BOX CULVERT ARMCO DIAMETER 2 M

No. URAIAN PEKERJAAN VOLUME SATUAN

I. PEKERJAAN PERSIAPAN & MOBILISASI


1 Pembersihan lahan 1.00 ls
2 Bow Plank dan Pengukuran 22.00 m
3 Armco dia.2,5 m 1,172.12 kg

II. PEKERJAAN TANAH


1 Galian tanah biasa sedalam ( 2 - 3 ) m 68.40 m3
2 Cerucuk dia.(12-15) cm panjang 4 m 54.00 btg
3 Urugan tanah pilihan dipadatkan 55.83 m3

III. PEKERJAAN BETON 1:3:5


1 Pasir urug tebal 10 cm 1.31 m3
2 Cor lantai kerja beton 1:3:5 tebal = 7 cm tidak bertulang 0.16 m3

IV. PEKERJAAN BETON1:2:3


1 Cor beton bertulang 1:2:3 5.70 m3
2 Penulangan 1,225.82 kg
3 Armco dia.2,5 m, t = 3.5 mm ( Type Multy Plate ) 4.00 m

V. PEKERJAAN LAIN-LAIN
1 Plesteran 1:2 di aci/di haluskan 52.37 m2
2 Pengecatan menggunakan cat minyak ex Avia Paint 52.37 m2

VI. PEKERJAAN FINISHING


1 Pembersihan lokasi 1.00 ls

Terbilang :
#NAME?

Note :
Armco
R2M

HARGA SATUAN SUB TOTAL


RP HARGA (RP.)

500,000.00 500,000.00 18,150.00


76,850.00 1,690,700.00 75,790.00
5,000.00 5,860,600.00

85,000.00 5,814,000.00 84,892.50


250,000.00 13,500,000.00 247,400.42
265,000.00 14,795,911.79 262,350.00

200,000.00 262,000.00 229,350.00


1,250,000.00 193,750.00 1,212,887.50

5,750,000.00 32,783,651.40 1,501,912.50 358,138.00 396,000.00 5,658,361.50


20,200.00 24,761,634.44 20,198.75
6,886,205.00 27,544,820.00

91,200.00 4,775,692.19 62,496.50 28,696.25 91,192.75


43,500.00 2,277,879.50 42,638.75

1,500,000.00 1,500,000.00 215.79


266.39
Jumlah 136,260,639.31 293.03 26.64
PPN 10% 13,626,063.93
Total Jumlah 149,886,703.25
Dibulatkan 149,886,000.00

3,153.80
BOX CULVERT ARMCO DIAMETER 2 M

HARGA SATUAN
No. URAIAN PEKERJAAN VOLUME SATUAN
RP

I. PEKERJAAN PERSIAPAN & MOBILISASI


1 Pembersihan lahan 1.00 ls 750,000.00
2 Bow Plank dan Pengukuran 20.00 m 76,850.00
3 Armco dia.2,0 m 937.68 kg 5,000.00

II. PEKERJAAN TANAH


1 Galian tanah biasa sedalam ( 2 - 3 ) m 52.80 m3 85,000.00
2 Cerucuk dia.(12-15) cm panjang 4 m 45.00 btg 250,000.00
3 Urugan tanah pilihan dipadatkan 40.23 m3 265,000.00

III. PEKERJAAN BETON 1:3:5


1 Pasir urug tebal 10 cm 1.48 m3 200,000.00
2 Cor lantai kerja beton 1:3:5 tebal = 7 cm tidak bertulang 0.14 m3 1,250,000.00

IV. PEKERJAAN BETON1:2:3


1 Cor beton bertulang 1:2:3 4.76 m3 5,750,000.00
2 Penulangan 1,024.12 kg 20,200.00
3 Armco dia.2 m, t = 3.5 mm ( Type Multy Plate ) 4.00 m 5,508,870.00

V. PEKERJAAN LAIN-LAIN
1 Plesteran 1:2 di aci/di haluskan 56.83 m2 91,200.00
2 Pengecatan menggunakan cat minyak ex Avia Paint 56.83 m2 43,500.00

VI. PEKERJAAN FINISHING


1 Pembersihan lokasi 1.00 ls 1,500,000.00

Jumlah
PPN 10%
Total Jumlah
Dibulatkan

Terbilang :
#NAME?
SUB TOTAL
HARGA (RP.)

750,000.00 18,150.00
1,537,000.00 75,790.00
4,688,400.00

4,488,000.00 84,892.50
11,250,000.00 247,400.42
10,661,911.79 262,350.00

296,000.00 229,350.00
175,000.00 1,212,887.50

27,389,336.90 1,501,912.50 358,138.00 396,000.00 5,658,361.50


20,687,285.24 20,198.75
22,035,480.00

5,183,227.00 62,496.50 28,696.25 91,192.75


2,472,262.88 42,638.75

1,500,000.00

113,113,903.80 172.63
11,311,390.38 213.11
124,425,294.18 234.42
124,425,000.00
BOX CULVERT ARMCO DIAMETER 1,5 M

No. URAIAN PEKERJAAN VOLUME SATUAN

I. PEKERJAAN PERSIAPAN & MOBILISASI


1 Pembersihan lahan 1.00 ls
2 Bow Plank dan Pengukuran 19.00 m
3 Armco dia.1,5 m 548.00 kg

II. PEKERJAAN TANAH


1 Galian tanah biasa sedalam ( 2 - 3 ) m 39.20 m3
2 Cerucuk dia.(12-15) cm panjang 4 m 45.00 btg
3 Urugan tanah pilihan dipadatkan 32.13 m3

III. PEKERJAAN BETON 1:3:5


1 Pasir urug tebal 10 cm 1.15 m3
2 Cor lantai kerja beton 1:3:5 tebal = 7 cm tidak bertulang 0.13 m3

IV. PEKERJAAN BETON1:2:3


1 Cor beton bertulang 1:2:3 3.87 m3
2 Penulangan 831.65 kg
3 Armco dia.1.5 m, t = 3.0 mm 4.00 m

V. PEKERJAAN LAIN-LAIN
1 Plesteran 1:2 di aci/di haluskan 39.43 m2
2 Pengecatan menggunakan cat minyak ex Avia Paint 39.43 m2

VI. PEKERJAAN FINISHING


1 Pembersihan lokasi 1.00 ls

Terbilang :
#NAME?
1,5 M

HARGA SATUAN SUB TOTAL


RP HARGA (RP.)

750,000.00 750,000.00 18,150.00


76,850.00 1,460,150.00 75,790.00
5,000.00 2,740,000.00

85,000.00 3,332,000.00 84,892.50


250,000.00 11,250,000.00 247,400.42
265,000.00 8,514,825.38 262,350.00

200,000.00 230,000.00 229,350.00


1,250,000.00 156,250.00 1,212,887.50

5,750,000.00 22,241,814.50 1,501,912.50 358,138.00 396,000.00 5,658,361.50


20,200.00 16,799,339.20 20,198.75
3,219,500.00 12,878,000.00

91,200.00 3,596,145.19 62,496.50 28,696.25 91,192.75


43,500.00 1,715,266.62 42,638.75

1,500,000.00 1,500,000.00

Jumlah 87,163,790.89
PPN 10% 8,716,379.09 110.98
Total Jumlah 95,880,169.98 1.234492694
Dibulatkan 95,880,000.00 137.00
BOX CULVERT ARMCO DIAMETER 1,0 M

No. URAIAN PEKERJAAN VOLUME SATUAN

I. PEKERJAAN PERSIAPAN & MOBILISASI


1 Pembersihan lahan 1.00 ls
2 Bow Plank dan Pengukuran 18.00 m
3 Pasang Armco dia.1,0 m 300.00 kg

II. PEKERJAAN TANAH


1 Galian tanah biasa sedalam ( 2 - 3 ) m 27.60 m3
2 Cerucuk dia.(12-15) cm panjang 4 m 27.00 btg
3 Urugan tanah pilihan dipadatkan 20.53 m3

III. PEKERJAAN BETON 1:3:5


1 Pasir urug tebal 10 cm 0.82 m3
2 Cor lantai kerja beton 1:3:5 tebal = 7 cm tidak bertulang 0.11 m3

IV. PEKERJAAN BETON1:2:3


1 Cor beton bertulang 1:2:3 3.02 m3
3 Armco dia.1 m, t = 2.5 mm 4.00 m

V. PEKERJAAN LAIN-LAIN
1 Plesteran 1:2 di aci/di haluskan 26.86 m2
2 Pengecatan menggunakan cat minyak ex Avia Paint 26.86 m2

VI. PEKERJAAN FINISHING


1 Pembersihan lokasi 1.00 ls

Terbilang :
#NAME?
1,0 M

HARGA SATUAN SUB TOTAL


RP HARGA (RP.)

750,000.00 750,000.00 18,150.00


76,850.00 1,383,300.00 75,790.00
5,000.00 1,500,000.00

85,000.00 2,346,000.00 84,892.50


30,000.00 810,000.00 247,400.42
40,000.00 821,256.66 262,350.00

245,000.00 200,900.00 229,350.00


650,000.00 71,500.00 1,212,887.50

5,000,000.00 15,079,203.67 1,501,912.50 358,138.00 396,000.00 5,658,361.50


1,762,500.00 7,050,000.00

91,200.00 2,449,486.75 62,496.50 28,696.25 91,192.75


43,500.00 1,168,340.72 42,638.75

500,000.00 500,000.00

Jumlah 34,129,987.80
PPN 10% 3,412,998.78 61.65
Total Jumlah 37,542,986.58 76.11
Dibulatkan 37,542,000.00
12,201,150.00
BOX CULVERT ARMCO DIAMETER 0,8 M

No. URAIAN PEKERJAAN VOLUME SATUAN

I. PEKERJAAN PERSIAPAN & MOBILISASI


1 Pembersihan lahan 1.00 ls
2 Bow Plank dan Pengukuran 18.00 m
3 Pasang Armco dia.0,8 m 196.00 kg

II. PEKERJAAN TANAH


1 Galian tanah biasa sedalam ( 2 - 3 ) m 18.00 m3
2 Cerucuk dia.(12-15) cm panjang 4 m 18.00 btg
3 Urugan tanah pilihan dipadatkan 10.93 m3

III. PEKERJAAN BETON 1:3:5


1 Pasir urug tebal 10 cm 0.39 m3
2 Cor lantai kerja beton 1:3:5 tebal = 7 cm tidak bertulang 0.10 m3

IV. PEKERJAAN BETON1:2:3


1 Cor beton bertulang 1:2:3 2.21 m3
3 Armco dia.0.8 m, t = 2.0 mm 4.00 m

V. PEKERJAAN LAIN-LAIN
1 Plesteran 1:2 di aci/di haluskan 19.21 m2
2 Pengecatan menggunakan cat minyak ex Avia Paint 19.21 m2

VI. PEKERJAAN FINISHING


1 Pembersihan lokasi 1.00 ls

Terbilang :
#NAME?
0,8 M

HARGA SATUAN SUB TOTAL


RP HARGA (RP.)

750,000.00 750,000.00 18,150.00


76,850.00 1,383,300.00 75,790.00
5,000.00 980,000.00

85,000.00 1,530,000.00 84,892.50


30,000.00 540,000.00 247,400.42
40,000.00 437,256.66 262,350.00

245,000.00 95,550.00 229,350.00


650,000.00 61,750.00 1,212,887.50

5,000,000.00 11,032,300.92 1,501,912.50 358,138.00 396,000.00 5,658,361.50


1,151,500.00 4,606,000.00

91,200.00 1,752,371.69 62,496.50 28,696.25 91,192.75


43,500.00 835,835.18 42,638.75

500,000.00 500,000.00

Jumlah 24,504,364.45
PPN 10% 2,450,436.44
Total Jumlah 26,954,800.89
Dibulatkan 26,954,000.00
REKAPITULASI
PEKERJAAN GORONG-GORONG ARMCO

No. URAIAN PEKERJAAN VOLUME SATUAN

I. PEKERJAAN GORONG-GORONG DIA. 2,5 M 1.00 UNIT

II. PEKERJAAN GORONG-GORONG DIA. 2,0 M 1.00 UNIT

III. PEKERJAAN GORONG-GORONG DIA. 1,5 M 1.00 UNIT

IV. PEKERJAAN GORONG-GORONG DIA. 1,0 M 1.00 UNIT

V. PEKERJAAN GORONG-GORONG DIA. 0,8 M 1.00 UNIT

Note :
Volume berat Armco 3,153.80 kg
CO

HARGA SATUAN SUB TOTAL


PER M' (RP.) HARGA (RP.)

37,471,500.00 37,471,500.00

31,106,250.00 31,106,250.00

23,970,000.00 23,970,000.00

9,385,500.00 9,385,500.00

6,738,500.00 6,738,500.00