The table below shows the recommended labour requirement for various civil
engineering/building/construction works:
Recommended
S.No. Description of work Unit Labour constant in Remarks
days.
1) Excavation over areas (hard/dense M3 Mate 0.06 _
soil),depth up to 1.5m and removal
(up to one meter from edge) Labour 0.62 _
2) Excavation in trenches (soft/ loose M3 Mate 0.05 _
soil),for foundations not exceeding
1.5m in width and for shafts, wells, Labour 0.50 _
cesspits and the like, not exceeding
10m3 and on plan, depth up to 1.5m
and removal(up to one meter away
from edge)
3) Returning, filling and ramming of M3 Mate 0.02 _
excavated earth in layers not
exceeding 20 cm in depth, watering, Labour 0.25 _
well ramming and leveling, lead up
to 50m Bhisti 0.02 _
3
4) Concrete : M Labour 0.50 _
Labour 1.63 _
bhisti 0.70 _
mixer 0.07 _
operator
0.07 _
mixer
0.07 _
vibrator
6) Reinforced cement concrete in situ M3 mason 0.17 The constants
in foundations, footings, bases for for items
columns, etc excluding form work Labour 2.00 include
and reinforcement mixing,
bhisti 0.90 pouring,
consolidating
mixer 0.07 and curing.
operator This does not
0.07 include fair
mixer finish.
0.07
vibrator
3
7) Reinforced cement concrete in situ M mason 0.24 _
in suspended floors/roofs excluding
form work, and reinforcement. Labour 2.50 _
bhisti 0.90 _
mixer 0.07 _
operator
0.07 _
mixer
0.07 _
vibrator
3
8) Mortars : M Labour 0.75 Labour
required will
Mixing by hand, cement mortar of Bhisti 0.07 be
any mix/proportions approximately
same for
different mix
proportions.
9) Brick work (straight walls) : M3 mason 0.94 The constants
include labour
Brick work in walls exceeding one Labour 1.80 involved in
brick thick, in cement / lime mortar scaffolding.
bhisti 0.20
2
10) Brick work in walls, one brick thick, M mason 0.25 The constants
in cement/lime mortar could be
Labour 0.40 adopted for
brick work
bhisti 0.10 with any mix
or mortar.
11) Formwork : M3 Carpenter 0.25 _
Labour 0.15 _
bhisti 0.10 _
3
14) Damping proof course : M Mason 0.10 _