Inspection Inspection Item Description Pending MECON’s Remark on Inspection Call Remarks

Call No. Call Date Days

ICL -56 11-09-18 01 no 5 T Capacity 24 Mechanical Comments 1. Refer to Compliance SL. No. 2, M/s Voltas
Electrically DP reports for only 3 hoists have been furnished. Please submitted the
Operated Under submit for balance two numbers. Further please indicate compliance on
slung Crane of the hoist/crane identification in respective DP report. 2. In 03.10.2018.
IWPH, 3T Electric inspection report, client’s order no. is 1100022090
Hoist of DWPH, 4T dtd.01.12.2018. Please clarify. 3. Test certificates for 4T
Electrically hook to be furnished. 4. Refer to compliance serial no. 1,
Operated Under the drawing no. BSP/VL/10/078A/15/004/01/DE/0006 and
slung Crane of BSP/VL/10/078A/15/004/01/DE/00064A indicated in
DWPH, 3T Electric Annexure-1 is not furnished. Further please indicate
Hoist respective drawing nos. against offered items in tabular
form for our correlation. Electrical comments 1. List of
offered electrical items for each crane are still not
furnished. Kindly furnish the same. 2. Compliance for all
observations shall be furnished by M/s Voltas.
ICL -65 01.10.2018 63 nos KSB Make 04 Reply of Voltas for point no.2 is not justified. It may be M/s Voltas not
Gate Valves noted that valves from KSB supplied through Vasuki Engg submitted the
in URM package of BSP were released by MECON where all compliance
MTCs were furnished by KSB. Hence, further to receipt of
mtcs of body and bonnet for this inspection call, IWC shall
be released by MECON only upon receipt of required MTCs
of components of valves.