MAIN SUMMARY
MAIN SUMMARY
MAIN SUMMARY
12 Boundary Wall - -
13 Electrification - -
10/6 Pacca brick work other than building There is necessary reopair work
in:- Cement sand mortar ratio 1:3 % 12500 0.000 0.00 2.976 37201.25 2.976 37201.25 is required at Fall Structure at
Cf
the channel.
Total 44340.00 121531.06 77191.06
lean (1:4:8)
Fall @ RD 14+000
Fall @ RD 26+000
Fall @ RD 32+500
PCC (1:2:4)
Fall @ RD 14+000
lean (1:4:8)
Fall @ RD 5+500
Fall @ RD 10+500
Fall @ RD 15+000
Fall @ RD 26+579
PCC (1:2:4)
Fall @ RD 5+500
Fall @ RD 10+500
Fall @ RD 15+000
Fall @ RD 26+579
8 Foot Bridge - -
Taskeen Disty
Taskeen Disty
Excavation
lean (1:3:6)
PCC (1:2:4)
Total = 94 Cft
Ch. 6 .IT 3(b) P.41 @ Rs. 7,964.05 % Cft
3 (a) (i) Reinforced cement concrete in roof slab, beams, .
columns lintels, girders and other structural members laid in
situ or precast laid in position, or prestressed members cast
in situ, complete in all respects:-
(3) (c) Type C (nominal mix 1: 2: 4)
Total = 292 Cft
Ch. 6 .IT 6 a (i) P.42 @ Rs. 230.70 P Cft
4 Fabrication of mild steel reinforcement for cement concrete,
including cutting, bending, laying in position, making joints
and fastenings, including cost of binding wire and labour
charges for binding of steel reinforcement (also includes
removal of rust from bars):-
(b) deformed bars
= = 1150
Ch. 6 .IT 9 (b) @ Rs. 9278.75 % kg
5 Pacca brick work in foundation and plinth in:-
i) Cement, sand mortar:-
Ratio 1:3
Total = 1171 Cft
Ch.7 .IT 4 (i) P.52 @ Rs. 11676.25 % Cft
8 Cement concrete plain including placing, compacting, finishing and curing
complete (including screening and washing of stone aggregate):
Total = 482 Cft
Ch.6 Itm-5f @ Rs. 14985.95 % Cft
9 Cement plaster 3/8" (10 mm) thick under soffit of R.C.C.
roof slabs only, upto 20' height
a) 1:2
R/Slab = 606 Sft
Ch.11 .IT 10 (a) @ Rs. 1286.10 % Sft
10 Cement pointing deep struck joint on walls up to 20 ft height ratio 1:2
cement sand mortar.
Abutment = 259.9156 Sft
Ch-11 P-76 Item-18-a @ Rs. 1077.75 % Sft
Bitumen coating to plastered or cement concrete surface 14 LBS bitumen %Sft
Serial No. 9(ii) Ch# 13 of MRS 2nd Quarter 2011 = 470.195
@ Rs. 519.8 % Sft
Total =
3426
7493
67291
106701
136775
72220
7796
2801
2444
406947
Sub Engineer
PUNJAB IIRIGATION SYSTEM IMPROVEMENT PROJECT
Village Road Bridge@ RD
Taskeen Disty
Excavation
lean (1:4:8)
RCC (1:2:4)
B/W (1:3)
Abutment Wall
Wing Wall
PCC (1:2:4)
"2 +"2
"8-'1
"2 +"2
"5
RCC Slab
Main Bars (Top) 16.667 #6 12" C/C 2 18 36 11.000 396.000 0.681 269.676 "0-'10 "6
"6
Distribution Bars (Bott) 8.25 #6 6" C/C 2 18 36 17.667 636.012 0.681 433.124 ""8-'16 "6
"6
PUNJAB IRRIGATION SYSTEM IMPROVEMENT PROJECT
Bar Bending Detail
VRB at Taskeen Disty @ RD
Description Distribution Dia of Spacing No No Total Cut Total Unit Total Bending
Span Bar of of Bar Length Length Weight Weight Detail
Ft items Bar No's Ft Ft Kg/Ft Kg
"2-'1
"6
Rings 16.667 #4 12" C/C 2 18 36 3.340 120.240 0.302 36.312 "2-'1
"6
Parapet
"5
"3-'1
Stirups 17 #4 12" C/C 2 18 36 7.750 279.000 0.302 84.258 "2-'1
"2-'1
Total Weight (Kg) 1149.949
Total Weight (%Kg) 11.499
Dia Of Bar Weight (Kg)
#4 447.149 "4
#6 702.8
Total Weight (Kg) 1149.95
"7
Contractor Sub Engineer Sub Divisional Officer
M/S Nishan Engineers Hajipur Sub Division Fazilpur
PUNJAB IRRIGATION SYSTEM IMPROVEMENT PROJECT
Appropriation Request (AR-DJT/RJP-02/01)
3 Dismantling of Outlet - -
4 Temporary Outlets - -
7 Cattle Ghat - - -
Excavation
lean (1:3:6)
PCC (1:2:4)
Fatehpur Disty
Fatehpur Disty
Excavation
lean (1:3:6)
PCC (1:2:4)
3426
7493
67291
106701
136775
72220
7796
2801
2444
406947
Sub Engineer
PUNJAB IIRIGATION SYSTEM IMPROVEMENT PROJECT
Village Road Bridge@ RD
Fatehpur Disty
Excavation
lean (1:4:8)
RCC (1:2:4)
B/W (1:3)
Abutment Wall
Wing Wall
PCC (1:2:4)
"2 +"2
"8-'1
"2 +"2
"5
RCC Slab
Main Bars (Top) 16.667 #6 12" C/C 2 18 36 11.000 396.000 0.681 269.676 "0-'10 "6
"6
Distribution Bars (Bott) 8.25 #6 6" C/C 2 18 36 17.667 636.012 0.681 433.124 ""8-'16 "6
"6
PUNJAB IRRIGATION SYSTEM IMPROVEMENT PROJECT
Bar Bending Detail
VRB at Fatehpur Disty @ RD
Description Distribution Dia of Spacing No No Total Cut Total Unit Total Bending
Span Bar of of Bar Length Length Weight Weight Detail
Ft items Bar No's Ft Ft Kg/Ft Kg
"2-'1
"6
Rings 16.667 #4 12" C/C 2 18 36 3.340 120.240 0.302 36.312 "2-'1
"6
Parapet
"5
"3-'1
Stirups 17 #4 12" C/C 2 18 36 7.750 279.000 0.302 84.258 "2-'1
"2-'1
Total Weight (Kg) 1149.949
Total Weight (%Kg) 11.499
Dia Of Bar Weight (Kg)
#4 447.149 "4
#6 702.8
Total Weight (Kg) 1149.95
"7
Contractor Sub Engineer Sub Divisional Officer
M/S Nishan Engineers Hajipur Sub Division Fazilpur
PUNJAB IRRIGATION SYSTEM IMPROVEMENT PROJECT
Appropriation Request (AR-DJT/RJP-02/01)
Excavation
lean (1:3:6)
PCC (1:2:4)
Civil Works
12/2 Dismantling brick work in lime or cement mortar.
Groves Cf 2.0 13.000 0.750 0.750 14.625 0.146 100 Cf
Crest Portion Cf 1.0 5.000 0.750 0.750 2.813 0.028 100 Cf
Total 17.438 0.174 100 Cf
12/3 Cement concrete plain including placing, compacting, finishing and curing complete
(including screening and washing of stone aggregate): Ratio 1: 2: 4 (3000 PSI)
Groves Cf 2.0 13.000 0.750 0.750 14.625 0.146 100 Cf
Crest Portion Cf 1.0 5.000 0.750 0.750 2.813 0.028 100 Cf
Deduction for Grove Cf 2.0 13.000 0.500 0.500 6.500 0.065 100 Cf
Channel
Deduction for Grove Cf 1.0 5.000 0.500 0.500 1.250 0.013 100 Cf
Channel in Bed
12/4 Pacca brick work other than building upto 10ft. (3 m) Ratio 1:3 Cement Sand mortar
Cf 2.0 5.000 3.000 3.000 90.000 0.900 100 Cf
Total 90.000 0.900 100 Cf
3426
7493
67291
106701
136775
72220
7796
2801
2444
406947
Sub Engineer
PUNJAB IIRIGATION SYSTEM IMPROVEMENT PROJECT
Village Road Bridge@ RD
1-L Fatehpur Minor
Excavation
lean (1:4:8)
RCC (1:2:4)
B/W (1:3)
Abutment Wall
Wing Wall
PCC (1:2:4)
"2 +"2
"8-'1
"2 +"2
"5
RCC Slab
Main Bars (Top) 16.667 #6 12" C/C 2 18 36 11.000 396.000 0.681 269.676 "0-'10 "6
"6
Distribution Bars (Bott) 8.25 #6 6" C/C 2 18 36 17.667 636.012 0.681 433.124 ""8-'16 "6
"6
PUNJAB IRRIGATION SYSTEM IMPROVEMENT PROJECT
Bar Bending Detail
VRB at 1-L Fatehpur Minor @ RD
Description Distribution Dia of Spacing No No Total Cut Total Unit Total Bending
Span Bar of of Bar Length Length Weight Weight Detail
Ft items Bar No's Ft Ft Kg/Ft Kg
"2-'1
"6
Rings 16.667 #4 12" C/C 2 18 36 3.340 120.240 0.302 36.312 "2-'1
"6
Parapet
"5
"3-'1
Stirups 17 #4 12" C/C 2 18 36 7.750 279.000 0.302 84.258 "2-'1
"2-'1
Total Weight (Kg) 1149.949
Total Weight (%Kg) 11.499
Dia Of Bar Weight (Kg)
#4 447.149 "4
#6 702.8
Total Weight (Kg) 1149.95
"7
Contractor Sub Engineer Sub Divisional Officer
M/S Nishan Engineers Hajipur Sub Division Fazilpur
PUNJAB IRRIGATION SYSTEM IMPROVEMENT PROJECT
Appropriation Request (AR-DJT/RJP-02/01)
12 Regulation Gate - -
13 Meter Flume - -
Excavation
lean (1:3:6)
PCC (1:2:4)
3426
7493
67291
106701
136775
72220
7796
2801
2444
406947
Sub Engineer
PUNJAB IIRIGATION SYSTEM IMPROVEMENT PROJECT
Village Road Bridge@ RD 59+500
Noor Dhundi Canal
Excavation
lean (1:4:8)
RCC (1:2:4)
B/W (1:3)
Abutment Wall
Wing Wall
PCC (1:2:4)
"2 +"2
"8-'1
"2 +"2
"5
RCC Slab
Main Bars (Top) 16.667 #6 12" C/C 2 18 36 11.000 396.000 0.681 269.676 "0-'10 "6
"6
Distribution Bars (Bott) 8.25 #6 6" C/C 2 18 36 17.667 636.012 0.681 433.124 ""8-'16 "6
"6
PUNJAB IRRIGATION SYSTEM IMPROVEMENT PROJECT
Bar Bending Detail
VRB at Noor Dhundi Canal @ RD 59+500
Description Distribution Dia of Spacing No No Total Cut Total Unit Total Bending
Span Bar of of Bar Length Length Weight Weight Detail
Ft items Bar No's Ft Ft Kg/Ft Kg
"2-'1
"6
Rings 16.667 #4 12" C/C 2 18 36 3.340 120.240 0.302 36.312 "2-'1
"6
Parapet
"5
"3-'1
Stirups 17 #4 12" C/C 2 18 36 7.750 279.000 0.302 84.258 "2-'1
"2-'1
Total Weight (Kg) 1149.949
Total Weight (%Kg) 11.499
Dia Of Bar Weight (Kg)
#4 447.149 "4
#6 702.8
Total Weight (Kg) 1149.95
"7
Contractor Sub Engineer Sub Divisional Officer
M/S Nishan Engineers Hajipur Sub Division Fazilpur
PUNJAB IRRIGATION SYSTEM IMPROVEMENT PROJECT
Appropriation Request (AR-DJT/RJP-02/01)
Sadiq Disty
Sadiq Disty
12 Regulation Gate - -
13 Meter Flume - -
14 Foot Bridge - - -
Excavation
lean (1:3:6)
PCC (1:2:4)
3426
7493
58612
101837
136775
72220
7414
2801
2444
393022
Sub Engineer
PUNJAB IIRIGATION SYSTEM IMPROVEMENT PROJECT
Village Road Bridge@ RD 55+460
Noor Dhundi Canal
Excavation
lean (1:4:8)
RCC (1:2:4)
B/W (1:3)
Abutment Wall
Wing Wall
PCC (1:2:4)
"2 +"2
"8-'1
"2 +"2
"5
RCC Slab
Main Bars (Top) 16.667 #6 12" C/C 2 18 36 9.250 333.000 0.681 226.773 "3-'8 "6
"6
Distribution Bars (Bott) 8.25 #6 6" C/C 2 18 36 17.667 636.012 0.681 433.124 ""8-'16 "6
"6
PUNJAB IRRIGATION SYSTEM IMPROVEMENT PROJECT
Bar Bending Detail
VRB at Sadiq Disty @ RD 55+460
Description Distribution Dia of Spacing No No Total Cut Total Unit Total Bending
Span Bar of of Bar Length Length Weight Weight Detail
Ft items Bar No's Ft Ft Kg/Ft Kg
"2-'1
"6
Rings 16.667 #4 12" C/C 2 18 36 3.340 120.240 0.302 36.312 "2-'1
"6
Parapet
"5
"3-'1
Stirups 17 #4 12" C/C 2 18 36 7.750 279.000 0.302 84.258 "2-'1
"2-'1
Total Weight (Kg) 1097.533
Total Weight (%Kg) 10.975
Dia Of Bar Weight (Kg)
#4 437.636 "4
#6 659.897
Total Weight (Kg) 1097.53
"7
Contractor Sub Engineer Sub Divisional Officer
M/S Nishan Engineers Hajipur Sub Division Fazilpur
PUNJAB IRRIGATION SYSTEM IMPROVEMENT PROJECT
Appropriation Request (AR-DJT/RJP-02/01)
Jalalpur Disty
Jalalpur Disty
Excavation
lean (1:3:6)
PCC (1:2:4)
Total = 94 Cft
Ch. 6 .IT 3(b) P.41 @ Rs. 7,964.05 % Cft
3 (a) (i) Reinforced cement concrete in roof slab, beams, .
columns lintels, girders and other structural members laid in
situ or precast laid in position, or prestressed members cast
in situ, complete in all respects:-
(3) (c) Type C (nominal mix 1: 2: 4)
Total = 292 Cft
Ch. 6 .IT 6 a (i) P.42 @ Rs. 230.70 P Cft
4 Fabrication of mild steel reinforcement for cement concrete,
including cutting, bending, laying in position, making joints
and fastenings, including cost of binding wire and labour
charges for binding of steel reinforcement (also includes
removal of rust from bars):-
(b) deformed bars
= = 1150
Ch. 6 .IT 9 (b) @ Rs. 9278.75 % kg
5 Pacca brick work in foundation and plinth in:-
i) Cement, sand mortar:-
Ratio 1:3
Total = 1171 Cft
Ch.7 .IT 4 (i) P.52 @ Rs. 11676.25 % Cft
8 Cement concrete plain including placing, compacting, finishing and curing
complete (including screening and washing of stone aggregate):
Total = 482 Cft
Ch.6 Itm-5f @ Rs. 14985.95 % Cft
9 Cement plaster 3/8" (10 mm) thick under soffit of R.C.C.
roof slabs only, upto 20' height
a) 1:2
R/Slab = 606 Sft
Ch.11 .IT 10 (a) @ Rs. 1286.10 % Sft
10 Cement pointing deep struck joint on walls up to 20 ft height ratio 1:2
cement sand mortar.
Abutment = 259.9156 Sft
Ch-11 P-76 Item-18-a @ Rs. 1077.75 % Sft
Bitumen coating to plastered or cement concrete surface 14 LBS bitumen %Sft
Serial No. 9(ii) Ch# 13 of MRS 2nd Quarter 2011 = 470.195
@ Rs. 519.8 % Sft
Total =
3426
7493
67291
106701
136775
72220
7796
2801
2444
406947
Sub Engineer
PUNJAB IIRIGATION SYSTEM IMPROVEMENT PROJECT
Village Road Bridge@ RD
Jalalpur Disty
Excavation
lean (1:4:8)
RCC (1:2:4)
B/W (1:3)
Abutment Wall
Wing Wall
PCC (1:2:4)
"2 +"2
"8-'1
"2 +"2
"5
RCC Slab
Main Bars (Top) 16.667 #6 12" C/C 2 18 36 11.000 396.000 0.681 269.676 "0-'10 "6
"6
Distribution Bars (Bott) 8.25 #6 6" C/C 2 18 36 17.667 636.012 0.681 433.124 ""8-'16 "6
"6
PUNJAB IRRIGATION SYSTEM IMPROVEMENT PROJECT
Bar Bending Detail
VRB at Jalalpur Disty @ RD
Description Distribution Dia of Spacing No No Total Cut Total Unit Total Bending
Span Bar of of Bar Length Length Weight Weight Detail
Ft items Bar No's Ft Ft Kg/Ft Kg
"2-'1
"6
Rings 16.667 #4 12" C/C 2 18 36 3.340 120.240 0.302 36.312 "2-'1
"6
Parapet
"5
"3-'1
Stirups 17 #4 12" C/C 2 18 36 7.750 279.000 0.302 84.258 "2-'1
"2-'1
Total Weight (Kg) 1149.949
Total Weight (%Kg) 11.499
Dia Of Bar Weight (Kg)
#4 447.149 "4
#6 702.8
Total Weight (Kg) 1149.95
"7
Contractor Sub Engineer Sub Divisional Officer
M/S Nishan Engineers Hajipur Sub Division Fazilpur
PUNJAB IRRIGATION SYSTEM IMPROVEMENT PROJECT
Appropriation Request (AR-DJT/RJP-02/01)
Jalalpur Minor
Jalalpur Minor
Excavation
lean (1:3:6)
PCC (1:2:4)
Jahanpur Minor
Jahanpur Minor
Excavation
lean (1:3:6)
PCC (1:2:4)
Rasulpur Minor
Rasulpur Minor
Excavation
lean (1:3:6)
PCC (1:2:4)
Total = 94 Cft
Ch. 6 .IT 3(b) P.41 @ Rs. 7,964.05 % Cft
3 (a) (i) Reinforced cement concrete in roof slab, beams, .
columns lintels, girders and other structural members laid in
situ or precast laid in position, or prestressed members cast
in situ, complete in all respects:-
(3) (c) Type C (nominal mix 1: 2: 4)
Total = 292 Cft
Ch. 6 .IT 6 a (i) P.42 @ Rs. 230.70 P Cft
4 Fabrication of mild steel reinforcement for cement concrete,
including cutting, bending, laying in position, making joints
and fastenings, including cost of binding wire and labour
charges for binding of steel reinforcement (also includes
removal of rust from bars):-
(b) deformed bars
= = 1150
Ch. 6 .IT 9 (b) @ Rs. 9278.75 % kg
5 Pacca brick work in foundation and plinth in:-
i) Cement, sand mortar:-
Ratio 1:3
Total = 1171 Cft
Ch.7 .IT 4 (i) P.52 @ Rs. 11676.25 % Cft
8 Cement concrete plain including placing, compacting, finishing and curing
complete (including screening and washing of stone aggregate):
Total = 482 Cft
Ch.6 Itm-5f @ Rs. 14985.95 % Cft
9 Cement plaster 3/8" (10 mm) thick under soffit of R.C.C.
roof slabs only, upto 20' height
a) 1:2
R/Slab = 606 Sft
Ch.11 .IT 10 (a) @ Rs. 1286.10 % Sft
10 Cement pointing deep struck joint on walls up to 20 ft height ratio 1:2
cement sand mortar.
Abutment = 259.9156 Sft
Ch-11 P-76 Item-18-a @ Rs. 1077.75 % Sft
Bitumen coating to plastered or cement concrete surface 14 LBS bitumen %Sft
Serial No. 9(ii) Ch# 13 of MRS 2nd Quarter 2011 = 470.195
@ Rs. 519.8 % Sft
Total =
3426
7493
67291
106701
136775
72220
7796
2801
2444
406947
Sub Engineer
PUNJAB IIRIGATION SYSTEM IMPROVEMENT PROJECT
Village Road Bridge@ RD
Rasulpur Minor
Excavation
lean (1:4:8)
RCC (1:2:4)
B/W (1:3)
Abutment Wall
Wing Wall
PCC (1:2:4)
"2 +"2
"8-'1
"2 +"2
"5
RCC Slab
Main Bars (Top) 16.667 #6 12" C/C 2 18 36 11.000 396.000 0.681 269.676 "0-'10 "6
"6
Distribution Bars (Bott) 8.25 #6 6" C/C 2 18 36 17.667 636.012 0.681 433.124 ""8-'16 "6
"6
PUNJAB IRRIGATION SYSTEM IMPROVEMENT PROJECT
Bar Bending Detail
VRB at Rasulpur Minor @ RD
Description Distribution Dia of Spacing No No Total Cut Total Unit Total Bending
Span Bar of of Bar Length Length Weight Weight Detail
Ft items Bar No's Ft Ft Kg/Ft Kg
"2-'1
"6
Rings 16.667 #4 12" C/C 2 18 36 3.340 120.240 0.302 36.312 "2-'1
"6
Parapet
"5
"3-'1
Stirups 17 #4 12" C/C 2 18 36 7.750 279.000 0.302 84.258 "2-'1
"2-'1
Total Weight (Kg) 1149.949
Total Weight (%Kg) 11.499
Dia Of Bar Weight (Kg)
#4 447.149 "4
#6 702.8
Total Weight (Kg) 1149.95
"7
Contractor Sub Engineer Sub Divisional Officer
M/S Nishan Engineers Hajipur Sub Division Fazilpur
PUNJAB IRRIGATION SYSTEM IMPROVEMENT PROJECT
Appropriation Request (AR-DJT/RJP-02/01)
Mehmood Minor
3 Dismantling of Outlet - -
4 Temporary Outlets - -
7 Cattle Ghat - - -
Mehmood Minor
Excavation
lean (1:3:6)
PCC (1:2:4)