PUNJAB IRRIGATION SYSTEM IMPROVEMENT PROJECT

Appropriation Request (AR-DJT/RJP-02/01)

MAIN SUMMARY

Sr. No. As Per Approved Bid Increrase/Decrease As Per AR/Draft VO-02/01


Name of Distributary/ Minor
Amount (Rs) Amount (Rs) Amount (Rs)

1 TASKEEN DISTRIBUTARY 4,258,360.56 (450,781.39) 3,807,579.17

2 FATEHPUR DISTRIBUTARY 7,608,802.76 (373,590.33) 7,235,212.43

3 SADIQ FEEDER 24,476,128.75 972.76 24,477,101.51

4 NOOR DHUNDI CANAL 20,486,514.58 (1,674,234.00) 18,812,280.58

5 SADIQ DISTRIBUTARY 11,089,539.49 11,089,539.49

SUB TOTAL(1) :- 67,919,346.14 (2,497,632.95) 65,421,713.18

1 TASKEEN DISTRIBUTARY 59,413,435.56 (1,193,235.58) 58,220,199.98

2 PATTI JUMMA MINOR 5,880,386.84 37,785.55 5,918,172.39

3 FATEHPUR DISTRIBUTARY 63,103,015.51 (768,383.69) 62,334,631.81

Contractor: Exuctive Engineer Resident Engineer


Nishan Engineers Rajanpur Canal Division Rajanpur PISIP Rajanpur
PUNJAB IRRIGATION SYSTEM IMPROVEMENT PROJECT
Appropriation Request (AR-DJT/RJP-02/01)

MAIN SUMMARY

Sr. No. As Per Approved Bid Increrase/Decrease As Per AR/Draft VO-02/01


Name of Distributary/ Minor
Amount (Rs) Amount (Rs) Amount (Rs)
4 1-L FATEHPUR MINOR 23,142,182.24 558,775.42 23,700,957.66

5 NOOR DHUNDI CANAL 49,010,141.55 (1,200,804.09) 47,809,337.46

6 SADIQ DISTRIBUTARY 35,901,929.03 (1,817,046.14) 34,084,882.88

7 JALALPUR DISTRIBUTARY 18,871,567.00 (401,555.98) 18,470,011.01

8 JALALPUR MINOR 10,390,231.66 (799,331.45) 9,590,900.20

9 JAHANPUR MINOR 24,479,873.73 (1,681,885.86) 22,797,987.87

10 RASULPUR MINOR 49,786,189.54 (1,211,596.57) 48,574,592.97

11 MEHMOOD MINOR 4,769,654.38 37,785.55 4,807,439.93

SUB TOTAL(1) :- 344,748,607.02 (8,439,492.84) 336,309,114.18

TOTAL (Sub Total(1)+Sub Total(2)) 412,667,953.16 (10,937,125.79) 401,730,827.37

Contractor: Exuctive Engineer Resident Engineer


Nishan Engineers Rajanpur Canal Division Rajanpur PISIP Rajanpur
PUNJAB IRRIGATION SYSTEM IMPROVEMENT PROJECT
Appropriation Request (AR-DJT/RJP-02/01)

MAIN SUMMARY

Sr. No. As Per Approved Bid Increrase/Decrease As Per AR/Draft VO-02/01


Name of Distributary/ Minor
Amount (Rs) Amount (Rs) Amount (Rs)
REBATE @ 3.7%:- 15,268,714.27 (404,673.65) 14,864,040.61

TOTAL AFTER REBATE:- 397,399,238.89 (10,532,452.13) 386,866,786.75

Contractor: Exuctive Engineer Resident Engineer


Nishan Engineers Rajanpur Canal Division Rajanpur PISIP Rajanpur
PUNJAB IRRIGATION SYSTEM IMPROVEMENT PROJECT
Appropriation Request (AR-DJT/RJP-02/01)

Rehabilitation: Taskeen Disty

Bill As Per Approved Bid Increrase/Decrease As Per AR/Draft VO-02/01


Description
No.
Amount (Rs) Amount (Rs) Amount (Rs)

1 Earthwork 394,090.20 394,090.20

2 Data Board for H/R, Fall etc. 22,720.50 22,720.50

3 Data Board for Outlets 14,450.00 14,450.00

4 Meter Flume 377,375.70 377,375.70

5 Outlets for Earthen Channels 809,812.00 809,812.00

6 Dismantling of Outlet 15,500.00 15,500.00

7 RD Marks 3,813.75 3,813.75

8 Foot Bridge 450,781.39 (450,781.39) -

9 Side Protection 719,770.02 719,770.02

10 Repairing Existing Structures 44,340.00 44,340.00

Contractor: Exuctive Engineer Resident Engineer


Nishan Engineers Rajanpur Canal Division Rajanpur PISIP Rajanpur
PUNJAB IRRIGATION SYSTEM IMPROVEMENT PROJECT
Appropriation Request (AR-DJT/RJP-02/01)

Rehabilitation: Taskeen Disty

Bill As Per Approved Bid Increrase/Decrease As Per AR/Draft VO-02/01


Description
No.
Amount (Rs) Amount (Rs) Amount (Rs)
11 Gauge Reader Hut 540,993.50 540,993.50

12 Boundary Wall 45,942.50 45,942.50

13 Electrification 12,300.00 12,300.00

14 Regulation Gate 806,471.00 806,471.00

SUB TOTAL(1) :- 4,258,360.56 (450,781.39) 3,807,579.17

Contractor: Exuctive Engineer Resident Engineer


Nishan Engineers Rajanpur Canal Division Rajanpur PISIP Rajanpur
PUNJAB IRRIGATION SYSTEM IMPROVEMENT PROJECT
Appropriation Request (AR-DJT/RJP-02/1)
Foot Bridge – Bill No. 8
Rehabilitation: Taskeen Disty
Sr. Description Unit Rate Quantity as per Bid Revised Quantity as Per Balance Quantity Remarks
No. (Rs.) Schedule AR-DJT/RJP-02/01
Qty Amount Qty Amount Qty Amount
8/1 Excavation in foundation of building,
bridges and other structures, including
dagbelling, dressing, refilling around
structure with excavated earth,
watering and rammiing lead Foot bridge is replaced with

upto one chain (30 m) and lif upto 5 3500 1.408 4926.60 0.000 0.00 (1.408) (4926.60) VRB to assure passage for
Cf
f. (1.5 m) tractor trolly.
b) in ordinary soil

8/2 Cement concrete plain including


placing, compacting, finishing and Foot bridge is replaced with
curing complete (including screening % 13500 5.665 76477.50 0.000 0.00 (5.665) (76477.50) VRB to assure passage for
and washing of stone aggregate) Cf
tractor trolly.
Ratio 1:4:8 (Type-E)
8/3 Pacca brick work in foundation and Foot bridge is replaced with
plinth in:- Ratio 1:3 Cement, sand Cf 12500 9.515 118937.50 0.000 0.00 (9.515) (118937.50) VRB to assure passage for
mortar
tractor trolly.
8/4 Pacca brick work other than building
upto 10f. (3 m) Ratio 1:3 Cement Foot bridge is replaced with
Sand mortar % 13500 16.594 224019.00 0.000 0.00 (16.594) (224019.00) VRB to assure passage for
Kg
tractor trolly.
PUNJAB IRRIGATION SYSTEM IMPROVEMENT PROJECT
Appropriation Request (AR-DJT/RJP-02/1)
Foot Bridge – Bill No. 8
Rehabilitation: Taskeen Disty
Sr. Description Unit Rate Quantity as per Bid Revised Quantity as Per Balance Quantity Remarks
No. (Rs.) Schedule AR-DJT/RJP-02/01
Qty Amount Qty Amount Qty Amount
8/5 Reinforced cement concrete in roof
slab, beams, columns lintels, girders
and other structural members laid in
situ or precast laid in position, or
prestressed members cast in situ, % Foot bridge is replaced with
complete in all respects:- 250 0.653 163.24 0.000 0.00 (0.653) (163.24) VRB to assure passage for
Cf
Ratio 1:2:4 (Type-C) tractor trolly.

8/6 Providing and fabrication of mild steel


reinforcement for cement concrete
including cutting bending laying in
position making joints and fastening
including cost of binding wire and
labour charges for binding of steel Foot bridge is replaced with
reinforcement (also includes removal % 9500 1.927 18305.55 0.000 0.00 (1.927) (18305.55) VRB to assure passage for
of rust from bars) deformed bars Cf tractor trolly.
(Grade-40)

8/7 Cement concrete plain including


placing, compacting, finishing and
curing complete (including screening
Foot bridge is replaced with
and washing of stone aggregate) % 16000 0.497 7952.00 0.000 0.00 (0.497) (7952.00) VRB to assure passage for
Ratio 1:2:4 (Type-C) Sf
tractor trolly.

Total 450781.39 0.00 (450781.39)


PUNJAB IRRIGATION SYSTEM IMPROVEMENT PROJECT
Appropriation Request (AR-DJT/RJP-02/1)
Foot Bridge – Bill No. 8
Rehabilitation: Taskeen Disty
Sr. Description Unit Rate Quantity as per Bid Revised Quantity as Per Balance Quantity Remarks
No. (Rs.) Schedule AR-DJT/RJP-02/01
Qty Amount Qty Amount Qty Amount

Contractor Sub Divisional Officer Executive Engineer


M/S Nishan Engineers Hajipur Sub Division Fazilpur Rajanpur Canal Division Rajanpur
PUNJAB IRRIGATION SYSTEM IMPROVEMENT PROJECT
Appropriation Request (AR-DJT/RJP-02/01)

Rehabilitation: Fatehpur Disty

Bill As Per Approved Bid Increrase/Decrease As Per AR/Draft VO-02/01


Description
No.
Amount (Rs) Amount (Rs) Amount (Rs)

1 Earthwork 2,591,224.30 2,591,224.30

2 Data Board for H/R, Fall etc. 30,294.00 30,294.00

3 Data Board for Outlets 34,680.00 34,680.00

4 Meter Flume 377,375.70 377,375.70

5 Outlets for Earthen Channels 1,943,548.80 1,943,548.80

6 Dismantling of Outlet 37,200.00 37,200.00

7 RD Marks 12,712.50 12,712.50

8 Foot Bridge 450,781.39 (450,781.39) -

9 Side Protection 1,016,850.72 1,016,850.72

10 Repairing Existing Structures 44,340.00 77,191.06 121,531.06

Contractor: Exuctive Engineer Resident Engineer


Nishan Engineers Rajanpur Canal Division Rajanpur PISIP Rajanpur
PUNJAB IRRIGATION SYSTEM IMPROVEMENT PROJECT
Appropriation Request (AR-DJT/RJP-02/01)

Rehabilitation: Fatehpur Disty

Bill As Per Approved Bid Increrase/Decrease As Per AR/Draft VO-02/01


Description
No.
Amount (Rs) Amount (Rs) Amount (Rs)
11 Gauge Reader Hut - -

12 Boundary Wall - -

13 Electrification - -

14 Regulation Gate 1,069,795.35 1,069,795.35

SUB TOTAL(1) :- 7,608,802.76 (373,590.33) 7,235,212.43

Contractor: Exuctive Engineer Resident Engineer


Nishan Engineers Rajanpur Canal Division Rajanpur PISIP Rajanpur
PUNJAB IRRIGATION SYSTEM IMPROVEMENT PROJECT
Appropriation Request (AR-DJT/RJP-02/1)
Foot Bridge – Bill No. 8
Rehabilitation: Fatehpur Disty
Sr. Description Unit Rate Quantity as per Bid Revised Quantity as Per Balance Quantity Remarks
No. (Rs.) Schedule AR-DJT/RJP-02/01
Qty Amount Qty Amount Qty Amount
8/1 Excavation in foundation of building,
bridges and other structures, including
dagbelling, dressing, refilling around
structure with excavated earth,
watering and rammiing lead Foot bridge is replaced with

upto one chain (30 m) and lif upto 5 3500 1.408 4926.60 0.000 0.00 (1.408) (4926.60) VRB to assure passage for
Cf
f. (1.5 m) tractor trolly.
b) in ordinary soil

8/2 Cement concrete plain including


placing, compacting, finishing and Foot bridge is replaced with
curing complete (including screening % 13500 5.665 76477.50 0.000 0.00 (5.665) (76477.50) VRB to assure passage for
and washing of stone aggregate) Cf
tractor trolly.
Ratio 1:4:8 (Type-E)
8/3 Pacca brick work in foundation and Foot bridge is replaced with
plinth in:- Ratio 1:3 Cement, sand Cf 12500 9.515 118937.50 0.000 0.00 (9.515) (118937.50) VRB to assure passage for
mortar
tractor trolly.
8/4 Pacca brick work other than building
upto 10f. (3 m) Ratio 1:3 Cement Foot bridge is replaced with
Sand mortar % 13500 16.594 224019.00 0.000 0.00 (16.594) (224019.00) VRB to assure passage for
Kg
tractor trolly.
PUNJAB IRRIGATION SYSTEM IMPROVEMENT PROJECT
Appropriation Request (AR-DJT/RJP-02/1)
Foot Bridge – Bill No. 8
Rehabilitation: Fatehpur Disty
Sr. Description Unit Rate Quantity as per Bid Revised Quantity as Per Balance Quantity Remarks
No. (Rs.) Schedule AR-DJT/RJP-02/01
Qty Amount Qty Amount Qty Amount
8/5 Reinforced cement concrete in roof
slab, beams, columns lintels, girders
and other structural members laid in
situ or precast laid in position, or
prestressed members cast in situ, % Foot bridge is replaced with
complete in all respects:- 250 0.653 163.24 0.000 0.00 (0.653) (163.24) VRB to assure passage for
Cf
Ratio 1:2:4 (Type-C) tractor trolly.

8/6 Providing and fabrication of mild steel


reinforcement for cement concrete
including cutting bending laying in
position making joints and fastening
including cost of binding wire and
labour charges for binding of steel Foot bridge is replaced with
reinforcement (also includes removal % 9500 1.927 18305.55 0.000 0.00 (1.927) (18305.55) VRB to assure passage for
of rust from bars) deformed bars Cf tractor trolly.
(Grade-40)

8/7 Cement concrete plain including


placing, compacting, finishing and
curing complete (including screening
Foot bridge is replaced with
and washing of stone aggregate) % 16000 0.497 7952.00 0.000 0.00 (0.497) (7952.00) VRB to assure passage for
Ratio 1:2:4 (Type-C) Sf
tractor trolly.

Total 450781.39 0.00 (450781.39)


PUNJAB IRRIGATION SYSTEM IMPROVEMENT PROJECT
Appropriation Request (AR-DJT/RJP-02/1)
Foot Bridge – Bill No. 8
Rehabilitation: Fatehpur Disty
Sr. Description Unit Rate Quantity as per Bid Revised Quantity as Per Balance Quantity Remarks
No. (Rs.) Schedule AR-DJT/RJP-02/01
Qty Amount Qty Amount Qty Amount

Contractor Sub Divisional Officer Executive Engineer


M/S Nishan Engineers Hajipur Sub Division Fazilpur Rajanpur Canal Division Rajanpur
PUNJAB IRRIGATION SYSTEM IMPROVEMENT PROJECT
Appropriation Request (AR-DJT/RJP-02/1)
Repair of Existing Structures – Bill No. 10
Rehabilitation: Fatehpur Disty
Revised Quantity
Sr. Description Unit Rate Quantity as per Bid as Per AR- Balance Quantity Remarks
No. (Rs.) Schedule DJT/RJP-02/01
Qty Amount Qty Amount Qty Amount
10/1 Pacca brick work in foundation and
plinth in:- Cement sand mortar ratio % 12500 1.020 12750.00 1.020 12750.00 0.000 0.00
1:3 Cf

10/2 Cement concrete plain including


placing, compacting, finishing and
curing complete (including screening % There is necessary reopair work
and washing of stone aggregate):ratio Cf 16500 1.380 22770.00 1.449 23908.50 0.069 1138.50 is required at Fall Structure at
(1:2:4) (Type C) the channel.

10/3 Cement plaster 3/8" (10 mm) thick


under soffit of R.C.C. Roof Slabs only % 1500 2.240 3360.00 2.240 3360.00 0.000 0.00
upto 20' height a) Ratio 1:2 Sf

10/4 Cement pointing deep struck joint on


walls up to 20 f height ratio 1:2 % 1300 4.200 5460.00 4.200 5460.00 0.000 0.00
cement sand mortar Sf

10/5 Cement concrete plain including


placing, compacting, finishing and
curing complete (including screening % There is necessary reopair work
and washing of stone aggregate) Ratio Cf 13500 0.000 0.00 2.878 38851.31 2.878 38851.31 is required at Fall Structure at
1:4:8 (Type-E) the channel.

10/6 Pacca brick work other than building There is necessary reopair work
in:- Cement sand mortar ratio 1:3 % 12500 0.000 0.00 2.976 37201.25 2.976 37201.25 is required at Fall Structure at
Cf
the channel.
Total 44340.00 121531.06 77191.06

Contractor Sub Divisional Officer Executive Engineer


PUNJAB IRRIGATION SYSTEM IMPROVEMENT PROJECT
Appropriation Request (AR-DJT/RJP-02/1)
Repair of Existing Structures – Bill No. 10
Rehabilitation: Fatehpur Disty
Revised Quantity
Sr. Description Unit Rate Quantity as per Bid as Per AR- Balance Quantity Remarks
No. (Rs.) Schedule DJT/RJP-02/01
Qty Amount Qty Amount Qty Amount
M/S Nishan Engineers Hajipur Sub Division Fazilpur Rajanpur Canal Division Rajanpur
PUNJAB IIRIGATION SYSTEM IMPROVEMENT PROJECT
Repair of Existing Structures
Fatehpur Disty

Description Unit No Length Width Depth Qty

lean (1:4:8)

Fall @ RD 14+000

Wing Wall L/S Cft 1 13 3.3 1.5 64.350

Fall @ RD 26+000

U/S Floor Cft 1 20 12.25 0.5 122.500

Cft 1 8.5 10.25 0.5 43.563

Fall @ RD 32+500

U/S Floor Cft 1 13.5 8.5 0.5 57.375

Total (Cft) 287.788

Total (%Cft) 2.878

PCC (1:2:4)

Fall @ RD 14+000

Wing Wall L/S Cft 1 12 1.15 0.5 6.900

Total (Cft) 6.900

Already in T.S 138.000

Total (%Cft) 1.449

B/W in 1:3 c/s

Fall @RD 14+000

U/S Wing Wall Step-1 Cft 1 12 2.3 0.6 16.560

Step-2 Cft 1 12 1.9 2 45.600

Step-3 Cft 1 12 1.5 2 36.000

Step-4 Cft 1 12 1.15 1.5 20.700

Fall @RD 26+000

Brick Floor Cft 1 20 12.25 0.4 98.000

Cft 1 8.5 10.25 0.4 34.850

Fall @RD 32+500

Cft 1 13.5 8.5 0.4 45.900

Total (Cft) 297.610

Total (%Cft) 2.976

Contractor Sub Divisional Officer Sub Engineer


M/S Nishan Engineers Hajipur Sub Division Fazilpur
PUNJAB IRRIGATION SYSTEM IMPROVEMENT PROJECT
Appropriation Request (AR-DJT/RJP-02/01)

Rehabilitation: Sadiq Feeder

Bill As Per Approved Bid Increrase/Decrease As Per AR/Draft VO-02/01


Description
No.
Amount (Rs) Amount (Rs) Amount (Rs)

1 Earthwork 6,067,121.30 6,067,121.30

2 Data Board for H/R, Fall etc. 60,588.00 60,588.00

3 Data Board for Outlets 86,700.00 86,700.00

4 Meter Flume 377,375.70 377,375.70

5 Outlets for Earthen Channels 4,858,872.00 4,858,872.00

6 Dismantling of Outlet 93,000.00 93,000.00

7 RD Marks 24,789.38 24,789.38

8 Foot Bridge 901,562.78 (901,562.78) -

9 Stone Pitching 7,220,304.00 7,220,304.00

10 Repairing Existing Structures 4,785,815.60 902,535.53 5,688,351.13

Contractor: Exuctive Engineer Resident Engineer


Nishan Engineers Rajanpur Canal Division Rajanpur PISIP Rajanpur
PUNJAB IRRIGATION SYSTEM IMPROVEMENT PROJECT
Appropriation Request (AR-DJT/RJP-02/01)

Rehabilitation: Sadiq Feeder

Bill As Per Approved Bid Increrase/Decrease As Per AR/Draft VO-02/01


Description
No.
Amount (Rs) Amount (Rs) Amount (Rs)
SUB TOTAL(1) :- 24,476,128.75 972.76 24,477,101.51

Contractor: Exuctive Engineer Resident Engineer


Nishan Engineers Rajanpur Canal Division Rajanpur PISIP Rajanpur
PUNJAB IRRIGATION SYSTEM IMPROVEMENT PROJECT
Appropriation Request (AR-DJT/RJP-02/1)
Foot Bridge – Bill No. 8
Rehabilitation: Sadiq Feeder
Sr. Description Unit Rate Quantity as per Bid Revised Quantity as Per Balance Quantity Remarks
No. (Rs.) Schedule AR-DJT/RJP-02/01
Qty Amount Qty Amount Qty Amount
8/1 Excavation in foundation of building,
bridges and other structures, including
dagbelling, dressing, refilling around
structure with excavated earth,
watering and rammiing lead Foot bridge is replaced with

upto one chain (30 m) and lif upto 5 3500 1.408 4926.60 0.000 0.00 (1.408) (4926.60) VRB to assure passage for
Cf
f. (1.5 m) tractor trolly.
b) in ordinary soil

8/2 Cement concrete plain including


placing, compacting, finishing and Foot bridge is replaced with
curing complete (including screening % 13500 5.665 76477.50 0.000 0.00 (5.665) (76477.50) VRB to assure passage for
and washing of stone aggregate) Cf
tractor trolly.
Ratio 1:4:8 (Type-E)
8/3 Pacca brick work in foundation and Foot bridge is replaced with
plinth in:- Ratio 1:3 Cement, sand Cf 12500 9.515 118937.50 0.000 0.00 (9.515) (118937.50) VRB to assure passage for
mortar
tractor trolly.
8/4 Pacca brick work other than building
upto 10f. (3 m) Ratio 1:3 Cement Foot bridge is replaced with
Sand mortar % 13500 16.594 224019.00 0.000 0.00 (16.594) (224019.00) VRB to assure passage for
Kg
tractor trolly.
PUNJAB IRRIGATION SYSTEM IMPROVEMENT PROJECT
Appropriation Request (AR-DJT/RJP-02/1)
Foot Bridge – Bill No. 8
Rehabilitation: Sadiq Feeder
Sr. Description Unit Rate Quantity as per Bid Revised Quantity as Per Balance Quantity Remarks
No. (Rs.) Schedule AR-DJT/RJP-02/01
Qty Amount Qty Amount Qty Amount
8/5 Reinforced cement concrete in roof
slab, beams, columns lintels, girders
and other structural members laid in
situ or precast laid in position, or
prestressed members cast in situ, % Foot bridge is replaced with
complete in all respects:- 250 0.653 163.24 0.000 0.00 (0.653) (163.24) VRB to assure passage for
Cf
Ratio 1:2:4 (Type-C) tractor trolly.

8/6 Providing and fabrication of mild steel


reinforcement for cement concrete
including cutting bending laying in
position making joints and fastening
including cost of binding wire and
labour charges for binding of steel Foot bridge is replaced with
reinforcement (also includes removal % 9500 1.927 18305.55 0.000 0.00 (1.927) (18305.55) VRB to assure passage for
of rust from bars) deformed bars Cf tractor trolly.
(Grade-40)

8/7 Cement concrete plain including


placing, compacting, finishing and
curing complete (including screening
Foot bridge is replaced with
and washing of stone aggregate) % 16000 0.497 7952.00 0.000 0.00 (0.497) (7952.00) VRB to assure passage for
Ratio 1:2:4 (Type-C) Sf
tractor trolly.

Total 450781.39 0.00 (450781.39)


2 No's 901562.78 0.00 (901562.78)
PUNJAB IRRIGATION SYSTEM IMPROVEMENT PROJECT
Appropriation Request (AR-DJT/RJP-02/1)
Foot Bridge – Bill No. 8
Rehabilitation: Sadiq Feeder
Sr. Description Unit Rate Quantity as per Bid Revised Quantity as Per Balance Quantity Remarks
No. (Rs.) Schedule AR-DJT/RJP-02/01
Qty Amount Qty Amount Qty Amount

Contractor Sub Divisional Officer Executive Engineer


M/S Nishan Engineers Hajipur Sub Division Fazilpur Rajanpur Canal Division Rajanpur
PUNJAB IRRIGATION SYSTEM IMPROVEMENT PROJECT
Appropriation Request (AR-DJT/RJP-02/1)
Repair of Existing Structures – Bill No. 10
Rehabilitation: Sadiq Feeder
Sr. Description Unit Rate Quantity as per Bid Revised Quantity as Per Balance Quantity Remarks
No. (Rs.) Schedule AR-DJT/RJP-02/01
Qty Amount Qty Amount Qty Amount
10/1 Dismentling Pacca brick work with %
cement or lime morter. 1300 236.966 308055.80 236.966 308055.80 0.000 0.00
Cf
10/2 Dismantling cement concrete plain %
(1:2:4). 2000 51.714 103427.80 51.714 103427.80 0.000 0.00
Cf
10/3 Pacca brick work other than building
upto 10f. (3 m) Ratio 1:3 Cement % 12500 236.966 2962075.00 236.966 2962075.00 0.000 0.00
Sand mortar Cf

10/4 Reinforced cement concrete in roof


slab, beams, columns, lintels, girders
& other structural members laid in
situ or precast laid in position or
prestressed members cast in situ,
complete in all respects:- Cf 275 5135.480 1412257.00 5135.480 1412257.00 0.000 0.00
Nominal Mix Ratio 1:2:4 (Type C)

10/5 Cement concrete plain including


placing, compacting, finishing and
This item is not given in T.S
curing complete (including screening
Estimate but as per construction
and washing of stone aggregate) % 13500 0.000 0.00 44.752 604150.65 44.752 604150.65 drawing it is essential for the
Ratio 1:4:8 (Type-E) Cf
structure hence added in scope
of work
PUNJAB IRRIGATION SYSTEM IMPROVEMENT PROJECT
Appropriation Request (AR-DJT/RJP-02/1)
Repair of Existing Structures – Bill No. 10
Rehabilitation: Sadiq Feeder
Sr. Description Unit Rate Quantity as per Bid Revised Quantity as Per Balance Quantity Remarks
No. (Rs.) Schedule AR-DJT/RJP-02/01
Qty Amount Qty Amount Qty Amount
10/6 Cement concrete plain including
placing, compacting, finishing and
This item is not given in T.S
curing complete (including screening
Estimate but as per construction
and washing of stone aggregate) % 16000 0.000 0.00 5.079 81266.40 5.079 81266.40 drawing it is essential for the
Ratio 1:2:4 (Type-C) Cf
structure hence added in scope
of work

10/7 Bailing out of Water This item is not given in T.S


Estimate but as per construction
‰ 238 0.000 0.00 71.190 16943.22 71.190 16943.22 drawing it is essential for the
Cf
structure hence added in scope
of work
10/8 Providing and lyaing stone or spawl This item is not given in T.S
filling. Estimate but as per construction
On Slope u/s % 1000 0.000 0.00 9.376 9376.21 9.376 9376.21 drawing it is essential for the
Cf
structure hence added in scope
of work
10/9 Borrowpit excavation undressed lead This item is not given in T.S
upto 1/4 Mile in ordinary soil Estimate but as per construction
‰ 3200 0.000 0.00 59.625 190799.06 59.625 190799.06 drawing it is essential for the
Cf
structure hence added in scope
of work
Total 4785815.60 5688351.13 902535.53
PUNJAB IRRIGATION SYSTEM IMPROVEMENT PROJECT
Appropriation Request (AR-DJT/RJP-02/1)
Repair of Existing Structures – Bill No. 10
Rehabilitation: Sadiq Feeder
Sr. Description Unit Rate Quantity as per Bid Revised Quantity as Per Balance Quantity Remarks
No. (Rs.) Schedule AR-DJT/RJP-02/01
Qty Amount Qty Amount Qty Amount
Contractor Sub Divisional Officer Executive Engineer
M/S Nishan Engineers Hajipur Sub Division Fazilpur Rajanpur Canal Division Rajanpur
PUNJAB IIRIGATION SYSTEM IMPROVEMENT PROJECT
Repair of Existing Structures
Sadiq Feeder

Description Unit No Length Width Depth Qty

lean (1:4:8)

Fall @ RD 5+500

Wing Wall R/S Cft 1 25 3.3 1.5 123.750

U/S Floor Cft 1 13.25 29 0.5 192.125

Cut off Wall Cft 1 34 2 0.5 34.000

Cft 1 21.15 40 0.5 423.000

Cft 1 40 1.5 1 60.000

U/S B. Pitch Cft 1 26.15 1.65 0.5 21.574

Cft 1 21.15 6.2 0.5 65.565

Fall @ RD 10+500

Wing Wall U/S Cft 1 18 4.45 1.5 120.150

Cft 1 25 3.7 2.5 231.250

Cut off Wall Cft 1 40 2 0.5 40.000

Pear Cft 2 18 4.1 1.5 221.400

U/S Floor Cft 1 15 23.5 0.5 176.250

Cft 1 13.5 40 0.5 270.000

Cft 1 8.82 31.75 0.5 140.018

U/S B. Pitch Cft 1 18.5 1.65 0.5 15.263

Cft 1 13.5 6.83 0.5 46.103

D/S B.Pitch Cft 1 45 1.65 0.5 37.125

Cft 1 40 5.5 0.5 110.000

Fall @ RD 15+000

Wing Wall R/S Cft 1 25 3.3 1.5 123.750

U/S Floor Cft 1 13.25 29 0.5 192.125

Cut off Wall Cft 1 34 2 0.5 34.000

Cft 1 21.15 40 0.5 423.000

Cft 1 40 1.5 1 60.000

U/S B. Pitch Cft 1 26.15 1.65 0.5 21.574

Cft 1 21.15 6.2 0.5 65.565

Fall @ RD 26+579

U/S Floor Cft 1 12.35 23.2 0.5 143.260

Cft 1 24 5.08 1.5 182.880

Cut off Wall Cft 1 23.7 2 0.5 23.700

Cft 2 40 3.3 1.5 396.000


PUNJAB IIRIGATION SYSTEM IMPROVEMENT PROJECT
Repair of Existing Structures
Sadiq Feeder

Description Unit No Length Width Depth Qty

D/S Floor Cft 1 9.1 27.15 1 247.065

D/S B.Pitch Cft 2 35 2 0.5 70.000

Cft 2 27 6.1 0.5 164.700

Total (Cft) 4475.190

Total (%Cft) 44.752

PCC (1:2:4)

Fall @ RD 5+500

Coping Cft 2 25 1.15 0.5 28.750

Cft 2 45.8 1.15 0.5 52.670

Fall @ RD 10+500

Abutment Cap Cft 2 16 1.5 0.5 24.000

Cft 2 16 1.5 2 96.000

Coping Cft 2 50.5 1.15 0.5 58.075

Cft 2 40 1.15 0.5 46.000

Top Floor Over Slab Cft 1 25 12 0.25 75.000

Fall @ RD 15+000

Coping Cft 2 25 1.15 0.5 28.750

Cft 2 45.8 1.15 0.5 52.670

Fall @ RD 26+579

Coping Cft 2 40 1.15 0.5 46.000

Total (Cft) 507.915

Total (%Cft) 5.079


Bailing out Water (by Pump)

Fall @RD 5+500

U/S Cft 1 100 40 3 12000.000

D/S Cft 1 110 39 3 12870.000

Fall @RD 10+500

U/S Cft 1 120 40 3 14400.000

D/S Cft 1 100 40 3 12000.000

Fall @RD 15+000

U/S Cft 1 90 40 3 10800.000

D/S Cft 1 80 38 3 9120.000

Total (Cft) 71190.000


PUNJAB IIRIGATION SYSTEM IMPROVEMENT PROJECT
Repair of Existing Structures
Sadiq Feeder

Description Unit No Length Width Depth Qty

Total (‰Cft) 71.190

Stone or spawl Filling

Fall @RD 26+579

U/S Cft 1 9.1 37 1.5 505.050

D/S Cft 1 8.57 33.65 1.5 432.571

Total (Cft) 937.621

Total (%Cft) 9.376

Contractor Sub Divisional Officer Sub Engineer


M/S Nishan Engineers Hajipur Sub Division Fazilpur
PUNJAB IIRIGATION SYSTEM IMPROVEMENT PROJECT
E/W for Repair of Existing Structures
Sadiq Feeder

RD Length X-Sec Area Mean Area Quantity


-

05+500 0 377.45 188.725 0

05+576 76 80.94 229.195 17418.820


-

10+500 0 638.64 319.32 0

10+577 77 112.87 375.755 28933.135


-

15+000 0 422.25 211.125 0

15+050 50 108.66 265.455 13272.750

Total (Cft) 59624.705

Total (‰Cft) 59.625

Contractor Sub Divisional Officer Sub Engineer


M/S Nishan Engineers Hajipur Sub Division Fazilpur
PUNJAB IRRIGATION SYSTEM IMPROVEMENT PROJECT
Appropriation Request (AR-DJT/RJP-02/01)

Rehabilitation: Noor Dhundi Canal

Bill As Per Approved Bid Increrase/Decrease As Per AR/Draft VO-02/01


Description
No.
Amount (Rs) Amount (Rs) Amount (Rs)

1 Earthwork 12,288,656.60 12,288,656.60

2 Data Board for H/R, Fall etc. 68,161.50 68,161.50

3 Data Board for Outlets 57,800.00 57,800.00

4 Meter Flume 377,375.70 377,375.70

5 Outlets for Earthen Channels 3,239,248.00 3,239,248.00

6 Dismantling of Outlet 62,000.00 62,000.00

7 RD Marks 31,781.25 31,781.25

8 Foot Bridge - -

9 Side Protection 705,462.30 705,462.30

10 Repairing Head Regulator 237,486.78 237,486.78

Contractor: Exuctive Engineer Resident Engineer


Nishan Engineers Rajanpur Canal Division Rajanpur PISIP Rajanpur
PUNJAB IRRIGATION SYSTEM IMPROVEMENT PROJECT
Appropriation Request (AR-DJT/RJP-02/01)

Rehabilitation: Noor Dhundi Canal

Bill As Per Approved Bid Increrase/Decrease As Per AR/Draft VO-02/01


Description
No.
Amount (Rs) Amount (Rs) Amount (Rs)
11 Gauge Reader Hut 540,993.50 540,993.50

12 Boundary Wall 45,942.50 45,942.50

13 Electrification 12,300.00 12,300.00

14 Regulation Gate 1,145,072.45 1,145,072.45

15 Cattle Ghat 1,674,234.00 (1,674,234.00) -

SUB TOTAL(1) :- 20,486,514.58 (1,674,234.00) 18,812,280.58

Contractor: Exuctive Engineer Resident Engineer


Nishan Engineers Rajanpur Canal Division Rajanpur PISIP Rajanpur
PUNJAB IRRIGATION SYSTEM IMPROVEMENT PROJECT
Appropriation Request (AR-DJT/RJP-02/1)
Cattle Ghat– Bill No.15
Rehabilitation: Noor Dhundi Canal
Revised
Sr. Quantity as Per
Description Unit Rate Quantity as per Bid Balance Quantity Remarks
No. (Rs.) Schedule AR-DJT/RJP-
01/02
Qty Amount Qty Amount Qty Amount
7/1 Excavation in foundation of building,
bridges and other
structures, including dagbelling,
dressing, refilling around structure As such there is no requirement
with excavated earth, watering and ‰ of the structure as per local
rammiing lead 3500 11.552 40432.00 0.000 0.00 (11.552) (40432.00)
Cf condition hence deleted from
upto one chain (30 m) and lif upto 5 scope of work.
f. (1.5 m)
b) in ordinary soil

7/2 Cement concrete brick or stone ballast


1.5" to 2" guage in foundation and As such there is no requirement
plinth ratio 1:3:6 % of the structure as per local
13500 10.590 142965.00 0.000 0.00 (10.590) (142965.00)
Cf condition hence deleted from
scope of work.

7/3 Cement concrete plain including


placing, compacting,finishing and
curing complete, (including As such there is no requirement
screening,leaning and washing of % of the structure as per local
16000 3.790 60640.00 0.000 0.00 (3.790) (60640.00)
stone aggrigate) Cf condition hence deleted from
ratio 1;2;4 (Type-C) scope of work.

7/4 Providing and laying reinforced


cement concrete (including As such there is no requirement
prestressed concrete) using coarse Cf 250 342.000 85500.00 0.000 0.00 (342.000) (85500.00) of the structure as per local
sand and screened, graded and condition hence deleted from
washed aggregate in required shape scope of work.
and design, including forms, moulds,
shuttering, lifing, compacting, curing,
rendering and finishing exposed
surface, complete (but excluding the
cost of steel reinforcement, its
fabrication & placing in position etc.)
a) Reinforced cement concrete in roof
slab, beams, columns, lintels, girders
PUNJAB IRRIGATION SYSTEM IMPROVEMENT PROJECT
Appropriation Request (AR-DJT/RJP-02/1)
Cattle Ghat– Bill No.15
Rehabilitation: Noor Dhundi Canal
Revised
Sr. Quantity as Per
Description Unit Rate Quantity as per Bid Balance Quantity Remarks
No. (Rs.) Schedule AR-DJT/RJP-
01/02
Qty Amount Qty Amount Qty Amount
7/5 Providing and fabrication of mild steel
reinforcement for cement concrete
including cutting bending laying in
position making joints and fastening
including cost of binding wire and
labour charges for binding of steel As such there is no requirement
reinforcement (also includes removal % 9500 8.540 81130.00 0.000 0.00 (8.540) (81130.00) of the structure as per local
of rust from bars) deformed bars Kg condition hence deleted from
(Grade-40) scope of work.

7/6 Dry rammed brick or stone ballast,1.5" As such there is no requirement


to 2" guage % of the structure as per local
2000 1.600 3200.00 0.000 0.00 (1.600) (3200.00)
Cf condition hence deleted from
scope of work.
7/7 Pacca brick work other than building As such there is no requirement
upto 10' height % of the structure as per local
Ratio (1:3) 12500 33.860 423250.00 0.000 0.00 (33.860) (423250.00)
Cf condition hence deleted from
scope of work.
Total 837117.00 0.00 (837117.00)
2 No's Total 1674234.00 0.00 (1674234.00)

Contractor Sub Divisional Officer Executive Engineer


M/S Nishan Engineers Hajipur Sub Division Fazilpur Rajanpur Canal Division Rajanpur
PUNJAB IRRIGATION SYSTEM IMPROVEMENT PROJECT
Appropriation Request (AR-DJT/RJP-02/01)

Taskeen Disty

Bill As Per Approved Bid Increrase/Decrease As Per AR/Draft VO-02/01


Description
No.
Amount (Rs) Amount (Rs) Amount (Rs)

1 Earthwork 18,708,032.50 18,708,032.50

2 Concrete Lining 36,062,166.54 36,062,166.54

3 Dismantling of Outlet 49,600.00 49,600.00

4 Temporary Outlets 408,299.52 408,299.52

5 APM Outlets for Lined Section 2,301,302.40 2,301,302.40

6 RD Marks 19,068.75 19,068.75

7 Cattle Ghat 1,674,234.00 (1,674,234.00) -

8 Repairing Existing Structures 44,340.00 44,340.00

9 Data Board for H/R, Fall etc. 53,014.50 53,014.50

10 Data Board for Outlets 49,130.00 49,130.00

Contractor: Exuctive Engineer Resident Engineer


Nishan Engineers Rajanpur Canal Division Rajanpur PISIP Rajanpur
PUNJAB IRRIGATION SYSTEM IMPROVEMENT PROJECT
Appropriation Request (AR-DJT/RJP-02/01)

Taskeen Disty

Bill As Per Approved Bid Increrase/Decrease As Per AR/Draft VO-02/01


Description
No.
Amount (Rs) Amount (Rs) Amount (Rs)
11 Tail Cluster 44,247.35 37,785.55 82,032.90

12 Village Road Bridge - 443,212.87 443,212.87

SUB TOTAL(1) :- 59,413,435.56 (1,193,235.58) 58,220,199.98

Contractor: Exuctive Engineer Resident Engineer


Nishan Engineers Rajanpur Canal Division Rajanpur PISIP Rajanpur
PUNJAB IRRIGATION SYSTEM IMPROVEMENT PROJECT
Appropriation Request (AR-DJT/RJP-02/1)
Cattle Ghat– Bill No.7
Taskeen Disty
Sr. Description Unit Rate Quantity as per Bid Revised Quantity as Per Balance Quantity Remarks
No. (Rs.) Schedule AR-DJT/RJP-02/01
Qty Amount Qty Amount Qty Amount
7/1 Excavation in foundation of building,
bridges and other
structures, including dagbelling,
dressing, refilling around structure As such there is no requirement
with excavated earth, watering and ‰ of the structure as per local
rammiing lead 3500 11.552 40432.00 0.000 0.00 (11.552) (40432.00)
Cf condition hence deleted from
upto one chain (30 m) and lif upto 5 scope of work.
f. (1.5 m)
b) in ordinary soil

7/2 Cement concrete brick or stone ballast


1.5" to 2" guage in foundation and As such there is no requirement
plinth ratio 1:3:6 % of the structure as per local
13500 10.590 142965.00 0.000 0.00 (10.590) (142965.00)
Cf condition hence deleted from
scope of work.

7/3 Cement concrete plain including


placing, compacting,finishing and
curing complete, (including As such there is no requirement
screening,leaning and washing of % of the structure as per local
16000 3.790 60640.00 0.000 0.00 (3.790) (60640.00)
stone aggrigate) Cf condition hence deleted from
ratio 1;2;4 (Type-C) scope of work.

7/4 Providing and laying reinforced


cement concrete (including As such there is no requirement
prestressed concrete) using coarse Cf 250 342.000 85500.00 0.000 0.00 (342.000) (85500.00) of the structure as per local
sand and screened, graded and condition hence deleted from
washed aggregate in required shape scope of work.
and design, including forms, moulds,
shuttering, lifing, compacting, curing,
rendering and finishing exposed
surface, complete (but excluding the
cost of steel reinforcement, its
fabrication & placing in position etc.)
a) Reinforced cement concrete in roof
slab, beams, columns, lintels, girders
PUNJAB IRRIGATION SYSTEM IMPROVEMENT PROJECT
Appropriation Request (AR-DJT/RJP-02/1)
Cattle Ghat– Bill No.7
Taskeen Disty
Sr. Description Unit Rate Quantity as per Bid Revised Quantity as Per Balance Quantity Remarks
No. (Rs.) Schedule AR-DJT/RJP-02/01
Qty Amount Qty Amount Qty Amount
7/5 Providing and fabrication of mild steel
reinforcement for cement concrete
including cutting bending laying in
position making joints and fastening
including cost of binding wire and
labour charges for binding of steel As such there is no requirement
reinforcement (also includes removal % 9500 8.540 81130.00 0.000 0.00 (8.540) (81130.00) of the structure as per local
of rust from bars) deformed bars Kg condition hence deleted from
(Grade-40) scope of work.

7/6 Dry rammed brick or stone ballast,1.5" As such there is no requirement


to 2" guage % of the structure as per local
2000 1.600 3200.00 0.000 0.00 (1.600) (3200.00)
Cf condition hence deleted from
scope of work.
7/7 Pacca brick work other than building As such there is no requirement
upto 10' height % of the structure as per local
Ratio (1:3) 12500 33.860 423250.00 0.000 0.00 (33.860) (423250.00)
Cf condition hence deleted from
scope of work.
Total 837117.00 0.00 (837117.00)
2 No's Total 1674234.00 0.00 (1674234.00)

Contractor Sub Divisional Officer Executive Engineer


M/S Nishan Engineers Hajipur Sub Division Fazilpur Rajanpur Canal Division Rajanpur
PUNJAB IRRIGATION SYSTEM IMPROVEMENT PROJECT
Appropriation Request (AR-DJT/RJP-02/1)
Tail Cluster– Bill No. 11
Taskeen Disty
Sr. Description Unit Rate Quantity as per Bid Revised Quantity as Per Balance Quantity Remarks
No. (Rs.) Schedule AR-DJT/RJP-01/02
Qty Amount Qty Amount Qty Amount
11/1 Excavation in foundation of building,
bridges and other structures, including
dagbelling, dressing, refilling around
structure with excavated earth,
watering and rammiing lead upto one ‰ Quantity increased/decreased
chain (30 m) and lif upto 5 f. (1.5 m) Cf 3000 0.338 1014.00 0.375 1125.69 0.037 111.69 due to compare of tender
in ordinary soil drawing to Construction Drawing

11/2 Cement concrete brick or stone ballast


1½ " to 2" (40 mm to 50 mm) Ratio Quantity increased/decreased
1:4:8 guage in foundation and plinth % 13500 0.763 10293.75 0.800 10800.10 0.038 506.35 due to compare of tender
Cf
drawing to Construction Drawing

11/3 Pacca brick work in foundation and


plinth in:- Quantity increased/decreased
%
Ratio 1:3 Cement sand mortar 12500 2.340 29250.00 4.071 50887.70 1.731 21637.70 due to compare of tender
Cf
drawing to Construction Drawing

11/4 Cement concrete plain including


placing, compacting, finishing and Quantity increased/decreased
curing complete (including screening % 16000 0.231 3689.60 1.201 19219.40 0.971 15529.80 due to compare of tender
and washing of stone aggregate): Cf
drawing to Construction Drawing
(f) Ratio 1: 2: 4 (Type-C)

Total 44247.35 82032.90 37785.55

Contractor Sub Divisional Officer Executive Engineer


PUNJAB IRRIGATION SYSTEM IMPROVEMENT PROJECT
Appropriation Request (AR-DJT/RJP-02/1)
Tail Cluster– Bill No. 11
Taskeen Disty
Sr. Description Unit Rate Quantity as per Bid Revised Quantity as Per Balance Quantity Remarks
No. (Rs.) Schedule AR-DJT/RJP-01/02
Qty Amount Qty Amount Qty Amount
M/S Nishan Engineers Hajipur Sub Division Fazilpur Rajanpur Canal Division Rajanpur
PUNJAB IRRIGATION SYSTEM IMPROVEMENT PROJECT
Appropriation Request (AR-DJT/RJP-02/1)
Village Road Bridge – Bill No. 12
Taskeen Disty
Sr. Description Unit Rate Quantity as per Bid Revised Quantity as Per Balance Quantity Remarks
No. (Rs.) Schedule AR-DJT/RJP-01/02
Qty Amount Qty Amount Qty Amount
12/1 Excavation in foundation of buildings,
bridges and other structures including
dagbelling, dressing, refilling around
structure with excavated earth, Area along the both sides of
watering and ramming lead up to one ‰ canal is populated area, there is
chain (30 m) and lif up to 5 f. (1.5 m) Cf 3000 0.000 0.00 1.143 3429.72 1.143 3429.72
requirement of VRB so that a
In ordinary soil new VRB is Provided.

12/2 Cement concrete brick or stone ballast


1½ " to 2" (40 mm to 80 mm) gauge, Area along the both sides of
in foundation and plinth:- % canal is populated area, there is
13500 0.000 0.00 0.941 12701.75 0.941 12701.75
(b) Ratio 1: 4: 8 Cf requirement of VRB so that a
new VRB is Provided.
12/3 Reinforced cement concrete in roof
slab, beams, columns, lintels, girders
& other structural members laid in
situ or precast laid in position or Area along the both sides of
prestressed members cast in situ, Cf 275 0.000 0.00 291.681 80212.14 291.681 80212.14 canal is populated area, there is
complete in all respects:- Ratio 1:2:4 requirement of VRB so that a
(Type-C) new VRB is Provided.

12/4 Providing and fabrication of mild steel


reinforcement for cement concrete Area along the both sides of
including cutting bending laying in % 9500 0.000 0.00 11.499 109245.16 11.499 109245.16 canal is populated area, there is
position deformed bars Kg requirement of VRB so that a
new VRB is Provided.
PUNJAB IRRIGATION SYSTEM IMPROVEMENT PROJECT
Appropriation Request (AR-DJT/RJP-02/1)
Village Road Bridge – Bill No. 12
Taskeen Disty
Sr. Description Unit Rate Quantity as per Bid Revised Quantity as Per Balance Quantity Remarks
No. (Rs.) Schedule AR-DJT/RJP-01/02
Qty Amount Qty Amount Qty Amount
12/5 Pacca brick work in foundation and
plinth in:- i) Cement, sand mortar:- Area along the both sides of
Ratio 1:3 % canal is populated area, there is
12500 0.000 0.00 11.714 146424.81 11.714 146424.81
Cf requirement of VRB so that a
new VRB is Provided.
12/6 Cement concrete plain including
placing, compacting, finishing and
curing complete (including screening Area along the both sides of
and washing of stone aggregate): % canal is populated area, there is
16000 0.000 0.00 4.819 77106.62 4.819 77106.62
(f) Ratio 1: 2: 4 (Type-C) Cf requirement of VRB so that a
new VRB is Provided.

12/7 Cement plaster 3/8" (10 mm) thick


under soffit of R.C.C. roof slabs only, Area along the both sides of
upto 20' height % canal is populated area, there is
1500 0.000 0.00 6.062 9092.93 6.062 9092.93
a) Ratio 1:2 Sf requirement of VRB so that a
new VRB is Provided.
12/8 Cement pointing struck joints, on Area along the both sides of
walls, upto 20' (6.00 m) hiehgt:- % canal is populated area, there is
a) ratio 1:2 1200 0.000 0.00 2.599 3118.99 2.599 3118.99
Sf requirement of VRB so that a
new VRB is Provided.
12/9 Bitumen coating to plastered or
cement concrete surface. Area along the both sides of
20 lbs per 100 Sf ( 9.07 kg per Sq. m.) % 400 0.000 0.00 4.702 1880.78 4.702 1880.78 canal is populated area, there is
Sf requirement of VRB so that a
new VRB is Provided.

Total 0.00 443212.87 443212.87


PUNJAB IRRIGATION SYSTEM IMPROVEMENT PROJECT
Appropriation Request (AR-DJT/RJP-02/1)
Village Road Bridge – Bill No. 12
Taskeen Disty
Sr. Description Unit Rate Quantity as per Bid Revised Quantity as Per Balance Quantity Remarks
No. (Rs.) Schedule AR-DJT/RJP-01/02
Qty Amount Qty Amount Qty Amount

Contractor Sub Divisional Officer Executive Engineer


M/S Nishan Engineers Hajipur Sub Division Fazilpur Rajanpur Canal Division Rajanpur
PUNJAB IIRIGATION SYSTEM IMPROVEMENT PROJECT
Tail Cluster
Taskeen Disty

Description Unit No Length Width Depth Qty

Excavation

Sec C-C Cft 1 7 10.3 2 144.200

Sec B-B Cft 3 13.7 3.41 1.25 175.189

Toe Wall Cft 3 5.53 1.65 2.04 55.842

Total (Cft) 375.231

Total (‰Cft) 0.375

lean (1:3:6)

Sec C-C Cft 1 7.06 10.3 0.333 24.215

Sec B-B Cft 3 13.7 3.41 0.333 46.670

Toe Wall Cft 3 5.53 1.65 0.333 9.115

Total (Cft) 80.001

Total (%Cft) 0.800

B/W 1:3 c/s Mortor

Sec C-C Cft 2 7.06 1.5 0.375 7.943

Cft 2 7.06 2.983 2.833 119.326

Cft 2 7.06 1.15 0.75 12.179

Outer Wall Cft 6 13.7 1.15 1.575 148.885

Cft 6 13.7 0.75 0.75 46.238

Bed Cft 3 8.13 0.53 0.375 4.848

Cft 3 6.15 1.03 0.375 7.126

Cut Wall Cft 3 5.53 1.15 1.125 21.463

Cft 6 2 1.15 2.833 39.095

Total (Cft) 407.102

Total (%Cft) 4.071

PCC (1:2:4)

Sec C-C Cft 1 7.06 10.3 0.5 36.359

Sec B-B Cft 3 13.7 3.41 0.5 70.076

Toe Wall Cft 3 5.53 1.65 0.5 13.687

Total (Cft) 120.121

Total (%Cft) 1.201


PUNJAB IIRIGATION SYSTEM IMPROVEMENT PROJECT
Tail Cluster
Taskeen Disty

Description Unit No Length Width Depth Qty


Contractor Sub Divisional Officer Sub Engineer
M/S Nishan Engineers Hajipur Sub Division Fazilpur
PUNJAB IRRIGATION SYSTEM IMPROVEMENT PROJECT. (Package No. DJT/RJP-2)
NAME OF WORK:- CONSTRUCTION OF V.R. BRRIDGE.
DETAIL OF WORK & COST.

Sr. # Description Qty Unit

1 Excavation in foundation of building, bridges and other


structures, including dagbelling, dressing, refilling around
structure with excavated earth, watering and rammiing lead
upto one chain (30 m) and lift upto 5 ft. (1.5 m)
in ordinary soil.
Total = 1143.24 Cft
Ch. 3 It 21 P.29 @ Rs. 2996.95 %o Cft
2 Cement concrete brick or stone ballast 1½ " to 2" (40 mm to
5(b) Ratio 1: 4: 80 mm) gauge, in foundation and plinth:

Total = 94 Cft
Ch. 6 .IT 3(b) P.41 @ Rs. 7,964.05 % Cft
3 (a) (i) Reinforced cement concrete in roof slab, beams, .
columns lintels, girders and other structural members laid in
situ or precast laid in position, or prestressed members cast
in situ, complete in all respects:-
(3) (c) Type C (nominal mix 1: 2: 4)
Total = 292 Cft
Ch. 6 .IT 6 a (i) P.42 @ Rs. 230.70 P Cft
4 Fabrication of mild steel reinforcement for cement concrete,
including cutting, bending, laying in position, making joints
and fastenings, including cost of binding wire and labour
charges for binding of steel reinforcement (also includes
removal of rust from bars):-
(b) deformed bars
= = 1150
Ch. 6 .IT 9 (b) @ Rs. 9278.75 % kg
5 Pacca brick work in foundation and plinth in:-
i) Cement, sand mortar:-
Ratio 1:3
Total = 1171 Cft
Ch.7 .IT 4 (i) P.52 @ Rs. 11676.25 % Cft
8 Cement concrete plain including placing, compacting, finishing and curing
complete (including screening and washing of stone aggregate):
Total = 482 Cft
Ch.6 Itm-5f @ Rs. 14985.95 % Cft
9 Cement plaster 3/8" (10 mm) thick under soffit of R.C.C.
roof slabs only, upto 20' height
a) 1:2
R/Slab = 606 Sft
Ch.11 .IT 10 (a) @ Rs. 1286.10 % Sft
10 Cement pointing deep struck joint on walls up to 20 ft height ratio 1:2
cement sand mortar.
Abutment = 259.9156 Sft
Ch-11 P-76 Item-18-a @ Rs. 1077.75 % Sft
Bitumen coating to plastered or cement concrete surface 14 LBS bitumen %Sft
Serial No. 9(ii) Ch# 13 of MRS 2nd Quarter 2011 = 470.195
@ Rs. 519.8 % Sft
Total =

Contractor Sub Divisional Officer Sub Engineer


M/S Nishan Engineers Hajipur Sub Division Fazilpur
YSTEM IMPROVEMENT PROJECT. (Package No. DJT/RJP-2)
ORK:- CONSTRUCTION OF V.R. BRRIDGE.
DETAIL OF WORK & COST.
Amount
(In Rs.)

3426

7493

67291

106701

136775

72220

7796

2801

2444
406947

Sub Engineer
PUNJAB IIRIGATION SYSTEM IMPROVEMENT PROJECT
Village Road Bridge@ RD
Taskeen Disty

Description Unit No Length Width Depth Qty

Excavation

Abutment Wall Cft 2 16.85 7 3 707.700

Wing Wall Cft 4 5.185 7 3 435.540

Total (Cft) 1143.240

Total (‰Cft) 1.143

lean (1:4:8)

Abutment Wall Cft 2 16.85 5.19 0.333 58.243

Wing Wall Cft 4 5.185 5.19 0.333 35.844

Total (Cft) 94.087

Total (%Cft) 0.941

RCC (1:2:4)

Abutment Cap Cft 2 18 1.91 0.75 51.570

Cft 2 18 0.666 0.75 17.982

Roof Slab Cft 1 17 10.333 1 175.661

Parapet Wall Cft 2 10.333 1.5 0.666 20.645

Cft 2 10.333 0.833 1.5 25.822

Total (Cft) 291.681

B/W (1:3)

Abutment Wall

Step-1 Cft 2 16.85 4.19 1 141.203

Step-2 Cft 2 16.85 3.81 1 128.397

Step-3 Cft 2 16.85 3.43 1 115.591

Step-4 Cft 2 16.85 3.05 1 102.785

Step-5 Cft 2 16.85 2.67 1 89.979

Step-6 Cft 2 16.85 2.29 1 77.173

Wing Wall

Step-1 Cft 4 5.185 4.19 1 86.901

Step-2 Cft 4 5.185 3.81 1 79.019

Step-3 Cft 4 5.185 3.43 1 71.138

Step-4 Cft 4 5.185 3.05 1 63.257

Step-5 Cft 4 5.185 2.67 1 55.376

Step-6 Cft 4 5.185 2.29 1 47.495


PUNJAB IIRIGATION SYSTEM IMPROVEMENT PROJECT
Village Road Bridge@ RD
Taskeen Disty

Description Unit No Length Width Depth Qty

Step-7 Cft 4 5.185 1.91 1 39.613

Step-8 Cft 4 5.185 1.53 1 31.732

Step-9 Cft 4 5.185 1.15 1.75 41.739

Total (Cft) 1171.398

Total (%Cft) 11.714

PCC (1:2:4)

Abutment Wall Cft 2 16.85 5.19 1 174.903

Wing Wall Cft 4 5.185 5.19 1 107.641

Coping at Wing Wall Cft 4 5.185 1.15 0.25 5.963

Floor Cft 1 18 8 0.25 36.000

Pcc Block Cft 2 15 4.5 0.583 78.705

Cft 2 15 3 0.583 52.470

Cft 2 15 1.5 0.583 26.235

Total (Cft) 481.916

Total (%Cft) 4.819

Plaster 3/8" thick in 1:2 c/s Mortor

Under Roof Slab Sft 1 17 8 136.000

Abutment Wall under Banks Sft 2 16.85 7.875 265.388

Wing Wall under Banks Sft 4 5.185 9.875 204.808

Total (Sft) 606.195

Total (%Sft) 6.062

Struck Pointing 1:2 c/s Mortor

Abutment Wall Sft 2 16.85 3.38 113.906

Wing Wall Sft 4 5.185 7.04 146.010

Total (Sft) 259.916

Total (%Sft) 2.599

Bitumen Coating at plastered surface below banks

Abutment Wall Sft 2 16.85 7.875 265.388

Wing Wall Sft 4 5.185 9.875 204.808

Total (Sft) 470.195

Total (%Sft) 4.702


PUNJAB IIRIGATION SYSTEM IMPROVEMENT PROJECT
Village Road Bridge@ RD
Taskeen Disty

Description Unit No Length Width Depth Qty

Contractor Sub Divisional Officer Sub Engineer


M/S Nishan Engineers Hajipur Sub Division Fazilpur
PUNJAB IRRIGATION SYSTEM IMPROVEMENT PROJECT
Bar Bending Detail
VRB at Taskeen Disty @ RD
Description Distribution Dia of Spacing No No Total Cut Total Unit Total Bending
Span Bar of of Bar Length Length Weight Weight Detail
Ft items Bar No's Ft Ft Kg/Ft Kg
Abuttment

Horizental Bars (Top) #4 2 2 4 17.667 70.668 0.302 21.342 "8-'17

Horizental Bars (Bott) #4 2 3 6 17.667 106.002 0.302 32.013 "8-'17

"2 +"2

Stirups 4.25 #4 6" C/C 2 35 70 4.667 326.690 0.302 98.660 "6

"8-'1

Side Bars (N.F) #4 2 2 4 17.667 70.668 0.302 21.342 "8-'17

Side Bars (F.F) #4 2 2 4 17.667 70.668 0.302 21.342 "8-'17

"2 +"2

Stirups 4.25 #4 6" C/C 2 35 70 3.667 256.690 0.302 77.520 "3-'1

"5

RCC Slab

Main Bars (Top) 16.667 #6 12" C/C 2 18 36 11.000 396.000 0.681 269.676 "0-'10 "6
"6

Distribution Bars (Bott) 8.25 #6 6" C/C 2 18 36 17.667 636.012 0.681 433.124 ""8-'16 "6
"6
PUNJAB IRRIGATION SYSTEM IMPROVEMENT PROJECT
Bar Bending Detail
VRB at Taskeen Disty @ RD
Description Distribution Dia of Spacing No No Total Cut Total Unit Total Bending
Span Bar of of Bar Length Length Weight Weight Detail
Ft items Bar No's Ft Ft Kg/Ft Kg
"2-'1
"6
Rings 16.667 #4 12" C/C 2 18 36 3.340 120.240 0.302 36.312 "2-'1

"6

Parapet

Longitudinal Bars (Top) #4 2 9 18 10.000 180.000 0.302 54.360 "0-'10

"5

"3-'1
Stirups 17 #4 12" C/C 2 18 36 7.750 279.000 0.302 84.258 "2-'1

"2-'1
Total Weight (Kg) 1149.949
Total Weight (%Kg) 11.499
Dia Of Bar Weight (Kg)
#4 447.149 "4
#6 702.8
Total Weight (Kg) 1149.95
"7
Contractor Sub Engineer Sub Divisional Officer
M/S Nishan Engineers Hajipur Sub Division Fazilpur
PUNJAB IRRIGATION SYSTEM IMPROVEMENT PROJECT
Appropriation Request (AR-DJT/RJP-02/01)

Patti Juma Minor

Bill As Per Approved Bid Increrase/Decrease As Per AR/Draft VO-02/01


Description
No.
Amount (Rs) Amount (Rs) Amount (Rs)

1 Earthwork 1,837,875.50 1,837,875.50

2 Concrete Lining 3,939,646.74 3,939,646.74

3 Dismantling of Outlet - -

4 Temporary Outlets - -

5 APM Outlets for Lined Section - -

6 RD Marks 3,813.75 3,813.75

7 Cattle Ghat - - -

8 Repairing Existing Structures 44,340.00 44,340.00

9 Data Board for H/R, Fall etc. 7,573.50 7,573.50

10 Data Board for Outlets 2,890.00 2,890.00

Contractor: Exuctive Engineer Resident Engineer


Nishan Engineers Rajanpur Canal Division Rajanpur PISIP Rajanpur
PUNJAB IRRIGATION SYSTEM IMPROVEMENT PROJECT
Appropriation Request (AR-DJT/RJP-02/01)

Patti Juma Minor

Bill As Per Approved Bid Increrase/Decrease As Per AR/Draft VO-02/01


Description
No.
Amount (Rs) Amount (Rs) Amount (Rs)
11 Tail Cluster 44,247.35 37,785.55 82,032.90

SUB TOTAL(1) :- 5,880,386.84 37,785.55 5,918,172.39

Contractor: Exuctive Engineer Resident Engineer


Nishan Engineers Rajanpur Canal Division Rajanpur PISIP Rajanpur
PUNJAB IRRIGATION SYSTEM IMPROVEMENT PROJECT
Appropriation Request (AR-DJT/RJP-02/1)
Tail Cluster– Bill No. 11
Patti Juma Minor
Sr. Description Unit Rate Quantity as per Bid Revised Quantity as Per Balance Quantity Remarks
No. (Rs.) Schedule AR-DJT/RJP-01/02
Qty Amount Qty Amount Qty Amount
11/1 Excavation in foundation of building,
bridges and other structures, including
dagbelling, dressing, refilling around
structure with excavated earth,
watering and rammiing lead upto one ‰ Quantity increased/decreased
chain (30 m) and lif upto 5 f. (1.5 m) Cf 3000 0.338 1014.00 0.375 1125.69 0.037 111.69 due to compare of tender
in ordinary soil drawing to Construction Drawing

11/2 Cement concrete brick or stone ballast


1½ " to 2" (40 mm to 50 mm) Ratio Quantity increased/decreased
1:4:8 guage in foundation and plinth % 13500 0.763 10293.75 0.800 10800.10 0.038 506.35 due to compare of tender
Cf
drawing to Construction Drawing

11/3 Pacca brick work in foundation and


plinth in:- Quantity increased/decreased
%
Ratio 1:3 Cement sand mortar 12500 2.340 29250.00 4.071 50887.70 1.731 21637.70 due to compare of tender
Cf
drawing to Construction Drawing

11/4 Cement concrete plain including


placing, compacting, finishing and Quantity increased/decreased
curing complete (including screening % 16000 0.231 3689.60 1.201 19219.40 0.971 15529.80 due to compare of tender
and washing of stone aggregate): Cf
drawing to Construction Drawing
(f) Ratio 1: 2: 4 (Type-C)

Total 44247.35 82032.90 37785.55

Contractor Sub Divisional Officer Executive Engineer


PUNJAB IRRIGATION SYSTEM IMPROVEMENT PROJECT
Appropriation Request (AR-DJT/RJP-02/1)
Tail Cluster– Bill No. 11
Patti Juma Minor
Sr. Description Unit Rate Quantity as per Bid Revised Quantity as Per Balance Quantity Remarks
No. (Rs.) Schedule AR-DJT/RJP-01/02
Qty Amount Qty Amount Qty Amount
M/S Nishan Engineers Hajipur Sub Division Fazilpur Rajanpur Canal Division Rajanpur
PUNJAB IIRIGATION SYSTEM IMPROVEMENT PROJECT
Tail Cluster
Patti Juma Minor

Description Unit No Length Width Depth Qty

Excavation

Sec C-C Cft 1 7 10.3 2 144.200

Sec B-B Cft 3 13.7 3.41 1.25 175.189

Toe Wall Cft 3 5.53 1.65 2.04 55.842

Total (Cft) 375.231

Total (‰Cft) 0.375

lean (1:3:6)

Sec C-C Cft 1 7.06 10.3 0.333 24.215

Sec B-B Cft 3 13.7 3.41 0.333 46.670

Toe Wall Cft 3 5.53 1.65 0.333 9.115

Total (Cft) 80.001

Total (%Cft) 0.800

B/W 1:3 c/s Mortor

Sec C-C Cft 2 7.06 1.5 0.375 7.943

Cft 2 7.06 2.983 2.833 119.326

Cft 2 7.06 1.15 0.75 12.179

Outer Wall Cft 6 13.7 1.15 1.575 148.885

Cft 6 13.7 0.75 0.75 46.238

Bed Cft 3 8.13 0.53 0.375 4.848

Cft 3 6.15 1.03 0.375 7.126

Cut Wall Cft 3 5.53 1.15 1.125 21.463

Cft 6 2 1.15 2.833 39.095

Total (Cft) 407.102

Total (%Cft) 4.071

PCC (1:2:4)

Sec C-C Cft 1 7.06 10.3 0.5 36.359

Sec B-B Cft 3 13.7 3.41 0.5 70.076

Toe Wall Cft 3 5.53 1.65 0.5 13.687

Total (Cft) 120.121

Total (%Cft) 1.201


PUNJAB IIRIGATION SYSTEM IMPROVEMENT PROJECT
Tail Cluster
Patti Juma Minor

Description Unit No Length Width Depth Qty


Contractor Sub Divisional Officer Sub Engineer
M/S Nishan Engineers Hajipur Sub Division Fazilpur
PUNJAB IRRIGATION SYSTEM IMPROVEMENT PROJECT
Appropriation Request (AR-DJT/RJP-02/01)

Fatehpur Disty

Bill As Per Approved Bid Increrase/Decrease As Per AR/Draft VO-02/01


Description
No.
Amount (Rs) Amount (Rs) Amount (Rs)

1 Earthwork 21,465,264.00 21,465,264.00

2 Concrete Lining 36,484,223.25 36,484,223.25

3 Dismantling of Outlet 58,900.00 58,900.00

4 Temporary Outlets 484,855.68 484,855.68

5 APM Outlets for Lined Section 2,732,796.60 2,732,796.60

6 RD Marks 26,060.63 26,060.63

7 Cattle Ghat 1,674,234.00 (1,674,234.00) -

8 Repairing Existing Structures 44,340.00 44,340.00

9 Data Board for H/R, Fall etc. 30,294.00 30,294.00

10 Data Board for Outlets 57,800.00 57,800.00

Contractor: Exuctive Engineer Resident Engineer


Nishan Engineers Rajanpur Canal Division Rajanpur PISIP Rajanpur
PUNJAB IRRIGATION SYSTEM IMPROVEMENT PROJECT
Appropriation Request (AR-DJT/RJP-02/01)

Fatehpur Disty

Bill As Per Approved Bid Increrase/Decrease As Per AR/Draft VO-02/01


Description
No.
Amount (Rs) Amount (Rs) Amount (Rs)
11 Tail Cluster 44,247.35 19,424.56 63,671.91

12 Village Road Bridge - 886,425.75 886,425.75

SUB TOTAL(1) :- 63,103,015.51 (768,383.69) 62,334,631.81

Contractor: Exuctive Engineer Resident Engineer


Nishan Engineers Rajanpur Canal Division Rajanpur PISIP Rajanpur
PUNJAB IRRIGATION SYSTEM IMPROVEMENT PROJECT
Appropriation Request (AR-DJT/RJP-02/1)
Cattle Ghat– Bill No.7
Fatehpur Disty
Sr. Description Unit Rate Quantity as per Bid Revised Quantity as Per Balance Quantity Remarks
No. (Rs.) Schedule AR-DJT/RJP-02/01
Qty Amount Qty Amount Qty Amount
7/1 Excavation in foundation of building,
bridges and other
structures, including dagbelling,
dressing, refilling around structure As such there is no requirement
with excavated earth, watering and ‰ of the structure as per local
rammiing lead 3500 11.552 40432.00 0.000 0.00 (11.552) (40432.00)
Cf condition hence deleted from
upto one chain (30 m) and lif upto 5 scope of work.
f. (1.5 m)
b) in ordinary soil

7/2 Cement concrete brick or stone ballast


1.5" to 2" guage in foundation and As such there is no requirement
plinth ratio 1:3:6 % of the structure as per local
13500 10.590 142965.00 0.000 0.00 (10.590) (142965.00)
Cf condition hence deleted from
scope of work.

7/3 Cement concrete plain including


placing, compacting,finishing and
curing complete, (including As such there is no requirement
screening,leaning and washing of % of the structure as per local
16000 3.790 60640.00 0.000 0.00 (3.790) (60640.00)
stone aggrigate) Cf condition hence deleted from
ratio 1;2;4 (Type-C) scope of work.

7/4 Providing and laying reinforced


cement concrete (including As such there is no requirement
prestressed concrete) using coarse Cf 250 342.000 85500.00 0.000 0.00 (342.000) (85500.00) of the structure as per local
sand and screened, graded and condition hence deleted from
washed aggregate in required shape scope of work.
and design, including forms, moulds,
shuttering, lifing, compacting, curing,
rendering and finishing exposed
surface, complete (but excluding the
cost of steel reinforcement, its
fabrication & placing in position etc.)
a) Reinforced cement concrete in roof
slab, beams, columns, lintels, girders
PUNJAB IRRIGATION SYSTEM IMPROVEMENT PROJECT
Appropriation Request (AR-DJT/RJP-02/1)
Cattle Ghat– Bill No.7
Fatehpur Disty
Sr. Description Unit Rate Quantity as per Bid Revised Quantity as Per Balance Quantity Remarks
No. (Rs.) Schedule AR-DJT/RJP-02/01
Qty Amount Qty Amount Qty Amount
7/5 Providing and fabrication of mild steel
reinforcement for cement concrete
including cutting bending laying in
position making joints and fastening
including cost of binding wire and
labour charges for binding of steel As such there is no requirement
reinforcement (also includes removal % 9500 8.540 81130.00 0.000 0.00 (8.540) (81130.00) of the structure as per local
of rust from bars) deformed bars Kg condition hence deleted from
(Grade-40) scope of work.

7/6 Dry rammed brick or stone ballast,1.5" As such there is no requirement


to 2" guage % of the structure as per local
2000 1.600 3200.00 0.000 0.00 (1.600) (3200.00)
Cf condition hence deleted from
scope of work.
7/7 Pacca brick work other than building As such there is no requirement
upto 10' height % of the structure as per local
Ratio (1:3) 12500 33.860 423250.00 0.000 0.00 (33.860) (423250.00)
Cf condition hence deleted from
scope of work.
Total 837117.00 0.00 (837117.00)
2 No's Total 1674234.00 0.00 (1674234.00)

Contractor Sub Divisional Officer Executive Engineer


M/S Nishan Engineers Hajipur Sub Division Fazilpur Rajanpur Canal Division Rajanpur
PUNJAB IRRIGATION SYSTEM IMPROVEMENT PROJECT
Appropriation Request (AR-DJT/RJP-02/1)
Tail Cluster– Bill No. 11
Fatehpur Disty
Sr. Description Unit Rate Quantity as per Bid Revised Quantity as Per Balance Quantity Remarks
No. (Rs.) Schedule AR-DJT/RJP-01/02
Qty Amount Qty Amount Qty Amount
11/1 Excavation in foundation of building,
bridges and other structures, including
dagbelling, dressing, refilling around
structure with excavated earth,
watering and rammiing lead upto one ‰ Quantity increased/decreased
chain (30 m) and lif upto 5 f. (1.5 m) Cf 3000 0.338 1014.00 0.298 894.66 (0.040) (119.34) due to compare of tender
in ordinary soil drawing to Construction Drawing

11/2 Cement concrete brick or stone ballast


1½ " to 2" (40 mm to 50 mm) Ratio Quantity increased/decreased
1:4:8 guage in foundation and plinth % 13500 0.763 10293.75 0.614 8289.75 (0.148) (2004.00) due to compare of tender
Cf
drawing to Construction Drawing

11/3 Pacca brick work in foundation and


plinth in:- Quantity increased/decreased
%
Ratio 1:3 Cement sand mortar 12500 2.340 29250.00 3.179 39735.42 0.839 10485.42 due to compare of tender
Cf
drawing to Construction Drawing

11/4 Cement concrete plain including


placing, compacting, finishing and Quantity increased/decreased
curing complete (including screening % 16000 0.231 3689.60 0.922 14752.08 0.691 11062.48 due to compare of tender
and washing of stone aggregate): Cf
drawing to Construction Drawing
(f) Ratio 1: 2: 4 (Type-C)

Total 44247.35 63671.91 19424.56

Contractor Sub Divisional Officer Executive Engineer


PUNJAB IRRIGATION SYSTEM IMPROVEMENT PROJECT
Appropriation Request (AR-DJT/RJP-02/1)
Tail Cluster– Bill No. 11
Fatehpur Disty
Sr. Description Unit Rate Quantity as per Bid Revised Quantity as Per Balance Quantity Remarks
No. (Rs.) Schedule AR-DJT/RJP-01/02
Qty Amount Qty Amount Qty Amount
M/S Nishan Engineers Hajipur Sub Division Fazilpur Rajanpur Canal Division Rajanpur
PUNJAB IRRIGATION SYSTEM IMPROVEMENT PROJECT
Appropriation Request (AR-DJT/RJP-02/1)
Village Road Bridge– Bill No. 12
Fatehpur Disty
Sr. Description Unit Rate Quantity as per Bid Revised Quantity as Per Balance Quantity Remarks
No. (Rs.) Schedule AR-DJT/RJP-01/02
Qty Amount Qty Amount Qty Amount
12/1 Excavation in foundation of buildings,
bridges and other structures including
dagbelling, dressing, refilling around
structure with excavated earth, Area along the both sides of
watering and ramming lead up to one ‰ canal is populated area, there is
chain (30 m) and lif up to 5 f. (1.5 m) Cf 3000 0.000 0.00 1.143 3429.72 1.143 3429.72
requirement of VRB so that a
In ordinary soil new VRB is Provided.

12/2 Cement concrete brick or stone ballast


1½ " to 2" (40 mm to 80 mm) gauge, Area along the both sides of
in foundation and plinth:- % canal is populated area, there is
13500 0.000 0.00 0.941 12701.75 0.941 12701.75
(b) Ratio 1: 4: 8 Cf requirement of VRB so that a
new VRB is Provided.
12/3 Reinforced cement concrete in roof
slab, beams, columns, lintels, girders
& other structural members laid in
situ or precast laid in position or Area along the both sides of
prestressed members cast in situ, Cf 275 0.000 0.00 291.681 80212.14 291.681 80212.14 canal is populated area, there is
complete in all respects:- Ratio 1:2:4 requirement of VRB so that a
(Type-C) new VRB is Provided.

12/4 Providing and fabrication of mild steel


reinforcement for cement concrete Area along the both sides of
including cutting bending laying in % 9500 0.000 0.00 11.499 109245.16 11.499 109245.16 canal is populated area, there is
position deformed bars Kg requirement of VRB so that a
new VRB is Provided.
PUNJAB IRRIGATION SYSTEM IMPROVEMENT PROJECT
Appropriation Request (AR-DJT/RJP-02/1)
Village Road Bridge– Bill No. 12
Fatehpur Disty
Sr. Description Unit Rate Quantity as per Bid Revised Quantity as Per Balance Quantity Remarks
No. (Rs.) Schedule AR-DJT/RJP-01/02
Qty Amount Qty Amount Qty Amount
12/5 Pacca brick work in foundation and
plinth in:- i) Cement, sand mortar:- Area along the both sides of
Ratio 1:3 % canal is populated area, there is
12500 0.000 0.00 11.714 146424.81 11.714 146424.81
Cf requirement of VRB so that a
new VRB is Provided.
12/6 Cement concrete plain including
placing, compacting, finishing and
curing complete (including screening Area along the both sides of
and washing of stone aggregate): % canal is populated area, there is
16000 0.000 0.00 4.819 77106.62 4.819 77106.62
(f) Ratio 1: 2: 4 (Type-C) Cf requirement of VRB so that a
new VRB is Provided.

12/7 Cement plaster 3/8" (10 mm) thick


under soffit of R.C.C. roof slabs only, Area along the both sides of
upto 20' height % canal is populated area, there is
1500 0.000 0.00 6.062 9092.93 6.062 9092.93
a) Ratio 1:2 Sf requirement of VRB so that a
new VRB is Provided.
12/8 Cement pointing struck joints, on Area along the both sides of
walls, upto 20' (6.00 m) hiehgt:- % canal is populated area, there is
a) ratio 1:2 1200 0.000 0.00 2.599 3118.99 2.599 3118.99
Sf requirement of VRB so that a
new VRB is Provided.
12/9 Bitumen coating to plastered or
cement concrete surface. Area along the both sides of
20 lbs per 100 Sf ( 9.07 kg per Sq. m.) % 400 0.000 0.00 4.702 1880.78 4.702 1880.78 canal is populated area, there is
Sf requirement of VRB so that a
new VRB is Provided.

Total 0.00 443212.87 443212.87


2 No VRB 0.00 886425.75 886425.75
PUNJAB IRRIGATION SYSTEM IMPROVEMENT PROJECT
Appropriation Request (AR-DJT/RJP-02/1)
Village Road Bridge– Bill No. 12
Fatehpur Disty
Sr. Description Unit Rate Quantity as per Bid Revised Quantity as Per Balance Quantity Remarks
No. (Rs.) Schedule AR-DJT/RJP-01/02
Qty Amount Qty Amount Qty Amount

Contractor Sub Divisional Officer Executive Engineer


M/S Nishan Engineers Hajipur Sub Division Fazilpur Rajanpur Canal Division Rajanpur
PUNJAB IIRIGATION SYSTEM IMPROVEMENT PROJECT
Tail Cluster
Fatehpur Disty

Description Unit No Length Width Depth Qty

Excavation

Sec C-C Cft 1 7 10.3 2 144.200

Sec B-B Cft 2 13.7 3.41 1.25 116.793

Toe Wall Cft 2 5.53 1.65 2.04 37.228

Total (Cft) 298.220

Total (‰Cft) 0.298

lean (1:3:6)

Sec C-C Cft 1 7.06 10.3 0.333 24.215

Sec B-B Cft 2 13.7 3.41 0.333 31.114

Toe Wall Cft 2 5.53 1.65 0.333 6.077

Total (Cft) 61.406

Total (%Cft) 0.614

B/W 1:3 c/s Mortor

Sec C-C Cft 2 7.06 1.5 0.375 7.943

Cft 2 7.06 2.983 2.833 119.326

Cft 2 7.06 1.15 0.75 12.179

Outer Wall Cft 4 13.7 1.15 1.575 99.257

Cft 4 13.7 0.75 0.75 30.825

Bed Cft 2 8.13 0.53 0.375 3.232

Cft 2 6.15 1.03 0.375 4.751

Cut Wall Cft 2 5.53 1.15 1.125 14.309

Cft 4 2 1.15 2.833 26.064

Total (Cft) 317.883

Total (%Cft) 3.179

PCC (1:2:4)

Sec C-C Cft 1 7.06 10.3 0.5 36.359

Sec B-B Cft 2 13.7 3.41 0.5 46.717

Toe Wall Cft 2 5.53 1.65 0.5 9.125

Total (Cft) 92.201

Total (%Cft) 0.922


PUNJAB IIRIGATION SYSTEM IMPROVEMENT PROJECT
Tail Cluster
Fatehpur Disty

Description Unit No Length Width Depth Qty


Contractor Sub Divisional Officer Sub Engineer
M/S Nishan Engineers Hajipur Sub Division Fazilpur
PUNJAB IRRIGATION SYSTEM IMPROVEMENT PROJECT. (Package No. DJT/RJP-2)
NAME OF WORK:- CONSTRUCTION OF V.R. BRRIDGE.
DETAIL OF WORK & COST.

Sr. # Description Qty Unit

1 Excavation in foundation of building, bridges and other


structures, including dagbelling, dressing, refilling around
structure with excavated earth, watering and rammiing lead
upto one chain (30 m) and lift upto 5 ft. (1.5 m)
in ordinary soil.
Total = 1143.24 Cft
Ch. 3 It 21 P.29 @ Rs. 2996.95 %o Cft
2 Cement concrete brick or stone ballast 1½ " to 2" (40 mm to
5(b) Ratio 1: 4: 80 mm) gauge, in foundation and plinth:

Total = 94.09 Cft


Ch. 6 .IT 3(b) P.41 @ Rs. 7,964.05 % Cft
3 (a) (i) Reinforced cement concrete in roof slab, beams, .
columns lintels, girders and other structural members laid in
situ or precast laid in position, or prestressed members cast
in situ, complete in all respects:-
(3) (c) Type C (nominal mix 1: 2: 4)
Total = 291.68 Cft
Ch. 6 .IT 6 a (i) P.42 @ Rs. 230.70 P Cft
4 Fabrication of mild steel reinforcement for cement concrete,
including cutting, bending, laying in position, making joints
and fastenings, including cost of binding wire and labour
charges for binding of steel reinforcement (also includes
removal of rust from bars):-
(b) deformed bars
= = 1149.95
Ch. 6 .IT 9 (b) @ Rs. 9278.75 % kg
5 Pacca brick work in foundation and plinth in:-
i) Cement, sand mortar:-
Ratio 1:3
Total = 1171.40 Cft
Ch.7 .IT 4 (i) P.52 @ Rs. 11676.25 % Cft
8 Cement concrete plain including placing, compacting, finishing and curing
complete (including screening and washing of stone aggregate):
Total = 481.92 Cft
Ch.6 Itm-5f @ Rs. 14985.95 % Cft
9 Cement plaster 3/8" (10 mm) thick under soffit of R.C.C.
roof slabs only, upto 20' height
a) 1:2
R/Slab = 606.20 Sft
Ch.11 .IT 10 (a) @ Rs. 1286.10 % Sft
10 Cement pointing deep struck joint on walls up to 20 ft height ratio 1:2
cement sand mortar.
Abutment = 259.92 Sft
Ch-11 P-76 Item-18-a @ Rs. 1077.75 % Sft
Bitumen coating to plastered or cement concrete surface 14 LBS bitumen %Sft
Serial No. 9(ii) Ch# 13 of MRS 2nd Quarter 2011 = 470.20
@ Rs. 519.8 % Sft
Total =

Contractor Sub Divisional Officer Sub Engineer


M/S Nishan Engineers Hajipur Sub Division Fazilpur
YSTEM IMPROVEMENT PROJECT. (Package No. DJT/RJP-2)
ORK:- CONSTRUCTION OF V.R. BRRIDGE.
DETAIL OF WORK & COST.
Amount
(In Rs.)

3426

7493

67291

106701

136775

72220

7796

2801

2444
406947

Sub Engineer
PUNJAB IIRIGATION SYSTEM IMPROVEMENT PROJECT
Village Road Bridge@ RD
Fatehpur Disty

Description Unit No Length Width Depth Qty

Excavation

Abutment Wall Cft 2 16.85 7 3 707.700

Wing Wall Cft 4 5.185 7 3 435.540

Total (Cft) 1143.240

Total (‰Cft) 1.143

lean (1:4:8)

Abutment Wall Cft 2 16.85 5.19 0.333 58.243

Wing Wall Cft 4 5.185 5.19 0.333 35.844

Total (Cft) 94.087

Total (%Cft) 0.941

RCC (1:2:4)

Abutment Cap Cft 2 18 1.91 0.75 51.570

Cft 2 18 0.666 0.75 17.982

Roof Slab Cft 1 17 10.333 1 175.661

Parapet Wall Cft 2 10.333 1.5 0.666 20.645

Cft 2 10.333 0.833 1.5 25.822

Total (Cft) 291.681

B/W (1:3)

Abutment Wall

Step-1 Cft 2 16.85 4.19 1 141.203

Step-2 Cft 2 16.85 3.81 1 128.397

Step-3 Cft 2 16.85 3.43 1 115.591

Step-4 Cft 2 16.85 3.05 1 102.785

Step-5 Cft 2 16.85 2.67 1 89.979

Step-6 Cft 2 16.85 2.29 1 77.173

Wing Wall

Step-1 Cft 4 5.185 4.19 1 86.901

Step-2 Cft 4 5.185 3.81 1 79.019

Step-3 Cft 4 5.185 3.43 1 71.138

Step-4 Cft 4 5.185 3.05 1 63.257

Step-5 Cft 4 5.185 2.67 1 55.376

Step-6 Cft 4 5.185 2.29 1 47.495


PUNJAB IIRIGATION SYSTEM IMPROVEMENT PROJECT
Village Road Bridge@ RD
Fatehpur Disty

Description Unit No Length Width Depth Qty

Step-7 Cft 4 5.185 1.91 1 39.613

Step-8 Cft 4 5.185 1.53 1 31.732

Step-9 Cft 4 5.185 1.15 1.75 41.739

Total (Cft) 1171.398

Total (%Cft) 11.714

PCC (1:2:4)

Abutment Wall Cft 2 16.85 5.19 1 174.903

Wing Wall Cft 4 5.185 5.19 1 107.641

Coping at Wing Wall Cft 4 5.185 1.15 0.25 5.963

Floor Cft 1 18 8 0.25 36.000

Pcc Block Cft 2 15 4.5 0.583 78.705

Cft 2 15 3 0.583 52.470

Cft 2 15 1.5 0.583 26.235

Total (Cft) 481.916

Total (%Cft) 4.819

Plaster 3/8" thick in 1:2 c/s Mortor

Under Roof Slab Sft 1 17 8 136.000

Abutment Wall under Banks Sft 2 16.85 7.875 265.388

Wing Wall under Banks Sft 4 5.185 9.875 204.808

Total (Sft) 606.195

Total (%Sft) 6.062

Struck Pointing 1:2 c/s Mortor

Abutment Wall Sft 2 16.85 3.38 113.906

Wing Wall Sft 4 5.185 7.04 146.010

Total (Sft) 259.916

Total (%Sft) 2.599

Bitumen Coating at plastered surface below banks

Abutment Wall Sft 2 16.85 7.875 265.388

Wing Wall Sft 4 5.185 9.875 204.808

Total (Sft) 470.195

Total (%Sft) 4.702


PUNJAB IIRIGATION SYSTEM IMPROVEMENT PROJECT
Village Road Bridge@ RD
Fatehpur Disty

Description Unit No Length Width Depth Qty

Contractor Sub Divisional Officer Sub Engineer


M/S Nishan Engineers Hajipur Sub Division Fazilpur
PUNJAB IRRIGATION SYSTEM IMPROVEMENT PROJECT
Bar Bending Detail
VRB at Fatehpur Disty @ RD
Description Distribution Dia of Spacing No No Total Cut Total Unit Total Bending
Span Bar of of Bar Length Length Weight Weight Detail
Ft items Bar No's Ft Ft Kg/Ft Kg
Abuttment

Horizental Bars (Top) #4 2 2 4 17.667 70.668 0.302 21.342 "8-'17

Horizental Bars (Bott) #4 2 3 6 17.667 106.002 0.302 32.013 "8-'17

"2 +"2

Stirups 4.25 #4 6" C/C 2 35 70 4.667 326.690 0.302 98.660 "6

"8-'1

Side Bars (N.F) #4 2 2 4 17.667 70.668 0.302 21.342 "8-'17

Side Bars (F.F) #4 2 2 4 17.667 70.668 0.302 21.342 "8-'17

"2 +"2

Stirups 4.25 #4 6" C/C 2 35 70 3.667 256.690 0.302 77.520 "3-'1

"5

RCC Slab

Main Bars (Top) 16.667 #6 12" C/C 2 18 36 11.000 396.000 0.681 269.676 "0-'10 "6
"6

Distribution Bars (Bott) 8.25 #6 6" C/C 2 18 36 17.667 636.012 0.681 433.124 ""8-'16 "6
"6
PUNJAB IRRIGATION SYSTEM IMPROVEMENT PROJECT
Bar Bending Detail
VRB at Fatehpur Disty @ RD
Description Distribution Dia of Spacing No No Total Cut Total Unit Total Bending
Span Bar of of Bar Length Length Weight Weight Detail
Ft items Bar No's Ft Ft Kg/Ft Kg
"2-'1
"6
Rings 16.667 #4 12" C/C 2 18 36 3.340 120.240 0.302 36.312 "2-'1

"6

Parapet

Longitudinal Bars (Top) #4 2 9 18 10.000 180.000 0.302 54.360 "0-'10

"5

"3-'1
Stirups 17 #4 12" C/C 2 18 36 7.750 279.000 0.302 84.258 "2-'1

"2-'1
Total Weight (Kg) 1149.949
Total Weight (%Kg) 11.499
Dia Of Bar Weight (Kg)
#4 447.149 "4
#6 702.8
Total Weight (Kg) 1149.95
"7
Contractor Sub Engineer Sub Divisional Officer
M/S Nishan Engineers Hajipur Sub Division Fazilpur
PUNJAB IRRIGATION SYSTEM IMPROVEMENT PROJECT
Appropriation Request (AR-DJT/RJP-02/01)

1-L Fatehpur Minor

Bill As Per Approved Bid Increrase/Decrease As Per AR/Draft VO-02/01


Description
No.
Amount (Rs) Amount (Rs) Amount (Rs)

1 Earthwork 6,244,606.50 6,244,606.50

2 Concrete Lining 13,343,000.88 13,343,000.88

3 Dismantling of Outlet 27,900.00 27,900.00

4 Temporary Outlets 229,668.48 229,668.48

5 APM Outlets for Lined Section 2,301,302.40 2,301,302.40

6 RD Marks 10,805.63 10,805.63

7 Cattle Ghat 837,117.00 (837,117.00) -

8 Repairing Existing Structures 44,340.00 44,340.00

9 Data Board for H/R, Fall etc. 30,294.00 30,294.00

10 Data Board for Outlets 28,900.00 28,900.00

Contractor: Exuctive Engineer Resident Engineer


Nishan Engineers Rajanpur Canal Division Rajanpur PISIP Rajanpur
PUNJAB IRRIGATION SYSTEM IMPROVEMENT PROJECT
Appropriation Request (AR-DJT/RJP-02/01)

1-L Fatehpur Minor

Bill As Per Approved Bid Increrase/Decrease As Per AR/Draft VO-02/01


Description
No.
Amount (Rs) Amount (Rs) Amount (Rs)
11 Tail Cluster 44,247.35 37,785.55 82,032.90

12 Regulation of Gate - 914,894.00 914,894.00

13 Village Road Bridge - 443,212.87 443,212.87

SUB TOTAL(1) :- 23,142,182.24 558,775.42 23,700,957.66

Contractor: Exuctive Engineer Resident Engineer


Nishan Engineers Rajanpur Canal Division Rajanpur PISIP Rajanpur
PUNJAB IRRIGATION SYSTEM IMPROVEMENT PROJECT
Appropriation Request (AR-DJT/RJP-02/1)
Cattle Ghat– Bill No.7
1-L Fatehpur Minor
Revised
Sr. Quantity as Per
Description Unit Rate Quantity as per Bid Balance Quantity Remarks
No. (Rs.) Schedule AR-DJT/RJP-
01/02
Qty Amount Qty Amount Qty Amount
7/1 Excavation in foundation of building,
bridges and other
structures, including dagbelling,
dressing, refilling around structure As such there is no requirement
with excavated earth, watering and ‰ of the structure as per local
rammiing lead 3500 11.552 40432.00 0.000 0.00 (11.552) (40432.00)
Cf condition hence deleted from
upto one chain (30 m) and lif upto 5 scope of work.
f. (1.5 m)
b) in ordinary soil

7/2 Cement concrete brick or stone ballast


1.5" to 2" guage in foundation and As such there is no requirement
plinth ratio 1:3:6 % of the structure as per local
13500 10.590 142965.00 0.000 0.00 (10.590) (142965.00)
Cf condition hence deleted from
scope of work.

7/3 Cement concrete plain including


placing, compacting,finishing and
curing complete, (including As such there is no requirement
screening,leaning and washing of % of the structure as per local
16000 3.790 60640.00 0.000 0.00 (3.790) (60640.00)
stone aggrigate) Cf condition hence deleted from
ratio 1;2;4 (Type-C) scope of work.

7/4 Providing and laying reinforced


cement concrete (including As such there is no requirement
prestressed concrete) using coarse Cf 250 342.000 85500.00 0.000 0.00 (342.000) (85500.00) of the structure as per local
sand and screened, graded and condition hence deleted from
washed aggregate in required shape scope of work.
and design, including forms, moulds,
shuttering, lifing, compacting, curing,
rendering and finishing exposed
surface, complete (but excluding the
cost of steel reinforcement, its
fabrication & placing in position etc.)
a) Reinforced cement concrete in roof
slab, beams, columns, lintels, girders
PUNJAB IRRIGATION SYSTEM IMPROVEMENT PROJECT
Appropriation Request (AR-DJT/RJP-02/1)
Cattle Ghat– Bill No.7
1-L Fatehpur Minor
Revised
Sr. Quantity as Per
Description Unit Rate Quantity as per Bid Balance Quantity Remarks
No. (Rs.) Schedule AR-DJT/RJP-
01/02
Qty Amount Qty Amount Qty Amount
7/5 Providing and fabrication of mild steel
reinforcement for cement concrete
including cutting bending laying in
position making joints and fastening
including cost of binding wire and
labour charges for binding of steel As such there is no requirement
reinforcement (also includes removal % 9500 8.540 81130.00 0.000 0.00 (8.540) (81130.00) of the structure as per local
of rust from bars) deformed bars Kg condition hence deleted from
(Grade-40) scope of work.

7/6 Dry rammed brick or stone ballast,1.5" As such there is no requirement


to 2" guage % of the structure as per local
2000 1.600 3200.00 0.000 0.00 (1.600) (3200.00)
Cf condition hence deleted from
scope of work.
7/7 Pacca brick work other than building As such there is no requirement
upto 10' height % of the structure as per local
Ratio (1:3) 12500 33.860 423250.00 0.000 0.00 (33.860) (423250.00)
Cf condition hence deleted from
scope of work.
Total 837117.00 0.00 (837117.00)

Contractor Sub Divisional Officer Executive Engineer


M/S Nishan Engineers Hajipur Sub Division Fazilpur Rajanpur Canal Division Rajanpur
PUNJAB IRRIGATION SYSTEM IMPROVEMENT PROJECT
Appropriation Request (AR-DJT/RJP-02/1)
Tail Cluster– Bill No. 11
1-L Fatehpur Minor
Sr. Description Unit Rate Quantity as per Bid Revised Quantity as Per Balance Quantity Remarks
No. (Rs.) Schedule AR-DJT/RJP-01/02
Qty Amount Qty Amount Qty Amount
11/1 Excavation in foundation of building,
bridges and other structures, including
dagbelling, dressing, refilling around
structure with excavated earth,
watering and rammiing lead upto one ‰ Quantity increased/decreased
chain (30 m) and lif upto 5 f. (1.5 m) Cf 3000 0.338 1014.00 0.375 1125.69 0.037 111.69 due to compare of tender
in ordinary soil drawing to Construction Drawing

11/2 Cement concrete brick or stone ballast


1½ " to 2" (40 mm to 50 mm) Ratio Quantity increased/decreased
1:4:8 guage in foundation and plinth % 13500 0.763 10293.75 0.800 10800.10 0.038 506.35 due to compare of tender
Cf
drawing to Construction Drawing

11/3 Pacca brick work in foundation and


plinth in:- Quantity increased/decreased
%
Ratio 1:3 Cement sand mortar 12500 2.340 29250.00 4.071 50887.70 1.731 21637.70 due to compare of tender
Cf
drawing to Construction Drawing

11/4 Cement concrete plain including


placing, compacting, finishing and Quantity increased/decreased
curing complete (including screening % 16000 0.231 3689.60 1.201 19219.40 0.971 15529.80 due to compare of tender
and washing of stone aggregate): Cf
drawing to Construction Drawing
(f) Ratio 1: 2: 4 (Type-C)

Total 44247.35 82032.90 37785.55

Contractor Sub Divisional Officer Executive Engineer


PUNJAB IRRIGATION SYSTEM IMPROVEMENT PROJECT
Appropriation Request (AR-DJT/RJP-02/1)
Tail Cluster– Bill No. 11
1-L Fatehpur Minor
Sr. Description Unit Rate Quantity as per Bid Revised Quantity as Per Balance Quantity Remarks
No. (Rs.) Schedule AR-DJT/RJP-01/02
Qty Amount Qty Amount Qty Amount
M/S Nishan Engineers Hajipur Sub Division Fazilpur Rajanpur Canal Division Rajanpur
PUNJAB IRRIGATION SYSTEM IMPROVEMENT PROJECT
Appropriation Request (AR-DJT/RJP-02/1)
Regulation of Gate – Bill No. 12
1-L Fatehpur Minor
Sr. Description Unit Rate Quantity as per Bid Revised Quantity as Per Balance Quantity Remarks
No. (Rs.) Schedule AR-DJT/RJP-01/02
Qty Amount Qty Amount Qty Amount
12/1 Providing and installing Iron gate and
gearing system. (Only Supply-70%) Sf 25000 0.000 0.00 36.000 900000.00 36.000 900000.00 Provision of new regulation gate

12/2 Dismantling brick work in lime or %


cement mortar. 1000 0.000 0.00 0.174 174.00 0.174 174.00 Provision of new regulation gate
Cf
12/3 Cement concrete plain including
placing, compacting, finishing and
curing complete (including screening
and washing of stone aggregate) % 16000 0.000 0.00 0.097 1550.00 0.097 1550.00 Provision of new regulation gate
Ratio 1:2:4 (Type-C) Cf

12/4 Pacca brick work other than building


upto 10f. (3 m) Ratio 1:3 Cement % 12500 0.000 0.00 0.900 11250.00 0.900 11250.00
Cf Provision of new regulation gate
Sand mortar

12/6 Cement plaster ratio 1:3 upto 20' (6.00


m) height:- % 1600 0.000 0.00 1.200 1920.00 1.200 1920.00 Provision of new regulation gate
3/4'' (20mm) thick Sf

Total 0.00 914894.00 914894.00

Contractor Sub Divisional Officer Executive Engineer


M/S Nishan Engineers Hajipur Sub Division Fazilpur Rajanpur Canal Division Rajanpur
PUNJAB IRRIGATION SYSTEM IMPROVEMENT PROJECT
Appropriation Request (AR-DJT/RJP-02/1)
Village Road Bridge – Bill No. 13
1-L Fatehpur Minor
Sr. Description Unit Rate Quantity as per Bid Revised Quantity as Per Balance Quantity Remarks
No. (Rs.) Schedule AR-DJT/RJP-01/02
Qty Amount Qty Amount Qty Amount
13/1 Excavation in foundation of buildings,
bridges and other structures including
dagbelling, dressing, refilling around
structure with excavated earth, Area along the both sides of
watering and ramming lead up to one ‰ canal is populated area, there is
chain (30 m) and lif up to 5 f. (1.5 m) Cf 3000 0.000 0.00 1.143 3429.72 1.143 3429.72
requirement of VRB so that a
In ordinary soil new VRB is Provided.

13/2 Cement concrete brick or stone ballast


1½ " to 2" (40 mm to 80 mm) gauge, Area along the both sides of
in foundation and plinth:- % canal is populated area, there is
13500 0.000 0.00 0.941 12701.75 0.941 12701.75
(b) Ratio 1: 4: 8 Cf requirement of VRB so that a
new VRB is Provided.
13/3 Reinforced cement concrete in roof
slab, beams, columns, lintels, girders
& other structural members laid in
situ or precast laid in position or Area along the both sides of
prestressed members cast in situ, Cf 275 0.000 0.00 291.681 80212.14 291.681 80212.14 canal is populated area, there is
complete in all respects:- Ratio 1:2:4 requirement of VRB so that a
(Type-C) new VRB is Provided.

13/4 Providing and fabrication of mild steel


reinforcement for cement concrete Area along the both sides of
including cutting bending laying in % 9500 0.000 0.00 11.499 109245.16 11.499 109245.16 canal is populated area, there is
position deformed bars Kg requirement of VRB so that a
new VRB is Provided.
PUNJAB IRRIGATION SYSTEM IMPROVEMENT PROJECT
Appropriation Request (AR-DJT/RJP-02/1)
Village Road Bridge – Bill No. 13
1-L Fatehpur Minor
Sr. Description Unit Rate Quantity as per Bid Revised Quantity as Per Balance Quantity Remarks
No. (Rs.) Schedule AR-DJT/RJP-01/02
Qty Amount Qty Amount Qty Amount
13/5 Pacca brick work in foundation and
plinth in:- i) Cement, sand mortar:- Area along the both sides of
Ratio 1:3 % canal is populated area, there is
12500 0.000 0.00 11.714 146424.81 11.714 146424.81
Cf requirement of VRB so that a
new VRB is Provided.
13/6 Cement concrete plain including
placing, compacting, finishing and
curing complete (including screening Area along the both sides of
and washing of stone aggregate): % canal is populated area, there is
16000 0.000 0.00 4.819 77106.62 4.819 77106.62
(f) Ratio 1: 2: 4 (Type-C) Cf requirement of VRB so that a
new VRB is Provided.

13/7 Cement plaster 3/8" (10 mm) thick


under soffit of R.C.C. roof slabs only, Area along the both sides of
upto 20' height % canal is populated area, there is
1500 0.000 0.00 6.062 9092.93 6.062 9092.93
a) Ratio 1:2 Sf requirement of VRB so that a
new VRB is Provided.
13/8 Cement pointing struck joints, on Area along the both sides of
walls, upto 20' (6.00 m) hiehgt:- % canal is populated area, there is
a) ratio 1:2 1200 0.000 0.00 2.599 3118.99 2.599 3118.99
Sf requirement of VRB so that a
new VRB is Provided.
13/9 Bitumen coating to plastered or
cement concrete surface. Area along the both sides of
20 lbs per 100 Sf ( 9.07 kg per Sq. m.) % 400 0.000 0.00 4.702 1880.78 4.702 1880.78 canal is populated area, there is
Sf requirement of VRB so that a
new VRB is Provided.

Total 0.00 443212.87 443212.87


PUNJAB IRRIGATION SYSTEM IMPROVEMENT PROJECT
Appropriation Request (AR-DJT/RJP-02/1)
Village Road Bridge – Bill No. 13
1-L Fatehpur Minor
Sr. Description Unit Rate Quantity as per Bid Revised Quantity as Per Balance Quantity Remarks
No. (Rs.) Schedule AR-DJT/RJP-01/02
Qty Amount Qty Amount Qty Amount

Contractor Sub Divisional Officer Executive Engineer


M/S Nishan Engineers Hajipur Sub Division Fazilpur Rajanpur Canal Division Rajanpur
PUNJAB IIRIGATION SYSTEM IMPROVEMENT PROJECT
Tail Cluster
1-L Fatehpur Minor

Description Unit No Length Width Depth Qty

Excavation

Sec C-C Cft 1 7 10.3 2 144.200

Sec B-B Cft 3 13.7 3.41 1.25 175.189

Toe Wall Cft 3 5.53 1.65 2.04 55.842

Total (Cft) 375.231

Total (‰Cft) 0.375

lean (1:3:6)

Sec C-C Cft 1 7.06 10.3 0.333 24.215

Sec B-B Cft 3 13.7 3.41 0.333 46.670

Toe Wall Cft 3 5.53 1.65 0.333 9.115

Total (Cft) 80.001

Total (%Cft) 0.800

B/W 1:3 c/s Mortor

Sec C-C Cft 2 7.06 1.5 0.375 7.943

Cft 2 7.06 2.983 2.833 119.326

Cft 2 7.06 1.15 0.75 12.179

Outer Wall Cft 6 13.7 1.15 1.575 148.885

Cft 6 13.7 0.75 0.75 46.238

Bed Cft 3 8.13 0.53 0.375 4.848

Cft 3 6.15 1.03 0.375 7.126

Cut Wall Cft 3 5.53 1.15 1.125 21.463

Cft 6 2 1.15 2.833 39.095

Total (Cft) 407.102

Total (%Cft) 4.071

PCC (1:2:4)

Sec C-C Cft 1 7.06 10.3 0.5 36.359

Sec B-B Cft 3 13.7 3.41 0.5 70.076

Toe Wall Cft 3 5.53 1.65 0.5 13.687

Total (Cft) 120.121

Total (%Cft) 1.201


PUNJAB IIRIGATION SYSTEM IMPROVEMENT PROJECT
Tail Cluster
1-L Fatehpur Minor

Description Unit No Length Width Depth Qty


Contractor Sub Divisional Officer Sub Engineer
M/S Nishan Engineers Hajipur Sub Division Fazilpur
PUNJAB IRRIGATION SYSTEM IMPROVEMENT PROJECT
Iron Hydraulic Gate
Channel Name: 1-L Fatehpur Minor
B.S
Length Width Height Quantity
Item Brief Description Unit Nos. Quantity Remarks
(L) W H (Units)
No.
Mechanical Works
12/1 Providing and installing Iron gate and gearing system
Sf 1.0 8.000 4.500 36.000 36.000 Sf
Total 36.000 36.000 Sft

Civil Works
12/2 Dismantling brick work in lime or cement mortar.
Groves Cf 2.0 13.000 0.750 0.750 14.625 0.146 100 Cf
Crest Portion Cf 1.0 5.000 0.750 0.750 2.813 0.028 100 Cf
Total 17.438 0.174 100 Cf
12/3 Cement concrete plain including placing, compacting, finishing and curing complete
(including screening and washing of stone aggregate): Ratio 1: 2: 4 (3000 PSI)
Groves Cf 2.0 13.000 0.750 0.750 14.625 0.146 100 Cf
Crest Portion Cf 1.0 5.000 0.750 0.750 2.813 0.028 100 Cf
Deduction for Grove Cf 2.0 13.000 0.500 0.500 6.500 0.065 100 Cf
Channel

Deduction for Grove Cf 1.0 5.000 0.500 0.500 1.250 0.013 100 Cf
Channel in Bed

Total 9.688 0.097 100 Cf

12/4 Pacca brick work other than building upto 10ft. (3 m) Ratio 1:3 Cement Sand mortar
Cf 2.0 5.000 3.000 3.000 90.000 0.900 100 Cf
Total 90.000 0.900 100 Cf

12/6 Cement plaster ratio 1:3 upto 20' (6.00 m) height:-


3/4'' (20mm) thick
Sf 2.0 5.000 3.000 30.000 0.300 100 Sf
Sf 2.0 5.000 3.000 30.000 0.300 100 Sf
Sf 2.0 5.000 3.000 30.000 0.300 100 Sf
Sf 2.0 5.000 3.000 30.000 0.300 100 Sf
Total 120.000 1.200 100 Sf

Contractor Sub Divisional Officer Sub Engineer


M/S Nishan Engineers Hajipur Sub Division Fazilpur
PUNJAB IRRIGATION SYSTEM IMPROVEMENT PROJECT. (Package No. DJT/RJP-2)
NAME OF WORK:- CONSTRUCTION OF V.R. BRRIDGE.
DETAIL OF WORK & COST.

Sr. # Description Qty Unit

1 Excavation in foundation of building, bridges and other


structures, including dagbelling, dressing, refilling around
structure with excavated earth, watering and rammiing lead
upto one chain (30 m) and lift upto 5 ft. (1.5 m)
in ordinary soil.
Total = 1143.24 Cft
Ch. 3 It 21 P.29 @ Rs. 2996.95 %o Cft
2 Cement concrete brick or stone ballast 1½ " to 2" (40 mm to
5(b) Ratio 1: 4: 80 mm) gauge, in foundation and plinth:

Total = 94.09 Cft


Ch. 6 .IT 3(b) P.41 @ Rs. 7,964.05 % Cft
3 (a) (i) Reinforced cement concrete in roof slab, beams, .
columns lintels, girders and other structural members laid in
situ or precast laid in position, or prestressed members cast
in situ, complete in all respects:-
(3) (c) Type C (nominal mix 1: 2: 4)
Total = 291.68 Cft
Ch. 6 .IT 6 a (i) P.42 @ Rs. 230.70 P Cft
4 Fabrication of mild steel reinforcement for cement concrete,
including cutting, bending, laying in position, making joints
and fastenings, including cost of binding wire and labour
charges for binding of steel reinforcement (also includes
removal of rust from bars):-
(b) deformed bars
= = 1149.95
Ch. 6 .IT 9 (b) @ Rs. 9278.75 % kg
5 Pacca brick work in foundation and plinth in:-
i) Cement, sand mortar:-
Ratio 1:3
Total = 1171.40 Cft
Ch.7 .IT 4 (i) P.52 @ Rs. 11676.25 % Cft
8 Cement concrete plain including placing, compacting, finishing and curing
complete (including screening and washing of stone aggregate):
Total = 481.92 Cft
Ch.6 Itm-5f @ Rs. 14985.95 % Cft
9 Cement plaster 3/8" (10 mm) thick under soffit of R.C.C.
roof slabs only, upto 20' height
a) 1:2
R/Slab = 606.20 Sft
Ch.11 .IT 10 (a) @ Rs. 1286.10 % Sft
10 Cement pointing deep struck joint on walls up to 20 ft height ratio 1:2
cement sand mortar.
Abutment = 259.92 Sft
Ch-11 P-76 Item-18-a @ Rs. 1077.75 % Sft
Bitumen coating to plastered or cement concrete surface 14 LBS bitumen %Sft
Serial No. 9(ii) Ch# 13 of MRS 2nd Quarter 2011 = 470.20
@ Rs. 519.8 % Sft
Total =

Contractor Sub Divisional Officer Sub Engineer


M/S Nishan Engineers Hajipur Sub Division Fazilpur
YSTEM IMPROVEMENT PROJECT. (Package No. DJT/RJP-2)
ORK:- CONSTRUCTION OF V.R. BRRIDGE.
DETAIL OF WORK & COST.
Amount
(In Rs.)

3426

7493

67291

106701

136775

72220

7796

2801

2444
406947

Sub Engineer
PUNJAB IIRIGATION SYSTEM IMPROVEMENT PROJECT
Village Road Bridge@ RD
1-L Fatehpur Minor

Description Unit No Length Width Depth Qty

Excavation

Abutment Wall Cft 2 16.85 7 3 707.700

Wing Wall Cft 4 5.185 7 3 435.540

Total (Cft) 1143.240

Total (‰Cft) 1.143

lean (1:4:8)

Abutment Wall Cft 2 16.85 5.19 0.333 58.243

Wing Wall Cft 4 5.185 5.19 0.333 35.844

Total (Cft) 94.087

Total (%Cft) 0.941

RCC (1:2:4)

Abutment Cap Cft 2 18 1.91 0.75 51.570

Cft 2 18 0.666 0.75 17.982

Roof Slab Cft 1 17 10.333 1 175.661

Parapet Wall Cft 2 10.333 1.5 0.666 20.645

Cft 2 10.333 0.833 1.5 25.822

Total (Cft) 291.681

B/W (1:3)

Abutment Wall

Step-1 Cft 2 16.85 4.19 1 141.203

Step-2 Cft 2 16.85 3.81 1 128.397

Step-3 Cft 2 16.85 3.43 1 115.591

Step-4 Cft 2 16.85 3.05 1 102.785

Step-5 Cft 2 16.85 2.67 1 89.979

Step-6 Cft 2 16.85 2.29 1 77.173

Wing Wall

Step-1 Cft 4 5.185 4.19 1 86.901

Step-2 Cft 4 5.185 3.81 1 79.019

Step-3 Cft 4 5.185 3.43 1 71.138

Step-4 Cft 4 5.185 3.05 1 63.257

Step-5 Cft 4 5.185 2.67 1 55.376

Step-6 Cft 4 5.185 2.29 1 47.495


PUNJAB IIRIGATION SYSTEM IMPROVEMENT PROJECT
Village Road Bridge@ RD
1-L Fatehpur Minor

Description Unit No Length Width Depth Qty

Step-7 Cft 4 5.185 1.91 1 39.613

Step-8 Cft 4 5.185 1.53 1 31.732

Step-9 Cft 4 5.185 1.15 1.75 41.739

Total (Cft) 1171.398

Total (%Cft) 11.714

PCC (1:2:4)

Abutment Wall Cft 2 16.85 5.19 1 174.903

Wing Wall Cft 4 5.185 5.19 1 107.641

Coping at Wing Wall Cft 4 5.185 1.15 0.25 5.963

Floor Cft 1 18 8 0.25 36.000

Pcc Block Cft 2 15 4.5 0.583 78.705

Cft 2 15 3 0.583 52.470

Cft 2 15 1.5 0.583 26.235

Total (Cft) 481.916

Total (%Cft) 4.819

Plaster 3/8" thick in 1:2 c/s Mortor

Under Roof Slab Sft 1 17 8 136.000

Abutment Wall under Banks Sft 2 16.85 7.875 265.388

Wing Wall under Banks Sft 4 5.185 9.875 204.808

Total (Sft) 606.195

Total (%Sft) 6.062

Struck Pointing 1:2 c/s Mortor

Abutment Wall Sft 2 16.85 3.38 113.906

Wing Wall Sft 4 5.185 7.04 146.010

Total (Sft) 259.916

Total (%Sft) 2.599

Bitumen Coating at plastered surface below banks

Abutment Wall Sft 2 16.85 7.875 265.388

Wing Wall Sft 4 5.185 9.875 204.808

Total (Sft) 470.195

Total (%Sft) 4.702


PUNJAB IIRIGATION SYSTEM IMPROVEMENT PROJECT
Village Road Bridge@ RD
1-L Fatehpur Minor

Description Unit No Length Width Depth Qty

Contractor Sub Divisional Officer Sub Engineer


M/S Nishan Engineers Hajipur Sub Division Fazilpur
PUNJAB IRRIGATION SYSTEM IMPROVEMENT PROJECT
Bar Bending Detail
VRB at 1-L Fatehpur Minor @ RD
Description Distribution Dia of Spacing No No Total Cut Total Unit Total Bending
Span Bar of of Bar Length Length Weight Weight Detail
Ft items Bar No's Ft Ft Kg/Ft Kg
Abuttment

Horizental Bars (Top) #4 2 2 4 17.667 70.668 0.302 21.342 "8-'17

Horizental Bars (Bott) #4 2 3 6 17.667 106.002 0.302 32.013 "8-'17

"2 +"2

Stirups 4.25 #4 6" C/C 2 35 70 4.667 326.690 0.302 98.660 "6

"8-'1

Side Bars (N.F) #4 2 2 4 17.667 70.668 0.302 21.342 "8-'17

Side Bars (F.F) #4 2 2 4 17.667 70.668 0.302 21.342 "8-'17

"2 +"2

Stirups 4.25 #4 6" C/C 2 35 70 3.667 256.690 0.302 77.520 "3-'1

"5

RCC Slab

Main Bars (Top) 16.667 #6 12" C/C 2 18 36 11.000 396.000 0.681 269.676 "0-'10 "6
"6

Distribution Bars (Bott) 8.25 #6 6" C/C 2 18 36 17.667 636.012 0.681 433.124 ""8-'16 "6
"6
PUNJAB IRRIGATION SYSTEM IMPROVEMENT PROJECT
Bar Bending Detail
VRB at 1-L Fatehpur Minor @ RD
Description Distribution Dia of Spacing No No Total Cut Total Unit Total Bending
Span Bar of of Bar Length Length Weight Weight Detail
Ft items Bar No's Ft Ft Kg/Ft Kg
"2-'1
"6
Rings 16.667 #4 12" C/C 2 18 36 3.340 120.240 0.302 36.312 "2-'1

"6

Parapet

Longitudinal Bars (Top) #4 2 9 18 10.000 180.000 0.302 54.360 "0-'10

"5

"3-'1
Stirups 17 #4 12" C/C 2 18 36 7.750 279.000 0.302 84.258 "2-'1

"2-'1
Total Weight (Kg) 1149.949
Total Weight (%Kg) 11.499
Dia Of Bar Weight (Kg)
#4 447.149 "4
#6 702.8
Total Weight (Kg) 1149.95
"7
Contractor Sub Engineer Sub Divisional Officer
M/S Nishan Engineers Hajipur Sub Division Fazilpur
PUNJAB IRRIGATION SYSTEM IMPROVEMENT PROJECT
Appropriation Request (AR-DJT/RJP-02/01)

Noor Dhundi Canal

Bill As Per Approved Bid Increrase/Decrease As Per AR/Draft VO-02/01


Description
No.
Amount (Rs) Amount (Rs) Amount (Rs)

1 Earthwork 15,299,377.50 15,299,377.50

2 Concrete Lining 27,917,214.94 27,917,214.94

3 Dismantling of Outlet 62,000.00 62,000.00

4 Temporary Outlets 510,374.40 510,374.40

5 APM Outlets for Lined Section 2,876,628.00 2,876,628.00

6 RD Marks 18,433.13 18,433.13

7 Cattle Ghat 1,674,234.00 (1,674,234.00) -

8 Repairing Existing Structures 44,340.00 44,340.00

9 Data Board for H/R, Fall etc. 7,573.50 7,573.50

10 Data Board for Outlets 60,690.00 60,690.00

Contractor: Exuctive Engineer Resident Engineer


Nishan Engineers Rajanpur Canal Division Rajanpur PISIP Rajanpur
PUNJAB IRRIGATION SYSTEM IMPROVEMENT PROJECT
Appropriation Request (AR-DJT/RJP-02/01)

Noor Dhundi Canal

Bill As Per Approved Bid Increrase/Decrease As Per AR/Draft VO-02/01


Description
No.
Amount (Rs) Amount (Rs) Amount (Rs)
11 Tail Cluster 88,494.70 37,785.55 126,280.25

12 Regulation Gate - -

13 Meter Flume - -

14 Foot Bridge 450,781.39 (450,781.39) -

15 Village Road Bridge - 886,425.75 886,425.75

SUB TOTAL(1) :- 49,010,141.55 (1,200,804.09) 47,809,337.46

Contractor: Exuctive Engineer Resident Engineer


Nishan Engineers Rajanpur Canal Division Rajanpur PISIP Rajanpur
PUNJAB IRRIGATION SYSTEM IMPROVEMENT PROJECT
Appropriation Request (AR-DJT/RJP-02/1)
Cattle Ghat– Bill No.7
Noor Dhundi Canal
Revised
Sr. Quantity as Per
Description Unit Rate Quantity as per Bid Balance Quantity Remarks
No. (Rs.) Schedule AR-DJT/RJP-
01/02
Qty Amount Qty Amount Qty Amount
7/1 Excavation in foundation of building,
bridges and other
structures, including dagbelling,
dressing, refilling around structure As such there is no requirement
with excavated earth, watering and ‰ of the structure as per local
rammiing lead 3500 11.552 40432.00 0.000 0.00 (11.552) (40432.00)
Cf condition hence deleted from
upto one chain (30 m) and lif upto 5 scope of work.
f. (1.5 m)
b) in ordinary soil

7/2 Cement concrete brick or stone ballast


1.5" to 2" guage in foundation and As such there is no requirement
plinth ratio 1:3:6 % of the structure as per local
13500 10.590 142965.00 0.000 0.00 (10.590) (142965.00)
Cf condition hence deleted from
scope of work.

7/3 Cement concrete plain including


placing, compacting,finishing and
curing complete, (including As such there is no requirement
screening,leaning and washing of % of the structure as per local
16000 3.790 60640.00 0.000 0.00 (3.790) (60640.00)
stone aggrigate) Cf condition hence deleted from
ratio 1;2;4 (Type-C) scope of work.

7/4 Providing and laying reinforced


cement concrete (including As such there is no requirement
prestressed concrete) using coarse Cf 250 342.000 85500.00 0.000 0.00 (342.000) (85500.00) of the structure as per local
sand and screened, graded and condition hence deleted from
washed aggregate in required shape scope of work.
and design, including forms, moulds,
shuttering, lifing, compacting, curing,
rendering and finishing exposed
surface, complete (but excluding the
cost of steel reinforcement, its
fabrication & placing in position etc.)
a) Reinforced cement concrete in roof
slab, beams, columns, lintels, girders
PUNJAB IRRIGATION SYSTEM IMPROVEMENT PROJECT
Appropriation Request (AR-DJT/RJP-02/1)
Cattle Ghat– Bill No.7
Noor Dhundi Canal
Revised
Sr. Quantity as Per
Description Unit Rate Quantity as per Bid Balance Quantity Remarks
No. (Rs.) Schedule AR-DJT/RJP-
01/02
Qty Amount Qty Amount Qty Amount
7/5 Providing and fabrication of mild steel
reinforcement for cement concrete
including cutting bending laying in
position making joints and fastening
including cost of binding wire and
labour charges for binding of steel As such there is no requirement
reinforcement (also includes removal % 9500 8.540 81130.00 0.000 0.00 (8.540) (81130.00) of the structure as per local
of rust from bars) deformed bars Kg condition hence deleted from
(Grade-40) scope of work.

7/6 Dry rammed brick or stone ballast,1.5" As such there is no requirement


to 2" guage % of the structure as per local
2000 1.600 3200.00 0.000 0.00 (1.600) (3200.00)
Cf condition hence deleted from
scope of work.
7/7 Pacca brick work other than building As such there is no requirement
upto 10' height % of the structure as per local
Ratio (1:3) 12500 33.860 423250.00 0.000 0.00 (33.860) (423250.00)
Cf condition hence deleted from
scope of work.
Total 837117.00 0.00 (837117.00)
2 No's Total 1674234.00 0.00 (1674234.00)

Contractor Sub Divisional Officer Executive Engineer


M/S Nishan Engineers Hajipur Sub Division Fazilpur Rajanpur Canal Division Rajanpur
PUNJAB IRRIGATION SYSTEM IMPROVEMENT PROJECT
Appropriation Request (AR-DJT/RJP-02/1)
Tail Cluster– Bill No. 11
Noor Dhundi Canal
Sr. Description Unit Rate Quantity as per Bid Revised Quantity as Per Balance Quantity Remarks
No. (Rs.) Schedule AR-DJT/RJP-01/02
Qty Amount Qty Amount Qty Amount
11/1 Excavation in foundation of building,
bridges and other structures, including
dagbelling, dressing, refilling around
structure with excavated earth,
watering and rammiing lead upto one ‰ Quantity increased/decreased
chain (30 m) and lif upto 5 f. (1.5 m) Cf 3000 0.338 1014.00 0.375 1125.69 0.037 111.69 due to compare of tender
in ordinary soil drawing to Construction Drawing

11/2 Cement concrete brick or stone ballast


1½ " to 2" (40 mm to 50 mm) Ratio Quantity increased/decreased
1:4:8 guage in foundation and plinth % 13500 0.763 10293.75 0.800 10800.10 0.038 506.35 due to compare of tender
Cf
drawing to Construction Drawing

11/3 Pacca brick work in foundation and


plinth in:- Quantity increased/decreased
%
Ratio 1:3 Cement sand mortar 12500 2.340 29250.00 4.071 50887.70 1.731 21637.70 due to compare of tender
Cf
drawing to Construction Drawing

11/4 Cement concrete plain including


placing, compacting, finishing and Quantity increased/decreased
curing complete (including screening % 16000 0.231 3689.60 1.201 19219.40 0.971 15529.80 due to compare of tender
and washing of stone aggregate): Cf
drawing to Construction Drawing
(f) Ratio 1: 2: 4 (Type-C)

Total 44247.35 82032.90 37785.55

Contractor Sub Divisional Officer Executive Engineer


PUNJAB IRRIGATION SYSTEM IMPROVEMENT PROJECT
Appropriation Request (AR-DJT/RJP-02/1)
Tail Cluster– Bill No. 11
Noor Dhundi Canal
Sr. Description Unit Rate Quantity as per Bid Revised Quantity as Per Balance Quantity Remarks
No. (Rs.) Schedule AR-DJT/RJP-01/02
Qty Amount Qty Amount Qty Amount
M/S Nishan Engineers Hajipur Sub Division Fazilpur Rajanpur Canal Division Rajanpur
PUNJAB IRRIGATION SYSTEM IMPROVEMENT PROJECT
Appropriation Request (AR-DJT/RJP-02/1)
Foot Bridge – Bill No. 14
NDC
Sr. Description Unit Rate Quantity as per Bid Revised Quantity as Per Balance Quantity Remarks
No. (Rs.) Schedule AR-DJT/RJP-02/01
Qty Amount Qty Amount Qty Amount
14/1 Excavation in foundation of building,
bridges and other structures, including
dagbelling, dressing, refilling around
structure with excavated earth,
watering and rammiing lead Foot bridge is replaced with

upto one chain (30 m) and lif upto 5 3500 1.408 4926.60 0.000 0.00 (1.408) (4926.60) VRB to assure passage for
Cf
f. (1.5 m) tractor trolly.
b) in ordinary soil

14/2 Cement concrete plain including


placing, compacting, finishing and Foot bridge is replaced with
curing complete (including screening % 13500 5.665 76477.50 0.000 0.00 (5.665) (76477.50) VRB to assure passage for
and washing of stone aggregate) Cf
tractor trolly.
Ratio 1:4:8 (Type-E)
14/3 Pacca brick work in foundation and Foot bridge is replaced with
plinth in:- Ratio 1:3 Cement, sand Cf 12500 9.515 118937.50 0.000 0.00 (9.515) (118937.50) VRB to assure passage for
mortar
tractor trolly.
14/4 Pacca brick work other than building
upto 10f. (3 m) Ratio 1:3 Cement Foot bridge is replaced with
Sand mortar % 13500 16.594 224019.00 0.000 0.00 (16.594) (224019.00) VRB to assure passage for
Kg
tractor trolly.
PUNJAB IRRIGATION SYSTEM IMPROVEMENT PROJECT
Appropriation Request (AR-DJT/RJP-02/1)
Foot Bridge – Bill No. 14
NDC
Sr. Description Unit Rate Quantity as per Bid Revised Quantity as Per Balance Quantity Remarks
No. (Rs.) Schedule AR-DJT/RJP-02/01
Qty Amount Qty Amount Qty Amount
14/5 Reinforced cement concrete in roof
slab, beams, columns lintels, girders
and other structural members laid in
situ or precast laid in position, or
prestressed members cast in situ, % Foot bridge is replaced with
complete in all respects:- 250 0.653 163.24 0.000 0.00 (0.653) (163.24) VRB to assure passage for
Cf
Ratio 1:2:4 (Type-C) tractor trolly.

14/6 Providing and fabrication of mild steel


reinforcement for cement concrete
including cutting bending laying in
position making joints and fastening
including cost of binding wire and
labour charges for binding of steel Foot bridge is replaced with
reinforcement (also includes removal % 9500 1.927 18305.55 0.000 0.00 (1.927) (18305.55) VRB to assure passage for
of rust from bars) deformed bars Cf tractor trolly.
(Grade-40)

14/7 Cement concrete plain including


placing, compacting, finishing and
curing complete (including screening
Foot bridge is replaced with
and washing of stone aggregate) % 16000 0.497 7952.00 0.000 0.00 (0.497) (7952.00) VRB to assure passage for
Ratio 1:2:4 (Type-C) Sf
tractor trolly.

Total 450781.39 0.00 (450781.39)


PUNJAB IRRIGATION SYSTEM IMPROVEMENT PROJECT
Appropriation Request (AR-DJT/RJP-02/1)
Foot Bridge – Bill No. 14
NDC
Sr. Description Unit Rate Quantity as per Bid Revised Quantity as Per Balance Quantity Remarks
No. (Rs.) Schedule AR-DJT/RJP-02/01
Qty Amount Qty Amount Qty Amount

Contractor Sub Divisional Officer Executive Engineer


M/S Nishan Engineers Hajipur Sub Division Fazilpur Rajanpur Canal Division Rajanpur
PUNJAB IRRIGATION SYSTEM IMPROVEMENT PROJECT
Appropriation Request (AR-DJT/RJP-02/1)
Village Road Bridge – Bill No. 15
NDC
Sr. Description Unit Rate Quantity as per Bid Revised Quantity as Per Balance Quantity Remarks
No. (Rs.) Schedule AR-DJT/RJP-01/02
Qty Amount Qty Amount Qty Amount
15/1 Excavation in foundation of buildings,
bridges and other structures including
dagbelling, dressing, refilling around
structure with excavated earth, Area along the both sides of
watering and ramming lead up to one ‰ canal is populated area, there is
chain (30 m) and lif up to 5 f. (1.5 m) Cf 3000 0.000 0.00 1.143 3429.72 1.143 3429.72
requirement of VRB so that a
In ordinary soil new VRB is Provided.

15/2 Cement concrete brick or stone ballast


1½ " to 2" (40 mm to 80 mm) gauge, Area along the both sides of
in foundation and plinth:- % canal is populated area, there is
13500 0.000 0.00 0.941 12701.75 0.941 12701.75
(b) Ratio 1: 4: 8 Cf requirement of VRB so that a
new VRB is Provided.

15/3 Reinforced cement concrete in roof


slab, beams, columns, lintels, girders
& other structural members laid in
situ or precast laid in position or Area along the both sides of
prestressed members cast in situ, Cf 275 0.000 0.00 291.681 80212.14 291.681 80212.14 canal is populated area, there is
complete in all respects:- Ratio 1:2:4 requirement of VRB so that a
(Type-C) new VRB is Provided.

15/4 Providing and fabrication of mild steel


reinforcement for cement concrete Area along the both sides of
including cutting bending laying in % 9500 0.000 0.00 11.499 109245.16 11.499 109245.16 canal is populated area, there is
position deformed bars Kg requirement of VRB so that a
new VRB is Provided.
PUNJAB IRRIGATION SYSTEM IMPROVEMENT PROJECT
Appropriation Request (AR-DJT/RJP-02/1)
Village Road Bridge – Bill No. 15
NDC
Sr. Description Unit Rate Quantity as per Bid Revised Quantity as Per Balance Quantity Remarks
No. (Rs.) Schedule AR-DJT/RJP-01/02
Qty Amount Qty Amount Qty Amount
15/5 Pacca brick work in foundation and
plinth in:- i) Cement, sand mortar:- Area along the both sides of
Ratio 1:3 % canal is populated area, there is
12500 0.000 0.00 11.714 146424.81 11.714 146424.81
Cf requirement of VRB so that a
new VRB is Provided.
15/6 Cement concrete plain including
placing, compacting, finishing and
curing complete (including screening Area along the both sides of
and washing of stone aggregate): % canal is populated area, there is
16000 0.000 0.00 4.819 77106.62 4.819 77106.62
(f) Ratio 1: 2: 4 (Type-C) Cf requirement of VRB so that a
new VRB is Provided.

15/7 Cement plaster 3/8" (10 mm) thick


under soffit of R.C.C. roof slabs only, Area along the both sides of
upto 20' height % canal is populated area, there is
1500 0.000 0.00 6.062 9092.93 6.062 9092.93
a) Ratio 1:2 Sf requirement of VRB so that a
new VRB is Provided.
15/8 Cement pointing struck joints, on Area along the both sides of
walls, upto 20' (6.00 m) hiehgt:- % canal is populated area, there is
a) ratio 1:2 1200 0.000 0.00 2.599 3118.99 2.599 3118.99
Sf requirement of VRB so that a
new VRB is Provided.
15/9 Bitumen coating to plastered or
cement concrete surface. Area along the both sides of
20 lbs per 100 Sf ( 9.07 kg per Sq. m.) % 400 0.000 0.00 4.702 1880.78 4.702 1880.78 canal is populated area, there is
Sf requirement of VRB so that a
new VRB is Provided.

Total 0.00 443212.87 443212.87


2 No VRB 0.00 886425.75 886425.75
PUNJAB IRRIGATION SYSTEM IMPROVEMENT PROJECT
Appropriation Request (AR-DJT/RJP-02/1)
Village Road Bridge – Bill No. 15
NDC
Sr. Description Unit Rate Quantity as per Bid Revised Quantity as Per Balance Quantity Remarks
No. (Rs.) Schedule AR-DJT/RJP-01/02
Qty Amount Qty Amount Qty Amount

Contractor Sub Divisional Officer Executive Engineer


M/S Nishan Engineers Hajipur Sub Division Fazilpur Rajanpur Canal Division Rajanpur
PUNJAB IIRIGATION SYSTEM IMPROVEMENT PROJECT
Tail Cluster
Noor Dhundi Canal

Description Unit No Length Width Depth Qty

Excavation

Sec C-C Cft 1 7 10.3 2 144.200

Sec B-B Cft 3 13.7 3.41 1.25 175.189

Toe Wall Cft 3 5.53 1.65 2.04 55.842

Total (Cft) 375.231

Total (‰Cft) 0.375

lean (1:3:6)

Sec C-C Cft 1 7.06 10.3 0.333 24.215

Sec B-B Cft 3 13.7 3.41 0.333 46.670

Toe Wall Cft 3 5.53 1.65 0.333 9.115

Total (Cft) 80.001

Total (%Cft) 0.800

B/W 1:3 c/s Mortor

Sec C-C Cft 2 7.06 1.5 0.375 7.943

Cft 2 7.06 2.983 2.833 119.326

Cft 2 7.06 1.15 0.75 12.179

Outer Wall Cft 6 13.7 1.15 1.575 148.885

Cft 6 13.7 0.75 0.75 46.238

Bed Cft 3 8.13 0.53 0.375 4.848

Cft 3 6.15 1.03 0.375 7.126

Cut Wall Cft 3 5.53 1.15 1.125 21.463

Cft 6 2 1.15 2.833 39.095

Total (Cft) 407.102

Total (%Cft) 4.071

PCC (1:2:4)

Sec C-C Cft 1 7.06 10.3 0.5 36.359

Sec B-B Cft 3 13.7 3.41 0.5 70.076

Toe Wall Cft 3 5.53 1.65 0.5 13.687

Total (Cft) 120.121

Total (%Cft) 1.201


PUNJAB IIRIGATION SYSTEM IMPROVEMENT PROJECT
Tail Cluster
Noor Dhundi Canal

Description Unit No Length Width Depth Qty


Contractor Sub Divisional Officer Sub Engineer
M/S Nishan Engineers Hajipur Sub Division Fazilpur
PUNJAB IRRIGATION SYSTEM IMPROVEMENT PROJECT. (Package No. DJT/RJP-2)
NAME OF WORK:- CONSTRUCTION OF V.R. BRRIDGE.
DETAIL OF WORK & COST.

Sr. # Description Qty Unit

1 Excavation in foundation of building, bridges and other


structures, including dagbelling, dressing, refilling around
structure with excavated earth, watering and rammiing lead
upto one chain (30 m) and lift upto 5 ft. (1.5 m)
in ordinary soil.
Total = 1143.24 Cft
Ch. 3 It 21 P.29 @ Rs. 2996.95 %o Cft
2 Cement concrete brick or stone ballast 1½ " to 2" (40 mm to
5(b) Ratio 1: 4: 80 mm) gauge, in foundation and plinth:

Total = 94.09 Cft


Ch. 6 .IT 3(b) P.41 @ Rs. 7,964.05 % Cft
3 (a) (i) Reinforced cement concrete in roof slab, beams, .
columns lintels, girders and other structural members laid in
situ or precast laid in position, or prestressed members cast
in situ, complete in all respects:-
(3) (c) Type C (nominal mix 1: 2: 4)
Total = 291.68 Cft
Ch. 6 .IT 6 a (i) P.42 @ Rs. 230.70 P Cft
4 Fabrication of mild steel reinforcement for cement concrete,
including cutting, bending, laying in position, making joints
and fastenings, including cost of binding wire and labour
charges for binding of steel reinforcement (also includes
removal of rust from bars):-
(b) deformed bars
= = 1149.95
Ch. 6 .IT 9 (b) @ Rs. 9278.75 % kg
5 Pacca brick work in foundation and plinth in:-
i) Cement, sand mortar:-
Ratio 1:3
Total = 1171.40 Cft
Ch.7 .IT 4 (i) P.52 @ Rs. 11676.25 % Cft
8 Cement concrete plain including placing, compacting, finishing and curing
complete (including screening and washing of stone aggregate):
Total = 481.92 Cft
Ch.6 Itm-5f @ Rs. 14985.95 % Cft
9 Cement plaster 3/8" (10 mm) thick under soffit of R.C.C.
roof slabs only, upto 20' height
a) 1:2
R/Slab = 606.20 Sft
Ch.11 .IT 10 (a) @ Rs. 1286.10 % Sft
10 Cement pointing deep struck joint on walls up to 20 ft height ratio 1:2
cement sand mortar.
Abutment = 259.92 Sft
Ch-11 P-76 Item-18-a @ Rs. 1077.75 % Sft
Bitumen coating to plastered or cement concrete surface 14 LBS bitumen %Sft
Serial No. 9(ii) Ch# 13 of MRS 2nd Quarter 2011 = 470.20
@ Rs. 519.8 % Sft
Total =

Contractor Sub Divisional Officer Sub Engineer


M/S Nishan Engineers Hajipur Sub Division Fazilpur
YSTEM IMPROVEMENT PROJECT. (Package No. DJT/RJP-2)
ORK:- CONSTRUCTION OF V.R. BRRIDGE.
DETAIL OF WORK & COST.
Amount
(In Rs.)

3426

7493

67291

106701

136775

72220

7796

2801

2444
406947

Sub Engineer
PUNJAB IIRIGATION SYSTEM IMPROVEMENT PROJECT
Village Road Bridge@ RD 59+500
Noor Dhundi Canal

Description Unit No Length Width Depth Qty

Excavation

Abutment Wall Cft 2 16.85 7 3 707.700

Wing Wall Cft 4 5.185 7 3 435.540

Total (Cft) 1143.240

Total (‰Cft) 1.143

lean (1:4:8)

Abutment Wall Cft 2 16.85 5.19 0.333 58.243

Wing Wall Cft 4 5.185 5.19 0.333 35.844

Total (Cft) 94.087

Total (%Cft) 0.941

RCC (1:2:4)

Abutment Cap Cft 2 18 1.91 0.75 51.570

Cft 2 18 0.666 0.75 17.982

Roof Slab Cft 1 17 10.333 1 175.661

Parapet Wall Cft 2 10.333 1.5 0.666 20.645

Cft 2 10.333 0.833 1.5 25.822

Total (Cft) 291.681

B/W (1:3)

Abutment Wall

Step-1 Cft 2 16.85 4.19 1 141.203

Step-2 Cft 2 16.85 3.81 1 128.397

Step-3 Cft 2 16.85 3.43 1 115.591

Step-4 Cft 2 16.85 3.05 1 102.785

Step-5 Cft 2 16.85 2.67 1 89.979

Step-6 Cft 2 16.85 2.29 1 77.173

Wing Wall

Step-1 Cft 4 5.185 4.19 1 86.901

Step-2 Cft 4 5.185 3.81 1 79.019

Step-3 Cft 4 5.185 3.43 1 71.138

Step-4 Cft 4 5.185 3.05 1 63.257

Step-5 Cft 4 5.185 2.67 1 55.376

Step-6 Cft 4 5.185 2.29 1 47.495


PUNJAB IIRIGATION SYSTEM IMPROVEMENT PROJECT
Village Road Bridge@ RD 59+500
Noor Dhundi Canal

Description Unit No Length Width Depth Qty

Step-7 Cft 4 5.185 1.91 1 39.613

Step-8 Cft 4 5.185 1.53 1 31.732

Step-9 Cft 4 5.185 1.15 1.75 41.739

Total (Cft) 1171.398

Total (%Cft) 11.714

PCC (1:2:4)

Abutment Wall Cft 2 16.85 5.19 1 174.903

Wing Wall Cft 4 5.185 5.19 1 107.641

Coping at Wing Wall Cft 4 5.185 1.15 0.25 5.963

Floor Cft 1 18 8 0.25 36.000

Pcc Block Cft 2 15 4.5 0.583 78.705

Cft 2 15 3 0.583 52.470

Cft 2 15 1.5 0.583 26.235

Total (Cft) 481.916

Total (%Cft) 4.819

Plaster 3/8" thick in 1:2 c/s Mortor

Under Roof Slab Sft 1 17 8 136.000

Abutment Wall under Banks Sft 2 16.85 7.875 265.388

Wing Wall under Banks Sft 4 5.185 9.875 204.808

Total (Sft) 606.195

Total (%Sft) 6.062

Struck Pointing 1:2 c/s Mortor

Abutment Wall Sft 2 16.85 3.38 113.906

Wing Wall Sft 4 5.185 7.04 146.010

Total (Sft) 259.916

Total (%Sft) 2.599

Bitumen Coating at plastered surface below banks

Abutment Wall Sft 2 16.85 7.875 265.388

Wing Wall Sft 4 5.185 9.875 204.808

Total (Sft) 470.195

Total (%Sft) 4.702


PUNJAB IIRIGATION SYSTEM IMPROVEMENT PROJECT
Village Road Bridge@ RD 59+500
Noor Dhundi Canal

Description Unit No Length Width Depth Qty

Contractor Sub Divisional Officer Sub Engineer


M/S Nishan Engineers Hajipur Sub Division Fazilpur
PUNJAB IRRIGATION SYSTEM IMPROVEMENT PROJECT
Bar Bending Detail
VRB at Noor Dhundi Canal @ RD 59+500
Description Distribution Dia of Spacing No No Total Cut Total Unit Total Bending
Span Bar of of Bar Length Length Weight Weight Detail
Ft items Bar No's Ft Ft Kg/Ft Kg
Abuttment

Horizental Bars (Top) #4 2 2 4 17.667 70.668 0.302 21.342 "8-'17

Horizental Bars (Bott) #4 2 3 6 17.667 106.002 0.302 32.013 "8-'17

"2 +"2

Stirups 4.25 #4 6" C/C 2 35 70 4.667 326.690 0.302 98.660 "6

"8-'1

Side Bars (N.F) #4 2 2 4 17.667 70.668 0.302 21.342 "8-'17

Side Bars (F.F) #4 2 2 4 17.667 70.668 0.302 21.342 "8-'17

"2 +"2

Stirups 4.25 #4 6" C/C 2 35 70 3.667 256.690 0.302 77.520 "3-'1

"5

RCC Slab

Main Bars (Top) 16.667 #6 12" C/C 2 18 36 11.000 396.000 0.681 269.676 "0-'10 "6
"6

Distribution Bars (Bott) 8.25 #6 6" C/C 2 18 36 17.667 636.012 0.681 433.124 ""8-'16 "6
"6
PUNJAB IRRIGATION SYSTEM IMPROVEMENT PROJECT
Bar Bending Detail
VRB at Noor Dhundi Canal @ RD 59+500
Description Distribution Dia of Spacing No No Total Cut Total Unit Total Bending
Span Bar of of Bar Length Length Weight Weight Detail
Ft items Bar No's Ft Ft Kg/Ft Kg
"2-'1
"6
Rings 16.667 #4 12" C/C 2 18 36 3.340 120.240 0.302 36.312 "2-'1

"6

Parapet

Longitudinal Bars (Top) #4 2 9 18 10.000 180.000 0.302 54.360 "0-'10

"5

"3-'1
Stirups 17 #4 12" C/C 2 18 36 7.750 279.000 0.302 84.258 "2-'1

"2-'1
Total Weight (Kg) 1149.949
Total Weight (%Kg) 11.499
Dia Of Bar Weight (Kg)
#4 447.149 "4
#6 702.8
Total Weight (Kg) 1149.95
"7
Contractor Sub Engineer Sub Divisional Officer
M/S Nishan Engineers Hajipur Sub Division Fazilpur
PUNJAB IRRIGATION SYSTEM IMPROVEMENT PROJECT
Appropriation Request (AR-DJT/RJP-02/01)

Sadiq Disty

Bill As Per Approved Bid Increrase/Decrease As Per AR/Draft VO-02/01


Description
No.
Amount (Rs) Amount (Rs) Amount (Rs)

1 Earthwork 10,618,403.50 10,618,403.50

2 Concrete Lining 19,882,136.66 19,882,136.66

3 Dismantling of Outlet 52,700.00 52,700.00

4 Temporary Outlets 433,818.24 433,818.24

5 APM Outlets for Lined Section 2,445,133.80 2,445,133.80

6 RD Marks 13,348.13 13,348.13

7 Cattle Ghat 1,674,234.00 (1,674,234.00) -

8 Repairing Existing Structures 44,340.00 44,340.00

9 Data Board for H/R, Fall etc. 15,147.00 15,147.00

10 Data Board for Outlets 52,020.00 52,020.00

Contractor: Exuctive Engineer Resident Engineer


Nishan Engineers Rajanpur Canal Division Rajanpur PISIP Rajanpur
PUNJAB IRRIGATION SYSTEM IMPROVEMENT PROJECT
Appropriation Request (AR-DJT/RJP-02/01)

Sadiq Disty

Bill As Per Approved Bid Increrase/Decrease As Per AR/Draft VO-02/01


Description
No.
Amount (Rs) Amount (Rs) Amount (Rs)
11 Tail Cluster 88,494.70 11,899.19 100,393.89

12 Regulation Gate - -

13 Meter Flume - -

14 Foot Bridge - - -

15 Village Road Bridge 582,153.00 (154,711.33) 427,441.67

SUB TOTAL(1) :- 35,901,929.03 (1,817,046.14) 34,084,882.88

Contractor: Exuctive Engineer Resident Engineer


Nishan Engineers Rajanpur Canal Division Rajanpur PISIP Rajanpur
PUNJAB IRRIGATION SYSTEM IMPROVEMENT PROJECT
Appropriation Request (AR-DJT/RJP-02/1)
Cattle Ghat– Bill No.7
Sadiq Disty
Revised
Sr. Quantity as Per
Description Unit Rate Quantity as per Bid Balance Quantity Remarks
No. (Rs.) Schedule AR-DJT/RJP-
01/02
Qty Amount Qty Amount Qty Amount
7/1 Excavation in foundation of building,
bridges and other
structures, including dagbelling,
dressing, refilling around structure As such there is no requirement
with excavated earth, watering and ‰ of the structure as per local
rammiing lead 3500 11.552 40432.00 0.000 0.00 (11.552) (40432.00)
Cf condition hence deleted from
upto one chain (30 m) and lif upto 5 scope of work.
f. (1.5 m)
b) in ordinary soil

7/2 Cement concrete brick or stone ballast


1.5" to 2" guage in foundation and As such there is no requirement
plinth ratio 1:3:6 % of the structure as per local
13500 10.590 142965.00 0.000 0.00 (10.590) (142965.00)
Cf condition hence deleted from
scope of work.

7/3 Cement concrete plain including


placing, compacting,finishing and
curing complete, (including As such there is no requirement
screening,leaning and washing of % of the structure as per local
16000 3.790 60640.00 0.000 0.00 (3.790) (60640.00)
stone aggrigate) Cf condition hence deleted from
ratio 1;2;4 (Type-C) scope of work.

7/4 Providing and laying reinforced


cement concrete (including As such there is no requirement
prestressed concrete) using coarse Cf 250 342.000 85500.00 0.000 0.00 (342.000) (85500.00) of the structure as per local
sand and screened, graded and condition hence deleted from
washed aggregate in required shape scope of work.
and design, including forms, moulds,
shuttering, lifing, compacting, curing,
rendering and finishing exposed
surface, complete (but excluding the
cost of steel reinforcement, its
fabrication & placing in position etc.)
a) Reinforced cement concrete in roof
slab, beams, columns, lintels, girders
PUNJAB IRRIGATION SYSTEM IMPROVEMENT PROJECT
Appropriation Request (AR-DJT/RJP-02/1)
Cattle Ghat– Bill No.7
Sadiq Disty
Revised
Sr. Quantity as Per
Description Unit Rate Quantity as per Bid Balance Quantity Remarks
No. (Rs.) Schedule AR-DJT/RJP-
01/02
Qty Amount Qty Amount Qty Amount
7/5 Providing and fabrication of mild steel
reinforcement for cement concrete
including cutting bending laying in
position making joints and fastening
including cost of binding wire and
labour charges for binding of steel As such there is no requirement
reinforcement (also includes removal % 9500 8.540 81130.00 0.000 0.00 (8.540) (81130.00) of the structure as per local
of rust from bars) deformed bars Kg condition hence deleted from
(Grade-40) scope of work.

7/6 Dry rammed brick or stone ballast,1.5" As such there is no requirement


to 2" guage % of the structure as per local
2000 1.600 3200.00 0.000 0.00 (1.600) (3200.00)
Cf condition hence deleted from
scope of work.
7/7 Pacca brick work other than building As such there is no requirement
upto 10' height % of the structure as per local
Ratio (1:3) 12500 33.860 423250.00 0.000 0.00 (33.860) (423250.00)
Cf condition hence deleted from
scope of work.
Total 837117.00 0.00 (837117.00)
2 No's Total 1674234.00 0.00 (1674234.00)

Contractor Sub Divisional Officer Executive Engineer


M/S Nishan Engineers Hajipur Sub Division Fazilpur Rajanpur Canal Division Rajanpur
PUNJAB IRRIGATION SYSTEM IMPROVEMENT PROJECT
Appropriation Request (AR-DJT/RJP-02/1)
Tail Cluster– Bill No. 11
Sadiq Disty
Sr. Description Unit Rate Quantity as per Bid Revised Quantity as Per Balance Quantity Remarks
No. (Rs.) Schedule AR-DJT/RJP-01/02
Qty Amount Qty Amount Qty Amount
11/1 Excavation in foundation of building,
bridges and other structures, including
dagbelling, dressing, refilling around
structure with excavated earth,
watering and rammiing lead upto one ‰ Quantity increased/decreased
chain (30 m) and lif upto 5 f. (1.5 m) Cf 3000 0.676 2028.00 0.452 1356.72 (0.224) (671.28) due to compare of tender
in ordinary soil drawing to Construction Drawing

11/2 Cement concrete brick or stone ballast


1½ " to 2" (40 mm to 50 mm) Ratio Quantity increased/decreased
1:4:8 guage in foundation and plinth % 13500 1.525 20587.50 0.986 13310.46 (0.539) (7277.04) due to compare of tender
Cf
drawing to Construction Drawing

11/3 Pacca brick work in foundation and


plinth in:- Quantity increased/decreased
%
Ratio 1:3 Cement sand mortar 12500 4.680 58500.00 4.963 62039.99 0.283 3539.99 due to compare of tender
Cf
drawing to Construction Drawing

11/4 Cement concrete plain including


placing, compacting, finishing and Quantity increased/decreased
curing complete (including screening % 16000 0.461 7379.20 1.480 23686.72 1.019 16307.52 due to compare of tender
and washing of stone aggregate): Cf
drawing to Construction Drawing
(f) Ratio 1: 2: 4 (Type-C)

Total 88494.70 100393.89 11899.19

Contractor Sub Divisional Officer Executive Engineer


PUNJAB IRRIGATION SYSTEM IMPROVEMENT PROJECT
Appropriation Request (AR-DJT/RJP-02/1)
Tail Cluster– Bill No. 11
Sadiq Disty
Sr. Description Unit Rate Quantity as per Bid Revised Quantity as Per Balance Quantity Remarks
No. (Rs.) Schedule AR-DJT/RJP-01/02
Qty Amount Qty Amount Qty Amount
M/S Nishan Engineers Hajipur Sub Division Fazilpur Rajanpur Canal Division Rajanpur
PUNJAB IRRIGATION SYSTEM IMPROVEMENT PROJECT
Appropriation Request (AR-DJT/RJP-02/1)
Village Road Bridge – Bill No. 15
Sadiq Disty
Sr. Description Unit Rate Quantity as per Bid Revised Quantity as Per Balance Quantity Remarks
No. (Rs.) Schedule AR-DJT/RJP-01/02
Qty Amount Qty Amount Qty Amount
15/1 Excavation in foundation of buildings,
bridges and other structures including
dagbelling, dressing, refilling around
structure with excavated earth, Area along the both sides of
watering and ramming lead up to one ‰ canal is populated area, there is
chain (30 m) and lif up to 5 f. (1.5 m) Cf 3000 1.971 5913.00 1.143 3429.72 (0.828) (2483.28)
requirement of VRB so that a
In ordinary soil new VRB is Provided.

15/2 Cement concrete brick or stone ballast


1½ " to 2" (40 mm to 80 mm) gauge, Area along the both sides of
in foundation and plinth:- % canal is populated area, there is
13500 8.750 118125.00 0.941 12701.75 (7.809) (105423.25)
(b) Ratio 1: 4: 8 Cf requirement of VRB so that a
new VRB is Provided.

15/3 Reinforced cement concrete in roof


slab, beams, columns, lintels, girders
& other structural members laid in
situ or precast laid in position or Area along the both sides of
prestressed members cast in situ, Cf 275 292.000 80300.00 254.061 69866.71 (37.939) (10433.29) canal is populated area, there is
complete in all respects:- Ratio 1:2:4 requirement of VRB so that a
(Type-C) new VRB is Provided.

15/4 Providing and fabrication of mild steel


reinforcement for cement concrete Area along the both sides of
including cutting bending laying in % 9500 8.930 84835.00 10.975 104265.64 2.045 19430.64 canal is populated area, there is
position deformed bars Kg requirement of VRB so that a
new VRB is Provided.
PUNJAB IRRIGATION SYSTEM IMPROVEMENT PROJECT
Appropriation Request (AR-DJT/RJP-02/1)
Village Road Bridge – Bill No. 15
Sadiq Disty
Sr. Description Unit Rate Quantity as per Bid Revised Quantity as Per Balance Quantity Remarks
No. (Rs.) Schedule AR-DJT/RJP-01/02
Qty Amount Qty Amount Qty Amount
15/5 Pacca brick work in foundation and
plinth in:- i) Cement, sand mortar:- Area along the both sides of
Ratio 1:3 % canal is populated area, there is
12500 21.000 262500.00 11.714 146424.81 (9.286) (116075.19)
Cf requirement of VRB so that a
new VRB is Provided.
15/6 Cement concrete plain including
placing, compacting, finishing and
curing complete (including screening Area along the both sides of
and washing of stone aggregate): % canal is populated area, there is
16000 1.380 22080.00 4.819 77106.62 3.439 55026.62
(f) Ratio 1: 2: 4 (Type-C) Cf requirement of VRB so that a
new VRB is Provided.

15/7 Cement plaster 3/8" (10 mm) thick


under soffit of R.C.C. roof slabs only, Area along the both sides of
upto 20' height % canal is populated area, there is
1500 2.240 3360.00 5.764 8646.68 3.524 5286.68
a) Ratio 1:2 Sf requirement of VRB so that a
new VRB is Provided.
15/8 Cement pointing struck joints, on Area along the both sides of
walls, upto 20' (6.00 m) hiehgt:- % canal is populated area, there is
a) ratio 1:2 1200 4.200 5040.00 2.599 3118.99 (1.601) (1921.01)
Sf requirement of VRB so that a
new VRB is Provided.
15/9 Bitumen coating to plastered or
cement concrete surface. Area along the both sides of
20 lbs per 100 Sf ( 9.07 kg per Sq. m.) % 400 0.000 0.00 4.702 1880.78 4.702 1880.78 canal is populated area, there is
Sf requirement of VRB so that a
new VRB is Provided.

Total 582153.00 427441.67 (154711.33)


PUNJAB IRRIGATION SYSTEM IMPROVEMENT PROJECT
Appropriation Request (AR-DJT/RJP-02/1)
Village Road Bridge – Bill No. 15
Sadiq Disty
Sr. Description Unit Rate Quantity as per Bid Revised Quantity as Per Balance Quantity Remarks
No. (Rs.) Schedule AR-DJT/RJP-01/02
Qty Amount Qty Amount Qty Amount

Contractor Sub Divisional Officer Executive Engineer


M/S Nishan Engineers Hajipur Sub Division Fazilpur Rajanpur Canal Division Rajanpur
PUNJAB IIRIGATION SYSTEM IMPROVEMENT PROJECT
Tail Cluster
Sadiq Disty

Description Unit No Length Width Depth Qty

Excavation

Sec C-C Cft 1 7 10.3 2 144.200

Sec B-B Cft 4 13.7 3.41 1.25 233.585

Toe Wall Cft 4 5.53 1.65 2.04 74.456

Total (Cft) 452.241

Total (‰Cft) 0.452

lean (1:3:6)

Sec C-C Cft 1 7.06 10.3 0.333 24.215

Sec B-B Cft 4 13.7 3.41 0.333 62.227

Toe Wall Cft 4 5.53 1.65 0.333 12.154

Total (Cft) 98.596

Total (%Cft) 0.986

B/W 1:3 c/s Mortor

Sec C-C Cft 2 7.06 1.5 0.375 7.943

Cft 2 7.06 2.983 2.833 119.326

Cft 2 7.06 1.15 0.75 12.179

Outer Wall Cft 8 13.7 1.15 1.575 198.513

Cft 8 13.7 0.75 0.75 61.650

Bed Cft 4 8.13 0.53 0.375 6.463

Cft 4 6.15 1.03 0.375 9.502

Cut Wall Cft 4 5.53 1.15 1.125 28.618

Cft 8 2 1.15 2.833 52.127

Total (Cft) 496.320

Total (%Cft) 4.963

PCC (1:2:4)

Sec C-C Cft 1 7.06 10.3 0.5 36.359

Sec B-B Cft 4 13.7 3.41 0.5 93.434

Toe Wall Cft 4 5.53 1.65 0.5 18.249

Total (Cft) 148.042

Total (%Cft) 1.480


PUNJAB IIRIGATION SYSTEM IMPROVEMENT PROJECT
Tail Cluster
Sadiq Disty

Description Unit No Length Width Depth Qty


Contractor Sub Divisional Officer Sub Engineer
M/S Nishan Engineers Hajipur Sub Division Fazilpur
PUNJAB IRRIGATION SYSTEM IMPROVEMENT PROJECT. (Package No. DJT/RJP-2)
NAME OF WORK:- CONSTRUCTION OF V.R. BRRIDGE.
DETAIL OF WORK & COST.

Sr. # Description Qty Unit

1 Excavation in foundation of building, bridges and other


structures, including dagbelling, dressing, refilling around
structure with excavated earth, watering and rammiing lead
upto one chain (30 m) and lift upto 5 ft. (1.5 m)
in ordinary soil.
Total = 1143.24 Cft
Ch. 3 It 21 P.29 @ Rs. 2996.95 %o Cft
2 Cement concrete brick or stone ballast 1½ " to 2" (40 mm to
5(b) Ratio 1: 4: 80 mm) gauge, in foundation and plinth:

Total = 94.09 Cft


Ch. 6 .IT 3(b) P.41 @ Rs. 7,964.05 % Cft
3 (a) (i) Reinforced cement concrete in roof slab, beams, .
columns lintels, girders and other structural members laid in
situ or precast laid in position, or prestressed members cast
in situ, complete in all respects:-
(3) (c) Type C (nominal mix 1: 2: 4)
Total = 254.06 Cft
Ch. 6 .IT 6 a (i) P.42 @ Rs. 230.70 P Cft
4 Fabrication of mild steel reinforcement for cement concrete,
including cutting, bending, laying in position, making joints
and fastenings, including cost of binding wire and labour
charges for binding of steel reinforcement (also includes
removal of rust from bars):-
(b) deformed bars
= = 1097.53
Ch. 6 .IT 9 (b) @ Rs. 9278.75 % kg
5 Pacca brick work in foundation and plinth in:-
i) Cement, sand mortar:-
Ratio 1:3
Total = 1171.40 Cft
Ch.7 .IT 4 (i) P.52 @ Rs. 11676.25 % Cft
8 Cement concrete plain including placing, compacting, finishing and curing
complete (including screening and washing of stone aggregate):
Total = 481.92 Cft
Ch.6 Itm-5f @ Rs. 14985.95 % Cft
9 Cement plaster 3/8" (10 mm) thick under soffit of R.C.C.
roof slabs only, upto 20' height
a) 1:2
R/Slab = 576.45 Sft
Ch.11 .IT 10 (a) @ Rs. 1286.10 % Sft
10 Cement pointing deep struck joint on walls up to 20 ft height ratio 1:2
cement sand mortar.
Abutment = 259.92 Sft
Ch-11 P-76 Item-18-a @ Rs. 1077.75 % Sft
Bitumen coating to plastered or cement concrete surface 14 LBS bitumen %Sft
Serial No. 9(ii) Ch# 13 of MRS 2nd Quarter 2011 = 470.20
@ Rs. 519.8 % Sft
Total =

Contractor Sub Divisional Officer Sub Engineer


M/S Nishan Engineers Hajipur Sub Division Fazilpur
YSTEM IMPROVEMENT PROJECT. (Package No. DJT/RJP-2)
ORK:- CONSTRUCTION OF V.R. BRRIDGE.
DETAIL OF WORK & COST.
Amount
(In Rs.)

3426

7493

58612

101837

136775

72220

7414

2801

2444
393022

Sub Engineer
PUNJAB IIRIGATION SYSTEM IMPROVEMENT PROJECT
Village Road Bridge@ RD 55+460
Noor Dhundi Canal

Description Unit No Length Width Depth Qty

Excavation

Abutment Wall Cft 2 16.85 7 3 707.700

Wing Wall Cft 4 5.185 7 3 435.540

Total (Cft) 1143.240

Total (‰Cft) 1.143

lean (1:4:8)

Abutment Wall Cft 2 16.85 5.19 0.333 58.243

Wing Wall Cft 4 5.185 5.19 0.333 35.844

Total (Cft) 94.087

Total (%Cft) 0.941

RCC (1:2:4)

Abutment Cap Cft 2 18 1.91 0.75 51.570

Cft 2 18 0.666 0.75 17.982

Roof Slab Cft 1 17 8.583 1 145.911

Parapet Wall Cft 2 8.583 1.5 0.666 17.149

Cft 2 8.583 0.833 1.5 21.449

Total (Cft) 254.061

B/W (1:3)

Abutment Wall

Step-1 Cft 2 16.85 4.19 1 141.203

Step-2 Cft 2 16.85 3.81 1 128.397

Step-3 Cft 2 16.85 3.43 1 115.591

Step-4 Cft 2 16.85 3.05 1 102.785

Step-5 Cft 2 16.85 2.67 1 89.979

Step-6 Cft 2 16.85 2.29 1 77.173

Wing Wall

Step-1 Cft 4 5.185 4.19 1 86.901

Step-2 Cft 4 5.185 3.81 1 79.019

Step-3 Cft 4 5.185 3.43 1 71.138

Step-4 Cft 4 5.185 3.05 1 63.257

Step-5 Cft 4 5.185 2.67 1 55.376

Step-6 Cft 4 5.185 2.29 1 47.495


PUNJAB IIRIGATION SYSTEM IMPROVEMENT PROJECT
Village Road Bridge@ RD 55+460
Noor Dhundi Canal

Description Unit No Length Width Depth Qty

Step-7 Cft 4 5.185 1.91 1 39.613

Step-8 Cft 4 5.185 1.53 1 31.732

Step-9 Cft 4 5.185 1.15 1.75 41.739

Total (Cft) 1171.398

Total (%Cft) 11.714

PCC (1:2:4)

Abutment Wall Cft 2 16.85 5.19 1 174.903

Wing Wall Cft 4 5.185 5.19 1 107.641

Coping at Wing Wall Cft 4 5.185 1.15 0.25 5.963

Floor Cft 1 18 8 0.25 36.000

Pcc Block Cft 2 15 4.5 0.583 78.705

Cft 2 15 3 0.583 52.470

Cft 2 15 1.5 0.583 26.235

Total (Cft) 481.916

Total (%Cft) 4.819

Plaster 3/8" thick in 1:2 c/s Mortor

Under Roof Slab Sft 1 17 6.25 106.250

Abutment Wall under Banks Sft 2 16.85 7.875 265.388

Wing Wall under Banks Sft 4 5.185 9.875 204.808

Total (Sft) 576.445

Total (%Sft) 5.764

Struck Pointing 1:2 c/s Mortor

Abutment Wall Sft 2 16.85 3.38 113.906

Wing Wall Sft 4 5.185 7.04 146.010

Total (Sft) 259.916

Total (%Sft) 2.599

Bitumen Coating at plastered surface below banks

Abutment Wall Sft 2 16.85 7.875 265.388

Wing Wall Sft 4 5.185 9.875 204.808

Total (Sft) 470.195

Total (%Sft) 4.702


PUNJAB IIRIGATION SYSTEM IMPROVEMENT PROJECT
Village Road Bridge@ RD 55+460
Noor Dhundi Canal

Description Unit No Length Width Depth Qty

Contractor Sub Divisional Officer Sub Engineer


M/S Nishan Engineers Hajipur Sub Division Fazilpur
PUNJAB IRRIGATION SYSTEM IMPROVEMENT PROJECT
Bar Bending Detail
VRB at Sadiq Disty @ RD 55+460
Description Distribution Dia of Spacing No No Total Cut Total Unit Total Bending
Span Bar of of Bar Length Length Weight Weight Detail
Ft items Bar No's Ft Ft Kg/Ft Kg
Abuttment

Horizental Bars (Top) #4 2 2 4 17.667 70.668 0.302 21.342 "8-'17

Horizental Bars (Bott) #4 2 3 6 17.667 106.002 0.302 32.013 "8-'17

"2 +"2

Stirups 4.25 #4 6" C/C 2 35 70 4.667 326.690 0.302 98.660 "6

"8-'1

Side Bars (N.F) #4 2 2 4 17.667 70.668 0.302 21.342 "8-'17

Side Bars (F.F) #4 2 2 4 17.667 70.668 0.302 21.342 "8-'17

"2 +"2

Stirups 4.25 #4 6" C/C 2 35 70 3.667 256.690 0.302 77.520 "3-'1

"5

RCC Slab

Main Bars (Top) 16.667 #6 12" C/C 2 18 36 9.250 333.000 0.681 226.773 "3-'8 "6
"6

Distribution Bars (Bott) 8.25 #6 6" C/C 2 18 36 17.667 636.012 0.681 433.124 ""8-'16 "6
"6
PUNJAB IRRIGATION SYSTEM IMPROVEMENT PROJECT
Bar Bending Detail
VRB at Sadiq Disty @ RD 55+460
Description Distribution Dia of Spacing No No Total Cut Total Unit Total Bending
Span Bar of of Bar Length Length Weight Weight Detail
Ft items Bar No's Ft Ft Kg/Ft Kg
"2-'1
"6
Rings 16.667 #4 12" C/C 2 18 36 3.340 120.240 0.302 36.312 "2-'1

"6

Parapet

Longitudinal Bars (Top) #4 2 9 18 8.250 148.500 0.302 44.847 "3-'8

"5

"3-'1
Stirups 17 #4 12" C/C 2 18 36 7.750 279.000 0.302 84.258 "2-'1

"2-'1
Total Weight (Kg) 1097.533
Total Weight (%Kg) 10.975
Dia Of Bar Weight (Kg)
#4 437.636 "4
#6 659.897
Total Weight (Kg) 1097.53
"7
Contractor Sub Engineer Sub Divisional Officer
M/S Nishan Engineers Hajipur Sub Division Fazilpur
PUNJAB IRRIGATION SYSTEM IMPROVEMENT PROJECT
Appropriation Request (AR-DJT/RJP-02/01)

Jalalpur Disty

Bill As Per Approved Bid Increrase/Decrease As Per AR/Draft VO-02/01


Description
No.
Amount (Rs) Amount (Rs) Amount (Rs)

1 Earthwork 5,774,969.00 5,774,969.00

2 Concrete Lining 10,465,253.57 10,465,253.57

3 Dismantling of Outlet 15,500.00 15,500.00

4 Temporary Outlets 127,593.60 127,593.60

5 APM Outlets for Lined Section 719,157.00 719,157.00

6 RD Marks 8,263.13 8,263.13

7 Cattle Ghat 837,117.00 (837,117.00) -

8 Repairing Existing Structures 44,340.00 44,340.00

9 Data Board for H/R, Fall etc. 30,294.00 30,294.00

10 Data Board for Outlets 17,340.00 17,340.00

Contractor: Exuctive Engineer Resident Engineer


Nishan Engineers Rajanpur Canal Division Rajanpur PISIP Rajanpur
PUNJAB IRRIGATION SYSTEM IMPROVEMENT PROJECT
Appropriation Request (AR-DJT/RJP-02/01)

Jalalpur Disty

Bill As Per Approved Bid Increrase/Decrease As Per AR/Draft VO-02/01


Description
No.
Amount (Rs) Amount (Rs) Amount (Rs)
11 Tail Cluster 44,247.35 (7,651.86) 36,595.49

12 Regulation Gate 410,116.65 410,116.65

13 Meter Flume 377,375.70 377,375.70

14 Village Road Bridge - 443,212.87 443,212.87

SUB TOTAL(1) :- 18,871,567.00 (401,555.98) 18,470,011.01

Contractor: Exuctive Engineer Resident Engineer


Nishan Engineers Rajanpur Canal Division Rajanpur PISIP Rajanpur
PUNJAB IRRIGATION SYSTEM IMPROVEMENT PROJECT
Appropriation Request (AR-DJT/RJP-02/1)
Cattle Ghat– Bill No.7
Jalalpur Disty
Sr. Unit Rate Quantity as per Bid Revised Quantity as Per
Description Balance Quantity Remarks
No. (Rs.) Schedule AR-DJT/RJP-01/02
Qty Amount Qty Amount Qty Amount
7/1 Excavation in foundation of building,
bridges and other
structures, including dagbelling,
dressing, refilling around structure As such there is no requirement
with excavated earth, watering and ‰ of the structure as per local
rammiing lead 3500 11.552 40432.00 0.000 0.00 (11.552) (40432.00)
Cf condition hence deleted from
upto one chain (30 m) and lif upto 5 scope of work.
f. (1.5 m)
b) in ordinary soil

7/2 Cement concrete brick or stone ballast


1.5" to 2" guage in foundation and As such there is no requirement
plinth ratio 1:3:6 % of the structure as per local
13500 10.590 142965.00 0.000 0.00 (10.590) (142965.00)
Cf condition hence deleted from
scope of work.

7/3 Cement concrete plain including


placing, compacting,finishing and
curing complete, (including As such there is no requirement
screening,leaning and washing of % of the structure as per local
16000 3.790 60640.00 0.000 0.00 (3.790) (60640.00)
stone aggrigate) Cf condition hence deleted from
ratio 1;2;4 (Type-C) scope of work.

7/4 Providing and laying reinforced


cement concrete (including As such there is no requirement
prestressed concrete) using coarse Cf 250 342.000 85500.00 0.000 0.00 (342.000) (85500.00) of the structure as per local
sand and screened, graded and condition hence deleted from
washed aggregate in required shape scope of work.
and design, including forms, moulds,
shuttering, lifing, compacting, curing,
rendering and finishing exposed
surface, complete (but excluding the
cost of steel reinforcement, its
fabrication & placing in position etc.)
a) Reinforced cement concrete in roof
slab, beams, columns, lintels, girders
PUNJAB IRRIGATION SYSTEM IMPROVEMENT PROJECT
Appropriation Request (AR-DJT/RJP-02/1)
Cattle Ghat– Bill No.7
Jalalpur Disty
Sr. Unit Rate Quantity as per Bid Revised Quantity as Per
Description Balance Quantity Remarks
No. (Rs.) Schedule AR-DJT/RJP-01/02
Qty Amount Qty Amount Qty Amount
7/5 Providing and fabrication of mild steel
reinforcement for cement concrete
including cutting bending laying in
position making joints and fastening
including cost of binding wire and
labour charges for binding of steel As such there is no requirement
reinforcement (also includes removal % 9500 8.540 81130.00 0.000 0.00 (8.540) (81130.00) of the structure as per local
of rust from bars) deformed bars Kg condition hence deleted from
(Grade-40) scope of work.

7/6 Dry rammed brick or stone ballast,1.5" As such there is no requirement


to 2" guage % of the structure as per local
2000 1.600 3200.00 0.000 0.00 (1.600) (3200.00)
Cf condition hence deleted from
scope of work.
7/7 Pacca brick work other than building As such there is no requirement
upto 10' height % of the structure as per local
Ratio (1:3) 12500 33.860 423250.00 0.000 0.00 (33.860) (423250.00)
Cf condition hence deleted from
scope of work.
Total 837117.00 0.00 (837117.00)

Contractor Sub Divisional Officer Executive Engineer


M/S Nishan Engineers Hajipur Sub Division Fazilpur Rajanpur Canal Division Rajanpur
PUNJAB IRRIGATION SYSTEM IMPROVEMENT PROJECT
Appropriation Request (AR-DJT/RJP-02/1)
Tail Cluster– Bill No. 11
Jalalpur Disty
Sr. Description Unit Rate Quantity as per Bid Revised Quantity as Per Balance Quantity Remarks
No. (Rs.) Schedule AR-DJT/RJP-01/02
Qty Amount Qty Amount Qty Amount
11/1 Excavation in foundation of building,
bridges and other structures, including
dagbelling, dressing, refilling around
structure with excavated earth,
watering and rammiing lead upto one ‰ Quantity increased/decreased
chain (30 m) and lif upto 5 f. (1.5 m) Cf 3000 0.338 1014.00 0.221 663.63 (0.117) (350.37) due to compare of tender
in ordinary soil drawing to Construction Drawing

11/2 Cement concrete brick or stone ballast


1½ " to 2" (40 mm to 50 mm) Ratio Quantity increased/decreased
1:4:8 guage in foundation and plinth % 13500 0.763 10293.75 0.428 5779.39 (0.334) (4514.36) due to compare of tender
Cf
drawing to Construction Drawing

11/3 Pacca brick work in foundation and


plinth in:- Quantity increased/decreased
%
Ratio 1:3 Cement sand mortar 12500 2.340 29250.00 1.589 19867.71 (0.751) (9382.29) due to compare of tender
Cf
drawing to Construction Drawing

11/4 Cement concrete plain including


placing, compacting, finishing and Quantity increased/decreased
curing complete (including screening % 16000 0.231 3689.60 0.643 10284.76 0.412 6595.16 due to compare of tender
and washing of stone aggregate): Cf
drawing to Construction Drawing
(f) Ratio 1: 2: 4 (Type-C)

Total 44247.35 36595.49 (7651.86)

Contractor Sub Divisional Officer Executive Engineer


PUNJAB IRRIGATION SYSTEM IMPROVEMENT PROJECT
Appropriation Request (AR-DJT/RJP-02/1)
Tail Cluster– Bill No. 11
Jalalpur Disty
Sr. Description Unit Rate Quantity as per Bid Revised Quantity as Per Balance Quantity Remarks
No. (Rs.) Schedule AR-DJT/RJP-01/02
Qty Amount Qty Amount Qty Amount
M/S Nishan Engineers Hajipur Sub Division Fazilpur Rajanpur Canal Division Rajanpur
PUNJAB IRRIGATION SYSTEM IMPROVEMENT PROJECT
Appropriation Request (AR-DJT/RJP-02/1)
Village Road Bridge – Bill No. 14
Jalalpur Disty
Sr. Description Unit Rate Quantity as per Bid Revised Quantity as Per Balance Quantity Remarks
No. (Rs.) Schedule AR-DJT/RJP-01/02
Qty Amount Qty Amount Qty Amount
14/1 Excavation in foundation of buildings,
bridges and other structures including
dagbelling, dressing, refilling around
structure with excavated earth, Area along the both sides of
watering and ramming lead up to one ‰ canal is populated area, there is
chain (30 m) and lif up to 5 f. (1.5 m) Cf 3000 0.000 0.00 1.143 3429.72 1.143 3429.72
requirement of VRB so that a
In ordinary soil new VRB is Provided.

14/2 Cement concrete brick or stone ballast


1½ " to 2" (40 mm to 80 mm) gauge, Area along the both sides of
in foundation and plinth:- % canal is populated area, there is
13500 0.000 0.00 0.941 12701.75 0.941 12701.75
(b) Ratio 1: 4: 8 Cf requirement of VRB so that a
new VRB is Provided.
14/3 Reinforced cement concrete in roof
slab, beams, columns, lintels, girders
& other structural members laid in
situ or precast laid in position or Area along the both sides of
prestressed members cast in situ, Cf 275 0.000 0.00 291.681 80212.14 291.681 80212.14 canal is populated area, there is
complete in all respects:- Ratio 1:2:4 requirement of VRB so that a
(Type-C) new VRB is Provided.

14/4 Providing and fabrication of mild steel


reinforcement for cement concrete Area along the both sides of
including cutting bending laying in % 9500 0.000 0.00 11.499 109245.16 11.499 109245.16 canal is populated area, there is
position deformed bars Kg requirement of VRB so that a
new VRB is Provided.
PUNJAB IRRIGATION SYSTEM IMPROVEMENT PROJECT
Appropriation Request (AR-DJT/RJP-02/1)
Village Road Bridge – Bill No. 14
Jalalpur Disty
Sr. Description Unit Rate Quantity as per Bid Revised Quantity as Per Balance Quantity Remarks
No. (Rs.) Schedule AR-DJT/RJP-01/02
Qty Amount Qty Amount Qty Amount
14/5 Pacca brick work in foundation and
plinth in:- i) Cement, sand mortar:- Area along the both sides of
Ratio 1:3 % canal is populated area, there is
12500 0.000 0.00 11.714 146424.81 11.714 146424.81
Cf requirement of VRB so that a
new VRB is Provided.
14/6 Cement concrete plain including
placing, compacting, finishing and
curing complete (including screening Area along the both sides of
and washing of stone aggregate): % canal is populated area, there is
16000 0.000 0.00 4.819 77106.62 4.819 77106.62
(f) Ratio 1: 2: 4 (Type-C) Cf requirement of VRB so that a
new VRB is Provided.

14/7 Cement plaster 3/8" (10 mm) thick


under soffit of R.C.C. roof slabs only, Area along the both sides of
upto 20' height % canal is populated area, there is
1500 0.000 0.00 6.062 9092.93 6.062 9092.93
a) Ratio 1:2 Sf requirement of VRB so that a
new VRB is Provided.
14/8 Cement pointing struck joints, on Area along the both sides of
walls, upto 20' (6.00 m) hiehgt:- % canal is populated area, there is
a) ratio 1:2 1200 0.000 0.00 2.599 3118.99 2.599 3118.99
Sf requirement of VRB so that a
new VRB is Provided.
14/9 Bitumen coating to plastered or
cement concrete surface. Area along the both sides of
20 lbs per 100 Sf ( 9.07 kg per Sq. m.) % 400 0.000 0.00 4.702 1880.78 4.702 1880.78 canal is populated area, there is
Sf requirement of VRB so that a
new VRB is Provided.

Total 0.00 443212.87 443212.87


PUNJAB IRRIGATION SYSTEM IMPROVEMENT PROJECT
Appropriation Request (AR-DJT/RJP-02/1)
Village Road Bridge – Bill No. 14
Jalalpur Disty
Sr. Description Unit Rate Quantity as per Bid Revised Quantity as Per Balance Quantity Remarks
No. (Rs.) Schedule AR-DJT/RJP-01/02
Qty Amount Qty Amount Qty Amount

Contractor Sub Divisional Officer Executive Engineer


M/S Nishan Engineers Hajipur Sub Division Fazilpur Rajanpur Canal Division Rajanpur
PUNJAB IIRIGATION SYSTEM IMPROVEMENT PROJECT
Tail Cluster
Jalalpur Disty

Description Unit No Length Width Depth Qty

Excavation

Sec C-C Cft 1 7 10.3 2 144.200

Sec B-B Cft 1 13.7 3.41 1.25 58.396

Toe Wall Cft 1 5.53 1.65 2.04 18.614

Total (Cft) 221.210

Total (‰Cft) 0.221

lean (1:3:6)

Sec C-C Cft 1 7.06 10.3 0.333 24.215

Sec B-B Cft 1 13.7 3.41 0.333 15.557

Toe Wall Cft 1 5.53 1.65 0.333 3.038

Total (Cft) 42.810

Total (%Cft) 0.428

B/W 1:3 c/s Mortor

Sec C-C Cft 1 7.06 1.5 0.375 3.971

Cft 1 7.06 2.983 2.833 59.663

Cft 1 7.06 1.15 0.75 6.089

Outer Wall Cft 2 13.7 1.15 1.575 49.628

Cft 2 13.7 0.75 0.75 15.413

Bed Cft 1 8.13 0.53 0.375 1.616

Cft 1 6.15 1.03 0.375 2.375

Cut Wall Cft 1 5.53 1.15 1.125 7.154

Cft 2 2 1.15 2.833 13.032

Total (Cft) 158.942

Total (%Cft) 1.589

PCC (1:2:4)

Sec C-C Cft 1 7.06 10.3 0.5 36.359

Sec B-B Cft 1 13.7 3.41 0.5 23.359

Toe Wall Cft 1 5.53 1.65 0.5 4.562

Total (Cft) 64.280

Total (%Cft) 0.643


PUNJAB IIRIGATION SYSTEM IMPROVEMENT PROJECT
Tail Cluster
Jalalpur Disty

Description Unit No Length Width Depth Qty


Contractor Sub Divisional Officer Sub Engineer
M/S Nishan Engineers Hajipur Sub Division Fazilpur
PUNJAB IRRIGATION SYSTEM IMPROVEMENT PROJECT. (Package No. DJT/RJP-2)
NAME OF WORK:- CONSTRUCTION OF V.R. BRRIDGE.
DETAIL OF WORK & COST.

Sr. # Description Qty Unit

1 Excavation in foundation of building, bridges and other


structures, including dagbelling, dressing, refilling around
structure with excavated earth, watering and rammiing lead
upto one chain (30 m) and lift upto 5 ft. (1.5 m)
in ordinary soil.
Total = 1143.24 Cft
Ch. 3 It 21 P.29 @ Rs. 2996.95 %o Cft
2 Cement concrete brick or stone ballast 1½ " to 2" (40 mm to
5(b) Ratio 1: 4: 80 mm) gauge, in foundation and plinth:

Total = 94 Cft
Ch. 6 .IT 3(b) P.41 @ Rs. 7,964.05 % Cft
3 (a) (i) Reinforced cement concrete in roof slab, beams, .
columns lintels, girders and other structural members laid in
situ or precast laid in position, or prestressed members cast
in situ, complete in all respects:-
(3) (c) Type C (nominal mix 1: 2: 4)
Total = 292 Cft
Ch. 6 .IT 6 a (i) P.42 @ Rs. 230.70 P Cft
4 Fabrication of mild steel reinforcement for cement concrete,
including cutting, bending, laying in position, making joints
and fastenings, including cost of binding wire and labour
charges for binding of steel reinforcement (also includes
removal of rust from bars):-
(b) deformed bars
= = 1150
Ch. 6 .IT 9 (b) @ Rs. 9278.75 % kg
5 Pacca brick work in foundation and plinth in:-
i) Cement, sand mortar:-
Ratio 1:3
Total = 1171 Cft
Ch.7 .IT 4 (i) P.52 @ Rs. 11676.25 % Cft
8 Cement concrete plain including placing, compacting, finishing and curing
complete (including screening and washing of stone aggregate):
Total = 482 Cft
Ch.6 Itm-5f @ Rs. 14985.95 % Cft
9 Cement plaster 3/8" (10 mm) thick under soffit of R.C.C.
roof slabs only, upto 20' height
a) 1:2
R/Slab = 606 Sft
Ch.11 .IT 10 (a) @ Rs. 1286.10 % Sft
10 Cement pointing deep struck joint on walls up to 20 ft height ratio 1:2
cement sand mortar.
Abutment = 259.9156 Sft
Ch-11 P-76 Item-18-a @ Rs. 1077.75 % Sft
Bitumen coating to plastered or cement concrete surface 14 LBS bitumen %Sft
Serial No. 9(ii) Ch# 13 of MRS 2nd Quarter 2011 = 470.195
@ Rs. 519.8 % Sft
Total =

Contractor Sub Divisional Officer Sub Engineer


M/S Nishan Engineers Hajipur Sub Division Fazilpur
YSTEM IMPROVEMENT PROJECT. (Package No. DJT/RJP-2)
ORK:- CONSTRUCTION OF V.R. BRRIDGE.
DETAIL OF WORK & COST.
Amount
(In Rs.)

3426

7493

67291

106701

136775

72220

7796

2801

2444
406947

Sub Engineer
PUNJAB IIRIGATION SYSTEM IMPROVEMENT PROJECT
Village Road Bridge@ RD
Jalalpur Disty

Description Unit No Length Width Depth Qty

Excavation

Abutment Wall Cft 2 16.85 7 3 707.700

Wing Wall Cft 4 5.185 7 3 435.540

Total (Cft) 1143.240

Total (‰Cft) 1.143

lean (1:4:8)

Abutment Wall Cft 2 16.85 5.19 0.333 58.243

Wing Wall Cft 4 5.185 5.19 0.333 35.844

Total (Cft) 94.087

Total (%Cft) 0.941

RCC (1:2:4)

Abutment Cap Cft 2 18 1.91 0.75 51.570

Cft 2 18 0.666 0.75 17.982

Roof Slab Cft 1 17 10.333 1 175.661

Parapet Wall Cft 2 10.333 1.5 0.666 20.645

Cft 2 10.333 0.833 1.5 25.822

Total (Cft) 291.681

B/W (1:3)

Abutment Wall

Step-1 Cft 2 16.85 4.19 1 141.203

Step-2 Cft 2 16.85 3.81 1 128.397

Step-3 Cft 2 16.85 3.43 1 115.591

Step-4 Cft 2 16.85 3.05 1 102.785

Step-5 Cft 2 16.85 2.67 1 89.979

Step-6 Cft 2 16.85 2.29 1 77.173

Wing Wall

Step-1 Cft 4 5.185 4.19 1 86.901

Step-2 Cft 4 5.185 3.81 1 79.019

Step-3 Cft 4 5.185 3.43 1 71.138

Step-4 Cft 4 5.185 3.05 1 63.257

Step-5 Cft 4 5.185 2.67 1 55.376

Step-6 Cft 4 5.185 2.29 1 47.495


PUNJAB IIRIGATION SYSTEM IMPROVEMENT PROJECT
Village Road Bridge@ RD
Jalalpur Disty

Description Unit No Length Width Depth Qty

Step-7 Cft 4 5.185 1.91 1 39.613

Step-8 Cft 4 5.185 1.53 1 31.732

Step-9 Cft 4 5.185 1.15 1.75 41.739

Total (Cft) 1171.398

Total (%Cft) 11.714

PCC (1:2:4)

Abutment Wall Cft 2 16.85 5.19 1 174.903

Wing Wall Cft 4 5.185 5.19 1 107.641

Coping at Wing Wall Cft 4 5.185 1.15 0.25 5.963

Floor Cft 1 18 8 0.25 36.000

Pcc Block Cft 2 15 4.5 0.583 78.705

Cft 2 15 3 0.583 52.470

Cft 2 15 1.5 0.583 26.235

Total (Cft) 481.916

Total (%Cft) 4.819

Plaster 3/8" thick in 1:2 c/s Mortor

Under Roof Slab Sft 1 17 8 136.000

Abutment Wall under Banks Sft 2 16.85 7.875 265.388

Wing Wall under Banks Sft 4 5.185 9.875 204.808

Total (Sft) 606.195

Total (%Sft) 6.062

Struck Pointing 1:2 c/s Mortor

Abutment Wall Sft 2 16.85 3.38 113.906

Wing Wall Sft 4 5.185 7.04 146.010

Total (Sft) 259.916

Total (%Sft) 2.599

Bitumen Coating at plastered surface below banks

Abutment Wall Sft 2 16.85 7.875 265.388

Wing Wall Sft 4 5.185 9.875 204.808

Total (Sft) 470.195

Total (%Sft) 4.702


PUNJAB IIRIGATION SYSTEM IMPROVEMENT PROJECT
Village Road Bridge@ RD
Jalalpur Disty

Description Unit No Length Width Depth Qty

Contractor Sub Divisional Officer Sub Engineer


M/S Nishan Engineers Hajipur Sub Division Fazilpur
PUNJAB IRRIGATION SYSTEM IMPROVEMENT PROJECT
Bar Bending Detail
VRB at Jalalpur Disty @ RD
Description Distribution Dia of Spacing No No Total Cut Total Unit Total Bending
Span Bar of of Bar Length Length Weight Weight Detail
Ft items Bar No's Ft Ft Kg/Ft Kg
Abuttment

Horizental Bars (Top) #4 2 2 4 17.667 70.668 0.302 21.342 "8-'17

Horizental Bars (Bott) #4 2 3 6 17.667 106.002 0.302 32.013 "8-'17

"2 +"2

Stirups 4.25 #4 6" C/C 2 35 70 4.667 326.690 0.302 98.660 "6

"8-'1

Side Bars (N.F) #4 2 2 4 17.667 70.668 0.302 21.342 "8-'17

Side Bars (F.F) #4 2 2 4 17.667 70.668 0.302 21.342 "8-'17

"2 +"2

Stirups 4.25 #4 6" C/C 2 35 70 3.667 256.690 0.302 77.520 "3-'1

"5

RCC Slab

Main Bars (Top) 16.667 #6 12" C/C 2 18 36 11.000 396.000 0.681 269.676 "0-'10 "6
"6

Distribution Bars (Bott) 8.25 #6 6" C/C 2 18 36 17.667 636.012 0.681 433.124 ""8-'16 "6
"6
PUNJAB IRRIGATION SYSTEM IMPROVEMENT PROJECT
Bar Bending Detail
VRB at Jalalpur Disty @ RD
Description Distribution Dia of Spacing No No Total Cut Total Unit Total Bending
Span Bar of of Bar Length Length Weight Weight Detail
Ft items Bar No's Ft Ft Kg/Ft Kg
"2-'1
"6
Rings 16.667 #4 12" C/C 2 18 36 3.340 120.240 0.302 36.312 "2-'1

"6

Parapet

Longitudinal Bars (Top) #4 2 9 18 10.000 180.000 0.302 54.360 "0-'10

"5

"3-'1
Stirups 17 #4 12" C/C 2 18 36 7.750 279.000 0.302 84.258 "2-'1

"2-'1
Total Weight (Kg) 1149.949
Total Weight (%Kg) 11.499
Dia Of Bar Weight (Kg)
#4 447.149 "4
#6 702.8
Total Weight (Kg) 1149.95
"7
Contractor Sub Engineer Sub Divisional Officer
M/S Nishan Engineers Hajipur Sub Division Fazilpur
PUNJAB IRRIGATION SYSTEM IMPROVEMENT PROJECT
Appropriation Request (AR-DJT/RJP-02/01)

Jalalpur Minor

Bill As Per Approved Bid Increrase/Decrease As Per AR/Draft VO-02/01


Description
No.
Amount (Rs) Amount (Rs) Amount (Rs)

1 Earthwork 2,605,230.50 2,605,230.50

2 Concrete Lining 6,150,171.92 6,150,171.92

3 Dismantling of Outlet 9,300.00 9,300.00

4 Temporary Outlets 76,556.16 76,556.16

5 APM Outlets for Lined Section 431,494.20 431,494.20

6 RD Marks 5,720.63 5,720.63

7 Cattle Ghat 837,117.00 (837,117.00) -

8 Repairing Existing Structures 44,340.00 44,340.00

9 Data Board for H/R, Fall etc. 15,147.00 15,147.00

10 Data Board for Outlets 11,560.00 11,560.00

Contractor: Exuctive Engineer Resident Engineer


Nishan Engineers Rajanpur Canal Division Rajanpur PISIP Rajanpur
PUNJAB IRRIGATION SYSTEM IMPROVEMENT PROJECT
Appropriation Request (AR-DJT/RJP-02/01)

Jalalpur Minor

Bill As Per Approved Bid Increrase/Decrease As Per AR/Draft VO-02/01


Description
No.
Amount (Rs) Amount (Rs) Amount (Rs)
11 Tail Cluster 44,247.35 37,785.55 82,032.90

12 Regulation Gate 159,346.90 159,346.90

SUB TOTAL(1) :- 10,390,231.66 (799,331.45) 9,590,900.20

Contractor: Exuctive Engineer Resident Engineer


Nishan Engineers Rajanpur Canal Division Rajanpur PISIP Rajanpur
PUNJAB IRRIGATION SYSTEM IMPROVEMENT PROJECT
Appropriation Request (AR-DJT/RJP-02/1)
Cattle Ghat– Bill No.7
Jalalpur Minor
Sr. Description Unit Rate Quantity as per Bid Revised Quantity as Per Balance Quantity Remarks
No. (Rs.) Schedule AR-DJT/RJP-01/02
Qty Amount Qty Amount Qty Amount
7/1 Excavation in foundation of building,
bridges and other
structures, including dagbelling,
dressing, refilling around structure As such there is no requirement
with excavated earth, watering and ‰ of the structure as per local
rammiing lead 3500 11.552 40432.00 0.000 0.00 (11.552) (40432.00)
Cf condition hence deleted from
upto one chain (30 m) and lif upto 5 scope of work.
f. (1.5 m)
b) in ordinary soil

7/2 Cement concrete brick or stone ballast


1.5" to 2" guage in foundation and As such there is no requirement
plinth ratio 1:3:6 % of the structure as per local
13500 10.590 142965.00 0.000 0.00 (10.590) (142965.00)
Cf condition hence deleted from
scope of work.

7/3 Cement concrete plain including


placing, compacting,finishing and
curing complete, (including As such there is no requirement
screening,leaning and washing of % of the structure as per local
16000 3.790 60640.00 0.000 0.00 (3.790) (60640.00)
stone aggrigate) Cf condition hence deleted from
ratio 1;2;4 (Type-C) scope of work.

7/4 Providing and laying reinforced


cement concrete (including As such there is no requirement
prestressed concrete) using coarse Cf 250 342.000 85500.00 0.000 0.00 (342.000) (85500.00) of the structure as per local
sand and screened, graded and condition hence deleted from
washed aggregate in required shape scope of work.
and design, including forms, moulds,
shuttering, lifing, compacting, curing,
rendering and finishing exposed
surface, complete (but excluding the
cost of steel reinforcement, its
fabrication & placing in position etc.)
a) Reinforced cement concrete in roof
slab, beams, columns, lintels, girders
PUNJAB IRRIGATION SYSTEM IMPROVEMENT PROJECT
Appropriation Request (AR-DJT/RJP-02/1)
Cattle Ghat– Bill No.7
Jalalpur Minor
Sr. Description Unit Rate Quantity as per Bid Revised Quantity as Per Balance Quantity Remarks
No. (Rs.) Schedule AR-DJT/RJP-01/02
Qty Amount Qty Amount Qty Amount
7/5 Providing and fabrication of mild steel
reinforcement for cement concrete
including cutting bending laying in
position making joints and fastening
including cost of binding wire and
labour charges for binding of steel As such there is no requirement
reinforcement (also includes removal % 9500 8.540 81130.00 0.000 0.00 (8.540) (81130.00) of the structure as per local
of rust from bars) deformed bars Kg condition hence deleted from
(Grade-40) scope of work.

7/6 Dry rammed brick or stone ballast,1.5" As such there is no requirement


to 2" guage % of the structure as per local
2000 1.600 3200.00 0.000 0.00 (1.600) (3200.00)
Cf condition hence deleted from
scope of work.
7/7 Pacca brick work other than building As such there is no requirement
upto 10' height % of the structure as per local
Ratio (1:3) 12500 33.860 423250.00 0.000 0.00 (33.860) (423250.00)
Cf condition hence deleted from
scope of work.
Total 837117.00 0.00 (837117.00)

Contractor Sub Divisional Officer Executive Engineer


M/S Nishan Engineers Hajipur Sub Division Fazilpur Rajanpur Canal Division Rajanpur
PUNJAB IRRIGATION SYSTEM IMPROVEMENT PROJECT
Appropriation Request (AR-DJT/RJP-02/1)
Tail Cluster– Bill No. 11
Jalalpur Minor
Sr. Description Unit Rate Quantity as per Bid Revised Quantity as Per Balance Quantity Remarks
No. (Rs.) Schedule AR-DJT/RJP-01/02
Qty Amount Qty Amount Qty Amount
11/1 Excavation in foundation of building,
bridges and other structures, including
dagbelling, dressing, refilling around
structure with excavated earth,
watering and rammiing lead upto one ‰ Quantity increased/decreased
chain (30 m) and lif upto 5 f. (1.5 m) Cf 3000 0.338 1014.00 0.375 1125.69 0.037 111.69 due to compare of tender
in ordinary soil drawing to Construction Drawing

11/2 Cement concrete brick or stone ballast


1½ " to 2" (40 mm to 50 mm) Ratio Quantity increased/decreased
1:4:8 guage in foundation and plinth % 13500 0.763 10293.75 0.800 10800.10 0.038 506.35 due to compare of tender
Cf
drawing to Construction Drawing

11/3 Pacca brick work in foundation and


plinth in:- Quantity increased/decreased
%
Ratio 1:3 Cement sand mortar 12500 2.340 29250.00 4.071 50887.70 1.731 21637.70 due to compare of tender
Cf
drawing to Construction Drawing

11/4 Cement concrete plain including


placing, compacting, finishing and Quantity increased/decreased
curing complete (including screening % 16000 0.231 3689.60 1.201 19219.40 0.971 15529.80 due to compare of tender
and washing of stone aggregate): Cf
drawing to Construction Drawing
(f) Ratio 1: 2: 4 (Type-C)

Total 44247.35 82032.90 37785.55

Contractor Sub Divisional Officer Executive Engineer


PUNJAB IRRIGATION SYSTEM IMPROVEMENT PROJECT
Appropriation Request (AR-DJT/RJP-02/1)
Tail Cluster– Bill No. 11
Jalalpur Minor
Sr. Description Unit Rate Quantity as per Bid Revised Quantity as Per Balance Quantity Remarks
No. (Rs.) Schedule AR-DJT/RJP-01/02
Qty Amount Qty Amount Qty Amount
M/S Nishan Engineers Hajipur Sub Division Fazilpur Rajanpur Canal Division Rajanpur
PUNJAB IIRIGATION SYSTEM IMPROVEMENT PROJECT
Tail Cluster
Jalalpur Minor

Description Unit No Length Width Depth Qty

Excavation

Sec C-C Cft 1 7 10.3 2 144.200

Sec B-B Cft 3 13.7 3.41 1.25 175.189

Toe Wall Cft 3 5.53 1.65 2.04 55.842

Total (Cft) 375.231

Total (‰Cft) 0.375

lean (1:3:6)

Sec C-C Cft 1 7.06 10.3 0.333 24.215

Sec B-B Cft 3 13.7 3.41 0.333 46.670

Toe Wall Cft 3 5.53 1.65 0.333 9.115

Total (Cft) 80.001

Total (%Cft) 0.800

B/W 1:3 c/s Mortor

Sec C-C Cft 2 7.06 1.5 0.375 7.943

Cft 2 7.06 2.983 2.833 119.326

Cft 2 7.06 1.15 0.75 12.179

Outer Wall Cft 6 13.7 1.15 1.575 148.885

Cft 6 13.7 0.75 0.75 46.238

Bed Cft 3 8.13 0.53 0.375 4.848

Cft 3 6.15 1.03 0.375 7.126

Cut Wall Cft 3 5.53 1.15 1.125 21.463

Cft 6 2 1.15 2.833 39.095

Total (Cft) 407.102

Total (%Cft) 4.071

PCC (1:2:4)

Sec C-C Cft 1 7.06 10.3 0.5 36.359

Sec B-B Cft 3 13.7 3.41 0.5 70.076

Toe Wall Cft 3 5.53 1.65 0.5 13.687

Total (Cft) 120.121

Total (%Cft) 1.201


PUNJAB IIRIGATION SYSTEM IMPROVEMENT PROJECT
Tail Cluster
Jalalpur Minor

Description Unit No Length Width Depth Qty


Contractor Sub Divisional Officer Sub Engineer
M/S Nishan Engineers Hajipur Sub Division Fazilpur
PUNJAB IRRIGATION SYSTEM IMPROVEMENT PROJECT
Appropriation Request (AR-DJT/RJP-02/01)

Jahanpur Minor

Bill As Per Approved Bid Increrase/Decrease As Per AR/Draft VO-02/01


Description
No.
Amount (Rs) Amount (Rs) Amount (Rs)

1 Earthwork 6,595,479.50 6,595,479.50

2 Concrete Lining 14,263,512.15 14,263,512.15

3 Dismantling of Outlet 27,900.00 27,900.00

4 Temporary Outlets 229,668.48 229,668.48

5 APM Outlets for Lined Section 1,294,482.60 1,294,482.60

6 RD Marks 11,441.25 11,441.25

7 Cattle Ghat 1,674,234.00 (1,674,234.00) -

8 Repairing Existing Structures 44,340.00 44,340.00

9 Data Board for H/R, Fall etc. 30,294.00 30,294.00

10 Data Board for Outlets 28,900.00 28,900.00

Contractor: Exuctive Engineer Resident Engineer


Nishan Engineers Rajanpur Canal Division Rajanpur PISIP Rajanpur
PUNJAB IRRIGATION SYSTEM IMPROVEMENT PROJECT
Appropriation Request (AR-DJT/RJP-02/01)

Jahanpur Minor

Bill As Per Approved Bid Increrase/Decrease As Per AR/Draft VO-02/01


Description
No.
Amount (Rs) Amount (Rs) Amount (Rs)
11 Tail Cluster 44,247.35 (7,651.86) 36,595.49

12 Regulation Gate 235,374.40 235,374.40

SUB TOTAL(1) :- 24,479,873.73 (1,681,885.86) 22,797,987.87

Contractor: Exuctive Engineer Resident Engineer


Nishan Engineers Rajanpur Canal Division Rajanpur PISIP Rajanpur
PUNJAB IRRIGATION SYSTEM IMPROVEMENT PROJECT
Appropriation Request (AR-DJT/RJP-02/1)
Cattle Ghat– Bill No.7
Jahanpur Minor
Sr. Description Unit Rate Quantity as per Bid Revised Quantity as Per Balance Quantity Remarks
No. (Rs.) Schedule AR-DJT/RJP-01/02
Qty Amount Qty Amount Qty Amount
7/1 Excavation in foundation of building,
bridges and other
structures, including dagbelling,
dressing, refilling around structure As such there is no requirement
with excavated earth, watering and ‰ of the structure as per local
rammiing lead 3500 11.552 40432.00 0.000 0.00 (11.552) (40432.00)
Cf condition hence deleted from
upto one chain (30 m) and lif upto 5 scope of work.
f. (1.5 m)
b) in ordinary soil

7/2 Cement concrete brick or stone ballast


1.5" to 2" guage in foundation and As such there is no requirement
plinth ratio 1:3:6 % of the structure as per local
13500 10.590 142965.00 0.000 0.00 (10.590) (142965.00)
Cf condition hence deleted from
scope of work.

7/3 Cement concrete plain including


placing, compacting,finishing and
curing complete, (including As such there is no requirement
screening,leaning and washing of % of the structure as per local
16000 3.790 60640.00 0.000 0.00 (3.790) (60640.00)
stone aggrigate) Cf condition hence deleted from
ratio 1;2;4 (Type-C) scope of work.

7/4 Providing and laying reinforced


cement concrete (including As such there is no requirement
prestressed concrete) using coarse Cf 250 342.000 85500.00 0.000 0.00 (342.000) (85500.00) of the structure as per local
sand and screened, graded and condition hence deleted from
washed aggregate in required shape scope of work.
and design, including forms, moulds,
shuttering, lifing, compacting, curing,
rendering and finishing exposed
surface, complete (but excluding the
cost of steel reinforcement, its
fabrication & placing in position etc.)
a) Reinforced cement concrete in roof
slab, beams, columns, lintels, girders
PUNJAB IRRIGATION SYSTEM IMPROVEMENT PROJECT
Appropriation Request (AR-DJT/RJP-02/1)
Cattle Ghat– Bill No.7
Jahanpur Minor
Sr. Description Unit Rate Quantity as per Bid Revised Quantity as Per Balance Quantity Remarks
No. (Rs.) Schedule AR-DJT/RJP-01/02
Qty Amount Qty Amount Qty Amount
7/5 Providing and fabrication of mild steel
reinforcement for cement concrete
including cutting bending laying in
position making joints and fastening
including cost of binding wire and
labour charges for binding of steel As such there is no requirement
reinforcement (also includes removal % 9500 8.540 81130.00 0.000 0.00 (8.540) (81130.00) of the structure as per local
of rust from bars) deformed bars Kg condition hence deleted from
(Grade-40) scope of work.

7/6 Dry rammed brick or stone ballast,1.5" As such there is no requirement


to 2" guage % of the structure as per local
2000 1.600 3200.00 0.000 0.00 (1.600) (3200.00)
Cf condition hence deleted from
scope of work.
7/7 Pacca brick work other than building As such there is no requirement
upto 10' height % of the structure as per local
Ratio (1:3) 12500 33.860 423250.00 0.000 0.00 (33.860) (423250.00)
Cf condition hence deleted from
scope of work.
Total 837117.00 0.00 (837117.00)
2 No's Total 1674234.00 0.00 (1674234.00)

Contractor Sub Divisional Officer Executive Engineer


M/S Nishan Engineers Hajipur Sub Division Fazilpur Rajanpur Canal Division Rajanpur
PUNJAB IRRIGATION SYSTEM IMPROVEMENT PROJECT
Appropriation Request (AR-DJT/RJP-02/1)
Tail Cluster– Bill No. 11
Jahanpur Minor
Sr. Description Unit Rate Quantity as per Bid Revised Quantity as Per Balance Quantity Remarks
No. (Rs.) Schedule AR-DJT/RJP-01/02
Qty Amount Qty Amount Qty Amount
11/1 Excavation in foundation of building,
bridges and other structures, including
dagbelling, dressing, refilling around
structure with excavated earth,
watering and rammiing lead upto one ‰ Quantity increased/decreased
chain (30 m) and lif upto 5 f. (1.5 m) Cf 3000 0.338 1014.00 0.221 663.63 (0.117) (350.37) due to compare of tender
in ordinary soil drawing to Construction Drawing

11/2 Cement concrete brick or stone ballast


1½ " to 2" (40 mm to 50 mm) Ratio Quantity increased/decreased
1:4:8 guage in foundation and plinth % 13500 0.763 10293.75 0.428 5779.39 (0.334) (4514.36) due to compare of tender
Cf
drawing to Construction Drawing

11/3 Pacca brick work in foundation and


plinth in:- Quantity increased/decreased
%
Ratio 1:3 Cement sand mortar 12500 2.340 29250.00 1.589 19867.71 (0.751) (9382.29) due to compare of tender
Cf
drawing to Construction Drawing

11/4 Cement concrete plain including


placing, compacting, finishing and Quantity increased/decreased
curing complete (including screening % 16000 0.231 3689.60 0.643 10284.76 0.412 6595.16 due to compare of tender
and washing of stone aggregate): Cf
drawing to Construction Drawing
(f) Ratio 1: 2: 4 (Type-C)

Total 44247.35 36595.49 (7651.86)

Contractor Sub Divisional Officer Executive Engineer


PUNJAB IRRIGATION SYSTEM IMPROVEMENT PROJECT
Appropriation Request (AR-DJT/RJP-02/1)
Tail Cluster– Bill No. 11
Jahanpur Minor
Sr. Description Unit Rate Quantity as per Bid Revised Quantity as Per Balance Quantity Remarks
No. (Rs.) Schedule AR-DJT/RJP-01/02
Qty Amount Qty Amount Qty Amount
M/S Nishan Engineers Hajipur Sub Division Fazilpur Rajanpur Canal Division Rajanpur
PUNJAB IIRIGATION SYSTEM IMPROVEMENT PROJECT
Tail Cluster
Jahanpur Minor

Description Unit No Length Width Depth Qty

Excavation

Sec C-C Cft 1 7 10.3 2 144.200

Sec B-B Cft 1 13.7 3.41 1.25 58.396

Toe Wall Cft 1 5.53 1.65 2.04 18.614

Total (Cft) 221.210

Total (‰Cft) 0.221

lean (1:3:6)

Sec C-C Cft 1 7.06 10.3 0.333 24.215

Sec B-B Cft 1 13.7 3.41 0.333 15.557

Toe Wall Cft 1 5.53 1.65 0.333 3.038

Total (Cft) 42.810

Total (%Cft) 0.428

B/W 1:3 c/s Mortor

Sec C-C Cft 1 7.06 1.5 0.375 3.971

Cft 1 7.06 2.983 2.833 59.663

Cft 1 7.06 1.15 0.75 6.089

Outer Wall Cft 2 13.7 1.15 1.575 49.628

Cft 2 13.7 0.75 0.75 15.413

Bed Cft 1 8.13 0.53 0.375 1.616

Cft 1 6.15 1.03 0.375 2.375

Cut Wall Cft 1 5.53 1.15 1.125 7.154

Cft 2 2 1.15 2.833 13.032

Total (Cft) 158.942

Total (%Cft) 1.589

PCC (1:2:4)

Sec C-C Cft 1 7.06 10.3 0.5 36.359

Sec B-B Cft 1 13.7 3.41 0.5 23.359

Toe Wall Cft 1 5.53 1.65 0.5 4.562

Total (Cft) 64.280

Total (%Cft) 0.643


PUNJAB IIRIGATION SYSTEM IMPROVEMENT PROJECT
Tail Cluster
Jahanpur Minor

Description Unit No Length Width Depth Qty


Contractor Sub Divisional Officer Sub Engineer
M/S Nishan Engineers Hajipur Sub Division Fazilpur
PUNJAB IRRIGATION SYSTEM IMPROVEMENT PROJECT
Appropriation Request (AR-DJT/RJP-02/01)

Rasulpur Minor

Bill As Per Approved Bid Increrase/Decrease As Per AR/Draft VO-02/01


Description
No.
Amount (Rs) Amount (Rs) Amount (Rs)

1 Earthwork 15,361,030.00 15,361,030.00

2 Concrete Lining 29,682,135.38 29,682,135.38

3 Dismantling of Outlet 40,300.00 40,300.00

4 Temporary Outlets 331,743.36 331,743.36

5 APM Outlets for Lined Section 1,869,808.20 1,869,808.20

6 RD Marks 21,611.25 21,611.25

7 Cattle Ghat 1,674,234.00 (1,674,234.00) -

8 Repairing Existing Structures 44,340.00 44,340.00

9 Data Board for H/R, Fall etc. 45,441.00 45,441.00

10 Data Board for Outlets 40,460.00 40,460.00

Contractor: Exuctive Engineer Resident Engineer


Nishan Engineers Rajanpur Canal Division Rajanpur PISIP Rajanpur
PUNJAB IRRIGATION SYSTEM IMPROVEMENT PROJECT
Appropriation Request (AR-DJT/RJP-02/01)

Rasulpur Minor

Bill As Per Approved Bid Increrase/Decrease As Per AR/Draft VO-02/01


Description
No.
Amount (Rs) Amount (Rs) Amount (Rs)
11 Tail Cluster 44,247.35 19,424.56 63,671.91

12 Regulation Gate 630,839.00 630,839.00

13 Village Road Bridge - 443,212.87 443,212.87

SUB TOTAL(1) :- 49,786,189.54 (1,211,596.57) 48,574,592.97

Contractor: Exuctive Engineer Resident Engineer


Nishan Engineers Rajanpur Canal Division Rajanpur PISIP Rajanpur
PUNJAB IRRIGATION SYSTEM IMPROVEMENT PROJECT
Appropriation Request (AR-DJT/RJP-02/1)
Cattle Ghat– Bill No.7
Rasulpur Minor
Sr. Description Unit Rate Quantity as per Bid Revised Quantity as Per Balance Quantity Remarks
No. (Rs.) Schedule AR-DJT/RJP-01/02
Qty Amount Qty Amount Qty Amount
7/1 Excavation in foundation of building,
bridges and other
structures, including dagbelling,
dressing, refilling around structure As such there is no requirement
with excavated earth, watering and ‰ of the structure as per local
rammiing lead 3500 11.552 40432.00 0.000 0.00 (11.552) (40432.00)
Cf condition hence deleted from
upto one chain (30 m) and lif upto 5 scope of work.
f. (1.5 m)
b) in ordinary soil

7/2 Cement concrete brick or stone ballast


1.5" to 2" guage in foundation and As such there is no requirement
plinth ratio 1:3:6 % of the structure as per local
13500 10.590 142965.00 0.000 0.00 (10.590) (142965.00)
Cf condition hence deleted from
scope of work.

7/3 Cement concrete plain including


placing, compacting,finishing and
curing complete, (including As such there is no requirement
screening,leaning and washing of % of the structure as per local
16000 3.790 60640.00 0.000 0.00 (3.790) (60640.00)
stone aggrigate) Cf condition hence deleted from
ratio 1;2;4 (Type-C) scope of work.

7/4 Providing and laying reinforced


cement concrete (including As such there is no requirement
prestressed concrete) using coarse Cf 250 342.000 85500.00 0.000 0.00 (342.000) (85500.00) of the structure as per local
sand and screened, graded and condition hence deleted from
washed aggregate in required shape scope of work.
and design, including forms, moulds,
shuttering, lifing, compacting, curing,
rendering and finishing exposed
surface, complete (but excluding the
cost of steel reinforcement, its
fabrication & placing in position etc.)
a) Reinforced cement concrete in roof
slab, beams, columns, lintels, girders
PUNJAB IRRIGATION SYSTEM IMPROVEMENT PROJECT
Appropriation Request (AR-DJT/RJP-02/1)
Cattle Ghat– Bill No.7
Rasulpur Minor
Sr. Description Unit Rate Quantity as per Bid Revised Quantity as Per Balance Quantity Remarks
No. (Rs.) Schedule AR-DJT/RJP-01/02
Qty Amount Qty Amount Qty Amount
7/5 Providing and fabrication of mild steel
reinforcement for cement concrete
including cutting bending laying in
position making joints and fastening
including cost of binding wire and
labour charges for binding of steel As such there is no requirement
reinforcement (also includes removal % 9500 8.540 81130.00 0.000 0.00 (8.540) (81130.00) of the structure as per local
of rust from bars) deformed bars Kg condition hence deleted from
(Grade-40) scope of work.

7/6 Dry rammed brick or stone ballast,1.5" As such there is no requirement


to 2" guage % of the structure as per local
2000 1.600 3200.00 0.000 0.00 (1.600) (3200.00)
Cf condition hence deleted from
scope of work.
7/7 Pacca brick work other than building As such there is no requirement
upto 10' height % of the structure as per local
Ratio (1:3) 12500 33.860 423250.00 0.000 0.00 (33.860) (423250.00)
Cf condition hence deleted from
scope of work.
Total 837117.00 0.00 (837117.00)
2 No's Total 1674234.00 0.00 (1674234.00)

Contractor Sub Divisional Officer Executive Engineer


M/S Nishan Engineers Hajipur Sub Division Fazilpur Rajanpur Canal Division Rajanpur
PUNJAB IRRIGATION SYSTEM IMPROVEMENT PROJECT
Appropriation Request (AR-DJT/RJP-02/1)
Tail Cluster– Bill No. 11
Rasulpur Minor
Sr. Description Unit Rate Quantity as per Bid Revised Quantity as Per Balance Quantity Remarks
No. (Rs.) Schedule AR-DJT/RJP-01/02
Qty Amount Qty Amount Qty Amount
11/1 Excavation in foundation of building,
bridges and other structures, including
dagbelling, dressing, refilling around
structure with excavated earth,
watering and rammiing lead upto one ‰ Quantity increased/decreased
chain (30 m) and lif upto 5 f. (1.5 m) Cf 3000 0.338 1014.00 0.298 894.66 (0.040) (119.34) due to compare of tender
in ordinary soil drawing to Construction Drawing

11/2 Cement concrete brick or stone ballast


1½ " to 2" (40 mm to 50 mm) Ratio Quantity increased/decreased
1:4:8 guage in foundation and plinth % 13500 0.763 10293.75 0.614 8289.75 (0.148) (2004.00) due to compare of tender
Cf
drawing to Construction Drawing

11/3 Pacca brick work in foundation and


plinth in:- Quantity increased/decreased
%
Ratio 1:3 Cement sand mortar 12500 2.340 29250.00 3.179 39735.42 0.839 10485.42 due to compare of tender
Cf
drawing to Construction Drawing

11/4 Cement concrete plain including


placing, compacting, finishing and Quantity increased/decreased
curing complete (including screening % 16000 0.231 3689.60 0.922 14752.08 0.691 11062.48 due to compare of tender
and washing of stone aggregate): Cf
drawing to Construction Drawing
(f) Ratio 1: 2: 4 (Type-C)

Total 44247.35 63671.91 19424.56

Contractor Sub Divisional Officer Executive Engineer


PUNJAB IRRIGATION SYSTEM IMPROVEMENT PROJECT
Appropriation Request (AR-DJT/RJP-02/1)
Tail Cluster– Bill No. 11
Rasulpur Minor
Sr. Description Unit Rate Quantity as per Bid Revised Quantity as Per Balance Quantity Remarks
No. (Rs.) Schedule AR-DJT/RJP-01/02
Qty Amount Qty Amount Qty Amount
M/S Nishan Engineers Hajipur Sub Division Fazilpur Rajanpur Canal Division Rajanpur
PUNJAB IRRIGATION SYSTEM IMPROVEMENT PROJECT
Appropriation Request (AR-DJT/RJP-02/1)
Village Road Bridge– Bill No. 14
Rasulpur Minor
Sr. Description Unit Rate Quantity as per Bid Revised Quantity as Per Balance Quantity Remarks
No. (Rs.) Schedule AR-DJT/RJP-01/02
Qty Amount Qty Amount Qty Amount
14/1 Excavation in foundation of buildings,
bridges and other structures including
dagbelling, dressing, refilling around
structure with excavated earth, Area along the both sides of
watering and ramming lead up to one ‰ canal is populated area, there is
chain (30 m) and lif up to 5 f. (1.5 m) Cf 3000 0.000 0.00 1.143 3429.72 1.143 3429.72
requirement of VRB so that a
In ordinary soil new VRB is Provided.

14/2 Cement concrete brick or stone ballast


1½ " to 2" (40 mm to 80 mm) gauge, Area along the both sides of
in foundation and plinth:- % canal is populated area, there is
13500 0.000 0.00 0.941 12701.75 0.941 12701.75
(b) Ratio 1: 4: 8 Cf requirement of VRB so that a
new VRB is Provided.
14/3 Reinforced cement concrete in roof
slab, beams, columns, lintels, girders
& other structural members laid in
situ or precast laid in position or Area along the both sides of
prestressed members cast in situ, Cf 275 0.000 0.00 291.681 80212.14 291.681 80212.14 canal is populated area, there is
complete in all respects:- Ratio 1:2:4 requirement of VRB so that a
(Type-C) new VRB is Provided.

14/4 Providing and fabrication of mild steel


reinforcement for cement concrete Area along the both sides of
including cutting bending laying in % 9500 0.000 0.00 11.499 109245.16 11.499 109245.16 canal is populated area, there is
position deformed bars Kg requirement of VRB so that a
new VRB is Provided.
PUNJAB IRRIGATION SYSTEM IMPROVEMENT PROJECT
Appropriation Request (AR-DJT/RJP-02/1)
Village Road Bridge– Bill No. 14
Rasulpur Minor
Sr. Description Unit Rate Quantity as per Bid Revised Quantity as Per Balance Quantity Remarks
No. (Rs.) Schedule AR-DJT/RJP-01/02
Qty Amount Qty Amount Qty Amount
14/5 Pacca brick work in foundation and
plinth in:- i) Cement, sand mortar:- Area along the both sides of
Ratio 1:3 % canal is populated area, there is
12500 0.000 0.00 11.714 146424.81 11.714 146424.81
Cf requirement of VRB so that a
new VRB is Provided.
14/6 Cement concrete plain including
placing, compacting, finishing and
curing complete (including screening Area along the both sides of
and washing of stone aggregate): % canal is populated area, there is
16000 0.000 0.00 4.819 77106.62 4.819 77106.62
(f) Ratio 1: 2: 4 (Type-C) Cf requirement of VRB so that a
new VRB is Provided.

14/7 Cement plaster 3/8" (10 mm) thick


under soffit of R.C.C. roof slabs only, Area along the both sides of
upto 20' height % canal is populated area, there is
1500 0.000 0.00 6.062 9092.93 6.062 9092.93
a) Ratio 1:2 Sf requirement of VRB so that a
new VRB is Provided.
14/8 Cement pointing struck joints, on Area along the both sides of
walls, upto 20' (6.00 m) hiehgt:- % canal is populated area, there is
a) ratio 1:2 1200 0.000 0.00 2.599 3118.99 2.599 3118.99
Sf requirement of VRB so that a
new VRB is Provided.
14/9 Bitumen coating to plastered or
cement concrete surface. Area along the both sides of
20 lbs per 100 Sf ( 9.07 kg per Sq. m.) % 400 0.000 0.00 4.702 1880.78 4.702 1880.78 canal is populated area, there is
Sf requirement of VRB so that a
new VRB is Provided.

Total 0.00 443212.87 443212.87


PUNJAB IRRIGATION SYSTEM IMPROVEMENT PROJECT
Appropriation Request (AR-DJT/RJP-02/1)
Village Road Bridge– Bill No. 14
Rasulpur Minor
Sr. Description Unit Rate Quantity as per Bid Revised Quantity as Per Balance Quantity Remarks
No. (Rs.) Schedule AR-DJT/RJP-01/02
Qty Amount Qty Amount Qty Amount

Contractor Sub Divisional Officer Executive Engineer


M/S Nishan Engineers Hajipur Sub Division Fazilpur Rajanpur Canal Division Rajanpur
PUNJAB IIRIGATION SYSTEM IMPROVEMENT PROJECT
Tail Cluster
Rasulpur Minor

Description Unit No Length Width Depth Qty

Excavation

Sec C-C Cft 1 7 10.3 2 144.200

Sec B-B Cft 2 13.7 3.41 1.25 116.793

Toe Wall Cft 2 5.53 1.65 2.04 37.228

Total (Cft) 298.220

Total (‰Cft) 0.298

lean (1:3:6)

Sec C-C Cft 1 7.06 10.3 0.333 24.215

Sec B-B Cft 2 13.7 3.41 0.333 31.114

Toe Wall Cft 2 5.53 1.65 0.333 6.077

Total (Cft) 61.406

Total (%Cft) 0.614

B/W 1:3 c/s Mortor

Sec C-C Cft 2 7.06 1.5 0.375 7.943

Cft 2 7.06 2.983 2.833 119.326

Cft 2 7.06 1.15 0.75 12.179

Outer Wall Cft 4 13.7 1.15 1.575 99.257

Cft 4 13.7 0.75 0.75 30.825

Bed Cft 2 8.13 0.53 0.375 3.232

Cft 2 6.15 1.03 0.375 4.751

Cut Wall Cft 2 5.53 1.15 1.125 14.309

Cft 4 2 1.15 2.833 26.064

Total (Cft) 317.883

Total (%Cft) 3.179

PCC (1:2:4)

Sec C-C Cft 1 7.06 10.3 0.5 36.359

Sec B-B Cft 2 13.7 3.41 0.5 46.717

Toe Wall Cft 2 5.53 1.65 0.5 9.125

Total (Cft) 92.201

Total (%Cft) 0.922


PUNJAB IIRIGATION SYSTEM IMPROVEMENT PROJECT
Tail Cluster
Rasulpur Minor

Description Unit No Length Width Depth Qty


Contractor Sub Divisional Officer Sub Engineer
M/S Nishan Engineers Hajipur Sub Division Fazilpur
PUNJAB IRRIGATION SYSTEM IMPROVEMENT PROJECT. (Package No. DJT/RJP-2)
NAME OF WORK:- CONSTRUCTION OF V.R. BRRIDGE.
DETAIL OF WORK & COST.

Sr. # Description Qty Unit

1 Excavation in foundation of building, bridges and other


structures, including dagbelling, dressing, refilling around
structure with excavated earth, watering and rammiing lead
upto one chain (30 m) and lift upto 5 ft. (1.5 m)
in ordinary soil.
Total = 1143.24 Cft
Ch. 3 It 21 P.29 @ Rs. 2996.95 %o Cft
2 Cement concrete brick or stone ballast 1½ " to 2" (40 mm to
5(b) Ratio 1: 4: 80 mm) gauge, in foundation and plinth:

Total = 94 Cft
Ch. 6 .IT 3(b) P.41 @ Rs. 7,964.05 % Cft
3 (a) (i) Reinforced cement concrete in roof slab, beams, .
columns lintels, girders and other structural members laid in
situ or precast laid in position, or prestressed members cast
in situ, complete in all respects:-
(3) (c) Type C (nominal mix 1: 2: 4)
Total = 292 Cft
Ch. 6 .IT 6 a (i) P.42 @ Rs. 230.70 P Cft
4 Fabrication of mild steel reinforcement for cement concrete,
including cutting, bending, laying in position, making joints
and fastenings, including cost of binding wire and labour
charges for binding of steel reinforcement (also includes
removal of rust from bars):-
(b) deformed bars
= = 1150
Ch. 6 .IT 9 (b) @ Rs. 9278.75 % kg
5 Pacca brick work in foundation and plinth in:-
i) Cement, sand mortar:-
Ratio 1:3
Total = 1171 Cft
Ch.7 .IT 4 (i) P.52 @ Rs. 11676.25 % Cft
8 Cement concrete plain including placing, compacting, finishing and curing
complete (including screening and washing of stone aggregate):
Total = 482 Cft
Ch.6 Itm-5f @ Rs. 14985.95 % Cft
9 Cement plaster 3/8" (10 mm) thick under soffit of R.C.C.
roof slabs only, upto 20' height
a) 1:2
R/Slab = 606 Sft
Ch.11 .IT 10 (a) @ Rs. 1286.10 % Sft
10 Cement pointing deep struck joint on walls up to 20 ft height ratio 1:2
cement sand mortar.
Abutment = 259.9156 Sft
Ch-11 P-76 Item-18-a @ Rs. 1077.75 % Sft
Bitumen coating to plastered or cement concrete surface 14 LBS bitumen %Sft
Serial No. 9(ii) Ch# 13 of MRS 2nd Quarter 2011 = 470.195
@ Rs. 519.8 % Sft
Total =

Contractor Sub Divisional Officer Sub Engineer


M/S Nishan Engineers Hajipur Sub Division Fazilpur
YSTEM IMPROVEMENT PROJECT. (Package No. DJT/RJP-2)
ORK:- CONSTRUCTION OF V.R. BRRIDGE.
DETAIL OF WORK & COST.
Amount
(In Rs.)

3426

7493

67291

106701

136775

72220

7796

2801

2444
406947

Sub Engineer
PUNJAB IIRIGATION SYSTEM IMPROVEMENT PROJECT
Village Road Bridge@ RD
Rasulpur Minor

Description Unit No Length Width Depth Qty

Excavation

Abutment Wall Cft 2 16.85 7 3 707.700

Wing Wall Cft 4 5.185 7 3 435.540

Total (Cft) 1143.240

Total (‰Cft) 1.143

lean (1:4:8)

Abutment Wall Cft 2 16.85 5.19 0.333 58.243

Wing Wall Cft 4 5.185 5.19 0.333 35.844

Total (Cft) 94.087

Total (%Cft) 0.941

RCC (1:2:4)

Abutment Cap Cft 2 18 1.91 0.75 51.570

Cft 2 18 0.666 0.75 17.982

Roof Slab Cft 1 17 10.333 1 175.661

Parapet Wall Cft 2 10.333 1.5 0.666 20.645

Cft 2 10.333 0.833 1.5 25.822

Total (Cft) 291.681

B/W (1:3)

Abutment Wall

Step-1 Cft 2 16.85 4.19 1 141.203

Step-2 Cft 2 16.85 3.81 1 128.397

Step-3 Cft 2 16.85 3.43 1 115.591

Step-4 Cft 2 16.85 3.05 1 102.785

Step-5 Cft 2 16.85 2.67 1 89.979

Step-6 Cft 2 16.85 2.29 1 77.173

Wing Wall

Step-1 Cft 4 5.185 4.19 1 86.901

Step-2 Cft 4 5.185 3.81 1 79.019

Step-3 Cft 4 5.185 3.43 1 71.138

Step-4 Cft 4 5.185 3.05 1 63.257

Step-5 Cft 4 5.185 2.67 1 55.376

Step-6 Cft 4 5.185 2.29 1 47.495


PUNJAB IIRIGATION SYSTEM IMPROVEMENT PROJECT
Village Road Bridge@ RD
Rasulpur Minor

Description Unit No Length Width Depth Qty

Step-7 Cft 4 5.185 1.91 1 39.613

Step-8 Cft 4 5.185 1.53 1 31.732

Step-9 Cft 4 5.185 1.15 1.75 41.739

Total (Cft) 1171.398

Total (%Cft) 11.714

PCC (1:2:4)

Abutment Wall Cft 2 16.85 5.19 1 174.903

Wing Wall Cft 4 5.185 5.19 1 107.641

Coping at Wing Wall Cft 4 5.185 1.15 0.25 5.963

Floor Cft 1 18 8 0.25 36.000

Pcc Block Cft 2 15 4.5 0.583 78.705

Cft 2 15 3 0.583 52.470

Cft 2 15 1.5 0.583 26.235

Total (Cft) 481.916

Total (%Cft) 4.819

Plaster 3/8" thick in 1:2 c/s Mortor

Under Roof Slab Sft 1 17 8 136.000

Abutment Wall under Banks Sft 2 16.85 7.875 265.388

Wing Wall under Banks Sft 4 5.185 9.875 204.808

Total (Sft) 606.195

Total (%Sft) 6.062

Struck Pointing 1:2 c/s Mortor

Abutment Wall Sft 2 16.85 3.38 113.906

Wing Wall Sft 4 5.185 7.04 146.010

Total (Sft) 259.916

Total (%Sft) 2.599

Bitumen Coating at plastered surface below banks

Abutment Wall Sft 2 16.85 7.875 265.388

Wing Wall Sft 4 5.185 9.875 204.808

Total (Sft) 470.195

Total (%Sft) 4.702


PUNJAB IIRIGATION SYSTEM IMPROVEMENT PROJECT
Village Road Bridge@ RD
Rasulpur Minor

Description Unit No Length Width Depth Qty

Contractor Sub Divisional Officer Sub Engineer


M/S Nishan Engineers Hajipur Sub Division Fazilpur
PUNJAB IRRIGATION SYSTEM IMPROVEMENT PROJECT
Bar Bending Detail
VRB at Rasulpur Minor @ RD
Description Distribution Dia of Spacing No No Total Cut Total Unit Total Bending
Span Bar of of Bar Length Length Weight Weight Detail
Ft items Bar No's Ft Ft Kg/Ft Kg
Abuttment

Horizental Bars (Top) #4 2 2 4 17.667 70.668 0.302 21.342 "8-'17

Horizental Bars (Bott) #4 2 3 6 17.667 106.002 0.302 32.013 "8-'17

"2 +"2

Stirups 4.25 #4 6" C/C 2 35 70 4.667 326.690 0.302 98.660 "6

"8-'1

Side Bars (N.F) #4 2 2 4 17.667 70.668 0.302 21.342 "8-'17

Side Bars (F.F) #4 2 2 4 17.667 70.668 0.302 21.342 "8-'17

"2 +"2

Stirups 4.25 #4 6" C/C 2 35 70 3.667 256.690 0.302 77.520 "3-'1

"5

RCC Slab

Main Bars (Top) 16.667 #6 12" C/C 2 18 36 11.000 396.000 0.681 269.676 "0-'10 "6
"6

Distribution Bars (Bott) 8.25 #6 6" C/C 2 18 36 17.667 636.012 0.681 433.124 ""8-'16 "6
"6
PUNJAB IRRIGATION SYSTEM IMPROVEMENT PROJECT
Bar Bending Detail
VRB at Rasulpur Minor @ RD
Description Distribution Dia of Spacing No No Total Cut Total Unit Total Bending
Span Bar of of Bar Length Length Weight Weight Detail
Ft items Bar No's Ft Ft Kg/Ft Kg
"2-'1
"6
Rings 16.667 #4 12" C/C 2 18 36 3.340 120.240 0.302 36.312 "2-'1

"6

Parapet

Longitudinal Bars (Top) #4 2 9 18 10.000 180.000 0.302 54.360 "0-'10

"5

"3-'1
Stirups 17 #4 12" C/C 2 18 36 7.750 279.000 0.302 84.258 "2-'1

"2-'1
Total Weight (Kg) 1149.949
Total Weight (%Kg) 11.499
Dia Of Bar Weight (Kg)
#4 447.149 "4
#6 702.8
Total Weight (Kg) 1149.95
"7
Contractor Sub Engineer Sub Divisional Officer
M/S Nishan Engineers Hajipur Sub Division Fazilpur
PUNJAB IRRIGATION SYSTEM IMPROVEMENT PROJECT
Appropriation Request (AR-DJT/RJP-02/01)

Mehmood Minor

Bill As Per Approved Bid Increrase/Decrease As Per AR/Draft VO-02/01


Description
No.
Amount (Rs) Amount (Rs) Amount (Rs)

1 Earthwork 1,046,996.00 1,046,996.00

2 Concrete Lining 3,535,996.23 3,535,996.23

3 Dismantling of Outlet - -

4 Temporary Outlets - -

5 APM Outlets for Lined Section - -

6 RD Marks 3,813.75 3,813.75

7 Cattle Ghat - - -

8 Repairing Existing Structures 44,340.00 44,340.00

9 Data Board for H/R, Fall etc. 7,573.50 7,573.50

10 Data Board for Outlets 2,890.00 2,890.00

Contractor: Exuctive Engineer Resident Engineer


Nishan Engineers Rajanpur Canal Division Rajanpur PISIP Rajanpur
PUNJAB IRRIGATION SYSTEM IMPROVEMENT PROJECT
Appropriation Request (AR-DJT/RJP-02/01)

Mehmood Minor

Bill As Per Approved Bid Increrase/Decrease As Per AR/Draft VO-02/01


Description
No.
Amount (Rs) Amount (Rs) Amount (Rs)
11 Tail Cluster 44,247.35 37,785.55 82,032.90

12 Regulation Gate 83,797.55 83,797.55

SUB TOTAL(1) :- 4,769,654.38 37,785.55 4,807,439.93

Contractor: Exuctive Engineer Resident Engineer


Nishan Engineers Rajanpur Canal Division Rajanpur PISIP Rajanpur
PUNJAB IRRIGATION SYSTEM IMPROVEMENT PROJECT
Appropriation Request (AR-DJT/RJP-02/1)
Tail Cluster– Bill No. 11
Mehmood Minor
Sr. Description Unit Rate Quantity as per Bid Revised Quantity as Per Balance Quantity Remarks
No. (Rs.) Schedule AR-DJT/RJP-01/02
Qty Amount Qty Amount Qty Amount
11/1 Excavation in foundation of building,
bridges and other structures, including
dagbelling, dressing, refilling around
structure with excavated earth,
watering and rammiing lead upto one ‰ Quantity increased/decreased
chain (30 m) and lif upto 5 f. (1.5 m) Cf 3000 0.338 1014.00 0.375 1125.69 0.037 111.69 due to compare of tender
in ordinary soil drawing to Construction Drawing

11/2 Cement concrete brick or stone ballast


1½ " to 2" (40 mm to 50 mm) Ratio Quantity increased/decreased
1:4:8 guage in foundation and plinth % 13500 0.763 10293.75 0.800 10800.10 0.038 506.35 due to compare of tender
Cf
drawing to Construction Drawing

11/3 Pacca brick work in foundation and


plinth in:- Quantity increased/decreased
%
Ratio 1:3 Cement sand mortar 12500 2.340 29250.00 4.071 50887.70 1.731 21637.70 due to compare of tender
Cf
drawing to Construction Drawing

11/4 Cement concrete plain including


placing, compacting, finishing and Quantity increased/decreased
curing complete (including screening % 16000 0.231 3689.60 1.201 19219.40 0.971 15529.80 due to compare of tender
and washing of stone aggregate): Cf
drawing to Construction Drawing
(f) Ratio 1: 2: 4 (Type-C)

Total 44247.35 82032.90 37785.55

Contractor Sub Divisional Officer Executive Engineer


PUNJAB IRRIGATION SYSTEM IMPROVEMENT PROJECT
Appropriation Request (AR-DJT/RJP-02/1)
Tail Cluster– Bill No. 11
Mehmood Minor
Sr. Description Unit Rate Quantity as per Bid Revised Quantity as Per Balance Quantity Remarks
No. (Rs.) Schedule AR-DJT/RJP-01/02
Qty Amount Qty Amount Qty Amount
M/S Nishan Engineers Hajipur Sub Division Fazilpur Rajanpur Canal Division Rajanpur
PUNJAB IIRIGATION SYSTEM IMPROVEMENT PROJECT
Tail Cluster
Mehmood Minor

Description Unit No Length Width Depth Qty

Excavation

Sec C-C Cft 1 7 10.3 2 144.200

Sec B-B Cft 3 13.7 3.41 1.25 175.189

Toe Wall Cft 3 5.53 1.65 2.04 55.842

Total (Cft) 375.231

Total (‰Cft) 0.375

lean (1:3:6)

Sec C-C Cft 1 7.06 10.3 0.333 24.215

Sec B-B Cft 3 13.7 3.41 0.333 46.670

Toe Wall Cft 3 5.53 1.65 0.333 9.115

Total (Cft) 80.001

Total (%Cft) 0.800

B/W 1:3 c/s Mortor

Sec C-C Cft 2 7.06 1.5 0.375 7.943

Cft 2 7.06 2.983 2.833 119.326

Cft 2 7.06 1.15 0.75 12.179

Outer Wall Cft 6 13.7 1.15 1.575 148.885

Cft 6 13.7 0.75 0.75 46.238

Bed Cft 3 8.13 0.53 0.375 4.848

Cft 3 6.15 1.03 0.375 7.126

Cut Wall Cft 3 5.53 1.15 1.125 21.463

Cft 6 2 1.15 2.833 39.095

Total (Cft) 407.102

Total (%Cft) 4.071

PCC (1:2:4)

Sec C-C Cft 1 7.06 10.3 0.5 36.359

Sec B-B Cft 3 13.7 3.41 0.5 70.076

Toe Wall Cft 3 5.53 1.65 0.5 13.687

Total (Cft) 120.121

Total (%Cft) 1.201


PUNJAB IIRIGATION SYSTEM IMPROVEMENT PROJECT
Tail Cluster
Mehmood Minor

Description Unit No Length Width Depth Qty


Contractor Sub Divisional Officer Sub Engineer
M/S Nishan Engineers Hajipur Sub Division Fazilpur