Inverted Tee Beam:

Beam 1:
No of sets = 300
0.0254 m 2
Area = 368 𝑖𝑛2 x( ) = 0.24 𝑚2
1 𝑖𝑛

Length = 5m
Volume = 1.19 𝑚3 x 300 = 356.13 𝑚3
Cement: 356.13 𝑚3 x 1 = 357 bags
Sand: 356.13 𝑚3 x 0.75 = 268 cu.m
Gravel: 356.13 𝑚3x 1.5 = 535 cu.m
Steel Tendons:
0.5 tons
9 pieces ½ inch: (270 ksi) x (0.153 sq.in.) = 41.3 kips x 9 = 371.7 kips x 1𝑘𝑖𝑝𝑠

= 185.85 tons x 300 = 55,755 tons


Beam 2:
No of sets = 240
0.0254 m 2
Area = 368 𝑖𝑛2 x( ) = 0.24 𝑚2
1 𝑖𝑛

Length = 4m
Volume = 0.96 𝑚3 x 240= 230.4 𝑚3
Cement: 230.4 𝑚3 x 1 = 231 bags
Sand: 230.4 𝑚3 x 0.75 = 173 cu.m
Gravel: 230.4 𝑚3 x 1.5 = 346 cu.m
Steel Tendons:
0.5 tons
9 pieces ½ inch: (270 ksi) x (0.153 sq.in.) = 41.3 kips x 5 = 371.7 kips x 1𝑘𝑖𝑝𝑠
= 185.85 tons x 240 = 44,604 tons
Total
CEMENT: 588 bags
SAND: 441 cu.m
GRAVEL: 881 cu.m
STEEL TENDONS: 100,359 tons
Column:
No. of sets: 375
Area = 0.25 𝑚2
Height of the building = 16.65 m
Volume = 4.17 𝑚3 x 375 = 1563.75 𝑚3
Cement:1563.75 𝑚3 x 1 = 1,564 bags
Sand: 1563.75 𝑚3x 0.75 = 1,173 cu.m
Gravel: 1563.75 𝑚3x 1.5 = 2,346 cu.m

Footings:
No. of sets: 75
Volume: 2.35 𝑚3 x 75 = 175.79 𝑚3
Cement: 175.79 𝑚3 x 1 = 176 bags
Sand: 175.79 𝑚3 x 0.75 = 132 cu.m
Gravel: 175.79 𝑚3x 1.5 = 264 cu.m

Slabs:
Area of the Building: 1,200 𝑚2
Thickness: 0.3 m
Volume: 360 𝑚3 x 5 = 1,800 𝑚3
Cement: 1,800 𝑚3 x 1 = 1,800 bags
Sand: 1,800 𝑚3 x 0.75 = 1350 cu.m
Gravel: 1,800 𝑚3 x 1.5 = 2700 cu.m
Steel:
6(1.5)+6(3)+13(1.5)+13(1.5)+6(1.5)+6(3.5)+11(1.5)+11(3.5)+21(5.6)+19(6.1) = 574.5 m
574.5 + 574.5(20%) = 689.4 m x 5 = 3447 m
12 mm = 3447 m