This document outlines the materials needed for a single box culvert construction project with 2 units that are each 11 meters long. It details the excavation of soil measuring 2 meters by 4 meters by 5 meters, totaling 40 cubic meters for each unit. It also specifies backfilling 40 square meters of soil at 0.1 meters depth for each unit, totaling 4 cubic meters.
This document outlines the materials needed for a single box culvert construction project with 2 units that are each 11 meters long. It details the excavation of soil measuring 2 meters by 4 meters by 5 meters, totaling 40 cubic meters for each unit. It also specifies backfilling 40 square meters of soil at 0.1 meters depth for each unit, totaling 4 cubic meters.
This document outlines the materials needed for a single box culvert construction project with 2 units that are each 11 meters long. It details the excavation of soil measuring 2 meters by 4 meters by 5 meters, totaling 40 cubic meters for each unit. It also specifies backfilling 40 square meters of soil at 0.1 meters depth for each unit, totaling 4 cubic meters.