629
ka * * h

3.496

BL 252.720
1.579
ka * * h Ultimate Load
Ultimate Factor t/m kN/m
Earth Pressure at Bottom = 1.579 t/m = 1.7 2.6843 26.843

RVNL WCR 4
Br no 20 Load URS

1.4 EARTH PRESSURE DUE TO Live Load SURCHARGE


(AS PER BRIDGE SUB-STRUCTURES & FOUNDATION CODE) 5.8.2
Height = H = 3.496 m
Length of BOx = L = 6.029 m
Width Of Distribution = B = 3.000 m

Net Live load Surcharge = S = = 13.7 t/m

Since H > (L-B)


CASE NO.= 2 will be used

Ultimate Factor = 1.7 As per CBC Ultimate


t/m kN/m
S * Ka / B = 1.146 t/m = 1.9482 19.482

Ultimate
t/m kN/m
S * Ka / L = 0.57 t/m = 0.969 9.69

1.5 EARTH PRESSURE DUE TO Dead Load SURCHARGE


(AS PER BRIDGE SUB-STRUCTURES & FOUNDATION CODE) 5.8.2
Height = H = 3.496 m
Length of BOx = L = 6.029 m
Width Of Distribution = B = 3.000 m

Net Live load Surcharge = V = = 6.2 t/m

Since H > (L-B)


CASE NO.= 2 will be used

Ultimate Factor = 1.7 As per CBC Ultimate


t/m kN/m
V * Ka / B = 0.519 t/m = 0.8823 8.823

Ultimate
t/m kN/m
V * Ka / L = 0.258 t/m = 0.4386 4.386

RVNL WCR 5
Br no 20 Load URS

Summary Of Load Ultimate Load

Case
DL 16.52 kN/m
Earth Top 0.629 KN/m
Pressure Bottom 26.843 kN/m
DL Top 8.823 KN/m
Surcharge Bottom 4.386 kN/m
LL Top 19.482 KN/m
Surcharge Bottom 9.69 kN/m
1 103 kN/m
2 76 kN/m
3 67 kN/m
4 61 kN/m
Live Load

5 57 kN/m
6 56 kN/m
7 54 kN/m
8 53 kN/m
9 52 kN/m
10 51 kN/m
11 50 kN/m
12 50 kN/m
1 108 kN
2 205 kN
3 244 kN
4 308 kN
Long Load

5 325 kN
6 410 kN
7 410 kN
8 410 kN
9 410 kN
10 410 kN
11 410 kN
12 423 kN

RVNL WCR 6
7

STAAD INPUT
STAAD SPACE
START JOB INFORMATION
ENGINEER DATE 17-Apr-11
JOB NAME Br No 45
ENGINEER NAME GEOTEST
JOB CLIENT WR
JOB REV R0
JOB PART 1/1
END JOB INFORMATION
INPUT WIDTH 79
UNIT METER KN
JOINT COORDINATES
1 -0.1 0 0; 13 6.509 0 0; 25 13.118 0 0; 26 -0.1 3.566 0; 27 6.509 3.566 0;
28 13.118 3.566 0; 29 26.336 0 0; 30 19.727 0 0; 31 26.336 3.566 0;
32 19.727 3.566 0; 33 32.945 0 0; 34 32.945 3.566 0; 35 39.554 0 0;
36 39.554 3.566 0; 37 46.163 0 0; 38 46.163 3.566 0; 39 52.772 0 0;
40 52.772 3.566 0; 41 59.381 0 0; 42 59.381 3.566 0; 43 65.99 0 0;
44 65.99 3.566 0; 45 72.599 0 0; 46 72.599 3.566 0; 47 79.208 0 0;
48 79.208 3.566 0; 49 0.9745 0 0; 50 2.049 0 0; 51 3.1235 0 0; 52 4.198 0 0;
53 5.2725 0 0; 54 7.5835 0 0; 55 8.658 0 0; 56 9.7325 0 0; 57 10.807 0 0;
58 11.8815 0 0; 59 25.0995 0 0; 60 24.025 0 0; 61 22.9505 0 0; 62 21.876 0 0;
63 20.8015 0 0; 64 18.4905 0 0; 65 17.416 0 0; 66 16.3415 0 0; 67 15.267 0 0;
68 14.1925 0 0; 69 31.7085 0 0; 70 30.634 0 0; 71 29.5595 0 0; 72 28.485 0 0;
73 27.4105 0 0; 74 38.3175 0 0; 75 37.243 0 0; 76 36.1685 0 0; 77 35.094 0 0;
78 34.0195 0 0; 79 44.9265 0 0; 80 43.852 0 0; 81 42.7775 0 0; 82 41.703 0 0;
83 40.6285 0 0; 84 51.5355 0 0; 85 50.461 0 0; 86 49.3865 0 0; 87 48.312 0 0;
88 47.2375 0 0; 89 58.1445 0 0; 90 57.07 0 0; 91 55.9955 0 0; 92 54.921 0 0;
93 53.8465 0 0; 94 64.7535 0 0; 95 63.679 0 0; 96 62.6045 0 0; 97 61.53 0 0;
98 60.4555 0 0; 99 71.3625 0 0; 100 70.288 0 0; 101 69.2135 0 0;
102 68.139 0 0; 103 67.0645 0 0; 104 77.9715 0 0; 105 76.897 0 0;
106 75.8225 0 0; 107 74.748 0 0; 108 73.6735 0 0;
MEMBER INCIDENCES
1 1 49; 2 49 50; 3 50 51; 4 51 52; 5 52 53; 6 53 13; 7 13 54; 8 54 55; 9 55 56;
10 56 57; 11 57 58; 12 58 25; 13 68 25; 14 67 68; 15 66 67; 16 65 66; 17 64 65;
18 30 64; 19 63 30; 20 62 63; 21 61 62; 22 60 61; 23 59 60; 24 29 59; 25 73 29;
26 72 73; 27 71 72; 28 70 71; 29 69 70; 30 33 69; 31 78 33; 32 77 78; 33 76 77;
34 75 76; 35 74 75; 36 35 74; 37 83 35; 38 82 83; 39 81 82; 40 80 81; 41 79 80;
42 37 79; 43 88 37; 44 87 88; 45 86 87; 46 85 86; 47 84 85; 48 39 84; 49 93 39;
50 92 93; 51 91 92; 52 90 91; 53 89 90; 54 41 89; 55 98 41; 56 97 98; 57 96 97;
58 95 96; 59 94 95; 60 43 94; 61 103 43; 62 102 103; 63 101 102; 64 100 101;
65 99 100; 66 45 99; 67 108 45; 68 107 108; 69 106 107; 70 105 106; 71 104 105;
72 47 104; 73 1 26; 74 13 27; 75 25 28; 76 30 32; 77 29 31; 78 33 34; 79 35 36;
80 37 38; 81 39 40; 82 41 42; 83 43 44; 84 45 46; 85 47 48; 86 26 27; 87 27 28;
88 32 28; 89 31 32; 90 31 34; 91 34 36; 92 36 38; 93 38 40; 94 40 42; 95 42 44;
96 44 46; 97 46 48;
DEFINE PMEMBER
1 TO 6 PMEMBER 1
7 TO 12 PMEMBER 2
18 17 16 15 14 13 PMEMBER 3
24 23 22 21 20 19 PMEMBER 4
30 29 28 27 26 25 PMEMBER 5
36 35 34 33 32 31 PMEMBER 6
42 41 40 39 38 37 PMEMBER 7
48 47 46 45 44 43 PMEMBER 8
54 53 52 51 50 49 PMEMBER 9
60 59 58 57 56 55 PMEMBER 10
66 65 64 63 62 61 PMEMBER 11

19/04/2013
8

72 71 70 69 68 67 PMEMBER 12
DEFINE MATERIAL START
ISOTROPIC CONCRETE
E 2.17185e+007
POISSON 0.17
DENSITY 23.5616
ALPHA 1e-005
DAMP 0.05
END DEFINE MATERIAL
MEMBER PROPERTY INDIAN
1 TO 72 86 TO 97 PRIS YD 0.55 ZD 1
MEMBER PROPERTY INDIAN
73 85 PRIS YD 0.55 ZD 1
MEMBER PROPERTY INDIAN
74 TO 84 PRIS YD 0.45 ZD 1
CONSTANTS
MATERIAL CONCRETE ALL
SUPPORTS
1 13 25 29 30 33 35 37 39 41 43 45 47 49 TO 107 -
108 FIXED BUT FX FZ MX MY MZ KFY 2000
LOAD 1 LOADTYPE Dead TITLE DL
SELFWEIGHT Y -1.4 LIST 1 TO 97
MEMBER LOAD
86 TO 97 UNI GY -14.7
LOAD 2 LOADTYPE Dead TITLE EARTH PRESSURE
MEMBER LOAD
73 TRAP GX 26.85 0
85 TRAP GX -26.85 -0
LOAD 3 LOADTYPE None TITLE DL SURCHARGE ON BOTH SIDE
MEMBER LOAD
73 TRAP GX 4.5 9
85 TRAP GX -4.5 -9
LOAD 4 LOADTYPE None TITLE LL SURCHARGE ONE SIDE
MEMBER LOAD
73 TRAP GX 9.9 19.9
LOAD 5 LOADTYPE None TITLE LL SURCHARGE ON BOTH SIDE
MEMBER LOAD
73 TRAP GX 9.9 19.9
85 TRAP GX -9.9 -19.5
LOAD 6 LOADTYPE Live TITLE LL ON ONE SPAN
MEMBER LOAD
86 UNI GY -109
LOAD 7 LOADTYPE Live TITLE LL ON TWO SPAN
MEMBER LOAD
86 87 UNI GY -80
LOAD 8 LOADTYPE Live TITLE LL ON 3 SPAN
MEMBER LOAD
86 TO 88 UNI GY -70
LOAD 9 LOADTYPE Live TITLE LL ON 4 SPAN
MEMBER LOAD
86 TO 89 UNI GY -63
LOAD 10 LOADTYPE Live TITLE LL ON 5 SPAN
MEMBER LOAD
86 TO 90 UNI GY -60
LOAD 11 LOADTYPE Live TITLE LL ON 6 SPAN
MEMBER LOAD
86 TO 91 UNI GY -57
LOAD 12 LOADTYPE Live TITLE LL ON 7 SPAN
MEMBER LOAD
86 TO 92 UNI GY -56

19/04/2013
9

LOAD 13 LOADTYPE Live TITLE LL ON 8 SPAN


MEMBER LOAD
86 TO 93 UNI GY -55
LOAD 14 LOADTYPE Live TITLE LL ON 9 SPAN
MEMBER LOAD
86 TO 94 UNI GY -54
LOAD 15 LOADTYPE Live TITLE LL ON 10 SPAN
MEMBER LOAD
86 TO 95 UNI GY -53
LOAD 16 LOADTYPE Live TITLE LL ON 11 SPAN
MEMBER LOAD
86 TO 96 UNI GY -52
LOAD 17 LOADTYPE Live TITLE LL ON 12 SPAN
MEMBER LOAD
86 TO 97 UNI GY -51
*Longtudinal Load
LOAD 18 LOADTYPE Live TITLE LONG LOAD ON ONE SPAN
JOINT LOAD
26 FX 110
LOAD 19 LOADTYPE Live TITLE LONG LOAD FOR 2 SPAN
JOINT LOAD
26 FX 208
LOAD 20 LOADTYPE Live TITLE LONG LOAD ON 3 SPAN
JOINT LOAD
26 FX 247
LOAD 21 LOADTYPE Live TITLE LONG LOAD ON 4 SPAN
JOINT LOAD
26 FX 277
LOAD 22 LOADTYPE Live TITLE LONG LOAD ON 5 SPAN
JOINT LOAD
26 FX 330
LOAD 23 LOADTYPE Live TITLE LONG LOAD ON 6 SPAN
JOINT LOAD
26 FX 381
LOAD 24 LOADTYPE Live TITLE LONG LOAD ON 7 SPAN
JOINT LOAD
26 FX 416
LOAD 25 LOADTYPE Live TITLE LONG LOAD ON 8 SPAN
JOINT LOAD
26 FX 416
LOAD 26 LOADTYPE Live TITLE LONG LOAD ON 9 SPAN
JOINT LOAD
26 FX 416
LOAD 27 LOADTYPE Live TITLE LONG LOAD ON 10 SPAN
JOINT LOAD
26 FX 416
LOAD 28 LOADTYPE Live TITLE LONG LOAD ON 11 SPAN
JOINT LOAD
26 FX 416
LOAD 29 LOADTYPE Live TITLE LONG LOAD ON 12 SPAN
JOINT LOAD
26 FX 416
LOAD COMB 30 TRAIN ON APPROACH
1 1.0 2 1.0 3 1.0 4 1.0
LOAD COMB 31 TRAIN ON 1 SPAN
1 1.0 2 1.0 3 1.0 4 1.0 6 1.0 18 1.0
LOAD COMB 32 TRAIN ON 2 SPAN
1 1.0 2 1.0 3 1.0 4 1.0 7 1.0 19 1.0
LOAD COMB 33 TRAIN ON 3 SPAN
1 1.0 2 1.0 3 1.0 4 1.0 8 1.0 20 1.0

19/04/2013
10

LOAD COMB 34 TRAIN ON 4 SPAN


1 1.0 2 1.0 3 1.0 4 1.0 9 1.0 21 1.0
LOAD COMB 35 TRAIN ON 5 SPAN
1 1.0 2 1.0 3 1.0 4 1.0 10 1.0 22 1.0
LOAD COMB 36 TRAIN ON 6 SPAN
1 1.0 2 1.0 3 1.0 4 1.0 11 1.0 23 1.0
LOAD COMB 37 TRAIN ON 7 SPAN
1 1.0 2 1.0 3 1.0 4 1.0 12 1.0 23 1.0
LOAD COMB 38 TRAIN ON 8 SPAN
1 1.0 2 1.0 3 1.0 4 1.0 13 1.0 25 1.0
LOAD COMB 39 TRAIN ON 9 SPAN
1 1.0 2 1.0 3 1.0 4 1.0 14 1.0 26 1.0
LOAD COMB 40 TRAIN ON 10 SPAN
1 1.0 2 1.0 3 1.0 4 1.0 15 1.0 27 1.0
LOAD COMB 41 TRAIN ON 11 SPAN
1 1.0 2 1.0 3 1.0 4 1.0 16 1.0 28 1.0
LOAD COMB 42 TRAIN ON 12 SPAN
1 1.0 2 1.0 3 1.0 4 1.0 17 1.0 29 1.0
PERFORM ANALYSIS
LOAD LIST 30 TO 42
START CONCRETE DESIGN
CODE INDIAN
FC 35000 ALL
FYMAIN 500000 ALL
FYSEC 415000 ALL
DESIGN BEAM 1 TO 97
END CONCRETE DESIGN
FINISH

6.61m 6.61m 6.61m 6.61m 6.61m 6.61m 6.61m 6.61m 6.61m 6.61m 6.61m 6.61m
3.57m

Y
Z X
Load 1

DIMN

19/04/2013
11

86 87 88 89 90 91 92 93 94 95 96 97
73 74 75 76 77 78 79 80 81 82 83 84 85
1 2 3 4 5 6 7 8 9 101112131415161718192021222324252627282930313233343536373839404142434445464748495051525354555657585960616263646566676869707172

Y
Z X
Load 0

Bean No

86 87 88 89 90 91 92 93 94 95 96 97
73 74 75 76 77 78 79 80 81 82 83 84 85
1 2 3 4 5 6 7 8 9 101112131415161718192021222324252627282930313233343536373839404142434445464748495051525354555657585960616263646566676869707172

Y
Z X
Load 0 : Bending Z

Bending Moment Envelop

19/04/2013
12

86 87 88 89 90 91 92 93 94 95 96 97
73 74 75 76 77 78 79 80 81 82 83 84 85
1 2 3 4 5 6 7 8 9 101112131415161718192021222324252627282930313233343536373839404142434445464748495051525354555657585960616263646566676869707172

Y
Z X
Load 0

Beam For Max Moment in TOP SLAB

Mz(kNm)
600 558 600
400 227 400
200 200
2.69
26 27
200 -29.1 -2.83 200
2 4 66.45
400 400
600 -419 600

Max Moment in TOP SPAB

Fy(kN)
600 600
388
400 400
200 1.68 200
26 27
200 -6.37 2 4 66.45 200
400 400
600 -526 600

Max Shear in Top SLAB

19/04/2013
13

86 87 88 89 90 91 92 93 94 95 96 97
73 74 75 76 77 78 79 80 81 82 83 84 85
1 2 3 4 5 6 7 8 9 101112131415161718192021222324252627282930313233343536373839404142434445464748495051525354555657585960616263646566676869707172

Y
Z X
Load 1

Beam For Max Moment in Vert Outer Wall

Mz(kNm)
398
400 400
227
200 200
1 26
1 2 3 -29.1
3.65 200
200
400 400

Max Moment in Vert Outer Wall

Fy(kN)
146
150 150
100 64.6 100
50 50
1 26
50 -34.6 1 2 3 3.65 50
100 -75.2 100
150 150

max Shear in Vert Outer Wall

19/04/2013
14

86 87 88 89 90 91 92 93 94 95 96 97
73 74 75 76 77 78 79 80 81 82 83 84 85
1 2 3 4 5 6 7 8 9 101112131415161718192021222324252627282930313233343536373839404142434445464748495051525354555657585960616263646566676869707172

Y
Z X
Load 0

Beam For Max Moment in INT WALL

Mz(kNm)
600 600
400 341 400
200 63.8 200
13 27
200 -85.4 1 2 3 3.65 200
400 400
600 -481 600

Max BM in INT WALL

Fy(kN)
300 225 225 300
200 200
100 100
13 27
100 -40.9 1 2 3 3.65 100
-40.9
200 200
300 300

MAX SHEAR in INt WALL

19/04/2013
15

86 87 88 89 90

73 74 75 76 77

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 3

Beam For Max BM in Bottom Outer Corner

Mz(kNm)
400 400
200 95 200
1 49
200 0.25 0.5 0.75 -64.8 200
11.07
400 400
-398

Max BM in Bottom OUTER CORNER

Fy(kN)
400 400
200 200
1.31 1.31
1 49
200 0.25 0.5 0.75 11.07 200
400 -305 -324 400

Max Shear in Bottom Outer Corner

19/04/2013
16

86 87 88 89 90

73 74 75 76 77

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 3

Beam For Max BM IN BOttom Center

Mz(kNm)
300 247 300
200 191 200
100 100
51 52
100 -15.6 -6.26
0.25 0.5 0.75 11.07 100
200 200
300 300

Max BM in Bottom Cneter

19/04/2013
17

86 87 88 89 90

73 74 75 76 77

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 3

Beam for MAx BM in Bottom INNER

Mz(kNm)
600 600
400 400
200 56.7 19 200
53 13
200 -104 0.25 0.5 0.75 11.07 200
400 400
600 -460 600

MAX BM in Bottom inner

Fy(kN)
400 341 321 400
200 200
53 13
-12.6 0.25 0.5 0.75 -12.6
11.07
200 200
400 400

Max Shear in Bottom Inner

19/04/2013
Br no 20 ReinForcement URS

RCC DETAIL OF BOX

Reinforcement Table

No Dia Sp Area No Dia Sp


a1 20 200 1570 h1 25 200
a2 20 200 1570 h2 25 200
a3 20 200 1570 h3 25 200
a4 20 200 1570 h4 25 200 Acorss
b 20 100 3140 j1 10 200 200
c 20 100 3140 j2 10 200 200
d1 25 200 2453 j3 10 200 200
d2 25 200 2453 j4 10 200 200
e 20 200 1570
f 20 200 1570
g 10 100 785

RCC Design of BOX

FOR BENDING

As per Cl 15.4.2.2.1 of IRS Concrete Bridge Code, taking it as Singly reinforced section

Checking for effective depth, d = Mu

REFERENCE FORMULAE
0.15 x b x fck

0.5 fck 4.6 Mu


Ast = 1- 1- bd
fy fck bd2

Checking of Mu as per Cl 15.4.2.2.1 of IRS Concrete Bridge Code

1.1 fy Ast
Lever Arm, z = 1- d Limited to 0.95d =
fck b d

Mur = 0.87 fy As z

RVNL WCR 18
Br no 20 ReinForcement URS

Note

Moment has been taekn from STAAD & Calculation of reinforcement has been done in TUBULATED Form, Based on above Formula & Notation

b = 1000 mm fck = 35
fy = 500

Mu D- d Ast Min Max Ast Ast p% z Mur Result


Location Mark Provide reqd reqd Steel
2
kN-m mm mm mm mm2 mm
2
mm
2
mm kN-m
Top Slab Outer Corner Top a1+a4 230.0 550 209 987 1100 1100 3140 0.571 550 751 OK
Top Slab Bottom b 430.0 550 286 1891 1100 1891 3140 0.571 550 751 OK
Top Slab Inner Corner Top a2+a4 558.0 550 326 2495 1100 2495 3140 0.571 550 751 OK
Bottom+Centre Top c 250.0 550 218 1075 1100 1100 3140 0.571 550 751 OK
Bottom+Corner+Bottom a1+d1 400.0 550 276 1753 1100 1753 4023 0.731 550 963 OK
Bottom+Inner+Bottom d1+d2 470.0 550 299 2078 1100 2078 4906 0.892 550 1174 OK
Vert + Outer e 400.0 550 276 1753 1100 1753 3140 0.571 550 751 OK
Vert + inner f 481.0 450 303 2688 900 2688 3140 0.698 450 615 OK

FOR SHEAR

V= Shear force in KN
b= Width of Section = 1000 mm
d= Effective depth of Section

REFERENCE FORMULAE
v = V/b.d = Shear Stress
v.max= Max Persmissible Shear Stress = 0.75 √fck = 4.437 mPa As per Clause 15.4.3.1 of CBC

1/4
500 As per Clause 15.4.3.2.1 of CBC
Depth factor, s = or 0.7, whichever is maximum
d

1/3
0.27 100 As 1/3 x As per Clause (Cl 15.4.3.2.1) CBC
Ultimate Shear Resistance of Concrete, v c = fck
Ym bd

Where Ym = 1.25

fy = 415 mPa (Should Not be > 415 As per CBC )

RVNL WCR 19
Br no 20 ReinForcement URS

Shear Reinforcement

Stress Depth p % Dia Leg Sv


Location Max Shear Thickness
v= V/bd Fac (Ast*10 In 1000 mm 0.87*fy*As/b(v+0 Sv Pro Mark
V ( kN) d ( mm ) mPa s 0/bd) vc svc Width .4-svc) Across Along no
Top Slab 520 550 0.945 0.98 0.571 0.586 0.572 10 5 183 200 200 j1
Bottom Slab 400 550 0.727 0.98 0.731 0.636 0.621 10 5 280 200 200 j2
Outer Wall 250 550 0.455 0.98 0.571 0.586 0.572 10 5 501 200 200 j3
Inner Wall 250 450 0.556 1.03 0.698 0.626 0.643 10 5 453 200 200 j4

Distribution Reinforcement

2
Area Of Distribution Reinforcement = 0.12 x 1000 x 550 = 660 mm
100

Dia of Reinforcement = 10 mm

Spacing Required = 1000 x 78.5 = 118.9 mm c/c


660
Hence Provided 10 # @ 100 mm c/c (Bar No g )

RVNL WCR 20
Br no 20 21

Name of work: CONSULTANT


Dat 4/19/2013 DOUBLING OF RUTHIYAI-KOTA URS
Revision No.: R0 Straight Return / Wing Wall

300
TOW = 256.136
EARTH
SIDE 8 

8b  1
8a  22
5416
1
22 1708

Curtail LVL = 254.428

5a  5b 
5+8
3708
6+7 
4  TOF = 250.720
2b  3
3b

500

500
500

500
BOF = 249.720

2a  2 
1800 247 300 247
3a 3000 1
5594

Bar No Dia Layer Spacing Leg


1 20 100
2 12 100
2a 12 100
2b 12 100
3 12 100
3a 12 100
3b 12 100
4 16 100
5 10 2 0
5a 10 100
5b 10 100
6 16 200
7 16 2 200
8 10 200
8a 10 200
8b 10 200
9 10 200 4

RVNL URS ECR


Br no 20 22

Name of work: CONSULTANT


Dat 4/19/2013 DOUBLING OF RUTHIYAI-KOTA URS
Revision No.: R0 Straight Return / Wing Wall
DESIGN OF WING WALL
Proposed Span 12 x 5.9 m RCC BOX
Standard of Loading 25 t
Level (m)
Top of Wing Wall 256.136 Formation Level 256.216
Top of Foundation 250.720 R.L of Bed Level 252.720
Bottom of Foundation 249.720 Deepest Scour Level 250.720
1 Height of Wall From Top of Foundation 5.416 m
2 Proposed Top Width 0.300 m
3 Back Batter (Equivalent for existing ) (1H:?V) 22.0
4 Intermediate Front Batter (1H:?V) 22.0
5 Second Front Batter (1H:?V) 22.0
6 Horz Projection of Toe ( Front ) 3.000 m
7 Thickness of Toe At Wall Face 1.000 m
8 End Thickness of Toe 0.500 m
9 Horz Projection of Heel ( Back ) 1.800 m
10 Thickness of Heel At Wall Face 1.000 m
11 Thickness of Heel At End 0.500 m
12 Angle of Friction of Wall with Soil ( 11.67 Deg 0.204 rad
13 Height of Second Batter (Intermediate Level) above Top of Foundation 3.708 m
14 Front Offset in Wall 0.000 m
15 Passive Height from Bottom of Foundation 3.000 m
16 Coefficient of Friction between Soil & Masonary ( 0.550
17 Distance form C/L of track to Back Face of Wall 3.125 m
18 Width of Sleeper 2.750 m
19 Depth of Ballast Cushion 0.350 m
20 Depth From Formation Level to Top of Wall 0.080 m
2
21 Live Load Surcharge 13.700 t/m
2
22 Dead Load Surcharge 6.200 t/m
23 Angle of Repose of Soil ( 35.00 Deg 0.611 rad
24 Angle of Surcharge () 0.460 rad
25 Cohesion (c) 10.000 t/m2
26 Angle of internal friction of Soil ( 32.00 Deg 0.559 rad
27 Density of Front Soil 1.000 t/m2
2
28 Density of Back Fill 1.800 t/m
Seismic Parameter
29 Method of Seismic Calculation(1= IRS Coeff Method, 2= IRC Response Spectrum) 1
Zone = III  0  0  = 0
30 Density of Masonry 2.500 t/m2
2
31 Density of Submerged Soil 1.000 t/m
32 F.O.S. for Passive Earth Pressure = 3 (0, IF PASSIVE IGNORED) 3
33 Front Delta 0.186 rad
34 Angle of Back Batter ( 0.045 rad
35 Safe Bearing Capacity 15.0 t/m2
36 Type of Structure ( 1 = Mass CC or Masonary , 2= RCC ) 2
37 Grade of Concrete fck = 35 Grade of Steel = 500
38 Type of Foundation ( 1 =OPEN , 2= CAP ) 1
Description Maximum (t/m2) Minimum (t/m2) Remark Result
Permissible Stress 1750.0 Stresses shown are maximum
At Intermediate Checking Level 22.6 -13.8 of (i) Normal (without seismic), OK
At Top of Foundation 270.6 -242.0 (ii) With Seismic divided by OK
At Bottom of Foundation 14.2 3.4 1.33 OK Over Sliding
Without Seismic With Seismic
Stability Check
Actual Per Result Actual Per Result
Against Overturning 2.6 2.0 OK 2.6 1.5 OK
Against Sliding 3.04 1.50 OK 3.04 1.50 OK
Stability Check OK 2.57 3.038

RVNL URS ECR


Br no 20 23

Name of work: CONSULTANT


Dat 4/19/2013 DOUBLING OF RUTHIYAI-KOTA URS
Revision No.: R0 Straight Return / Wing Wall
RCC Design of Wing

STEM Default
Effective cover (mm) 70
Reqd Pro HT
Depth (mm)
316 722 OK
At Top of Foundation (Up to INT LVL) Reqd Pro 100
Dia mm 16
Main Reinforcement (Back Side of Wall)
Spacing mm c/c 117 100 OK
Reinforcement on Comp. Sdie (Front Side of Dia mm 10
Wall) Spacing mm c/c 128 100 OK
Allowable 0.420
Shear Check Actual 0.340
Reinforcement No Any
From INT LVL to TOP Reqd Pro 1
Dia mm 16
Main Reinforcement (Back Side of Wall)
Spacing mm c/c 261 200 OK
Reinforcement on Comp. Side (Front Side of Dia mm 10 100
Wall) Spacing mm c/c 191 100 OK
Allowable 0.147
Shear Check Actual 0.064
Reinforcement No Any

Toe SLAB
Reqd Pro
Depth (mm)
454 930 OK
Reqd Pro
Dia mm 20
Main Reinforcement (Bottom)
Spacing mm c/c 112 100 OK
Dia mm 12 100
Reinforcement on Comp. Side
Spacing mm c/c 132 100 OK
Dia mm 10
Shear stirrups No. of Legs 4
Spacing mm c/c 246 200 OK

Heel SLAB
Reqd Pro
Depth (mm)
270 930 OK
Reqd Pro
Dia mm 16
Main Reinforcement (Top Along)
Spacing mm c/c 108 100 OK
Dia mm 12 100
Reinforcement on Comp. Sdie
Spacing mm c/c 132 100 OK

RVNL URS ECR


Br no 20 24

Name of work: CONSULTANT


Dat 4/19/2013 DOUBLING OF RUTHIYAI-KOTA URS
Revision No.: R0 Straight Return / Wing Wall
DETAIL CALCULATION

1.0 ACTIVE EARTH PRESSURE

For Calculating the Active Earth Pressure COULOMB's theory is followed.

Pa = 0.5Kawh (h+2h3)

Where :-
Ka = Coeff. of Active Earth Pressure
h = Height of Soil
w = Unit Weight of Soil

2
Cos ( - ) 5.7.1 Sub Str
Ka = 2 Sin( - )Sin( - ) 2
Cos ()Cos( + ) 1 +
Cos(+ )Cos ( - )

Following values are taken for calculating the active earth pressure.
Level Int. Chk & TOF BOF
Slope of Batter with Vert. = 0.045 rad
Coff. of internal friction of Soil = 0.611 rad
Angle of friction bet. Wall & earth = 0.204 rad
Angle of slope of fill with Horz. = 0.000 rad
Ka = 0.269

(Effect of sloping Surcharge has been taken as per CL 5.8.4 of Sub Str. Code, So "  " is taken = 0 for calculation of K a )

 Horizontal Component of Active Earth Pressure


Pah = Pa Cos( + )
Acting at Y1= (h/3) above section considered

Vertical Component of Active Earth Pressure
Pav = Pa Sin( + )
Pah Acting at X1 = Y1Cot (90-) from face of Wall

Y1 =h/3 
Pa 
Pav

1.1 At Intermediate Checking Level FL


Height from Formation Level, h = 1.746 m h3 = 0.412 m
Pa = 0.5 x 0.269 x 1.800 x 1.746 x 2.5703 = 1.085 t/m (Width)
Int. Lvl
Horizontal Component
Pah = 1.085 x Cos( 0.045+ 0.204 ) = 1.052 t/m (Width)
Will act at Y1 1.746 / 3 = 0.582 m TOF

Vertical Component BOF


Pav = 1.085 x Sin( 0.045+ 0.204 ) = 0.268 t/m (Width)
Will act at X1 = Y1Cot(90-) = 0.582 x Cot(90 - 0.045 ) = 0.026 m

1.2 At Top of Foundation


Height from Formation Level, h = 5.496 m h3 = 1.296 m
Pa = 0.5 x 0.269 x 1.800 x 5.496 x 8.08855 = 10.749 t/m (Width)

Horizontal Component
Pah = 10.749 x Cos( 0.045+ 0.204 ) = 10.417 t/m (Width)
Will act at Y2 5.496 / 3 = 1.832 m

Vertical Component
Pav = 10.749 x Sin( 0.045+ 0.204 ) = 2.650 t/m (Width)
Will act at X2 = Y2Cot(90-) = 1.832 x Cot(90 - 0.045 ) = 0.083 m

RVNL URS ECR


Br no 20 25

Name of work: CONSULTANT


Dat 4/19/2013 DOUBLING OF RUTHIYAI-KOTA URS
Revision No.: R0 Straight Return / Wing Wall
1.3 At Bottom of Foundation
Height from Formation Level, h = 6.496 m h3 = 1.532 m
Pa = 0.5 x 0.269 x 1.800 x 6.496 x 9.56027 = 15.016 t/m (Width)

Horizontal Component
Pah = 15.016 x Cos( 0.045+ 0.204 ) = 14.553 t/m (Width)
Will act at Y2 6.496 / 3 = 2.165 m

Vertical Component
Pav = 15.016 x Sin( 0.045+ 0.204 ) = 3.702 t/m (Width)
Will act at X2 = Y2Cot(90-) 2.165 x Cot(90 - 0.045 ) = 0.098 m

2.0 EARTH PRESSURE DUE TO SURCHARGE

As per Cl 5.8.3 of Sub Str. Code


Earth pressure due to surcharge is assumed to be dispersed below formation level at an angle of 45°.

(S + V) x h1 x Ka
P1 = Will act at h1/2
(B + 2D)

2
Live Load Surcharge per m, S= 13.700 t/m
2
Dead Load Surcharge per m, V = 6.200 t/m
Width of Distribution, B = 2.750 m

2.1 At Intermediate Checking Level

3.125
0.078 1.672 2.750 Formation Level
B

D 1.672

45
1.788

h1 0.466

Checking Level

Height, h1 = 0.466 m
Depth of Dispersion, D = 1.672 m

13.700+ 6.200 0.466 x 0.269


P1 = = 0.408 t/m Will act at h1/2 0.233 m
2.750+ 3.345

2.2 At Top of Foundation

3.125
0.246 1.504 2.750 Formation Level
B

D 1.504

45
5.496

h1 4.342

Top of Foundation

Height, h1 = 4.342 m
Width of Distribution, B = 2.750 m
Depth of Dispersion, D = 1.504 m

RVNL URS ECR


Br no 20 26

Name of work: CONSULTANT


Dat 4/19/2013 DOUBLING OF RUTHIYAI-KOTA URS
Revision No.: R0 Straight Return / Wing Wall
13.700+ 6.200 4.342 x 0.269
P1 = = 4.032 t/m Will act at h1/2 2.171 m
2.750+ 3.008

2.3 At Bottom of Foundation

3.125
2.046 0.000 2.750 Formation Level
B

D 0.000


45

6.496
h1 6.846

Bottom of Foundation

Height, h1 = 6.846 m
Depth of Dispersion, D = 0.000 m

13.700+ 6.200 6.846 x 0.269


P1 = = 13.309 t/m Will act at h1/2 3.423 m
2.750+ 0.000

3.0 PASSIVE EARTH PRESSURE

For Calculation Of Passive Earth Pressure On Substructure Coulomb Theory Is Used

Pp = 0.5 Kp w h2

2
Cos ()
Kp= 2 Sin( + ) Sin( + ) 2
Cos Cos( - ) 1-
Cos(- ) Cos ( - )

 0.559 rad  0.186 rad  0.000 rad = 0.000 rad
Kp= 4.678 Factor of Safety for Passive = 3
Pph = Pp Cos( - ) Acting at (h/3) above section. Ppv = Pp Sin( - ) Acting at X=Y Cot(90 - )

Considering only Horizontal component because Vertical Component will be ineffective.

3.1 At Top of Foundation


Passive Height = Bed Lvl or Scour Lvl - TOF = 250.72- 250.72- 0.000 m
Pp = 0.5 x 4.678 x 1.000 x 0.000 2 = 0.000 t/m

Safe Passive Pressure = 0.000 / 3 = 0.000 t/m


Ph = 0.000 x Cos( 0.186- 0.000 ) = 0.000 t/m Will act @ h/3 = 0.000 m
Resisting Moment = 0.000 x 0.000 = 0.000 t-m

3.2 At Bottom of Foundation


Passive Height = Bed Lvl or Scour Lvl - BOF = 250.72- 249.72- 1.000 m
2
Pp = 0.5 x 4.678 x 1.000 x 1.000 = 2.339 t/m

Safe Passive Pressure = 2.339 /3 = 0.000 t/m


Ph = 0.000 x Cos( 0.186- 0.000 ) = 0.000 t/m Will act @ h/3 = 0.333 m
Resisting Moment = 0.000 x 0.333 = 0.000 t-m

RVNL URS ECR


Br no 20 27

Name of work: CONSULTANT


Dat 4/19/2013 DOUBLING OF RUTHIYAI-KOTA URS
Revision No.: R0 Straight Return / Wing Wall
4.0 SELF WEIGHT

4.1 At Intermediate Checking Level


FL
0.080
5 Top of Wall
0.300
Back Fill 4
0.000
1 Passive 1.708
6
6
3 2 0.000

A
0.078 0.078

No. Shape Horz. Vert. (m) Density Weight L.A. from Moment L.A. Moment
Factor (m) (t/m3) W(t) A (m) W X (tm) above A W Y (tm)
(m)
W1 1.0 x 0.300 x 1.708 x 2.500 = 1.281 0.228 0.292 0.854 1.094
W2 0.5 x 0.078 x 1.708 x 2.500 = 0.166 0.404 0.067 0.569 0.094
ll
Fi

W3 0.5 x 0.078 x 1.708 x 2.500 = 0.166 0.052 0.009 0.569 0.094


e
tiv

W4 0.5 x 0.078 x 1.708 x 1.800 = 0.119 0.026 0.003 1.139 0.136


Ac

W5 0.5 x 0.078 x 0.038 x 1.800 = 0.003 0.026 0.000 1.721 0.005


Passive W6 0.5 x 0.000 x 0.000 x 1.000 = 0.000 0.455 0.000
Sum 1.735 0.370 1.423
CG of Total Mass from A = Moment/Weight = WX /W = 0.370 / 1.735 = 0.213 m
CG of Total Mass above Intermediate Level = WY /W = 1.423 / 1.735 = 0.821 m

FL
0.080
11 Top of Wall
Back Fill   0.300 Passive
10 9
0.000 0.000
1 1.708
1
   
2 13 15
0.000
2

0.078
14
5 2.000
3 2.000 3.708
4
B
250.72
10a 0.246 0.169 16
6a 0.500
1.000 6 7 1.000
0.500 1.800 8
0.500
6b 249.72
C
2.592 3.000
5.592

4.2 At Top of Foundation

No. Shape Horz. Vert. (m) Density Weight L.A. from Moment L.A. Moment
(m) (t/m3) W(t) B (m) W X (tm) above B W Y (tm)
(m)
W1 1.0 x 0.300 x 5.416 x 4.062 2.500 = 0.396 1.609 2.708 11.000
W2 0.5 x 0.078 x 1.708 x
2.500 = 0.166 0.572 0.095 4.277 0.709
W3 1.0 x 0.078 x 3.708 x
2.500 = 0.720 0.585 0.421 1.854 1.334
ll
Fi

W4 0.5 x 0.169 x 3.708 x


2.500 = 0.781 0.680 0.531 1.236 0.966
e
tiv

W5 0.5 x 0.246 x 5.416 x


2.500 = 1.667 0.164 0.274 1.805 3.009
Ac

W9 0.5 x 0.246 x 5.416 x


1.800 = 1.200 0.082 0.098 3.611 4.333
W11 0.5 x 0.246 x 0.122 x
1.800 = 0.027 0.082 0.002 5.457 0.147
W12 0.5 x 0.000 x 0.000 x
1.000 = 0.000 0.624 0.000
Fi ive

W13 1.0 x 0.169 x 0.000 x


1.000 = 0.000 0.708 0.000
ss
ll
Pa

W14 0.5 x 0.091 x 2.000 x


1.000 = 0.091 2.562 0.233
Sum 8.713 3.263 21.498
CG of Total Mass from B = Moment/Weight = WX /W = 3.263 / 8.713 = 0.375 m

RVNL URS ECR


Br no 20 28

Name of work: CONSULTANT


Dat 4/19/2013 DOUBLING OF RUTHIYAI-KOTA URS
Revision No.: R0 Straight Return / Wing Wall
CG of Total Mass above Top of Foundation = WY /W = 21.498 / 8.713 = 2.467 m

4.3 At Bottom of Foundation

No. Shape Horz. Vert. (m) Density Weight L.A. from Moment L.A. Moment
(m) 3
(t/m ) W(t) C (m) W X (tm) above C W Y (tm)
(m)
W1 1.0 x 0.300 x 4.062
5.416 x 2.196
2.500 = 8.921 3.708 15.062 1.625
W2 0.5 x 0.078 x 0.166
1.708 x
2.500 = 2.372 0.393 5.277 0.875 0.066
W3 1.0 x 0.078 x 0.720
3.708 x
2.500 = 2.385 1.716 2.854 2.054 0.288
W4 0.5 x 0.169 x 0.781
3.708 x
2.500 = 2.480 1.937 2.236 1.747 0.312
W5 0.5 x 0.246 x 1.667
5.416 x
2.500 = 1.964 3.274 2.805 4.676 0.667
W6 1.0 x 0.792 x 1.981
1.000 x
2.500 = 1.296 2.568 0.500 0.990 0.792
W6a 0.5 x 1.800 x 1.125 1.200 1.350 0.667 0.750 0.450
ll

0.500 x
2.500 =
Fi
e

W6b 1.0 x 1.800 x 2.250


0.500 x
2.500 = 0.900 2.025 0.250 0.563 0.900
tiv
Ac

W7 0.5 x 3.000 x 1.875


0.500 x
2.500 = 3.592 6.736 0.667 1.250 0.750
W8 1.0 x 3.000 x 3.750
0.500 x
2.500 = 4.092 15.346 0.250 0.938 1.500
W9 0.5 x 0.246 x 1.200
5.416 x
1.800 = 1.882 2.258 4.611 5.533 0.000
W10 1.0 x 1.800 x 17.548
5.416 x
1.800 = 0.900 15.793 3.708 65.067 0.000
W 10a 0.5 x 1.800 x 0.810
0.500 x
1.800 = 0.600 0.486 0.833 0.675 0.000
W11 1.0 x 2.046 x 3.734
1.014 x
1.800 = 0.682 2.547 6.754 25.218 0.000
W12 0.5 x 0.000 x 0.000
0.000 x
1.000 = 2.424 0.000 0.000
W13 1.0 x 0.169 x 0.000
0.000 x
1.000 = 2.508 0.000 0.000
ll
Fi

W14 0.5 x 0.091 x 0.091


2.000 x
1.000 = 4.362 0.397 0.000
e
siv

W15 1.0 x 3.000 x 6.000


2.000 x 4.092 24.554 0.000
s

1.000 =
Pa

W16 0.5 x 3.000 x 0.750


0.500 x
1.000 = 4.592 3.444 0.000
Sum 48.509 93.745 125.397 7.350
C.G. of mass from C = Moment/Weight = WX /W = 93.745 / 48.509 = 1.933 m
C.G. of Total Mass above Bott of Foundation = WY /W = 125.397 / 48.509 = 2.585 m

5.0 SEISMIC FORCE

Earth Pressure Due to Seismic Effect 5.12.6.1 Sub Str


h = x x o
h = 0.00 x 0.0 x 0.000 = 0.000 v = 0.00 / 2 = 0.000

Final Value
h = 0.000 v = 0.000

Level Int. Chk & TOF BOF


Slope of Batter with Vert. = 0.045 rad
Coff. of internal friction of Soil = 0.611 rad
Angle of friction bet. Wall & earth = 0.204 rad
Angle of slope of fill with Horz. = 0.000 rad
TOF
a tan-1 h tan-1 0.000 With (+) Pt I 0.737
 = = = 0.000
1+v
"+" & "+" value
Case I: With

1 + 0.000 Pt II 0.656

Ca = (1 +  v) Cos2( -  - ) 1 2
x 0.269
2 Sin( + )Sin( -  - ) =
Cos Cos  Cos( +  + ) 1 +
Cos(+  + )Cos( - )
b tan-1 h tan-1 0.000 With (-) Pt I 0.737
 = = = 0.000
Case II: With "-

1-v
" & "-" value

1 - 0.000 Pt II 0.656

Ca = (1 +  v) Cos2( -  - ) 1 2
x 0.269
2 Sin( + )Sin( -  - ) =
Cos Cos  Cos( +  + ) 1 +
Cos(+  + )Cos( - )

At Int. Chk & TOF BOF


Final Ca = 0.269 (Max Value of above, i.e., a and b)
Ka = 0.269
Dynamic Increment (Ca - Ka) = 0.000

RVNL URS ECR


Br no 20 29

Name of work: CONSULTANT


Dat 4/19/2013 DOUBLING OF RUTHIYAI-KOTA URS
Revision No.: R0 Straight Return / Wing Wall
5.1 At Intermediate Checking Level

DESCRIPTION FORCE L.A. Moment


DUE TO SELF WT. OF Wall SFH 0.000 0.821 0.000
DUE TO SELF WT. OF Wall SFV 0.000 0.000 0.000
Increment in Earth Pressure [0.5h2(Ca-Ka)] 0.000 0.854 0.000
Increment in Earth Pressure Surcharge 0.000 0.310 0.000
Total Ver Load = 0.000 t
Total Horz Load = 0.000 t
Total Moment = 0.000 t-m

5.2 At Top of Foundation

DESCRIPTION FORCE L.A. Moment


DUE TO SELF WT. OF Wall SFH 0.000 2.467 0.000
DUE TO SELF WT. OF Wall SFV 0.000 0.000 0.000
Increment in Earth Pressure [0.5h2(Ca-Ka)] 0.000 2.708 0.000
Increment in Earth Pressure Surcharge 0.000 2.895 0.000
Total Ver Load = 0.000 t
Total Horz Load = 0.000 t
Total Moment = 0.000 t-m

5.3 At Bottom of Foundation

DESCRIPTION FORCE L.A. Moment


DUE TO SELF WT. OF Wall SFH 0.000 2.585 0.000
DUE TO SELF WT. OF Wall SFV 0.000 0.000 0.000
Increment in Earth Pressure [0.5h2(Ca-Ka)] 0.000 3.208 0.000
Increment in Earth Pressure Surcharge 0.000 4.564 0.000
Total Ver Load = 0.000 t
Total Horz Load = 0.000 t
Total Moment = 0.000 t-m

6.0 STRESS CALCULATION

6.1 At Intermediate Checking Level

DESCRI LOAD L.A. (m) Moment Ultimate Load


S.No.
VERT HORZ. (t-m) Fac Hu Vu Mu
1 Active Earth Pressure
Horizontal Component Pah 1.052 0.582 0.612 1.70 1.7882 1.04
Vertical Component Pav 0.268 0.026 0.007 1.70 0.45484 0.01
2 Earth Pressure due to Surcharge Ph 0.408 0.233 0.095 1.70 0.69437 0.16
3 Self Weight & Back Fill 1.735 0.370 1.40 2.42835 0.52
TOTAL - Without Seismic 2.002 1.460 1.085 2.483 2.883 1.733
Due to seismic Effect 0.000 0.000 0.000 1.600 0 0 0.00
Combined Load with Seismic 2.002 1.460 1.085 2.48 2.88 1.73

6.1.1 Stresses at Intermediate Checking Level

Vert. Moment Z (m) e (m) 2


Pmax (t/m )
2
Pmin (t/m ) Permissible (t/m )
2

Case Load (t) (t-m) B (m)


W M M/W Z-B/2 W/B(1+6e/B) W/B(1-6e/B) Comp Tension
Without Seismic 2.002 1.085 0.542 0.314 22.61 -13.81 1750.0
0.455
With Seismic 2.002 1.085 0.542 0.314 22.61 -13.81 2333.3

Width of the section = 0.455 m = 455 mm


Cover = 70 mm ( Effective )
Effective Depth = 455 - 70 = 385 mm

Mu = 17.3 kN-m

Checking for effective depth = d = Mu


0.15 x b x fck

17330216 = 57.5 mm
d =

RVNL URS ECR


Br no 20 30

Name of work: CONSULTANT


Dat 4/19/2013 DOUBLING OF RUTHIYAI-KOTA URS
Revision No.: R0 Straight Return / Wing Wall
d =
0.15 x 35 x 1000

Ast = .5 fck 1 - 1- 4.6 Mu


2
bd
fy fck bd

Here :-
fck = 35 N /mm2 Mu = 17.3 KN - m
fy = 500 N /mm2 Ast = 103.9 mm2
b = 1000 mm Dia Of Main Bar = # 16 mm
d = 385 mm Dia Of Bar on Comp Side = # 10 mm

2
Min Steel Required = 0.2 % = 0.2 x 1000 x 385 / 100 = 771 mm

2
Steel to be Provided = 771 mm

Spacing of Main Bar required = 200.96 x 1000


= 261 mm
770.5

So Provide Spacing = 200 mm < 3d = 1155.82 O.K


% of Steel Provided = p = 1004.8 x 100
1000 x 385.273
= 0.261 % > 0.20% OK

Checking of Mu as per Cl 15-4-2-2-1 of C.B.C

Leaver Arm = z = 1 - 1.1 fy Ast d


fck b d

z = 552640
1- 385 = 369 0.95 d = 366
13484545

final z = 366 mm ( Min of above )

Mur = 0.87 * fy *As * z =

0.87 * 500 * 1004.8 * 366 = 159978181.5 N-mm

= 159.978 kN-m > 17 kN-m OK

Steel on Other side Parallel to Main Steel


Avg Width
Area of Stee Required = 0.12 % = 0.12 X 1000 X 342.6
100
2
= 411.164 mm
Required Spacing = 78.5 x 1000
411
191 mm
Provide Spacing = 100 mm

1343.75
Checking for Shear Stress 1793.75

Ultimate Shear = Vu = 24.8 kN


b = 1000 mm
d = 385 mm

Shear stress = v = 24.8 * 1000 = 0.06444 N/mm2 < 0.75 fck = 0.75 OK
1000* 385

1/4
Depth factor = s = 500 or 0.7 whichever is maximum = 1.06733
d

1/3 1/3
0.27 100 As x fck ( Cl 15-4-3-2-1)
Ultimate Shear Resistance of Concrete = vc = Ym bd

2 1/3
As = 1004.8 mm vc = 0.27 x 100480
1/3
x 1
Ym = 1.25 1.25 385273
vc = 0.138

RVNL URS ECR


Br no 20 31

Name of work: CONSULTANT


Dat 4/19/2013 DOUBLING OF RUTHIYAI-KOTA URS
Revision No.: R0 Straight Return / Wing Wall

2
s * vc = 1.06733 * 0.138 = 0.14736 N/mm
v = 0.06444 N/mm2

Hence NO Shear Reinforcement Required

6.2 At Top of Foundation

S.No. DESCRI LOAD L.A. (m) Moment Ultimate Load


VERT HORZ. (t-m) Fac Hu Vu Mu
1 Active Earth Pressure
Horizontal Component Pah 10.417 1.832 19.084 1.70 17.7089 32.44
Vertical Component Pav 2.650 0.083 0.221 1.70 4.5044 0.38
2 Earth Pressure due to Surcharge Ph 4.032 2.171 8.754 1.70 6.85426 14.88
3 Passive Earth Pressure 0.000 0.000 0.000 1.70 0 0.00
4 Self Weight & Back Fill 8.713 0.375 3.263 1.40 12.1985 4.57
TOTAL 11.363 31.322 24.563 16.703 52.268
Due to seismic Effect 0.000 0.000 0.000 1.600 0 0 0.00
Combined Load with Seismic 11.363 31.322 24.56 16.70 52.27

6.2.1 Stresses at Top of Foundation

Vert. Moment Z (m) e (m) Pmax (t/m2) Pmin (t/m2) Permissible (t/m2)
Case Load (t) (t-m) B (m)
W M M/W Z-B/2 W/B(1+6e/B) W/B(1-6e/B) Comp Tension
Without Seismic 11.363 31.322 2.756 2.360 270.65 -241.97 1750.0
0.792
With Seismic 11.363 31.322 2.756 2.360 270.65 -241.97 2333.3

Width of the section = 0.792 m = 792 mm


Cover = 70 mm ( Effective )
Effective Depth = 792 - 70 = 722 mm

Mu = 522.7 kN-m

Checking for effective depth = d = Mu


0.15 x b x fck

522678487 = 315.5 mm
d =
0.15 x 35 x 1000

Ast = .5 fck 1 - 1- 4.6 Mu


bd
fy fck bd2

Here :-
fck = 35 N /mm2 Mu = 522.7 KN - m
fy = 500 N /mm2 Ast = 1722.9 mm2
b = 1000 mm Dia Of Main Bar = # 16 mm
d = 722 mm Dia Of Bar on Comp Side = # 10 mm

2
Min Steel Required = 0.2 % = 0.2 x 1000 x 722 / 100 = 1445 mm

2
Steel to be Provided = 1723 mm

Spacing of Main Bar required = 200.96 x 1000


= 117 mm
1722.9

So Provide Spacing = 100 mm < 3d = 2167.09 O.K


% of Steel Provided = p = 2009.6 x 100
1000 x 722.364
= 0.278 % > 0.20% OK

Checking of Mu as per Cl 15-4-2-2-1 of C.B.C

Leaver Arm = z = 1 - 1.1 fy Ast d


fck b d

RVNL URS ECR


Br no 20 32

Name of work: CONSULTANT


Dat 4/19/2013 DOUBLING OF RUTHIYAI-KOTA URS
Revision No.: R0 Straight Return / Wing Wall
z = 1105280
1- 722 = 691 0.95 d = 686
25282727

final z = 686 mm ( Min of above )

Mur = 0.87 * fy *As * z =

0.87 * 500 * 2009.6 * 686 = 599899306.5 N-mm

= 599.899 kN-m > 523 kN-m OK

Steel on Other side Parallel to Main Steel


Avg Width
Area of Stee Required = 0.12 % = 0.12 X 1000 X 511.2
100
2
= 613.418 mm
Required Spacing = 78.5 x 1000
613
128 mm
Provide Spacing = 100 mm

1343.75
Checking for Shear Stress 1793.75

Ultimate Shear = Vu = 245.6 kN


b = 1000 mm
d = 722 mm

Shear stress = v = 245.6 * 1000 = 0.34004 N/mm2 < 0.75 fck = 4.43706 OK
1000* 722

1/4
Depth factor = s = 500 or 0.7 whichever is maximum = 0.91212
d

1/3 1/3
0.27 100 As x fck ( Cl 15-4-3-2-1)
Ultimate Shear Resistance of Concrete = vc = Ym bd

2 1/3
As = 2009.6 mm vc = 0.27 x 200960 1/3
x 35
Ym = 1.25 1.25 722364
vc = 0.461

s * vc = 0.91212 * 0.461 = 0.42039 N/mm2


v = 0.34004 N/mm2

Hence NO Shear Reinforcement Required

6.3 At Bottom of Foundation

LOAD L.A. (m) Moment Moment (t-m)


S.No. DESCRIPTION OF LOAD
VERT HORZ. (t-m) Front L.A. Ms
1 Active Earth Pressure
Horizontal Component Pah 14.553 2.165 31.511
Vertical Component Pav 3.702 0.098 0.364 5.494 20.336
2 Earth Pressure due to Surcharge Ph 13.309 3.423 45.557
3 Passive Earth Pressure 0.000 0.333 0.000
4 Self Weight & Back Fill 48.509 1.933 93.745 3.660 177.534
TOTAL 52.210 171.178 197.870
Due to seismic Effect 0.000 0.000
Combined Load with Seismic 52.210 171.178 197.870

6.2.1 Stresses at Bottom of Foundation

Vert. Moment Z (m) e (m) Pmax (t/m2) Pmin (t/m2) Permissible (t/m2)
Case Load (t) (t-m) B (m)
W M M/W Z-B/2 W/B(1+6e/B) W/B(1-6e/B) Max Min
Without Seismic 52.210 171.178 3.279 0.482 14.17 4.50 15.0 0.0
5.592
With Seismic 52.210 171.178 3.279 0.482 14.17 4.50 20.0 0.0

RVNL URS ECR


Br no 20 33

Name of work: CONSULTANT


Dat 4/19/2013 DOUBLING OF RUTHIYAI-KOTA URS
Revision No.: R0 Straight Return / Wing Wall

2
t/m

Design of Toe Slab

Max Projection of Toe Slab = 3.000 m

On safer side Taking Max Foundation Pressure as UDL ( Though it will be Trapezoidal )

Max Pressure = 141.684 kN/m ( Taking Unit Width in Consideration )

2
141.684 x 3.000
Max Moment = = 637.58
2

Ultimate Moment = 1.700 x 637.58 = 1083.88 kN-m

Mu = 1083.9 kN-m

Checking for effective depth = d = Mu


0.15 x b x fck

1083884407 = 454.4 mm
d =
0.15 x 35 x 1000

Ast = .5 fck 1 - 1- 4.6 Mu


bd
fy fck bd2

Here :-
fck = 35 N /mm2 Mu = 1083.9 KN - m
fy = 500 N /mm2 Ast = 2801.1 mm2
b = 1000 mm Dia Of Main Bar = # 20 mm
d = 930 mm Dia Of Bar on Comp Side = # 12 mm

2
Min Steel Required = 0.2 % = 0.2 x 1000 x 930 / 100 = 1860 mm

2
Steel to be Provided = 2801 mm

Spacing of Main Bar required = 314 x 1000


= 112 mm
2801.1

So Provide Spacing = 100 mm < 3d = 2790 O.K


% of Steel Provided = p = 3140 x 100
1000 x 930
= 0.338 % > 0.20% OK

Steel on Other side Parallel to Main Steel


Avg Thick
Area of Stee Required = 0.12 % = 0.12 X 1000 X 715.0
100
= 858 mm2
Required Spacing = 113.04 x 1000
858
132 mm
Provide Spacing = 100 mm

Checking for Shear Stress


Ulti Fac

Ultimate Shear, Hu = 141.684 x 2.000 x 1.9 = 538.4 kN


b = 1000 mm
d = 930 mm
As per Clause 15.4.3.1 of CBC
538.4 1000 2
Shear stress, v = = 0.57892 N/mm < 0.75 √fck = 4.43706 OK
1000 930
As per Clause 15.4.3.2.1 of CBC
1/4
500
Depth factor, s = or 0.7, whichever is maximum 0.85629
d

RVNL URS ECR


Br no 20 34

Name of work: CONSULTANT


Dat 4/19/2013 DOUBLING OF RUTHIYAI-KOTA URS
Revision No.: R0 Straight Return / Wing Wall

1/3
0.27 100 As 1/3
x (Cl 15.4.3.2.1)
Ultimate Shear Resistance of Concrete, vc = fck
Ym bd

2
2801.1 mm
1/3
As = 0.27 280109.9004 1/3
x
vc = 40
Ym = 1.25 1.25 930000
= 0.49476

s vc = 0.85629 0.49476 = 0.42366 N/mm2


v = 0.57892 N/mm2

Dia of Shear stirrups = 10 mm having nos of leg in 1 m = 4

2
Asv = 314.159 mm

As per Cl 15.4.3.2 (Table - 14)

v > s vc

sv = 0.87 fyv Asv / b (v + 0.4 - s vc) = 136659 555.265 = 246.115

It should not be more than 0.75 d or 450 mm As per Clause 15.4.3.2.4 of CBC

Therefore required, sv = 246.115 (0.75d = 697.5 mm)

So provide Sv = 200 mm

Design of Heel Slab

Max Projection of Toe Slab = 1.800 m

Total Weight of Soil / m Run = 5.496 x 18.000 = 98.928 kN/m

Surcharge = 40.319 kN/m

Total Vertical UDL = 98.928 + 40.319 = 139.247 kN/m

Vertical UDL 139.247 kN/m ( Taking Unit Width in Consideration )

2
139.247 x 1.800
Max Moment = = 225.58
2

Ultimate Moment = 1.700 x 225.58 = 383.49 kN-m

Mu = 383.5 kN-m

Checking for effective depth = d = Mu


0.15 x b x fck

383486789 = 270.3 mm
d =
0.15 x 35 x 1000

Ast = .5 fck 1 - 1- 4.6 Mu


bd
fy fck bd2

Here :-
fck = 35 N /mm2 Mu = 383.5 KN - m
fy = 500 N /mm2 Ast = 962.6 mm2
b = 1000 mm Dia Of Main Bar = # 16 mm
d = 930 mm Dia Of Bar on Comp Side = # 12 mm

2
Min Steel Required = 0.2 % = 0.2 x 1000 x 930 / 100 = 1860 mm

2
Steel to be Provided = 1860 mm

RVNL URS ECR


Br no 20 35

Name of work: CONSULTANT


Dat 4/19/2013 DOUBLING OF RUTHIYAI-KOTA URS
Revision No.: R0 Straight Return / Wing Wall

Spacing of Main Bar required = 200.96 x 1000


= 108 mm
1860.0

So Provide Spacing = 100 mm < 3d = 2790 O.K


% of Steel Provided = p = 2009.6 x 100
1000 x 930
= 0.216 % > 0.20% OK

Steel on Other side Parallel to Main Steel


Avg Thick
Area of Stee Required = 0.12 % = 0.12 X 1000 X 715.0
100
= 858 mm2
Required Spacing = 113.04 x 1000
858
132 mm
Provide Spacing = 100 mm

7.0 STABILITY CALCULATION

7.1 Against Overturning (Sub Structure Code Clause 5.10.1.1 and 6.8 )

Mo = Moment due to [E.P. (Horz. Component) + Surcharge (Horz. Component)]

Without seismic, Mo = 31.511 + 45.557 = 77.069 t-m


With seismic, Mo = 31.511 + 45.557 + 0.000 = 77.069 t-m

Ms = Moment due to [E.P. (Vert. Component) + Surcharge (Vert. Component)] +


Moment due to self Wt. & Earth Fill
Without seismic, Ms = 197.870 t-m (Calculated in Table 6.3 )
With seismic, Ms = 197.870 t-m (Calculated in Table 6.3 )

Description Restoring moment (Ms) Overturning moment (Mo) Factor of Safety (Ms/Mo) FOS (Reqd.)
Without Seismic 197.870 77.069 2.57 2.0
With Seismic 197.870 77.069 2.57 1.5

7.2 Against Sliding (Sub Structure Code Clause 6.8 )

Total Horz. Force, H = 14.553 + 13.309 = 27.862 t

Total Vert. Force, W = 52.210 t

Coff of Friction,  0.550


Base Width = 5.592 m
2
Cohesion, c = 10.000 t/m
Passive Force, Pp = 0.000 t (Ref. 9.2 )
Total Resisting Force, R =  W+Bc+P p
28.716 + 55.924 + 0.000

= 84.639 t

Factor of Safety = Resisting Force 84.639


= = 3.038 >1.5 SAFE
Horz. Force 27.862

RVNL URS ECR


Br no 20 36

Name of work: CONSULTANT


Dat 4/19/2013 DOUBLING OF RUTHIYAI-KOTA URS
Revision No.: R0 Return Wall

300
TOW = 254.220
EARTH
SIDE 8 

8b  1
8a  22
3500
1
22 1750

Curtail LVL = 252.470

5a  5b 
5+8
1750
6+7 
4  TOF = 250.720
2b  3
3b

500

500
500

500
BOF = 249.720

2a  2 
1000 160 300 160
3a 1200 1
2820

Bar No Dia Layer Spacing Leg


1 16 100
2 12 100
2a 12 100
2b 12 100
3 12 100
3a 12 100
3b 12 100
4 16 100
5 10 2 0
5a 10 100
5b 10 100
6 12 100
7 12 2 0
8 10 100
8a 10 100
8b 10 100
9 10 300 4

RVNL URS ECR


Br no 20 37

Name of work: CONSULTANT


Dat 4/19/2013 DOUBLING OF RUTHIYAI-KOTA URS
Revision No.: R0 Return Wall
DESIGN OF RETURN WALL
Proposed Span 12 x 5.9 m RCC BOX
Standard of Loading 25 t
Level (m)
Top of Wing Wall 254.220 Formation Level 256.216
Top of Foundation 250.720 R.L of Bed Level 252.720
Bottom of Foundation 249.720 Deepest Scour Level 250.720
1 Height of Wall From Top of Foundation 3.500 m
2 Proposed Top Width 0.300 m
3 Back Batter (Equivalent for existing ) (1H:?V) 22.0
4 Intermediate Front Batter (1H:?V) 22.0
5 Second Front Batter (1H:?V) 22.0
6 Horz Projection of Toe ( Front ) 1.200 m
7 Thickness of Toe At Wall Face 1.000 m
8 End Thickness of Toe 0.500 m
9 Horz Projection of Heel ( Back ) 1.000 m
10 Thickness of Heel At Wall Face 1.000 m
11 Thickness of Heel At End 0.500 m
12 Angle of Friction of Wall with Soil ( 11.67 Deg 0.204 rad
13 Height of Second Batter (Intermediate Level) above Top of Foundation 1.750 m
14 Front Offset in Wall 0.000 m
15 Passive Height from Bottom of Foundation 3.000 m
16 Coefficient of Friction between Soil & Masonary ( 0.550
17 Distance form C/L of track to Back Face of Wall 7.117 m
18 Width of Sleeper 2.750 m
19 Depth of Ballast Cushion 0.350 m
20 Depth From Formation Level to Top of Wall 1.996 m
2
21 Live Load Surcharge 13.700 t/m
2
22 Dead Load Surcharge 6.200 t/m
23 Angle of Repose of Soil ( 35.00 Deg 0.611 rad
24 Angle of Surcharge () 0.460 rad
25 Cohesion (c) 10.000 t/m2
26 Angle of internal friction of Soil ( 32.00 Deg 0.559 rad
27 Density of Front Soil 1.000 t/m2
2
28 Density of Back Fill 1.800 t/m
Seismic Parameter
29 Method of Seismic Calculation(1= IRS Coeff Method, 2= IRC Response Spectrum) 1
Zone = III  0  0  = 0
30 Density of Masonry 2.500 t/m2
2
31 Density of Submerged Soil 1.000 t/m
32 F.O.S. for Passive Earth Pressure = 3 (0, IF PASSIVE IGNORED) 3
33 Front Delta 0.186 rad
34 Angle of Back Batter ( 0.045 rad
35 Safe Bearing Capacity 15.0 t/m2
36 Type of Structure ( 1 = Mass CC or Masonary , 2= RCC ) 2
37 Grade of Concrete fck = 35 Grade of Steel = 500
38 Type of Foundation ( 1 =OPEN , 2= CAP ) 1
2
Description Maximum (t/m ) Minimum (t/m2) Remark
Result
Permissible Stress 1750.0 Stresses shown are maximum
At Intermediate Checking Level 20.9 -11.9 of (i) Normal (without seismic), OK
At Top of Foundation 87.2 -68.6 (ii) With Seismic divided by OK
At Bottom of Foundation 13.2 2.4 1.33 OK Over Sliding
Without Seismic With Seismic
Stability Check
Actual Per Result Actual Per Result
Against Overturning 2.6 2.0 OK 2.6 1.5 OK
Against Sliding 4.14 1.50 OK 4.14 1.50 OK
Stability Check OK 2.61 4.137

RVNL URS ECR


Br no 20 38

Name of work: CONSULTANT


Dat 4/19/2013 DOUBLING OF RUTHIYAI-KOTA URS
Revision No.: R0 Return Wall
RCC Design of Wing

STEM Default
Effective cover (mm) 70
Reqd Pro HT
Depth (mm)
145 548 OK
At Top of Foundation (Up to INT LVL) Reqd Pro 100
Dia mm 12
Main Reinforcement (Back Side of Wall)
Spacing mm c/c 103 100 OK
Reinforcement on Comp. Sdie (Front Side of Dia mm 10
Wall) Spacing mm c/c 154 100 OK
Allowable 0.408
Shear Check Actual 0.140
Reinforcement No Any
From INT LVL to TOP Reqd Pro 0
Dia mm 12
Main Reinforcement (Back Side of Wall)
Spacing mm c/c 145 100 OK
Reinforcement on Comp. Side (Front Side of Dia mm 10 100
Wall) Spacing mm c/c 190 100 OK
Allowable 0.152
Shear Check Actual 0.048
Reinforcement No Any

Toe SLAB
Reqd Pro
Depth (mm)
176 930 OK
Reqd Pro
Dia mm 16
Main Reinforcement (Bottom)
Spacing mm c/c 108 100 OK
Dia mm 12 100
Reinforcement on Comp. Side
Spacing mm c/c 132 100 OK
Dia mm 10
Shear stirrups No. of Legs 4
Spacing mm c/c 342 300 OK

Heel SLAB
Reqd Pro
Depth (mm)
127 930 OK
Reqd Pro
Dia mm 16
Main Reinforcement (Top Along)
Spacing mm c/c 108 100 OK
Dia mm 12 100
Reinforcement on Comp. Sdie
Spacing mm c/c 132 100 OK

RVNL URS ECR


Br no 20 39

Name of work: CONSULTANT


Dat 4/19/2013 DOUBLING OF RUTHIYAI-KOTA URS
Revision No.: R0 Return Wall
DETAIL CALCULATION

1.0 ACTIVE EARTH PRESSURE

For Calculating the Active Earth Pressure COULOMB's theory is followed.

Pa = 0.5Kawh (h+2h3)

Where :-
Ka = Coeff. of Active Earth Pressure
h = Height of Soil
w = Unit Weight of Soil

2
Cos ( - ) 5.7.1 Sub Str
Ka = 2 Sin( - )Sin( - ) 2
Cos ()Cos( + ) 1 +
Cos(+ )Cos ( - )

Following values are taken for calculating the active earth pressure.
Level Int. Chk & TOF BOF
Slope of Batter with Vert. = 0.045 rad
Coff. of internal friction of Soil = 0.611 rad
Angle of friction bet. Wall & earth = 0.204 rad
Angle of slope of fill with Horz. = 0.000 rad
Ka = 0.269

(Effect of sloping Surcharge has been taken as per CL 5.8.4 of Sub Str. Code, So "  " is taken = 0 for calculation of K a )

 Horizontal Component of Active Earth Pressure


Pah = Pa Cos( + )
Acting at Y1= (h/3) above section considered

Vertical Component of Active Earth Pressure
Pav = Pa Sin( + )
Pah Acting at X1 = Y1Cot (90-) from face of Wall

Y1 =h/3 
Pa 
Pav

1.1 At Intermediate Checking Level FL


Height from Formation Level, h = 1.789 m h3 = 0.422 m
Pa = 0.5 x 0.269 x 1.800 x 1.789 x 2.6335 = 1.139 t/m (Width)
Int. Lvl
Horizontal Component
Pah = 1.139 x Cos( 0.045+ 0.204 ) = 1.104 t/m (Width)
Will act at Y1 1.789 / 3 = 0.596 m TOF

Vertical Component BOF


Pav = 1.139 x Sin( 0.045+ 0.204 ) = 0.281 t/m (Width)
Will act at X1 = Y1Cot(90-) = 0.596 x Cot(90 - 0.045 ) = 0.027 m

1.2 At Top of Foundation


Height from Formation Level, h = 3.579 m h3 = 0.844 m
Pa = 0.5 x 0.269 x 1.800 x 3.579 x 5.26701 = 4.558 t/m (Width)

Horizontal Component
Pah = 4.558 x Cos( 0.045+ 0.204 ) = 4.417 t/m (Width)
Will act at Y2 3.57882 / 3 = 1.193 m

Vertical Component
Pav = 4.558 x Sin( 0.045+ 0.204 ) = 1.124 t/m (Width)
Will act at X2 = Y2Cot(90-) = 1.193 x Cot(90 - 0.045 ) = 0.054 m

RVNL URS ECR


Br no 20 40

Name of work: CONSULTANT


Dat 4/19/2013 DOUBLING OF RUTHIYAI-KOTA URS
Revision No.: R0 Return Wall
1.3 At Bottom of Foundation
Height from Formation Level, h = 5.074 m h3 = 1.197 m
Pa = 0.5 x 0.269 x 1.800 x 5.074 x 7.46789 = 9.162 t/m (Width)

Horizontal Component
Pah = 9.162 x Cos( 0.045+ 0.204 ) = 8.880 t/m (Width)
Will act at Y2 5.07427 / 3 = 1.691 m

Vertical Component
Pav = 9.162 x Sin( 0.045+ 0.204 ) = 2.259 t/m (Width)
Will act at X2 = Y2Cot(90-) 1.691 x Cot(90 - 0.045 ) = 0.077 m

2.0 EARTH PRESSURE DUE TO SURCHARGE

As per Cl 5.8.3 of Sub Str. Code


Earth pressure due to surcharge is assumed to be dispersed below formation level at an angle of 45°.

(S + V) x h1 x Ka
P1 = Will act at h1/2
(B + 2D)

2
Live Load Surcharge per m, S= 13.700 t/m
2
Dead Load Surcharge per m, V = 6.200 t/m
Width of Distribution, B = 2.750 m

2.1 At Intermediate Checking Level

7.117
0.080 5.662 2.750 Formation Level
B

D 5.662

45
3.746

h1 0.000

Checking Level

Height, h1 = 0.000 m
Depth of Dispersion, D = 5.662 m

13.700+ 6.200 0.000 x 0.269


P1 = = 0.000 t/m Will act at h1/2 0.000 m
2.750+ 11.325

2.2 At Top of Foundation

7.117
0.159 5.583 2.750 Formation Level
B

D 5.583

45
5.496

h1 0.263

Top of Foundation

Height, h1 = 0.263 m
Width of Distribution, B = 2.750 m
Depth of Dispersion, D = 5.583 m

RVNL URS ECR


Br no 20 41

Name of work: CONSULTANT


Dat 4/19/2013 DOUBLING OF RUTHIYAI-KOTA URS
Revision No.: R0 Return Wall
13.700+ 6.200 0.263 x 0.269
P1 = = 0.101 t/m Will act at h1/2 0.132 m
2.750+ 11.166

2.3 At Bottom of Foundation

7.117
1.159 4.583 2.750 Formation Level
B

D 4.583


45

6.496
h1 2.263

Bottom of Foundation

Height, h1 = 2.263 m
Depth of Dispersion, D = 4.583 m

13.700+ 6.200 2.263 x 0.269


P1 = = 1.015 t/m Will act at h1/2 1.132 m
2.750+ 9.166

3.0 PASSIVE EARTH PRESSURE

For Calculation Of Passive Earth Pressure On Substructure Coulomb Theory Is Used

Pp = 0.5 Kp w h2

2
Cos ()
Kp= 2 Sin( + ) Sin( + ) 2
Cos Cos( - ) 1-
Cos(- ) Cos ( - )

 0.559 rad  0.186 rad  0.000 rad = 0.000 rad
Kp= 4.678 Factor of Safety for Passive = 3
Pph = Pp Cos( - ) Acting at (h/3) above section. Ppv = Pp Sin( - ) Acting at X=Y Cot(90 - )

Considering only Horizontal component because Vertical Component will be ineffective.

3.1 At Top of Foundation


Passive Height = Bed Lvl or Scour Lvl - TOF = 250.72- 250.72- 0.000 m
Pp = 0.5 x 4.678 x 1.000 x 0.000 2 = 0.000 t/m

Safe Passive Pressure = 0.000 / 3 = 0.000 t/m


Ph = 0.000 x Cos( 0.186- 0.000 ) = 0.000 t/m Will act @ h/3 = 0.000 m
Resisting Moment = 0.000 x 0.000 = 0.000 t-m

3.2 At Bottom of Foundation


Passive Height = Bed Lvl or Scour Lvl - BOF = 250.72- 249.72- 1.000 m
2
Pp = 0.5 x 4.678 x 1.000 x 1.000 = 2.339 t/m

Safe Passive Pressure = 2.339 /3 = 0.000 t/m


Ph = 0.000 x Cos( 0.186- 0.000 ) = 0.000 t/m Will act @ h/3 = 0.333 m
Resisting Moment = 0.000 x 0.333 = 0.000 t-m

RVNL URS ECR


Br no 20 42

Name of work: CONSULTANT


Dat 4/19/2013 DOUBLING OF RUTHIYAI-KOTA URS
Revision No.: R0 Return Wall
4.0 SELF WEIGHT

4.1 At Intermediate Checking Level


FL
1.996
5 Top of Wall
0.300
Back Fill 4
0.000
1 Passive 1.750
6
6
3 2 0.000

A
0.080 0.080

No. Shape Horz. Vert. (m) Density Weight L.A. from Moment L.A. Moment
Factor (m) (t/m3) W(t) A (m) W X (tm) above A W Y (tm)
(m)
W1 1.0 x 0.300 x 1.750 x 2.500 = 1.313 0.230 0.301 0.875 1.148
W2 0.5 x 0.080 x 1.750 x 2.500 = 0.174 0.406 0.071 0.583 0.102
ll
Fi

W3 0.5 x 0.080 x 1.750 x 2.500 = 0.174 0.053 0.009 0.583 0.102


e
tiv

W4 0.5 x 0.080 x 1.750 x 1.800 = 0.125 0.027 0.003 1.167 0.146


Ac

W5 0.5 x 0.080 x 0.039 x 1.800 = 0.003 0.027 0.000 1.763 0.005


Passive W6 0.5 x 0.000 x 0.000 x 1.000 = 0.000 0.459 0.000
Sum 1.789 0.385 1.503
CG of Total Mass from A = Moment/Weight = WX /W = 0.385 / 1.789 = 0.215 m
CG of Total Mass above Intermediate Level = WY /W = 1.503 / 1.789 = 0.840 m

FL
1.996
11 Top of Wall
Back Fill   0.300 Passive
10 9
0.011 0.000
1 1.750
1
   
2 13 15
0.250
2

0.080
14
5 2.000
3 1.750 1.750
4
B
250.72
10a 0.159 0.080 16
6a 0.500
1.000 6 7 1.000
0.500 1.000 8
0.500
6b 249.72
C
1.618 1.200
2.818

4.2 At Top of Foundation

No. Shape Horz. Vert. (m) Density Weight L.A. from Moment L.A. Moment
(m) (t/m3) W(t) B (m) W X (tm) above B W Y (tm)
(m)
W1 1.0 x 0.300 x 3.500 x 2.625 2.500 = 0.309 0.811 1.750 4.594
W2 0.5 x 0.080 x 1.750 x
2.500 = 0.174 0.486 0.084 2.333 0.406
W3 1.0 x 0.080 x 1.750 x
2.500 = 0.348 0.499 0.174 0.875 0.305
ll
Fi

W4 0.5 x 0.080 x 1.750 x


2.500 = 0.174 0.565 0.098 0.583 0.102
e
tiv

W5 0.5 x 0.159 x 3.500 x


2.500 = 0.696 0.106 0.074 1.167 0.812
Ac

W9 0.5 x 0.159 x 3.500 x


1.800 = 0.501 0.053 0.027 2.333 1.169
W11 0.5 x 0.159 x 0.079 x
1.800 = 0.011 0.053 0.001 3.526 0.040
W12 0.5 x 0.011 x 0.250 x
1.000 = 0.001 0.535 0.001
Fi ive

W13 1.0 x 0.080 x 0.250 x


1.000 = 0.020 0.578 0.012
ss
ll
Pa

W14 0.5 x 0.080 x 1.750 x


1.000 = 0.070 1.592 0.111
Sum 4.620 1.392 7.427
CG of Total Mass from B = Moment/Weight = WX /W = 1.392 / 4.620 = 0.301 m

RVNL URS ECR


Br no 20 43

Name of work: CONSULTANT


Dat 4/19/2013 DOUBLING OF RUTHIYAI-KOTA URS
Revision No.: R0 Return Wall
CG of Total Mass above Top of Foundation = WY /W = 7.427 / 4.620 = 1.607 m

4.3 At Bottom of Foundation

No. Shape Horz. Vert. (m) Density Weight L.A. from Moment L.A. Moment
(m) 3
(t/m ) W(t) C (m) W X (tm) above C W Y (tm)
(m)
W1 1.0 x 0.300 x 2.625
3.500 x 1.309
2.500 = 3.436 2.750 7.219 1.050
W2 0.5 x 0.080 x 0.174
1.750 x
2.500 = 1.486 0.259 3.333 0.580 0.070
W3 1.0 x 0.080 x 0.348
1.750 x
2.500 = 1.499 0.522 1.875 0.653 0.139
W4 0.5 x 0.080 x 0.174
1.750 x
2.500 = 1.565 0.272 1.583 0.276 0.070
W5 0.5 x 0.159 x 0.696
3.500 x
2.500 = 1.106 0.770 2.167 1.508 0.278
W6 1.0 x 0.618 x 1.545
1.000 x
2.500 = 0.809 1.250 0.500 0.773 0.618
W6a 0.5 x 1.000 x 0.625 0.667 0.417 0.667 0.417 0.250
ll

0.500 x
2.500 =
Fi
e

W6b 1.0 x 1.000 x 1.250


0.500 x
2.500 = 0.500 0.625 0.250 0.313 0.500
tiv
Ac

W7 0.5 x 1.200 x 0.750


0.500 x
2.500 = 2.018 1.514 0.667 0.500 0.300
W8 1.0 x 1.200 x 1.500
0.500 x
2.500 = 2.218 3.327 0.250 0.375 0.600
W9 0.5 x 0.159 x 0.501
3.500 x
1.800 = 1.053 0.528 3.333 1.670 0.000
W10 1.0 x 1.000 x 6.300
3.500 x
1.800 = 0.500 3.150 2.750 17.325 0.000
W 10a 0.5 x 1.000 x 0.450
0.500 x
1.800 = 0.333 0.150 0.833 0.375 0.000
W11 1.0 x 1.159 x 1.198
0.574 x
1.800 = 0.386 0.463 4.691 5.621 0.000
W12 0.5 x 0.011 x 0.001
0.250 x
1.000 = 1.535 0.002 0.000
W13 1.0 x 0.080 x 0.020
0.250 x
1.000 = 1.578 0.031 0.000
ll
Fi

W14 0.5 x 0.080 x 0.070


1.750 x
1.000 = 2.592 0.180 0.000
e
siv

W15 1.0 x 1.200 x 2.400


2.000 x 2.218 5.324 0.000
s

1.000 =
Pa

W16 0.5 x 1.200 x 0.300


0.500 x
1.000 = 2.418 0.725 0.000
Sum 20.928 22.945 37.603 3.875
C.G. of mass from C = Moment/Weight = WX /W = 22.945 / 20.928 = 1.096 m
C.G. of Total Mass above Bott of Foundation = WY /W = 37.603 / 20.928 = 1.797 m

5.0 SEISMIC FORCE

Earth Pressure Due to Seismic Effect 5.12.6.1 Sub Str


h = x x o
h = 0.00 x 0.0 x 0.000 = 0.000 v = 0.00 / 2 = 0.000

Final Value
h = 0.000 v = 0.000

Level Int. Chk & TOF BOF


Slope of Batter with Vert. = 0.045 rad
Coff. of internal friction of Soil = 0.611 rad
Angle of friction bet. Wall & earth = 0.204 rad
Angle of slope of fill with Horz. = 0.000 rad
TOF
a tan-1 h tan-1 0.000 With (+) Pt I 0.737
 = = = 0.000
1+v
"+" & "+" value
Case I: With

1 + 0.000 Pt II 0.656

Ca = (1 +  v) Cos2( -  - ) 1 2
x 0.269
2 Sin( + )Sin( -  - ) =
Cos Cos  Cos( +  + ) 1 +
Cos(+  + )Cos( - )
b tan-1 h tan-1 0.000 With (-) Pt I 0.737
 = = = 0.000
Case II: With "-

1-v
" & "-" value

1 - 0.000 Pt II 0.656

Ca = (1 +  v) Cos2( -  - ) 1 2
x 0.269
2 Sin( + )Sin( -  - ) =
Cos Cos  Cos( +  + ) 1 +
Cos(+  + )Cos( - )

At Int. Chk & TOF BOF


Final Ca = 0.269 (Max Value of above, i.e., a and b)
Ka = 0.269
Dynamic Increment (Ca - Ka) = 0.000

RVNL URS ECR


Br no 20 44

Name of work: CONSULTANT


Dat 4/19/2013 DOUBLING OF RUTHIYAI-KOTA URS
Revision No.: R0 Return Wall
5.1 At Intermediate Checking Level

DESCRIPTION FORCE L.A. Moment


DUE TO SELF WT. OF Wall SFH 0.000 0.840 0.000
DUE TO SELF WT. OF Wall SFV 0.000 0.000 0.000
Increment in Earth Pressure [0.5h2(Ca-Ka)] 0.000 0.875 0.000
Increment in Earth Pressure Surcharge 0.000 0.000 0.000
Total Ver Load = 0.000 t
Total Horz Load = 0.000 t
Total Moment = 0.000 t-m

5.2 At Top of Foundation

DESCRIPTION FORCE L.A. Moment


DUE TO SELF WT. OF Wall SFH 0.000 1.607 0.000
DUE TO SELF WT. OF Wall SFV 0.000 0.000 0.000
Increment in Earth Pressure [0.5h2(Ca-Ka)] 0.000 1.750 0.000
Increment in Earth Pressure Surcharge 0.000 0.175 0.000
Total Ver Load = 0.000 t
Total Horz Load = 0.000 t
Total Moment = 0.000 t-m

5.3 At Bottom of Foundation

DESCRIPTION FORCE L.A. Moment


DUE TO SELF WT. OF Wall SFH 0.000 1.797 0.000
DUE TO SELF WT. OF Wall SFV 0.000 0.000 0.000
Increment in Earth Pressure [0.5h2(Ca-Ka)] 0.000 2.250 0.000
Increment in Earth Pressure Surcharge 0.000 1.509 0.000
Total Ver Load = 0.000 t
Total Horz Load = 0.000 t
Total Moment = 0.000 t-m

6.0 STRESS CALCULATION

6.1 At Intermediate Checking Level

DESCRI LOAD L.A. (m) Moment Ultimate Load


S.No.
VERT HORZ. (t-m) Fac Hu Vu Mu
1 Active Earth Pressure
Horizontal Component Pah 1.104 0.596 0.659 1.70 1.87723 1.12
Vertical Component Pav 0.281 0.027 0.008 1.70 0.47749 0.01
2 Earth Pressure due to Surcharge Ph 0.000 0.000 0.000 1.70 0 0.00
3 Self Weight & Back Fill 1.789 0.385 1.40 2.50406 0.54
TOTAL - Without Seismic 2.069 1.104 1.051 1.877 2.982 1.671
Due to seismic Effect 0.000 0.000 0.000 1.600 0 0 0.00
Combined Load with Seismic 2.069 1.104 1.051 1.88 2.98 1.67

6.1.1 Stresses at Intermediate Checking Level

Vert. Moment Z (m) e (m) 2


Pmax (t/m )
2
Pmin (t/m ) Permissible (t/m )
2

Case Load (t) (t-m) B (m)


W M M/W Z-B/2 W/B(1+6e/B) W/B(1-6e/B) Comp Tension
Without Seismic 2.069 1.051 0.508 0.278 20.90 -11.88 1750.0
0.459
With Seismic 2.069 1.051 0.508 0.278 20.90 -11.88 2333.3

Width of the section = 0.459 m = 459 mm


Cover = 70 mm ( Effective )
Effective Depth = 459 - 70 = 389 mm

Mu = 16.7 kN-m

Checking for effective depth = d = Mu


0.15 x b x fck

16710407 = 56.4 mm
d =

RVNL URS ECR


Br no 20 45

Name of work: CONSULTANT


Dat 4/19/2013 DOUBLING OF RUTHIYAI-KOTA URS
Revision No.: R0 Return Wall
d =
0.15 x 35 x 1000

Ast = .5 fck 1 - 1- 4.6 Mu


2
bd
fy fck bd

Here :-
fck = 35 N /mm2 Mu = 16.7 KN - m
fy = 500 N /mm2 Ast = 99.1 mm2
b = 1000 mm Dia Of Main Bar = # 12 mm
d = 389 mm Dia Of Bar on Comp Side = # 10 mm

2
Min Steel Required = 0.2 % = 0.2 x 1000 x 389 / 100 = 778 mm

2
Steel to be Provided = 778 mm

Spacing of Main Bar required = 113.04 x 1000


= 145 mm
778.2

So Provide Spacing = 100 mm < 3d = 1167.27 O.K


% of Steel Provided = p = 1130.4 x 100
1000 x 389.091
= 0.291 % > 0.20% OK

Checking of Mu as per Cl 15-4-2-2-1 of C.B.C

Leaver Arm = z = 1 - 1.1 fy Ast d


fck b d

z = 621720
1- 389 = 371 0.95 d = 370
13618182

final z = 370 mm ( Min of above )

Mur = 0.87 * fy *As * z =

0.87 * 500 * 1130.4 * 370 = 181759071.3 N-mm

= 181.759 kN-m > 17 kN-m OK

Steel on Other side Parallel to Main Steel


Avg Width
Area of Stee Required = 0.12 % = 0.12 X 1000 X 344.5
100
2
= 413.455 mm
Required Spacing = 78.5 x 1000
413
190 mm
Provide Spacing = 100 mm

1343.75
Checking for Shear Stress 1793.75

Ultimate Shear = Vu = 18.8 kN


b = 1000 mm
d = 389 mm

Shear stress = v = 18.8 * 1000 = 0.04825 N/mm2 < 0.75 fck = 0.75 OK
1000* 389

1/4
Depth factor = s = 500 or 0.7 whichever is maximum = 1.06471
d

1/3 1/3
0.27 100 As x fck ( Cl 15-4-3-2-1)
Ultimate Shear Resistance of Concrete = vc = Ym bd

2 1/3
As = 1130.4 mm vc = 0.27 x 113040
1/3
x 1
Ym = 1.25 1.25 389091
vc = 0.143

RVNL URS ECR


Br no 20 46

Name of work: CONSULTANT


Dat 4/19/2013 DOUBLING OF RUTHIYAI-KOTA URS
Revision No.: R0 Return Wall

2
s * vc = 1.06471 * 0.143 = 0.15238 N/mm
v = 0.04825 N/mm2

Hence NO Shear Reinforcement Required

6.2 At Top of Foundation

S.No. DESCRI LOAD L.A. (m) Moment Ultimate Load


VERT HORZ. (t-m) Fac Hu Vu Mu
1 Active Earth Pressure
Horizontal Component Pah 4.417 1.193 5.269 1.70 7.50892 8.96
Vertical Component Pav 1.124 0.054 0.061 1.70 1.90995 0.10
2 Earth Pressure due to Surcharge Ph 0.101 0.132 0.013 1.70 0.17183 0.02
3 Passive Earth Pressure 0.000 0.000 0.000 1.70 0 0.00
4 Self Weight & Back Fill 4.620 0.301 1.392 1.40 6.46853 1.95
TOTAL 5.744 6.735 7.681 8.378 11.032
Due to seismic Effect 0.000 0.000 0.000 1.600 0 0 0.00
Combined Load with Seismic 5.744 6.735 7.68 8.38 11.03

6.2.1 Stresses at Top of Foundation

Vert. Moment Z (m) e (m) 2


Pmax (t/m ) Pmin (t/m2) Permissible (t/m2)
Case Load (t) (t-m) B (m)
W M M/W Z-B/2 W/B(1+6e/B) W/B(1-6e/B) Comp Tension
Without Seismic 5.744 6.735 1.173 0.864 87.17 -68.58 1750.0
0.618
With Seismic 5.744 6.735 1.173 0.864 87.17 -68.58 2333.3

Width of the section = 0.618 m = 618 mm


Cover = 70 mm ( Effective )
Effective Depth = 618 - 70 = 548 mm

Mu = 110.3 kN-m

Checking for effective depth = d = Mu


0.15 x b x fck

110324541 = 145.0 mm
d =
0.15 x 35 x 1000

Ast = .5 fck 1 - 1- 4.6 Mu


bd
fy fck bd2

Here :-
fck = 35 N /mm2 Mu = 110.3 KN - m
fy = 500 N /mm2 Ast = 468.6 mm2
b = 1000 mm Dia Of Main Bar = # 12 mm
d = 548 mm Dia Of Bar on Comp Side = # 10 mm

2
Min Steel Required = 0.2 % = 0.2 x 1000 x 548 / 100 = 1096 mm

2
Steel to be Provided = 1096 mm

Spacing of Main Bar required = 113.04 x 1000


= 103 mm
1096.4

So Provide Spacing = 100 mm < 3d = 1644.55 O.K


% of Steel Provided = p = 1130.4 x 100
1000 x 548.182
= 0.206 % > 0.20% OK

Checking of Mu as per Cl 15-4-2-2-1 of C.B.C

Leaver Arm = z = 1 - 1.1 fy Ast d


fck b d

RVNL URS ECR


Br no 20 47

Name of work: CONSULTANT


Dat 4/19/2013 DOUBLING OF RUTHIYAI-KOTA URS
Revision No.: R0 Return Wall
z = 621720
1- 548 = 530 0.95 d = 521
19186364

final z = 521 mm ( Min of above )

Mur = 0.87 * fy *As * z =

0.87 * 500 * 1130.4 * 521 = 256076448.5 N-mm

= 256.076 kN-m > 110 kN-m OK

Steel on Other side Parallel to Main Steel


Avg Width
Area of Stee Required = 0.12 % = 0.12 X 1000 X 424.1
100
2
= 508.909 mm
Required Spacing = 78.5 x 1000
509
154 mm
Provide Spacing = 100 mm

1343.75
Checking for Shear Stress 1793.75

Ultimate Shear = Vu = 76.8 kN


b = 1000 mm
d = 548 mm

Shear stress = v = 76.8 * 1000 = 0.14011 N/mm2 < 0.75 fck = 4.43706 OK
1000* 548

1/4
Depth factor = s = 500 or 0.7 whichever is maximum = 0.97726
d

1/3 1/3
0.27 100 As x fck ( Cl 15-4-3-2-1)
Ultimate Shear Resistance of Concrete = vc = Ym bd

2 1/3
As = 1130.4 mm vc = 0.27 x 113040 1/3
x 35
Ym = 1.25 1.25 548182
vc = 0.417

s * vc = 0.97726 * 0.417 = 0.40767 N/mm2


v = 0.14011 N/mm2

Hence NO Shear Reinforcement Required

6.3 At Bottom of Foundation

LOAD L.A. (m) Moment Moment (t-m)


S.No. DESCRIPTION OF LOAD
VERT HORZ. (t-m) Front L.A. Ms
1 Active Earth Pressure
Horizontal Component Pah 8.880 1.691 15.019
Vertical Component Pav 2.259 0.077 0.174 2.741 6.192
2 Earth Pressure due to Surcharge Ph 1.015 1.132 1.149
3 Passive Earth Pressure 0.000 0.333 0.000
4 Self Weight & Back Fill 20.928 1.096 22.945 1.722 36.033
TOTAL 23.186 39.287 42.224
Due to seismic Effect 0.000 0.000
Combined Load with Seismic 23.186 39.287 42.224

6.2.1 Stresses at Bottom of Foundation

Vert. Moment Z (m) e (m) Pmax (t/m2) Pmin (t/m2) Permissible (t/m2)
Case Load (t) (t-m) B (m)
W M M/W Z-B/2 W/B(1+6e/B) W/B(1-6e/B) Max Min
Without Seismic 23.186 39.287 1.694 0.285 13.23 3.23 15.0 0.0
2.818
With Seismic 23.186 39.287 1.694 0.285 13.23 3.23 20.0 0.0

RVNL URS ECR


Br no 20 48

Name of work: CONSULTANT


Dat 4/19/2013 DOUBLING OF RUTHIYAI-KOTA URS
Revision No.: R0 Return Wall

2
t/m

Design of Toe Slab

Max Projection of Toe Slab = 1.200 m

On safer side Taking Max Foundation Pressure as UDL ( Though it will be Trapezoidal )

Max Pressure = 132.252 kN/m ( Taking Unit Width in Consideration )

2
132.252 x 1.200
Max Moment = = 95.22
2

Ultimate Moment = 1.700 x 95.22 = 161.88 kN-m

Mu = 161.9 kN-m

Checking for effective depth = d = Mu


0.15 x b x fck

161876651 = 175.6 mm
d =
0.15 x 35 x 1000

Ast = .5 fck 1 - 1- 4.6 Mu


bd
fy fck bd2

Here :-
fck = 35 N /mm2 Mu = 161.9 KN - m
fy = 500 N /mm2 Ast = 402.8 mm2
b = 1000 mm Dia Of Main Bar = # 16 mm
d = 930 mm Dia Of Bar on Comp Side = # 12 mm

2
Min Steel Required = 0.2 % = 0.2 x 1000 x 930 / 100 = 1860 mm

2
Steel to be Provided = 1860 mm

Spacing of Main Bar required = 200.96 x 1000


= 108 mm
1860.0

So Provide Spacing = 100 mm < 3d = 2790 O.K


% of Steel Provided = p = 2009.6 x 100
1000 x 930
= 0.216 % > 0.20% OK

Steel on Other side Parallel to Main Steel


Avg Thick
Area of Stee Required = 0.12 % = 0.12 X 1000 X 715.0
100
= 858 mm2
Required Spacing = 113.04 x 1000
858
132 mm
Provide Spacing = 100 mm

Checking for Shear Stress


Ulti Fac

Ultimate Shear, Hu = 132.252 x 0.200 x 1.9 = 50.2558 kN


b = 1000 mm
d = 930 mm
As per Clause 15.4.3.1 of CBC
50.2558 1000 2
Shear stress, v = = 0.05404 N/mm < 0.75 √fck = 4.43706 OK
1000 930
As per Clause 15.4.3.2.1 of CBC
1/4
500
Depth factor, s = or 0.7, whichever is maximum 0.85629
d

RVNL URS ECR


Br no 20 49

Name of work: CONSULTANT


Dat 4/19/2013 DOUBLING OF RUTHIYAI-KOTA URS
Revision No.: R0 Return Wall

1/3
0.27 100 As 1/3
x (Cl 15.4.3.2.1)
Ultimate Shear Resistance of Concrete, vc = fck
Ym bd

2
1860 mm
1/3
As = 0.27 186000 1/3
x
vc = 40
Ym = 1.25 1.25 930000
= 0.4317

s vc = 0.85629 0.4317 = 0.36966 N/mm2


v = 0.05404 N/mm2

Dia of Shear stirrups = 10 mm having nos of leg in 1 m = 4

2
Asv = 314.159 mm

As per Cl 15.4.3.2 (Table - 14)

v ≤ s vc

sv = 0.87 fyv Asv / 0.4 b = 136659 400 = 341.648

It should not be more than 0.75 d or 450 mm As per Clause 15.4.3.2.4 of CBC

Therefore required, sv = 341.648 (0.75d = 697.5 mm)

So provide Sv = 300 mm

Design of Heel Slab

Max Projection of Toe Slab = 1.000 m

Total Weight of Soil / m Run = 5.496 x 18.000 = 98.928 kN/m

Surcharge = 1.011 kN/m

Total Vertical UDL = 98.928 + 1.011 = 99.939 kN/m

Vertical UDL 99.939 kN/m ( Taking Unit Width in Consideration )

2
99.939 x 1.000
Max Moment = = 49.97
2

Ultimate Moment = 1.700 x 49.97 = 84.95 kN-m

Mu = 84.9 kN-m

Checking for effective depth = d = Mu


0.15 x b x fck

84947940 = 127.2 mm
d =
0.15 x 35 x 1000

Ast = .5 fck 1 - 1- 4.6 Mu


bd
fy fck bd2

Here :-
fck = 35 N /mm2 Mu = 84.9 KN - m
fy = 500 N /mm2 Ast = 210.8 mm2
b = 1000 mm Dia Of Main Bar = # 16 mm
d = 930 mm Dia Of Bar on Comp Side = # 12 mm

2
Min Steel Required = 0.2 % = 0.2 x 1000 x 930 / 100 = 1860 mm

2
Steel to be Provided = 1860 mm

RVNL URS ECR


Br no 20 50

Name of work: CONSULTANT


Dat 4/19/2013 DOUBLING OF RUTHIYAI-KOTA URS
Revision No.: R0 Return Wall

Spacing of Main Bar required = 200.96 x 1000


= 108 mm
1860.0

So Provide Spacing = 100 mm < 3d = 2790 O.K


% of Steel Provided = p = 2009.6 x 100
1000 x 930
= 0.216 % > 0.20% OK

Steel on Other side Parallel to Main Steel


Avg Thick
Area of Stee Required = 0.12 % = 0.12 X 1000 X 715.0
100
= 858 mm2
Required Spacing = 113.04 x 1000
858
132 mm
Provide Spacing = 100 mm

7.0 STABILITY CALCULATION

7.1 Against Overturning (Sub Structure Code Clause 5.10.1.1 and 6.8 )

Mo = Moment due to [E.P. (Horz. Component) + Surcharge (Horz. Component)]

Without seismic, Mo = 15.019 + 1.149 = 16.168 t-m


With seismic, Mo = 15.019 + 1.149 + 0.000 = 16.168 t-m

Ms = Moment due to [E.P. (Vert. Component) + Surcharge (Vert. Component)] +


Moment due to self Wt. & Earth Fill
Without seismic, Ms = 42.224 t-m (Calculated in Table 6.3 )
With seismic, Ms = 42.224 t-m (Calculated in Table 6.3 )

Description Restoring moment (Ms) Overturning moment (Mo) Factor of Safety (Ms/Mo) FOS (Reqd.)
Without Seismic 42.224 16.168 2.61 2.0
With Seismic 42.224 16.168 2.61 1.5

7.2 Against Sliding (Sub Structure Code Clause 6.8 )

Total Horz. Force, H = 8.880 + 1.015 = 9.895 t

Total Vert. Force, W = 23.186 t

Coff of Friction,  0.550


Base Width = 2.818 m
2
Cohesion, c = 10.000 t/m
Passive Force, Pp = 0.000 t (Ref. 9.2 )
Total Resisting Force, R =  W+Bc+P p
12.752 + 28.182 + 0.000

= 40.934 t

Factor of Safety = Resisting Force 40.934


= = 4.137 >1.5 SAFE
Horz. Force 9.895