You are on page 1of 1

INTEGRATED ENGINEERS

Project SHOWROOM SAHIWAL 450X600


INTERNATIONAL
Client MHM Made by Date Page
Location SHOWROOM GF B-1 SAA 15-Mar-19 3
CONTINUOUS BEAM ANALYSIS & DESIGN to EC2 (DD ENV 1992-1-1 : 1992) Checked Revision Job No
Originated from RCCe41.xls on CD © 1999 BCA for RCC MHM GF B-1

SPAN 1 LEFT CENTRE RIGHT


ACTIONS M kNm 389.2 440.4 383.0
d 0.90 1.13 0.90
DESIGN d mm 515.3 540.3 515.3
As mm² 2439 2495 2399
As' mm² 695 3209 654
TOP STEEL Layer 1 5 R 25 5 R 25 5 R 25
Layer 2 0 19 2 R 25 0 19
As prov mm² 2454 As' prov 3436 As prov 2454
BTM STEEL Layer 1 2 R 25 5 R 25 2 R 25
Layer 2 0 19 3 R 19 0 19
As' prov mm² 982 As prov 3305 As' prov 982
DEFLECTION L/d 18.60 Allowed 19.66 As auto-increased by 25.3 %
SHEAR Vsd kN 343.1 LINK Ø 343.1
VRd1 kN 85.8 10 85.8
VRd2 kN 695.6 NOMINAL 695.6
s req mm 81 282 81
LINKS R10 @ 80 for 3520 R10 @ 275 R10 @ 80 for 3520
legs No 2 2 2

CHECKS % As ok ok ok
Cover ok ok ok
min S ok ok ok
max S ok ok ok
Links ok ok ok
Main bars ok ok ok
max V ok ok
Deflection ok

You might also like