You are on page 1of 8

KEYPLAN

PETRON CORPORATION (BACONG)

KEYPLAN
TOP SLAB

PETRON CORPORATION (BACONG)

TOP SLAB
TOP SLAB

BREASTING DOLPHIN NO.2 (TOP SLAB)

TOP SLAB

BREASTING DOLPHIN NO.2 (SIDE ELEVATION) BREASTING DOLPHIN NO.2 (FRONT ELEVATION)

PETRON CORPORATION (BACONG)

TOP SLAB AND BREASTING DOLPHIN NO.2


RIGHT-SDIE ELEVATION

LEFT-SIDE ELEVATION

PETRON CORPORATION (BACONG)

ELEVATION
UNDER SLAB

PETRON CORPORATION (BACONG)

UNDER SLAB
DETAIL - A

PS (PIPE SUPPORT DETAIL) GRID - 33, 34 & 36 DETAIL

DETAIL - B GRID - 1 & 5 BEAM DETAIL GRID - 3 BEAM DETAIL

PETRON CORPORATION (BACONG)

DETAIL - E & BREASTING DOLPHIN NO.1


UNDER SLAB
DETAIL - C

SECTION - 1 SECTION - 2

DETAIL - D

PETRON CORPORATION (BACONG)

DETAIL - C & D
UNDER SLAB
DETAIL - E

BREASTING DOLPHIN NO.1 BREASTING DOLPHIN NO.2

PETRON CORPORATION (BACONG)

DETAIL - E, BREASTING DOLPHIN NO.1 & 2


UNDER SLAB

You might also like