FORM016-FIELD INSTRUCTION
FIELD INSTRUCTION
No. 002
.
SCOPE OF WORK :
[ ] AR [ ] Struct [ ] Civil [ ] Mech [ ] Elect [✔] Plum [ ] Fire Pro [ ] Electronics [ ] LPG
[ ] Lift [ ] others: _______________________
SUBJECT : Installation of three (3) downpipes at the hallway between NCB-PET
Line 8 and CSD-RGB Line 4
INSTRUCTION:
To compensate for the insufficiency of the elevation of collecting pipe which causes standing water
at the roof gutter and unmanageable leakage, Sir Walton agreed with the suggestion to install
additional downpipes at the hallway between NCB-PET Line 8 and CSD-RGB Line 4 to solve the
issue.
REMARKS:
Upon installing the downpipes, it is more observable that the solution is a success.
This Field Instruction (FI) is issued to the Contractor for deviations in plans and specifications that are
without cost and time implications.