SUBSTATION & OPERATION SYSTEM

SUBSTATION

Substation Fitter 1 (Maintenance)


1 TT05/06 10 3-14 8-19 11-22
Asas Jurugegas Pencawang 1 (Senggaraan)

Substation Fitter 2 (Construction)


2 TT05/06 10 24-5/10 19-30 1-12
Asas Jurugegas Pencawang 2 (Pembinaan)

Transformer Operation & Maintenance up to


33kV & PPVR (Malim Nawar)
3 TT07/08 5 19-23 18-22
Kendalian & Penyelenggaraan Alatubah
setakat 33kV & PPVR (Malim Nawar)
Earthing Installation of Distribution Substation
4 Pemasangan Pembumian Pencawang TT07/08 2 18-19 12-13 17-18
Pembahagian

Senggaraan Pencawang
5 TT07/08 5 1-5, 29-2/11 25-29
Substation Maintenance

Senggaraan Pencawang (Malim Nawar)


6 TT07/08 5 04 - 08 08 - 12 10 - 14
Substation Maintenance

Sistem Pembumian
7 TT09/14 2 22-23 26-27 29-30
Earthing System

Transformer Construction & Maintenance up to


33kV (Malim Nawar)
8 TT09/14 5 8-12 7-11 15-19
Pembinaan & Penyelenggaraan Alatubah
S t k t 33kV (Malim
Setakat (M li Nawar)
N )
Switchgear Installation and Maintenance up
to 33kV
9 TT09/14 5 29-2/11 3-7 10-14
Pemasangan dan Penyelenggaraan Alatsuis
setakat 33kV

10 Introduction to LV Capacitor Bank TT11/12 3 22-24 12-14 21-23

Pengenalan Pencawang Pembahagian Untuk


Anggota Kerja Perjangkaan
11 TT09/14 3 18-20 13-15 20-22
Introduction of Distribution Substation for
Metering Staff

Construction and Maintenance of Distribution E07/08/12/13


12 5 24-28 15-19, 5-9 17-21 1-5 3-7
Substation ET & Engineer

Transformer & OLTC Maintenance up to 33kV E07/08/12/13


13 4 26-29 14-17 6-9
for Executive ET & Engineer
ILSAS PROGRAM SCHEDULE FY2012/2013

DISTRIBUTION TRAINING

Target Participant Duration


No Course Title Sept 12 Oct 12 Nov 12 Dec 12 Jan 13 Feb 13 Mac 13 Apr 13 May 13 Jun 13 Jul 13 Aug 13
(Grade) (days)

OPERATION SYSTEM 11kV

Cable Fault Location


14 TT07/14 5 8-12 18-22
Mencari Kerosakan Kabel

Sheath Fault Location


15 TT07/14 2 31/1-1/2 25-26
Mencari Kerosakan Kabel 'Sheath'

Substation Switching Operation up to 11kV


(Malim Nawar) 08 - 12,
16 TT09/14 5 10-14, 24-28 19-23 3-7
Kendalian Pencawang - Setakat 11kV (Malim 29 - 02/11
Nawar)

Switching Operation up to 1kV Kendalian


17 TT09/14 4 8-11, 29-31 1 14-17 8-11
(Switching Operation) - setakat 1kV (AP),

Refresher Practical Substation Switching


Operation up to 11kV BO (TNBD)
18 TT09/14 1
Refresher Amali Kendalian Pencawang 11kV
BO (TNBD)

Switching Operation up to 11kV E07/08/12/13


19 5 3-7 1-5, 15-19 5-9, 26-30 7-11
Kendalian Pencawang - Setakat 11kV ET & Engineer

Cable Fault Location


20 E07-E15 5 1-5 14-18
Mencari Kerosakan Kabel

Sheath Fault Location


21 E07-E15 2 1-2 29-30
Mencari Kerosakan Kabel 'Sheath'

Refresher Practical Substation Switching


Operation up to 11kV BO (TNBG) Non Exec – Exec TNBG
22 5
Refresher Amali Kendalian Pencawang 11kV Only
BO (TNBG)
Practical Test Switching Operation BO (ST-
TNBG) Non Exec – Exec TNBG
23 1
Ujian Amali Kendalian Pencawang BO (ST – Only
TNBG)
Switching Operation up to 11kV
24 Kendalian Pencawang - Setakat 11kV (TNBG Non Exec – Exec TNBG 5
only)
ILSAS PROGRAM SCHEDULE FY2012/2013

DISTRIBUTION TRAINING

Target Participant Duration


No Course Title Sept 12 Oct 12 Nov 12 Dec 12 Jan 13 Feb 13 Mac 13 Apr 13 May 13 Jun 13 Jul 13 Aug 13
(Grade) (days)

OPERATION SYSTEM 33kV

Switching Operation up to 33kV


(Module 1 - Introduction to 33kV System)
25 TT09/14 3 10 - 12 30 - 1 Nov 3-5 29 - 31 24 - 26
Kendalian Pencawang - Setakat 33kV
(Modul 1 - Pengenalan Sistem 33KV)
Switching Operation up to 33kV
(Module 2 - System Operation 33kV)
26 TT09/14 5 1- 5 19 - 23 14 - 18 10 - 14 19 - 23
Kendalian Pencawang - Setakat 33kV
(Modul 2 - Kendalian Sistem 33KV)
Switching Operation up to 33kV
(Module 1 - Introduction to 33kV System)
27 E07-E15 3 24 - 26 5-7 17 - 19 8 - 10 1-3
Kendalian Pencawang - Setakat 33kV
(Modul 1 - Pengenalan Sistem 33KV)
Switching Operation up to 33kV
(Module 2 - System Operation 33kV)
28 E07-E15 5 15 - 19 26 - 30 4-8 17 - 21 26 - 30
Kendalian Pencawang - Setakat 33kV
(Modul 2 - Kendalian Sistem 33KV)

OVERHEAD LINES & CABLE

OVERHEAD LINES

Fault Finder Competency


29 TT05 5 3-14 29/10-9/11 18 - 29 15 - 26 29Apr - 10
Kompetensi Pembaik Kerosakan

Low Voltage Live Line Work


30 TT05 - TT06 3 11-13 2-4 6-8 5-7
Kerja Talian Hidup Voltan Rendah

Construction and Maintenance of Overhead


Line Bare Conductor
31 TT07/08 5 24-28
24 28
P
Pemasangan dan
d Penyelenggaraan
P l Talian
T li
Atas Voltan Sederhana Tidak Bertebat

Refresher For Fault Finder


32 TT07/08 4 24-27 15-18 4-7 20 - 23
Ulangkaji Pembaik Kerosakan

Low Voltage Live Line Work for


Executives/Supervisors
33 TT09-E12 1 6
Kerja Talian Hidup Voltan Rendah
Eksekutif/Penyelia

Low Voltage Overhead Line for Executives ET & Jurutera O&M,


34 5 8-12 5-9 4-8 25 - 29 22 - 26 13 - 17
Talian Atas Voltan Rendah Utk. Eksekutif Pembinaan (E07-E13)

Refresher Course for 33kV Overhead Line for


E07-E13 @ ET & Jurutera
35 Executives 2 16-17 22 - 23
O&M 33kV (E07-E13)
Ulangkaji Talian Atas 33kV Utk. Eksekutif

Refresher for Low Voltage Live Line 30 - 31 26 - 27


36 TT05 - 08 2 23-24 4 - 5, 12 - 13
Ulangkaji Kerja Talian Hidup Voltan Rendah

37 Pembinaan dan Senggaraan Talian Atas VR TT09/10 @ TT12 5 10-14 26-30 25-1/3 15-19
ILSAS PROGRAM SCHEDULE FY2012/2013

DISTRIBUTION TRAINING

Target Participant Duration


No Course Title Sept 12 Oct 12 Nov 12 Dec 12 Jan 13 Feb 13 Mac 13 Apr 13 May 13 Jun 13 Jul 13 Aug 13
(Grade) (days)

OVERHEAD LINES (MALIM NAWAR)

High Voltage Overhead Line for Linesman


(Malim Nawar)
38 TT05/07 20 5-30
Asas Pemasang Talian Voltan Tinggi (Malim
Nawar)

Low Voltage Live Line Work (Malim Nawar)


5-7'
39 Kerja Talian Hidup Voltan Rendah (Malim TT05/06 3 31 - 02/11 4-6
19-21
Nawar)

Low Voltage Overhead Line for Linesman


Module 1 (Malim Nawar)
40 TT05/06 10 24 - 05/10 15 - 25 07 - 18 18 - 01/03
Kompetensi Pemasang Talian VR Modul
1(Malim Nawar)

Low Voltage Overhead Line for Linesman


04 - 15/03,
41 Module 2 TT05/06 10 01 - 12 06 - 17
18 - 29
Kompetensi Pemasang Talian VR Modul 2

42 MV ABC for Executive (Malim Nawar) E07-E14 2 31 - 01/02 17 - 18

Construction and Maintenance of MV ABC


Cable (Malim Nawar) 20 - 23,
43 Open 5
Pemasangan dan Penyelenggaraan Kabel 27 - 31
MV ABC (Malim Nawar)
Pengendalian & Penyelenggaraan Kren -
Auger (Malim Nawar)
44 TD05 5 10-14 8-12 22 - 26
Operation & Maintenance of Crane - Auger
(Malim Nawar)

45 Vegetation Management (Malim Nawar) 2 29 - 30 15 - 16

Refresher for Low Voltage Live Line (Malim


18 - 19,
46 Nawar) 2 10 - 11, 13 - 14 21 - 22
25 - 26
Ulangkajiji Kerja
j Talian
i Hidup
i Voltan Rendah
ILSAS PROGRAM SCHEDULE FY2012/2013

DISTRIBUTION TRAINING

Target Participant Duration


No Course Title Sept 12 Oct 12 Nov 12 Dec 12 Jan 13 Feb 13 Mac 13 Apr 13 May 13 Jun 13 Jul 13 Aug 13
(Grade) (days)

CABLE

LV Jointing Practices
47 TT05/06 7 3-11 1-9 1-9 31/1-8/2 7-15 13-21 3-11 22-30
Amalan Pencantuman Kabel Voltan Rendah

11kV Jointing Practices 6-14 17-25


48 TT05/06/07 7 20-28 11-19 29 - 7/12 14-22 27/6-5/7 19-27
Amalan Pencantuman Kabel hingga 11 kV 27/6-5/7

33kV Jointing Practices 6-10 13-


49 TT07/08 5 22-26 1-5 19-23
Amalan Pencantuman Kabel hingga 33 kV 17

ST Cable Jointing Level 1 (LV)


50 Percantuman Kabel Tahap 1 (Voltan Rendah) - TT05/06 12 4-19 7-22 18/3-2/4 18/3-2/4 13-28
TNBD / Open

ST Cable Jointing Level 2 (LV)


18/2-1/3
51 Percantuman Kabel Tahap 2 (11kV) - TNBD / TT05/06/07 10 18/2-1/3 1-12
18-29
Open

Cable Laying Practices up to 33kV (Supervisor)


52 Amalan Rentang Kabel hingga 33kV TT05-10 2 4-5 8-9 20-21 25-26 4-5
(Penyelia TNB)

ST Cable Jointing Level 3 (33kV)


53 Percantuman Kabel Tahap 3 (33kV) - TNBD / TT07/08 10 21-31
Open

TT09 -14
54 Cable Fault Post Mortem (Exec & NonExec) 2
E07-E14

55 Cable Laying & Jointing TT09-14 3 1-3 5-7 17-19 22-24 1-3

56 Condition Based Maintenance - Cable CPD E07/08 - E14 3 15-17 5-7 17-19

E07/08- E14
57 U/G Distribution Cables CPD 3 17-19 4-6 27-29
ET & Engineer

22kV Jointing Practices


58 TT05/06/07 7
Amalan Pencantuman Kabel hingga 22 kV

11kV Jointing Practices (Refresher)


59 TT05-08 2
Amalan Percantuman Kabel 11kV (Refresher)

Cable Laying Practices up to 33kV


(Contractor)
60 Contractor 2
Amalan Rentang Kabel Hingga 33kV
(Kontraktor)
ILSAS PROGRAM SCHEDULE FY2012/2013

DISTRIBUTION TRAINING

Target Participant Duration


No Course Title Sept 12 Oct 12 Nov 12 Dec 12 Jan 13 Feb 13 Mac 13 Apr 13 May 13 Jun 13 Jul 13 Aug 13
(Grade) (days)

SAFETY & ENVIRONMENT (OSHE & CORPORATE TRAINING)

Technician's Safety Module (Modul


Keselamatan Juruteknik)
-Electric Safety Rules (Aturan Keselamatan TT09/10
61 4 Upon Request
Elektrik) (TNBD Only)
-Safety training Guideline (Panduan Latihan
Keselamatan)
TNBD Engineer's Safety Module I (Modul
Keselamatan Jurutera Pembahagian I)
-Electric Safety Rules (Aturan Keselamatan E11/12/13
62 4 3-6 7-10 4-7 18-21 11-14
Elektrik) (TNBD Only)
-Safety training Guideline (Panduan Latihan
Keselamatan)
TNBD Engineer's Safety Module II (Modul
Keselamatan Jurutera Pembahagian II) E11/12/13
63 2 17-18 21-22 1-2 15-16 6-7
-NIOSH-TNB Safety Passport (TNBD Only)
-SEMS Awareness

Engineer ** 3-4 7-8 1-2


64 BEM Engineering Management Practice 2 22-23 18-19 14-15 27-28
(Open) 6-7 10-11 18-19

Engineer **
65 BEM Safety & Health 2 22-23 29-30 6-7 13-14 10-11 21-22 21-22 18-19 8-9 6-7
(Open)

Engineer **
66 BEM Code of Ethics and Regulations 2 29-30 3-4 13-14 7-8 21-22 18-19 11-12 25-26 11-12 20-21
(Open)

PROTECTION (ENGINEERING SERVICES TRAINING)

Distribution Network Power System Protection E12 - 13


67 3 21-23 26-28 19-21 23-25 28-30
33/11KkV
/ ((Post-PEP))

Earth Fault Indication (EFI) Installation 6-7


68  E07 - 15 2 12-13 15-16 19-20
Operation & Maintenance 27-28

Earth Fault Indication (EFI) Installation 5-6 7-8


69 TT09-TT14 2 16-17 25-26
Operation & Maintenance 27-28 28-29

Distribution System Protection 33/11kV (Basic)


10-12 9-11
70 Perlindungan Sistem Pembahagian 33/11kV TT05-TT06 3 6-8
25-27 22-24
(Asas)
Distribution System Protection 33/11kV
(Intermediate) 4-6
71 TT07-TT08 3 20-22
Perlindungan Sistem Pembahagian 33/11kV 17-19
(Pertengahan)
Distribution System Protection 33/11kV
(Advance) 15-17
72 TT09-TT14 3 13-15
Perlindungan Sistem Pembahagian 33/11kV 29-31
(Lanjutan)

Advanced Power System Protection (Analysis Protection


73 10
& Protection of Power System - APPS) Engineer/Manager
ILSAS PROGRAM SCHEDULE FY2012/2013

DISTRIBUTION TRAINING

Target Participant Duration


No Course Title Sept 12 Oct 12 Nov 12 Dec 12 Jan 13 Feb 13 Mac 13 Apr 13 May 13 Jun 13 Jul 13 Aug 13
(Grade) (days)

SYSTEM AUTOMATION & SCADA (ENGINEERING SERVICES TRAINING)

SCADA System (M1) - Distribution @ Sistem


74 TT09 (TNBD Only) 3 9-11 19-21
SCADA (Modul 1)

SCADA System(M3) - Distribution @ Sistem


75 TT09 - E14 (TNBD Only) 3 2-4 7-9
SCADA (Modul 3)

76 RTU-Foxboro TT09-TT14 (TNBD Only) 4 3-6 4-7

77 RTU- Dongfang TT09-TT14 (TNBD Only) 4 6-9 8-11

78 RTU-Viscon Dua TT09-TT14 (TNBD Only) 3 16-18 18-20


ILSAS PROGRAM SCHEDULE FY2012/2013

DISTRIBUTION TRAINING

Target Participant Duration


No Course Title Sept 12 Oct 12 Nov 12 Dec 12 Jan 13 Feb 13 Mac 13 Apr 13 May 13 Jun 13 Jul 13 Aug 13
(Grade) (days)

PLANNING (ENGINEERING SERVICES TRAINING)

LV Planning Guidelines for Non-executive (to


79 be conducted together with MV Planning TT09/10 3 01-03 18-20
Guidelines for Non-exec)

MV Planning Guidelines for Non-executive (to


80 be conducted together with MV Planning TT09/10 2 04-05 21-22
Guidelines for Non-exec)

81 Basic PSS-Adept for Non-executive TT11/12 3 22-24 19-21 05-07

82 Introduction to Power Quality for Executive E07-12 2 18-19 10-11

83 LV Planning Guidelines for Executive E07-13 3 15-17 25-27

84 MV Planning Guidelines for Executive E07-13 4 11-14 30/10-02/11 19-22

85 Power Quality for O&M Executive E12-15 3 14-16 04-06 04-06

86 Failure Analysis Methodology for MV VCBs E07-15 3 11-13 27-29

Introduction to LV Planning (to be conducted


87 E12 3 24-26 05-07
together with Introduction to MV Planning)

Introduction to MV Planning (to be conducted


88 E12 2 27-28 08-09
together with Introduction to LV Planning)

89 Basic PSS-Adept for Executive E12-13 3 01-03 07-09


ILSAS PROGRAM SCHEDULE FY2012/2013

DISTRIBUTION TRAINING

Target Participant Duration


No Course Title Sept 12 Oct 12 Nov 12 Dec 12 Jan 13 Feb 13 Mac 13 Apr 13 May 13 Jun 13 Jul 13 Aug 13
(Grade) (days)

METERING (ENGINEERING SERVICES TRAINING)

Installation and Testing of OPC Meters


90 TT05/06 3 15-17
Pemasangan dan Pengujian Jangka OPC

Installation and Testing of LPC LV Meters


91 TT05/06 2 18-19
Pemasangan dan Pengujian Jangka LPC LV

Inspection of OPC/LPC Meters


92 TT07/08 5 29/10 - 2/11
Pemeriksaan Jangka OPC/LPC

Installation and Testing of OPC and LPC Meters


93 Pemasangan dan Pengujian Jangka OPC & TT09/10 4 4-7 19-22 2-5
LPC

Inspection and Detection of LPC Metering


Irregularities
94 TT09/10 4 6-9 26-29 14-17
Pemeriksaan dan Mengesan Kejanggalan
Jangka LPC

95 Metering Wiring and Inspection E07-13 3 21-23 25-27

Metering and Billing For Non Technical


96 E07-13 3 Upon Request
Executives

97 Introduction to Metering & Supply Application E12/13 4 26/2-1/3 23-26

98 High Voltage Metering E12/13 5 17-21

CUSTOMER SERVICES CENTRE MODULE

METERING SYSTEM FOR PP&P
99 - Meter types for all types of tariffs FRONTLINER 2 27-28 27-28

METERING SYSTEM FOR METER READERS PS 04/04 
100 (New) PS 0304 2 18-19 15-16
- Meter types for all types of tariffs
ILSAS PROGRAM SCHEDULE FY2012/2013

DISTRIBUTION TRAINING

Target Participant Duration


No Course Title Sept 12 Oct 12 Nov 12 Dec 12 Jan 13 Feb 13 Mac 13 Apr 13 May 13 Jun 13 Jul 13 Aug 13
(Grade) (days)

AM MODULE

TECHNICAL

Fault Analysis & Troubleshooting E14/E15


101 - Substation E12/E13 2
- Overhead Lines & Cable E07/E08

Metering E14/E15
102 - Losses E12/E13 2 21-22 3-4
- Remote Meter Reading E07/E08

Planning E14/E15
19 (Planning), 20
103 - Planning (1 day) E12/E13 2
(PQ)
- Power Quality (1 day) E07/E08

E14/E15
104 Operational Safety & Switching E12/E13 2
E07/E08

POST PEP

Distribution Network Power System Protection E12-E13


105 21-23 26-28 19-21 23-25 28-30
33/11kV (Post PEP)