Power Requirement
Limestone size ranges from 10 to 200 mm but the average size of limestone feed in a jaw
crusher is 90 mm. In the primary crushing stage, the feed is reduced to less than 20 mm for the
next crushing stage which is milling (Alsop et.al, 2007). Bond’s crushing law was used to calculate
the power requirement of the jaw crusher.
𝑃 1 1
= √100 × 10−3 𝑊𝑖 [ − ]
𝑚 √𝐷𝑝𝑏 √𝐷𝑝𝑎
𝑘𝑔 1 𝑡𝑜𝑛 𝑡𝑜𝑛𝑠
𝑚 = 294,578.67 × = 294.57867
ℎ𝑟 1000 𝑘𝑔 ℎ𝑟
1 1
𝑃 = √100 × 10−3 (12.74) [ − ] × 294.57867
√10 √90
𝑃 = 250.20 𝑘𝑊
Blending Silo
Sand (FS)
6,924.33 kg/hr
Clay (FC)
45,008.17 kg/hr
Power Requirement
According to Alsop et. Al (2007), the power consumption of a blending silos to
homogenize the raw mill is 0.5 kWh/ton.
𝑘𝑊ℎ 1 𝑡𝑜𝑛 346,216.66 𝑘𝑔
0.5 × × = 173.11 𝑘𝑊
𝑡𝑜𝑛 1000 𝑘𝑔 ℎ𝑟
𝑃 = 173.11 𝑘𝑊
Blending Silo
Power Requirement
According to Alsop et. Al (2007), the power consumption of a blending silos to
homogenize the raw mill is 0.5 kWh/ton.
𝑘𝑊ℎ 1 𝑡𝑜𝑛 231,481.48 𝑘𝑔
0.5 × × = 115.74 𝑘𝑊
𝑡𝑜𝑛 1000 𝑘𝑔 ℎ𝑟
𝑃 = 115.74 𝑘𝑊
Alsop, P. A., Chen, H. & Tseng, H. (2007). The cement plant operations handbook. Surrey, UK:
International Cement Review
Limestone – Its processing and application in iron and steel industry. Retrieved March 2, 2019
from http://ispatguru.com/limestone-its-processing-and-application-in-iron-and-steel-industry/