KUWAIT CEMENT READY MIX COMPANY

QUALITY ASSURANCE / QUALITY CONTROL RECORDS .

PLANT TRIAL MIX REPORT FOR THE GRADE OF CONCRETE C 35/45 ⅜ GGB

CLIENT : KIPIC
CONSULTANT : AMEC FOASTER WHEELER
CONTRACTOR : HYUNDAI ENGINEERING & CONSTRUCTION COMPANY
PROJECT : CONTRACT NO # ZOR/LNG/EPC-0058 AL ZOUR LNG IMPORT PROJECT ( LNGI)
LOCATION : KCRM MINA AL ZOUR BATCHING PLANT

S.NO. MATERIAL DESCRIPTION SOURCE


1 CEMENT OPC KUWAIT CEMENT COMPANY
2 GGBS KUWAIT CEMENT COMPANY
3 TOTAL WATER MINISTRY OF ELECTRICITY & WATER
4 AGGREGATE 20 mm COMBINED GROUP (LIME STONE FROM RASS AL KHEIMAH)
5 NATURAL WASHED SAND AL DAWARY
6 GLENIUM SKY 504E BASF

FRESH CONCRETE PROPORTIES :-


TEST / TIME INITIAL 30 MIN 60 MIN 90 MIN
WORKABILITY SLUMP FLOW
FRESH CONCRETE TEMPERATURE
FRESH CONCRETE DENSITY kgs/ m3
BLEEDING
ACTUAL FREE WATER CEMENT RATIO

AIR CONTENT

HARDEND CONCRETE PHYSICAL PROPORTIES :-

AGE
TEST DESCRIPTION
3 DAYS 7 DAYS 14 DAYS
COMPRESSIVE STRENGTH (CUBE 150x150x150) N/mm2

HARDENED CONCRETE DENSITY g/cc

STANDARD DEVIATION N/mm2

SPLITTING TENSILE STRENGTH N/mm2

WATER ABSORPTION TEST ( % )

RAPID CHLORIDE ION PENETRATION TEST ( Couloms )

WATER PERMEABILITY TEST ( mm )

10 MIN 30 MIN 60 MIN


INITIAL SURFACE ABSORPTION TEST ISAT

HARDEND CONCRETE CHEMICAL PROPORTIES :-

TEST DESCRIPTION PERCENTAGE BY WEIGHT OF CEMENT


SULPHATE
CHLORIDE
PREPARD BY VERIFIED BY

SHABBIR AHMAD NBTC


TECHNICAL MANAGER
E GRADE OF CONCRETE C 35/45 ⅜ GGBS MIX

QUANTITY PER M3
170 kgs
310 lts
172 lts
1125 kgs
630 kgs
7.5 lts

PROJECT SPECIFIED LIMIT


650 - 550 mm
MAXIMUM 30 0 C
N.S
MAXIMUM 0.5 %
0.33
MAXIMUM 2 %

AGE
PROJECT SPECIFIED LIMIT
28 DAYS
45 N/mm2 AT AGE OF 28 DAYS

N.S

3.5 ( @ 28 DAYS )

2 % AT THE AGE OF 28 DAYS

1500 Coulombs

20 mm

0.25 / 0.17 / 0.10

PROJECT SPECIFIED LIMIT

4.00%
0.20%
TEST
3 DAYS COMPRESSIVE STRENGTH N/mm2

7 DAYS COMPRESSIVE STRENGTH N/mm2

14 DAYS COMPRESSIVE STRENGTH N/mm2

28 DAYS COMPRESSIVE STRENGTH N/mm2

SPLITTING TENSILE STRENGTH N/mm2 ( 28 DAYS)

WATER ABSORPTION %

RAPID CHLORIDE PERMEABILITY TEST


CONTRACT NO : ZOR /LNG/EPC-0058 AL ZOUR L
PLANT TRIAL MIX SCHEDULE FOR THE GRAD
BS 1881 P-122
BS 1881 P-116

BS 1881 P-116

ASTM C 1202
GRADE OF CONCRETE STANDARD

nos 3 3 3 3 3 3 3

<1500
PROJECT SPECIFIED LIMITS 27 45 3.5 Mpa < 2% Coulombs

COMPLIANCE WITH PROJECT SPECIFICATION

NOTE :- N.S = NOT SPECIFIED IN PROJECT SPECIFICATION / R.A = RESULTT AWAITED / * TEST

Heat of hydration record for 7 days

Trial mix witnessed


POROSITY

WATER PERMEABILITY TEST mm

ISAT ( INITIAL SURFACE ABSORPTION TEST %

CHLORIDE MIGRATION COEFFICIENT

CHLORIDE CONTENT Cl

SULPHATE CONTENT SO4


GRADE OF CONCRETE C 35/45 ⅜ GGBS MIX
UR LNG IMPORT FACILITY PROJECT ( LNGI )

DRYING SHRINKAGE

REMARKS IF ANY
BS 1881 P-124

BS 1881 P-124
BS 1881 P 208
BS EN 12390
ASTM C 652

BS 1881
1 3 1 1 1 1 1 1 1 1

< 10% < 20 mm <0.25 <0.17 <0.10 <0.07

/ * TEST FACILITY NOT AVAILABLE IN KUWAIT

SHABBIR AHMAD
TECHNICAL & BUSINESS DEVELOPMENT MANAGER