PROJECT CALC.

NO
JOB NO REV NO
CLIENT BY DATE
LOCATION CHECK DATE
SUBJECT APPR. DATE

DESIGN DATA REFER STAAD OUTPUT FOR REACTIONS CORRESPONDING TO NODE NO. 180

Pedestal Information

Pedestal Height Pedestal_Ht = 9.417 ft


Dead weight D = 108.500 kip
Along Z: Shear Force (dead load) Hdz = 2.940 kip
Along X: Shear Force (dead load) Hdx = 0.870 kip
About Z: Overturning Moment (dead load) Mdz = 5.350 ft-kip
About X: Overturning Moment (dead load) Mdx = 0.660 ft-kip

Fluid load Lp = 15.28 kip


Along Z: Shear Force (fluid load) Hpz = 0.04 kip
Along X: Shear Force (fluid load) Hpx = 0.20 kip
About Z: Overturning Moment (fluid load) Mpz = 1.26 ft-kip
About X : Overturning Moment (fluid load) Mpx = 0.08 ft-kip

Wind Load at Top of Pedestal

Vertical load due to wind along X Vw_x = 6.64 kip


About Z: Overturning Moment (wind load) Mwz = 65.97 ft-kip
Along X: Shear Force (wind load) Hwx = 5.79 kip

Seismic Load at Top of Pedestal

Vertical load due to seismic along X (empty) Ve_x = 22.34 kip


Empty: Overturning Moment about Z due to seismic along X Meze_x = 219.50 ft-kip
Empty: Shear Force due to seismic along X Hexe_x = 19.25 kip

Vertical load due to seismic along Z (empty) Ve_z = 157.74 kip


Empty: Shear Force due to seismic along Z Heze_z = 53.74 kip
Empty: Overturning Moment about X due to seismic along Z Mexe_z = 9.13 ft-kip

Vertical load due to seismic along X (operating) Vo_x = 26.06 kip


Operating: Overturning Moment about Z due to seismic along X Mezo_x = 252.70 ft-kip
Operating: Shear Force due to seismic along X Hexo_x = 22.13 kip

Vertical load due to seismic along Z (operating) Vo_z = 182.37 kip


Operating: Shear Force due to seismic along Z Hezo_z = 61.71 kip
Operating: Overturning Moment about X due to seismic along Z Mexo_z = 10.48 ft-kip

Empty : Vertical component of Seismic force Eve = 17.71 kip


Empty :Horizontal Component of vertical Seismic force along Z Evez = 0.04 kip
Empty :Horizontal Component of vertical Seismic force along X Evex = 0.00 kip
Empty :Overturning Moment about Z due to vertical Seismic force Mevez = 0.01 ft-kip
Empty :Overturning Moment about X due to vertical Seismic force Mevex = 0.03 ft-kip

Operating : Vertical component of Seismic force Evo = 20.29 kip


Operating :Horizontal Component of vertical Seismic force along Z Evoz = 0.05 kip
Operating :Horizontal Component of vertical Seismic force along X Evox = 0.00 kip
Operating :Overturning Moment about Z due to vertical Seismic force Mevoz = 0.01 ft-kip
Operating :Overturning moment about X due to vertical Seismic force Mevox = 0.03 ft-kip

Along Z : Friction load FFz = 11.64 kip


Friction load : Vertical Component FFy = 35.40 kip
Overturning moment about X due to friction Mfx = 2.00 kip

Unrestricted
PROJECT CALC. NO
JOB NO REV NO
CLIENT BY DATE
LOCATION CHECK DATE
SUBJECT APPR. DATE

Ground water depth dw = 10.00 ft

Unit Weight of Material

Unit weight of Concrete gc = 0.150 kcf


Unit weight of Soil gs = 0.121 kcf
Unit weight of Water gw = 0.062 kcf

Allowable net soil bearing capacity SOIL_CAP = 5.00 ksf


Allowable gross soil bearing capacity = 6.03 ksf

Material strength :

Compressive strength of concrete f'c = 4 ksi


Reinforcement yield strength fy = 60 ksi

FOUNDATION

Size of Foundation (ft)


L1 = 9.50 h2 = h3 + h6 = 9.417
df = h1 + h6 = 8.500
L2 = 3.50 hf = h1+ h2 + grout = 11.000
Z P
Y M
Grout = 0.083
H h3 = 2.417

h2 h6 = 7.000
hf df
B2= 3.50

B1= 9.50

d
X X h1 = 1.500
w

Foundation Weight ; Wc

Area of footing Af = L1*B1 90.25 ft2

Pedestal Wp = L2*B2 * h2 * gc 17.30 kip


Footing Wft = L1*B1 * h1 * gc 20.31 kip
Soil on footing Ws = (L1*B1 - L2*B2 ) * h6 * gs 66.07 kip
Buoyant force Vf = [df>dw]: Af * (df - dw)* gw / [df<dw]: 0.0 0.00 kip

Net Foundation weight Wc = Wp + Wft + Ws - Vf 103.68 kip


(con.vol.= 250.73 m3)
LATERAL FORCE AND OVERTURNING MOMENT

Due to Vertical force, Wind Load, Seismic Load and frictional force

Lateral force (kip) Overturning moment (ft-kip)


Hdx 0.87 Mdz' = Mdz+Hdx*hf 14.92
Hdz 2.94 Mdx' = Mdx+Hdz*hf 33.00
Hpx 0.20 Mpz' = Mpz+Hpx*hf 3.46
Hpz 0.04 Mpx' = Mpx+Hpz*hf 0.52
Hwx 5.79 Mwz' = Mwz+Hwx*hf 129.66
Hexe_x=Exe 19.25 Meze=Meze_x+Hexe_x*hf 431.25
Heze_z=Eze 53.74 Mexe=Mexe_z+Heze_z*hf 600.27
Hexo_x=Exo 22.13 Mezo=Mezo_x+Hexo_x*hf 496.13
Hezo_z=Ezo 61.71 Mexo=Mexo_z+Hezo_z*hf 689.29
Evex 0.00 Mvez = Mevez+Evex*hf 0.01
Evez 0.04 Mvex = Mevex+Evez*hf 0.47
Evox 0.00 Mvoz = Mevoz+Evox*hf 0.01
Evoz 0.05 Mvox = Mevox+Evoz*hf 0.58
FFz 11.64 Mf'x = Mfx + FFz*hf 130.04

Unrestricted
PROJECT CALC. NO
JOB NO REV NO
CLIENT BY DATE
LOCATION CHECK DATE
SUBJECT APPR. DATE

CHECK ON SOIL BEARING CAPACITY

Vertical load & Overturning moment

Vert. load Overturning moment, (Mo)


Loading Condition
(kip) (ft-kip)
Dead load, D (lateral force along X) + Wc 212.18 14.92
Dead load, D (lateral force along Z) + Wc 212.18 33.00
Fluid load, Lp (lateral force along X) 15.28 3.46
Fluid load, Lp (lateral force along Z) 15.28 0.52
Wind ,Wx 6.64 129.66
Horz. Seismic along X (Empty), Exe 22.34 431.25
Horz. Seismic along X (Operating), Exo 26.06 496.13
Horz. Seismic along Z (Empty), Eze 157.74 600.27
Horz. Seismic along Z (Operating), Ezo 182.37 689.29
Horz.comp.along X due to Vertical seismic (empty) 17.71 0.01
Horz.comp.along Z due to Vertical seismic (empty) 17.71 0.47
Horz.comp.along X due to Vertical seismic (operating) 20.29 0.01
Horz.comp.along Z due to Vertical seismic (operating) 20.29 0.58
Friction load, FF 35.40 130.04

Moment of inertia of footing, Iz = B1xL13 /12 = 678.76 ft4 Ix = L1*B13 /12 = 678.76 ft4
Section modulus of footing, Zz = B1*L12/6 = 142.90 ft3 Zx = L1*B12 /6 = 142.90 ft3
Area of Footing, Af = 90.25 ft2

Calculation of Soil pressure, Q = (W+Wc)/Af + Mo/Z

Compression side Tension side


Loading Condition
Qi ksf Qi' ksf
Dead load, D (lateral force along X) 2.46 2.25
Dead load, D (lateral force along Z) 2.58 2.12
Fluid load, Lp (lateral force along X) 0.19 0.15
Fluid load, Lp (lateral force along Z) 0.17 0.17
Wind , Wx 0.98 -0.83
Seismic along X (Empty), Exe 3.27 -2.77 Refer Note :1
Seismic along X (Operating), Exo 3.76 -3.18 Refer Note :1
Seismic along Z (Empty), Eze 5.95 -2.45 Refer Note :1
Seismic along Z (Operating), Ezo 6.84 -2.80 Refer Note :1
Horz.comp.along X due to Vertical seismic (empty) 0.20 0.20
Horz.comp.along Z due to Vertical seismic (empty) 0.20 0.19
Horz.comp.along X due to Vertical seismic (operating) 0.22 0.22
Horz.comp.along Z due to Vertical seismic (operating) 0.23 0.22
Friction load, FF 0.91 -0.52

Note :1 - These values are at strength level, and are divided by 1.4 to bring down to service level during load combination.

Maximum / Minimum Soil pressures due to critical loading conditions (ksf) :

In case eccentricity e <= L1 / 6 or B1 / 6 : P / A x ( 1 + 6 x e / L1 or 6 x e / B1)


where, multiplier 'm' = ( 1 + 6 x e / L1 or 6 x e / B1)

In case eccentricity e > L1 / 6 or B1 / 6: Maximum Pressure = 2 x P / ( 3 x L1 or B1 x (L1 / 2 or B1 / 2 - e)


where, multiplier, 'm' = ( 4 / (3 x (1 - 2 x e / L1 or 2 x e / B1)))

Load m
Combination Description P (kip) M (ft-kip) e = M/P (ft)
Comb No along X-axis along Z-axis
101 D + Lp 227.46 33.52 0.15 1.09
103 D + Wx 218.82 144.58 0.66 1.42
107 D + 0.72Exe 228.26 325.42 1.43 1.90
109 D + 0.72Eze 325.75 465.19 1.43 1.90
111 D + 0.75 Lp +0.75 Wx 228.62 114.76 0.50 1.32
115 D + 0.75 Lp + 0.54 Exo 237.71 285.43 1.20 1.76
117 D + 0.75 Lp + 0.54 Ezo 322.12 405.61 1.26 1.80
119 0.9D + 0.72Exe 207.04 323.93 1.56 1.99
121 0.9D + 0.72Eze 304.53 461.89 1.52 1.96
123 D + Lp + FF 262.86 148.42 0.56 1.36

Unrestricted
PROJECT CALC. NO
JOB NO REV NO
CLIENT BY DATE
LOCATION CHECK DATE
SUBJECT APPR. DATE

Soil Bearing Pressure calculation for different loading conditions:(for foundation sizing)
(ksf)
Load Comb Max. Compression Min. Compression Allowable Remarks
Combination Description
No. Soil Pressure
101 D + Lp 2.755 2.29 6.03 Pass
103 D + Wx 3.436 1.41 7.68 Pass
107 D + 0.72Exe 4.807 0.25 7.68 Pass
109 D + 0.72Eze 6.865 0.35 7.68 Pass
111 D + 0.75 Lp +0.75 Wx 3.336 1.73 7.68 Pass
115 D + 0.75 Lp + 0.54 Exo 4.631 0.64 7.68 Pass
117 D + 0.75 Lp + 0.54 Ezo 6.408 0.73 7.68 Pass
119 0.9D + 0.72Exe 4.561 0.03 7.68 Pass
121 0.9D + 0.72Eze 6.607 0.14 7.68 Pass
123 D + Lp + FF 3.951 1.87 7.68 Pass

CHECK ON STABILITY
Overturning

Resisting moment, Mr about Z axis Overturning moment, Mo


Loading W+Wc Mr Mo
Lever arm (ft) Loading condition
condition (kip) (ft-kip) (ft-kip)
D 212.18 4.75 1007.83 Hdx 14.92
Lp 15.28 4.75 72.58 Hdz 33.00
Hpx 3.46
Resisting moment, Mr about X axis Hpz 0.52
Wx 129.66
Loading W+Wc Mr Exe 431.25 Refer Note :1 above
Lever arm (ft)
condition (kip) (ft-kip) Exo 496.13 Refer Note :1 above
D 212.18 4.75 1007.83 Eze 600.27
Lp 15.28 4.75 72.58 Ezo 689.29
FF 130.04
Factor of safety, Fs = Mr / Mo
Load Comb Allowable
Design Conditions FS Remarks
No. Fs

103 D + Wx 6.97 1.5 Pass


111 D + 0.75Lp+ 0.75Wx 9.26 1.5 Pass
115 D + 0.75Lp+ 0.54Exo 3.72 1.5 Pass
117 D + 0.75Lp+ 0.54Ezo 3.11 1.5 Pass
119 0.9D + 0.72Exe 2.80 1.0 Pass
121 0.9D + 0.72Eze 1.96 1.0 Pass
123 D + Lp + FF 7.28 1.5 Pass
Sliding
(W + Wc) * m where : W Equipment weight (kip)
Factor of safety, S r = Wc Foundation weight (kip)
H H Imposed lateral force (kip)
m Concrete to soil friction factor = 0.40

Load Comb W+Wc (W+Wc)*m H Allowable


Design Conditions Sr Remarks
No. (kip) (kip) (kip) Sr

103 D + Wx 218.82 87.53 6.66 13.14 1.50 Pass


107 D + 0.72Exe 228.26 91.30 14.73 6.20 1.00 Pass
109 D + 0.72Eze 325.75 130.30 41.63 3.13 1.00 Pass
111 D + 0.75Lp+ 0.75Wx 228.62 91.45 5.36 17.05 1.50 Pass
115 D + 0.75Lp+ 0.54Exo 237.71 95.08 12.97 7.33 1.00 Pass
117 D + 0.75Lp+ 0.54Ezo 322.12 128.85 36.29 3.55 1.00 Pass
123 D + Lp + FF 262.86 105.14 12.71 8.27 1.50 Pass

Buoyancy
Min vertical load amongst all the design cases = 212.18 kip
Buoyant force = 0.00 kip
Factor of safety against buoyancy = N/A

Unrestricted
PROJECT CALC. NO
JOB NO REV NO
CLIENT BY DATE
LOCATION CHECK DATE
SUBJECT APPR. DATE

MEMBER DESIGN

Material strength:
f'c 4 ksi fy 60 ksi
Footing

D1 : Width of rectangular footing = 9.500 ft


L1 : Length of rectangular footing 9.500 ft
D2 : Width of rectangular pedestal = 3.500 ft
L2 : Length of rectangular pedestal 3.500 ft
Section forces due to footing weight, soil, and buoyant force:
Calculation of moment at critical section i.e. at the face of pedestal / ft width of footing unit '@X-Axis @Z - Axis

a2x : Footing edge to face of pedestal = ft 3.00 3


(if < 0 then a1 = 0 )
Mft : Bending moment due to the self weight of footing
= gc * h1 * 1.0 * a22 / 2 ft-kip 1.01 1.01
Ms : Bending moment due to weight of soil
= gs * h6 * 1.0 * a22 / 2 ft-kip 3.81 3.81
Mbf : Bending moment due to buoyant force (0 if dw > df)
= gw * (df - dw) * 1.0 * a22 / 2 ft-kip 0.00 0

Mn = Mft + Ms - Mbf ft-kip 4.82 4.82

Calculation of shear at critical section i.e. at a distance of effective depth from the face of pedestal
Cover to bottom reinforcement ( Cc ) : = 3.0 in
Cover to top reinforcement (Ct ) : = 3.0 in
Effective depth for bottom reinforcement ( d ) : = 14.1 in
Effective depth for top reinforcement ( d' ) : = 14.3 in
unit '@X-Axis @Z - Axis
Distance of footing edge from the d distance of the pedestal edge ( a1) in 21.9 21.94
Area of the footing at a distance d from the edge of pedestal ( A l ) ft2 1.83 1.83
( A l = 1.0 * a1 )
Vf : Shear force due to the self weight of footing
= gc * h1 * A l kip 0.41 0.41
Vs : Shear force due to the weight of soil
= gs * h6 * A l kip 1.55 1.55
Vbf : Shear force due to buoyant force (0 if dw > df)
= gw * (df - dw) * A l kip 0.00 0.00

Vn = Vf + Vs - Vbf kip 1.96 1.96

Section forces due to soil pressure


critical plane for punching shear (Typ)
Critical plane for
Iz = 678.76 ft4 d/2 direct shear. d/2
Ix = 678.76 ft4 (Typ)
Zz = 142.90 ft3 d a1 d a1
Zx = 142.90 ft3
Af = 90.25 ft2 a2 a2

top bar

B1 q4 q3 q2 q2' q3 q1
q1 q2 q2'
q2"
L2 q2"
L1 x
L1
Figure -1 Figure -2
(Applicable for Full Base contact load case) (Applicable for Partial Base contact
load case)

Unrestricted
PROJECT CALC. NO
JOB NO REV NO
CLIENT BY DATE
LOCATION CHECK DATE
SUBJECT APPR. DATE

Calculation of Soil pressure, Q = (W+Wc)/Af + Mo/Z


for primary load

Compression side Tension side


Loading Condition
Qi ksf Qi' ksf
Dead load, D (lateral force along X) 2.46 2.25
Dead load, D (lateral force along Z) 2.58 2.12
Fluid load, Lp (lateral force along X) 0.19 0.15
Fluid load, Lp (lateral force along Z) 0.17 0.17
Wind along X, Wx 0.98 -0.83
Horizontal Seismic (Empty), Exe 3.27 -2.77
Horizontal Seismic (Operating), Exo 3.76 -3.18
Horizontal Seismic (Empty), Eze 5.95 -2.45
Horizontal Seismic (Operating), Ezo 6.84 -2.80
Vertical Seismic (Empty), Evex 0.20 0.20
Vertical Seismic (Empty), Evez 0.20 0.19
Vertical Seismic (Operating), Evox 0.22 0.22
Vertical Seismic (Operating), Evoz 0.23 0.22
Friction load, FF 0.91 -0.52

Load factors ' lf '


Load Seismic Seismic Seismic
Seismic Empty
Comb. Design Conditions Empty Live Wind-X Wind-Z Empty Operating Operating
X
No. Z X Z
D Lp Wx Wz Exe Eze Exo Ezo
201 0.9D + 1.6Wx 0.90 1.60
205 0.9D + 1.0Exe-1.0Eve 0.90 1.00
207 0.9D + 1.0Eze-1.0Eve 0.90 1.00
209 1.4D 1.40
210 1.2D +1.6Lp 1.20 1.60
213 1.2D + 1.0Lp + 1.6Wx 1.20 1.00 1.60
221 1.2D + 1.0Lp+ 1.0Exo+1.0Evo 1.20 1.00 1.00
223 1.2D + 1.0Lp+ 1.0Ezo+1.0Evo 1.20 1.00 1.00
242 1.2D + 1.6Lp + 1.6FF 1.20 1.6

Load factors ' lf '


Load
Comb. Design Conditions Vert. Seismic
Friction load Vert. Seismic Empty
No. Operating
FF Eve Evo
201 0.9D + 1.6Wx
205 0.9D + 1.0Exe-1.0Eve -1
207 0.9D + 1.0Eze-1.0Eve -1
209 1.4D
210 1.2D +1.6Lp
213 1.2D + 1.0Lp + 1.6Wx
221 1.2D + 1.0Lp+ 1.0Exo+1.0Evo 1
223 1.2D + 1.0Lp+ 1.0Ezo+1.0Evo 1
242 1.2D + 1.6Lp + 1.6FF 1.6

E = Eh + Ev , where Ev is acting vertically downward when load factor for Dead load is > 1.0
E = Eh - Ev , where Ev is acting vertically upward when load factor for Dead load is < 1.0
where, Eh = Horizontal component of earthquake load

Maximum / Minimum Soil pressures due to critical loading conditions (ksf) :

In case eccentricity e <= L1 / 6 : P/A+ M/ Z

In case eccentricity e > L1 / 6: 2 x P / [ 3 x L1 x ( L1 / 2 - e )]

L.C. # Design conditions Mu Pu


201 0.9D + 1.6Wx 220.88 201.58
205 0.9D + 1.0Exe-1.0Eve 444.67 214.57
207 0.9D + 1.0Eze-1.0Eve 629.50 330.99
209 1.4D 46.20 297.05
210 1.2D +1.6Lp 40.43 279.06
213 1.2D + 1.0Lp + 1.6Wx 228.82 280.51
221 1.2D + 1.0Lp+ 1.0Exo+1.0Evo 517.50 316.24
223 1.2D + 1.0Lp+ 1.0Ezo+1.0Evo 729.99 472.55
242 1.2D + 1.6Lp + 1.6FF 231.50 311.25

Unrestricted
PROJECT CALC. NO
JOB NO REV NO
CLIENT BY DATE
LOCATION CHECK DATE
SUBJECT APPR. DATE

Factored soil bearing pressure (ksf)


Load Length of
Comb. Design conditions Contact
No. e = Mu/Pu q1 q2 q3 q4 q2' q2" x (Ft)
201 0.9D + 1.6Wx 1.10 3.78 2.80 1.66 0.69 3.18 2.99 Full Contact
205 0.9D + 1.0Exe-1.0Eve 2.07 5.13 3.21 0.98 0.00 3.96 3.59 8.03
207 0.9D + 1.0Eze-1.0Eve 1.90 8.16 5.29 1.95 0.00 6.41 5.85 8.54
209 1.4D 0.16 3.61 3.41 3.17 2.97 3.49 3.45 Full Contact
210 1.2D +1.6Lp 0.14 3.38 3.20 2.99 2.81 3.27 3.23 Full Contact
213 1.2D + 1.0Lp + 1.6Wx 0.82 4.71 3.70 2.52 1.51 4.09 3.90 Full Contact
221 1.2D + 1.0Lp+ 1.0Exo+1.0Evo 1.64 7.13 4.84 2.17 0.00 5.73 5.29 9.34
223 1.2D + 1.0Lp+ 1.0Ezo+1.0Evo 1.54 10.34 7.12 3.35 0.13 8.38 7.75 Full Contact
242 1.2D + 1.6Lp + 1.6FF 0.74 4.71 3.89 2.92 2.10 4.21 4.05 Full Contact

Design Forces

Moment : M = 1.0 * [q2 * a2 2 / 2 + (q1 - q2) * a2 2 / 3]

Shear : V = ( q1 + q2' ) * a1 / 2

Load Comb. Moment due to soil pressure Shear due to Design Moment 'Mu'* (ft- Design Shear
Design conditions
No. 'M' (ft-kip) soil pr. 'V' (kip) kip) 'Vu'* (kip)
/ ft width / ft width / ft width / ft width
201 0.9D + 1.6Wx 15.54 6.37 11.20 4.60
205 0.9D + 1.0Exe-1.0Eve 20.20 8.31 15.85 6.54
207 0.9D + 1.0Eze-1.0Eve 32.40 13.32 28.06 11.55
209 1.4D 15.96 6.50 9.21 3.75
210 1.2D +1.6Lp 14.92 6.07 9.13 3.72
213 1.2D + 1.0Lp + 1.6Wx 19.68 8.05 13.89 5.70
221 1.2D + 1.0Lp+ 1.0Exo+1.0Evo 28.64 11.76 22.85 9.41
223 1.2D + 1.0Lp+ 1.0Ezo+1.0Evo 41.71 17.12 35.92 14.77
242 1.2D + 1.6Lp + 1.6FF 19.97 8.16 14.18 5.80
* Design moment , Mu = M - lf*Mn (ft-kip / ft width)
* Design shear, Vu = V - lf*Vn (kip / ft width)

Design for Flexure:

Compressive strength of concrete f'c = 4.0 ksi


Reinforcement steel grade RBG = Grade60
Reinforcement yield strength fy = 60.0 ksi
Modulus of elasticity of reinforcing steel Es = 29000.0 ksi

factor used to calculate the equivalent rectangular stress block b1 = 0.85 (ACI 318, 10.2.2.3)
Strength reduction factor in flexure (ACI R-9.3.2.1) f,flexure = 0.90
Balanced steel ratio, rb = 0.85 * b1 * (f'c/fy) * [ 87ksi / ( 87ksi + fy ) ] = 0.0285
Actual steel ratio must be less than 0.75 * rb , rmax = 0.75 * rb = 0.0214 (ACI 318, R10.3.5)
Maximum design moment / ft width of footing , Mu = 35.92 ft-kip
Footing width b = 12.0 in

rreq = 0.85 * f'c 2 * Mu = 0.0035


1 - 1-
fy f * 0.85 * f'c * b * d2

Asreq = rreq * b * d = 0.586 in2

Nominal shrinkage & temperature reinforcement (for both faces) Asmin = 0.0018 * b * D = 0.194 in2 in each face
(ACI 318, 7.12)
Asreq = 0.586 in2
Maximum spacing of rebars = 3 times thickness of foundation or 18 inches, whichever is lower.
Maximum spacing of rebars = 18.00 in
Consider 16mm-6in c/c
Asprovided = 0.623 in2 > Asreq Pass
rprovided , rw = Asprov./bd= 0.0037

The nominal flexural strength of the member provided, f * Mn = f * rw * fy * b * d2 * ( 1- ( 0.59 * r * fy) / f'c )
= 38.13 ft-kip > Mu Pass
Bottom reinforcement: Provide 16mm-6in c/c (b)

Unrestricted
PROJECT CALC. NO
JOB NO REV NO
CLIENT BY DATE
LOCATION CHECK DATE
SUBJECT APPR. DATE

Checking of requirement of top bar in footing :

Loss of Moment due to overburden


Load Comb. Contact length
Design conditions Status of Soil & Footing Base contact contact pressure
No. (ft)
(ft) Mu (ft-kip /ft)

L= (L1 - x)
(x) Mu = 1.4*(gs*h6+gc*h1)*L2/2
or (B1-x)
201 0.9D + 1.6Wx No loss of contact Full Contact N/A 0.00
205 0.9D + 1.0Exe-1.0Eve Loss of Contact 8.03 1.47 1.62
207 0.9D + 1.0Eze-1.0Eve Loss of Contact 8.54 0.96 0.69
209 1.4D No loss of contact Full Contact N/A 0.00
210 1.2D +1.6Lp No loss of contact Full Contact N/A 0.00
213 1.2D + 1.0Lp + 1.6Wx No loss of contact Full Contact N/A 0.00
221 1.2D + 1.0Lp+ 1.0Exo+1.0Evo Loss of Contact 9.34 0.16 0.02
223 1.2D + 1.0Lp+ 1.0Ezo+1.0Evo No loss of contact Full Contact N/A 0.00
242 1.2D + 1.6Lp + 1.6FF No loss of contact Full Contact N/A 0.00

Maximum hogging Moment (Mu) = 1.62 ft-kip / ft


Calculated Stress (scal) = 29.91 psi
(scal = 6*Mu/h12 )
Allowable Stress without Top reinforcement = 173.93 psi (Refer Section R22.7.4 of ACI 318)
(Ft = 5*f*√fc') where f = 0.55
Top reinforcement is not required.

rreq = 0.85 * f'c" 2 * Mu = 0.00


1 - 1-
fy f * 0.85 * f'c * b * d2
Asreq = rreq * b * d = 0.000

Nominal shrinkage & temperature reinforcement (for both faces) Asmin = 0.0018 * b * D = 0.194 in2 in each face
Asreq = 0.194 in2
Maximum spacing of rebars = 3 times thickness of foundation or 18 inches, whichever is lower.
Maximum spacing of rebars = 18.00 in
Top reinforcement: Provide 12mm-6in
Asprovided = 0.351 in2 Pass

Direct shear check:


(Refer to ACI 318, 11.1.1)
a) Concrete nominal shear strength , Vc = 2 * √(f 'c) * b * d . = 21.334 kip (ACI 318,11.3.1.1)
b) Vc = (1.9 * √(f'c) + 2500 * rw * (Vu * d / Mu)) * bw * d = 21.018 kip (ACI 318,11.3.2.1)

Strength reduction factor in shear (ACI R-9.3.2.3) f,shear = 0.75


Maximum design shear / ft width of footing Vu = 14.77 kip

Design shear strength f * Vc = 15.763 kip > Vu Pass

Punching Shear check :


(Refer to ACI 318, 11.12)
The critical plane for punching shear is at a distance of d/2 from the pedestal face.

The distance from the critical plane to the edge of the footing = 28.97 in
The area of the footing effective for producing punching force = 68.43 ft2
Ap = L1*B1 - (L2 + d) *(B2+d)
Actual punching force Vp = [(q2"+q1)/2 * Ap -k*gc * h1 * Ap - k*gs * h6 *Ap] =" = 531.00 kip
( k = dead load factor corresponding to the load combination)
Punching perimeter, bo = 2 * ( L2 + d + B2 + d) = 18.69 ft
(The above expression is considered when punching area is within the footing)
Allowable punching force f * Vc should be minimum of the following: (Refer to ACI 318, 11.12.2.1)

i) f*(2 + 4/b)* √f'c*bo*d Eq. No. (11-33) b = Ratio of long side to short side of pedestal = 1
ii) f* 4 * √f'c*bo*d Eq. No. (11-35)

Allowable punching force f * Vc = 597.94 kip from Eq. No. (11-35)


Pass

Unrestricted
PROJECT CALC. NO
JOB NO REV NO
CLIENT BY DATE
LOCATION CHECK DATE
SUBJECT APPR. DATE

Vu
Mu
Transfer of Moment at footing-pedestal interface (Refer to ACI 318, 11.12.6)

Fraction of moment transferred by flexure, gf =


[ gfx = 1 / (1+(2/3)*√(L2+d)/(B2+d))] 0.60
[ gfz = 1 / (1+(2/3)*√(B2+d)/(L2+d))] 0.60
Fraction of moment transferred by eccentricity of shear, gvx = 0.40
gvz = 0.40
Unbalanced moment transferred by flexure, ft-kip : gf * Mu
Unbalanced moment transferred by shear, ft-kip : gv * Mu d
Area of concrete section resisting shear transfer, ft2 : Ac
Distance of critical section from centroid, ft : cAB
Polar moment of inertia of punching area, Jc =
[ Jcx = d*(L2+d)3/6+(L2+d)*d3/6+d*(B2+d)*(L2+d)2/2 ] 80.84 ft4
[ Jcz = d*(B2+d)3/6+(B2+d)*d3/6+d*(L2+d)*(B2+d)2/2 ] 80.84
D A
Punching area, Ac = bo * d 21.89 ft2

Allowable shear stress, f * vn = f *Vc / bo * d = 27.32 ksf C B

D2
d/2 d/2
cAB

D2+d
Maximum shear stress at line AB, nAB = Vu / Ac + gv * Mu * cAB / Jc
nAB
Max. shear
Load Comb. stress
Loading Condition Mu (ft-kip) Vu (kip)
No. nAB (ksf)
201 0.9D + 1.6Wx 220.88 123.85 8.21
205 0.9D + 1.0Exe-1.0Eve 444.67 117.85 10.52
207 0.9D + 1.0Eze-1.0Eve 629.50 253.25 18.85
209 1.4D 46.20 176.12 8.58
210 1.2D +1.6Lp 40.43 175.41 8.48
213 1.2D + 1.0Lp + 1.6Wx 228.82 176.87 10.73
221 1.2D + 1.0Lp+ 1.0Exo+1.0Evo 517.50 212.59 15.69
223 1.2D + 1.0Lp+ 1.0Ezo+1.0Evo 729.99 368.90 25.29
242 1.2D + 1.6Lp + 1.6FF 231.50 232.05 13.28

Maximum shear stress is less than Allowable shear stress, Pass

Design of Pedestal

Acting forces

Moment at top of footing / bottom of pedestal:

Due to dead load (shear along along X dir.) Mdz" = Mdz+Hdx*h2 13.62
Due to dead load (shear along Z dir.) Mdx" = Mdx+Hdz*h2 28.59
Due to fluid load (shear along X dir.) Mpz" = Mpz+Hpx*h2 3.16
Due to fluid load (shear along Z dir.) Mpx" = Mpx+Hpz*h2 0.46
Due to wind load along X dir. Mwz" = Mwz + Hwx * h2 120.98
Due to seismic load along X (Empty) Meze" = Meze + Hexe * h2 402.38
Due to seismic load along Z (Empty) Mexe" = Mexe + Heze * h2 519.66
Due to seismic load along X (Operating) Mezo" = Mezo + Hexo * h2 462.94
Due to seismic load along Z (Operating) Mexo" = Mexo + Hezo * h2 596.73
Horz.Comp.of vertical seismic load (Empty) along X Mvez"= Mevez+Evex*h2 0.01
Horz.comp.of vertical seismic load (Empty) along Z Mvex"= Mevex+Evez*h2 0.41
Horz.comp.of vertical seismic load (Empty) along X Mvoz"= Mevoz+Evox*h2 0.01
Horz.comp.of vertical seismic load (Empty) along Z Mvox"= Mevox+Evoz*h2 0.51
Due to friction load Mf"= Mfx + FFz*h2 112.58

Unrestricted
PROJECT CALC. NO
JOB NO REV NO
CLIENT BY DATE
LOCATION CHECK DATE
SUBJECT APPR. DATE

Vertical loads:
Self weight of pedestal Pp 17.30 kip
Empty wt. of equip. D 108.50 kip
Live Load Lp 15.28 kip

Critical loading under factored load:

Load Comb.
Loading Condition Axial load (kip) Moment (ft-kip)
No.
201 0.9D + 1.6Wx P = 0.9(Pp + D ) 123.85 M =0.9Md+1.6 Mw 205.81
205 0.9D + 1.0Exe-1.0Eve P = 0.9(Pp + D ) - 1.0Eve 117.85 M = 0.9Md+1.0 Ms 414.62
207 0.9D + 1.0Eze-1.0Eve P = 0.9(Pp + D ) - 1.0Eve 117.85 M =0.9Md+1.0 Ms 544.98
209 1.4D P = 1.4(Pp + D) 176.12 M = 1.4Md 19.06
210 1.2D +1.6Lp P = 1.2(Pp + D)+1.6L 175.41 M = 1.2Md+1.6Mp 21.39
213 1.2D + 1.0Lp + 1.6Wx P = 1.2(Pp + D)+1.0L 176.87 M =1.2Md+Mp+1.6 Mw 213.06
221 1.2D + 1.0Lp+ 1.0Exo+1.0Evo P = 1.2(Pp + D)+1.0L +1.0Evo 212.59 M =1.2Mp+1.0Mp+1.0 Ms 482.44
223 1.2D + 1.0Lp+ 1.0Ezo+1.0Evo P = 1.2(Pp + D)+1.0L +1.0Evo 212.59 M = 1.2Md+1.0Mp+1.0 Ms 630.99
242 1.2D + 1.6Lp + 1.6FF P = 1.2(Pp + D)+1.6Lp 232.05 M = 1.2Md+1.6Mp+1.6 * Mf" 201.52

Pedestal Dowel Bars


Shorter dimension of pedestal = 42.0 in
Clear cover for pedestal = 3 in
Pedestal dowel bar diameter = 20 mm
Total area of anchor bolts provided = 4.71 in2
In terms of steel grade fy = 60 ksi used for reinforcement, area equivalent for anchor bolt,
= 2.83 in2
Strength reduction factor (f,tf) = 0.90
The area of pedestal dowel bar required ( in2 ) is given by
4*(Mu *12/ dc - Wu/ 4) / (f,tf*fy)) = 12.36 in2
where, Mu = Factored moment on top of footing / bottom of pedestal = 630.99 kip-ft
dc = Pedestal dowel bar lever arm (minimum) = 34.43 in
Wu = Factored load on top of footing / bottom of pedestal =
fy = Yield strength of rebar (ksi) = 60 ksi

Load Comb.
Loading Condition Mu (ft-kip) Wu (kip) As reqd. (in2) Remarks
No.
201 0.9D + 1.6Wx 205.81 123.85 3.02 Tension
205 0.9D + 1.0Exe-1.0Eve 414.62 117.85 8.52 Tension
207 0.9D + 1.0Eze-1.0Eve 544.98 117.85 11.89 Tension
209 1.4D 19.06 176.12 0.00 No Tension
210 1.2D +1.6Lp 21.39 175.41 0.00 No Tension
213 1.2D + 1.0Lp + 1.6Wx 213.06 176.87 2.23 Tension
221 1.2D + 1.0Lp+ 1.0Exo+1.0Evo 482.44 212.59 8.52 Tension
223 1.2D + 1.0Lp+ 1.0Ezo+1.0Evo 630.99 212.59 12.36 Tension
242 1.2D + 1.6Lp + 1.6FF 201.52 232.05 0.91 Tension

For design purpose, consider 50% of the pedestal gross area as effective area. (Refer to ACI 318, 10.8.4)
Thus, effective gross area considered, Ag' = 6.125 ft2
Hence, effective dimension of pedestal considered, h = 2.475 ft (square root of Ag')
For a given load condition with maximum moment (governing case),
Kn = Pn /fc' * Ag' = 0.060
Rn = Mn /fc' * Ag' * h = 0.072
g= 0.8
(Refer Design Handbook for ACI 318 (SP-17), L4-60.8)
rg = 0.01
Asreq = 8.82 in2
Minimum As required = 0.5% of the pedestal c/s area = 8.82 in2 (Refer to ACI 318, 15.8.2.1)

Comparing the rebar requirement from all the above,


Area of reinforcement to be provided Asreq = 12.36 in2
Spacing of reinforcement with 20 mm dia. dowel bars 5 in

Vertical reinforcement per face: Provide 20mm-8 nos. EF ( 28 total )


Total number of rebars provided in the square pedestal, = 28 (qty)
Area of reinforcement provided = 13.63 in2
Provide lateral tie 10 mm dia
Maximum spacing of tie provided: 10.0 in
(limited to least lateral dimension, 16 times vertical bar dia., 48 times lateral tie dia.)

Ties : Provide generally 10mm-10in c/c

Unrestricted