You are on page 1of 4

PT.

VIKING ENGINEERING
Prepared by: Approved by: Issue 1 Date Issued: Document No:
HSE Manager Director Rev. 01 Feb 2016 Form VB/CL 02
Pages:
Document Title: JOB SAFETY ANALYSIS Page 1 of 4

Job Description: Lifting (Container) Department : Production


Ref No. : VB/RA/16-03
Location: SIEMENS YARD - Batam Date : May 23, 2016

JOB STEP HAZARD CONTROL


No (Potential Risk) Action Party
(Sequence of Activity) (Recommended Measures)

1 Preparation: Human Performance - Ensure the PTW issued is compatible with the activity Supervisor
Preparation of - Human Error (Issued Wrong - Ensure all persons involved pay attantion on the discussion
procedures. (PTW, JSA PTW, Not focus on JSA - Use loud and clear sound
and Toolbox Talk/ discussion, Sound not clear on - Use understood language on the discussion
Meeting) JSA and TBT discussion and - Pastikan PTW yang diterbitkan sesuai dengan pekerjaannya
Persiapan: missundertand the discussion) - Pastikan seluruh pekerja memperhatikan pembahasannya
Persiapan prosedur- Kinerja Manusia - Gunakan suara yang keras dan jelas
prosedur (PTW, JSA dan - Kesalahan Manusia - Gunakan bahasa yang dipahami saat diskusi
Toolbox Talk/ Meeting) (Menerbitkan PTW yang salah,
Tidak fokus saat pembahasan
JSA, Suara tidak jelas saat
membahas JSA dan TBT, dan
salah mengerti pembahasan)

2 Preparation of Lifting Gravity - Check and ensure working area clear from any obstacle and puddle of water Foreman
Equipment and Lifting - Body slip, trip or falling before mobilization.
Gears Grafitasi - Periksa dan pastikan area pekerjaan bebas dari halangan dan genangan air
- Terpeleset, tersandung atau sebelum mobilisasi
Persiapan Alat Angkat terjatuh
dan Perlengkapan
pengangkatan Motion - Use manual handling technique anytime use manual handling.
- Manual Handling - Ask for assist when do manual handling more than 25Kg and/or the material to
- Pinch Point wide/high.
- To always aware of body and fingger position.
- Monitoring each other and remind anyone who in pinch point area.
PT. VIKING ENGINEERING
Prepared by: Approved by: Issue 1 Date Issued: Document No:
HSE Manager Director Rev. 01 Feb 2016 Form VB/CL 02
Pages:
Document Title: JOB SAFETY ANALYSIS Page 2 of 4

3 Lifting Activities Gravity - Ensure no un-authorized persons near the working area. Supervisor
Kegiatan - Falling object - Ensure no one standing below the lifted material.
Pengangkatan Gravitasi - Ensure all persons involved the lifting activity using head protection (Safety
- Benda Jatuh helmet)
- Ensure the lifted material been clear from any drop object before do the lifting.
- Do visual check for the lifting gears and lifting equipment to ensure all are ready
to use and in good condition.
- Provide lifting plan before start the activity.
- Pastikan orang tidak berkepentingan tidak mendekati area pekerjaan.
- Pastikan tidak ada seorangpun yang berada dibawah barang yang diangkat.
- Pastikan semua orang yang terlibat dalam kegiatan pengangkatan
menggunakan pelindung kepala.
- Pastikan benda yang diangkat sudah bebas dari segala benda yang dapat
terjatuh sebelum melakukan pengangkatan.
- Lakukan pemeriksaan perlengkapan dan alat pengangkatan secara visual untuk
memastikan semua siapuntuk digunakan dan dalam kondisi yang baik.

Motion - Use manual handling technique anytime use manual lifting.


- Manual Lifting - Ask for assist when do manual handling more than 25Kg and/or the material to
- Pinch Point wide/high.
Gerakan - To always aware of body and fingers position.
- Pengangkatan Manual - Ensure to use hand gloves.
- Titik Jepit - No one stand between lifted material.
- Partikel berterbangan - Monitoring each other and remind anyone who in pinch point area.
- Ensure the material attached with 2 tag lines for controling the movement of
material lifted.
- Minimize using hand / touching the lifted material to controling/ arrange position
of lifted material.
- Gunakan manual handling technique saat melakukan pengangkatan manual
- Perhatikan posisi tubuh dan jari.
- Gunakan sarung tangan.
- Dilarang berada diantara material yang diangkat.
PT. VIKING ENGINEERING
Prepared by: Approved by: Issue 1 Date Issued: Document No:
HSE Manager Director Rev. 01 Feb 2016 Form VB/CL 02
Pages:
Document Title: JOB SAFETY ANALYSIS Page 3 of 4

- Perhatikan sesama dan saling mengingatkan sesama yang berada di titik jepit.
- Pastikan material yang diangkat dilengkapi dengan 2 tag lines untuk mengontrol
gerakan material tersebut.
- Minimalkan penggunaan tangan / menyentuh material yang diangkat untuk
mengontrol / mengatur posisi material yang diangkat.

Mechanical - Ensure all the daily inspection of crane been done before using the crane.
- Equipment failure - Only certified operator allowed to operate the crane.
- Un-familiar of how to operate - Pastikan inspeksi harian sudah dilakukan sebelum menggunakan crane.
the crane - Hanya operator yang bersertifikat dibenarkan mengoperasikan crane.
Mekanik
- Kegagalan alat
- Tidak terbiasa
mengoperasikan crane

Temperature - Maintain the body fluids with drink enough water.


- Weather Condition - Jaga cairan tubuh dengan minum air secukupnya.
Suhu
- Cuaca

Radiation - Use dark safety glasses when working under solar rays impact.
- Solar rays - Gunakan kaca mata hitam saat bekerja ditempat yang terkena sinar matahari
Radiasi secara langsung.
- Sinar matahari

Sound - Ensure loud and clear sound during signaling the crane operator.
- Communication - Stop and ask for re-signal when in doubt.
Suara - Do not assume any signal if the signal given un-clear.
- Komunikasi - Pastikan suara nyaring dan jelas saat memberikan signal kepada crane
operator.
- Berhenti dan minta kembali signal saat ada keraguan.
- Jangan berasumsi pada signal yang diberikan apabila signal tersebut tidak jelas.
4 Housekeeping Gravity: - To ensure clear the area from slip, trip and falling hazards after done the job. Foreman
Housekeeping - Slip, Trip and Falling - Pastikan area pekerjaan bebas dari bahaya terpeleset, tersandung dan terjatuh
Gravitasi: setelah selesai melakukan pekerjaan.
Terpeleset, tersandung dan
terjatuh
PT. VIKING ENGINEERING
Prepared by: Approved by: Issue 1 Date Issued: Document No:
HSE Manager Director Rev. 01 Feb 2016 Form VB/CL 02
Pages:
Document Title: JOB SAFETY ANALYSIS Page 4 of 4

Review & Recommendation for improvements to this JSA:

Safety Officer: Review Date :