The evidence must show that the trainee…
Plans and details are correctly interpreted and / /
identified according to job requirements
Materials, tools and equipment are identified / /
consistent with job requirements
Materials and tools are properly stored and / /
freed from defects.
Appropriate PPE are selected according to job / /
requirements.
Plans and details are correctly interpreted and / /
identified according to job requirements
Stakes are set out from pre-determined / /
building lines
Batter board materials are measured, laid out / /
and cut according to specification
Stakes are set 0.75-1.00 meter away from the / /
pre-determined building lines
Batter boards are properly secured with
tolerance for dimensions at 5 mm, and / /
levelness of 3 mm.
Building lines are squared with end tolerance / /
of 3 mm
Building lines are measured and set / /
# of
Objectives/Content items/
Knowledge Comprehension Application
area/Topics % of
test
Concepts of
setting batter 1 2 1 40%
boards
TOTAL 100
Written Test
1. What do you call the horizontal boards placed at the corners and at the sides
2. It is the most accurate tool for guiding work in establishing a horizontal level
3. of the projected building when final layout takes place?
4. What should be the height of the batter boards?
5. What are the two types of batter boards?
6. In constructing with different heights of foundation posts, what is the height of
the batter boards?
7. What particular dimension is found in an elevation plan?
8. What is the importance of a detailed drawing?
9. What is the vital aspect of specification?
10. What are the names of different room’s in the floor plan?
Performance Test
Qualification CARPENTRY NC II
PREPARE STAKE-OUT BUILDING
Unit of Competency LINES
General Instruction:
Given the tools and materials you must perform laying out building lines
Specific Instruction:
Wear PPE
Once you are finished call the attention of your trainer for
evaluationn
QUESTIONING TOOL
Satisfactory
Questions to probe the candidate’s underpinning knowledge
response
Extension/Reflection Questions Yes No
1. How important is building steakout
Safety Questions
3.What are the PPE use in carpentry
4.what are the Dos and Donts in the working area
Contingency Questions
5. What will you do if your push pull rule is damage or is not
working?
Job Role/Environment Questions
7. What is a role of a carpenter
8. What is a role of a foreman
Rules and Regulations
9. What is the most important thing to do before performing
laying out building lines
The candidate’s underpinning Satisfactory Not
knowledge was: Satisfactory