You are on page 1of 1

Transmart :

Bulan :
Engineering Department
LOG SHEET WARMING UP GENSET
Date
On
Time
Off
L1 - N
Voltage 1~ L2 - N
L3 - N
L1 - L2
Voltage 3~ L2 - L3
L3 - L1
Frequency Hz
L1
Arus (Ampere) L2
L3
L1
Load (KW) L2
L3
KW
Total Load
%
L1
Load (KVA) L2
L3
Total Load KVA
L1
KVAR L2
L3
Total KVAR

Cos α (Pf Lg)

Average Cos α
Speed Rpm
Past
Running Hour
Present
Teg. Charger V
Teg. Baterai V
Engine Temp. °C
Oil Pressure Psi
Oil Temp °C
Daily Tank Liter
Monthly Tank Liter
Radiator
Action By