You are on page 1of 2

PT.

PATCO ELEKTRONIK TEKNOLOGI Approved by Checked by Prepared by


JOB DESCRIPTION

TITLE MANAGER PED EFF. DATE


DOC. NO JD-PED-0001 PAGE 1 of 2
REV. NO A.4 ISSUED BY PED

Personnel Qualification :
Education : D3/ S1 Graduate
Experience : Min 3 years
Special Requirement : Understand ISO 9000,ISO 14000, 5S, written and oral English, Computer
literate
Report to : Director
Division / Department : Production Engineering Division

1. JOB AND RESPONSIBILITY


1.1. Responsible to ensure that plan and preparation for new project have been made and done as
well.
1.2. Responsible to prepare and re-arrange/ re-layout factory space, machine and other equipment
for new project purpose.
1.3. Responsible to ensure that over all plan maintenance were properly maintained and carried
out.
1.4. Responsible to prepare, internal and controlled new project.
1.5. Responsible to establish budget for servicing / over haul.
1.6. Responsible to maintenance all of customer property (maintenance, jig, document) for new
project.
1.7. Responsible to ensure the implementation of Quality Management System and Operational
Control of Environmental Management System.
1.8. Responsible to identify training need for subordinate.
1.9. Responsible to study and develop the current project or the new project.
DATE DESCRIPTION OF REVISION REASON OF REVISION RESP. PERSON
03-05-04 Add ISO 9000 and ISO 14000, Implementation of ISO 14000 Hardizon
Environmental Management System
10-08-05 Add Operational Control of EMS Implementasi ISO 14001 Hardizon
07-04-09 Delete Authority for Approve Corrective Move this Job to GA Dept Didik S.
& Preventive Maintenance Schedule
Infrastructure
25-05-11 Add. authority for control General Re-structure Krisno N.
Facility
PT. PATCO ELEKTRONIK TEKNOLOGI
JOB DESCRIPTION

TITLE MANAGER PED EFF. DATE


DOC. NO JD-PED-0001 PAGE 2 of 2
REV. NO A.4 ISSUED BY PED

1.10. Responsible to control the implementation of ERS activities are sufficient to full fill
customer requirement.
1.11. Responsible to changes on material, equipment, and method related with ERS.

2. AUTHORITY
2.1. To agree and approval to:
2.1.1. Draft Product Master Record.
2.1.2. Trail Master Schedule.
2.1.3. Trial Result Report.
2.1.4. Request for Approval.
2.1.5. PQC Set.
2.1.6. Preventive and Corrective Maintenance Schedule Infrastructure.
2.1.7. Preventive and Corrective Maintenance Record Infrastructure.
2.2. To verified if any changes on material, equipment and method related with ERS are not
contain or contain by banned substance.

DATE DESCRIPTION OF REVISION REASON OF REVISION RESP. PERSON


03-05-04 Add ISO 9000 and ISO 14000, Implementation of ISO 14000 Hardizon
Environmental Management System
10-08-05 Add Operational Control of EMS Implementasi ISO 14001 Hardizon
07-04-09 Delete Authority for Approve Corrective Move this Job to GA Dept Didik S.
& Preventive Maintenance Schedule
Infrastructure
25-05-11 Add. authority for control General Re-structure Krisno N.
Facility

You might also like