You are on page 1of 114

Minutes of 496th meeting of

Operation & Coordination sub-Committee of WRPC


held on 13th June, 2017 at WRPC, Mumbai

The 496th meeting of Operation & Co-ordination Sub-Committee of WRPC was


held on 13th June 2017 at WRPC Mumbai. The list of participants is enclosed at
Annexure-A.
Shri A. Balan, Member Secretary, WRPC extended warm welcome to all the
participants of the 496th OCC meeting. He requested the participants to
participate in the meeting pro-actively so that all the issues of agenda items
could be resolved amicably. He informed that 3rd meeting of technical
committee constituted by CEA for “Study of optimal location of various types of
balancing energy sources/energy storing devices to facilitate grid integration of
RES and associated issues” was held at Vadodara on 05.06.2017. He told that
an online portal for merit order dispatch for generating stations/utilities is being
developed. He briefly spoke about the advantages of MOD portal.
Thereafter he requested SE (OPN), WRPC to take up regular agenda items.

█ Item no. 1: Confirmation of the Minutes


Minutes of 495th meeting of Operation & Coordination Sub-Committee
(OCC) of WRPC held on 12th May 2017 at WRPC Mumbai were forwarded vide
letter No. WRPC/OPN/OCC-Minutes/2016-17/6321 dated 24.05.2017. Since
no comments were received from the constituents, the above minutes were
confirmed without any modification.
Sub-Committee confirmed the Minutes of 495th OCCM without
modification.

█ Item no. 2: Review of system operation during the month of


May 2017
Member Secretary, WRPC requested WRLDC to brief the Committee on
Grid performance during the month of May, 2017. Asst GM, WRLDC presented
the performance of the WR Grid during the month of May 2017.

2.1 Frequency Particulars


The average frequency during the month of May, 2017 was 49.99 Hz. The
maximum instantaneous frequency was 50.32 Hz at 18:07:00 hrs on
21.05.2017, while minimum instantaneous frequency was 49.64 Hz at 15:11:40
hrs on 11.05.2017. The frequency profile during May, 2017 was as under:
01st - 31st May, 2017 01st - 30th April 2017
Range (% time)
(% time)
IEGC band 74.49
71.45
(49.9 < f < 50.05 Hz)
< 49.9 Hz 9.09 9.05

> 50.05 Hz 19.46 16.45

Member Secretary, WRPC enquired regarding quantum of demand at the


time of maximum & minimum instantaneous frequency. Representative from
WRLDC informed that demand were 39017 MW & 48928 MW at the time of
maximum & minimum instantaneous frequency respectively.
The frequency particulars is enclosed at Annexure-2.1.
The Sub-Committee noted the above information.

2.2 Inter-Regional Exchanges


There was a net inter-regional export of 6012.00 MUs by WR against net
export schedule of 5917.00 MUs.

SCH DRAWL OD/UD


WR-ER 45 -440 -485
WR-NR -4128 -3891 236
WR-SR -1835 -1681 154
WR NET -5917 -6012 -95
The Sub-Committee noted the above information.

2.3 Voltage Profile


Voltage profile at some of 765/400 kV sub-stations during the month of
May, 2017 furnished by WRLDC is enclosed at Annexure-2.3.
Member Secretary, WRPC pointed out that most of the important nodes in
WR are facing over voltage problem & asked about measures being taken to
control voltage problem.
AGM, WRLDC informed that WRLDC is following possible measures given
below to control the voltage:
1. Switching ON available Reactors.
2. Intimation to nearby generators for VAR absorption.
3. Tap changing arrangements.
4. Even if voltages are beyond prescribed limit, in such a situation, RLDC
normally direct to open the respective line.
The Sub-Committee noted as above.
2.4 U/F Relay Operations
As per WRLDC records during May, 2017 the system frequency didn’t
touch 49.2 Hz and no UFR operation was reported to WRLDC.
The Sub-Committee noted as above.

2.4 Power Cuts / Load Restrictions


Details of Power Cuts and Regulatory measures during May, 2017 as
furnished by the State utilities are given in Annexure-2.5.
The Sub-Committee noted as above.

2.5 Details of Generating Units under Forced outages


Details of generating units under forced outages during the month of May,
2017 are given in Annexure-2.6.
CE, SLDC, Maharashtra informed that Chandrapur unit - 1 and 2(210
MW each) & Koradi unit -5(200 MW) have been decommissioned and requested
for deletion of above units from the list.
He further requested all other generators to update the status & furnish
to WRLDC. WRLDC shall compile & send to WRPC for OCC record.
The Sub-Committee noted the information.

2.7 Details of Generating Units under Planned outages


The details of generating units under Planned Outages during May, 2017
are given in Annexure-2.7.
Representative from Tata Power informed that Trombay unit- 6 is under
economic shut down rather than annual overhaul and therefore he requested
for the change. The sub-committee agreed for the above change.
The Sub-Committee noted with above modification.

█ Item no. 3: Operational Planning


3.1 Proposed planned maintenance programme of generating units
The maintenance programme of generating units for the months June &
July 2017 is given in Annexure 3.1.
Representative from MP told that Sanjay Gandhi TPS unit- 1 is deferred.
WRPC asked MP representative to submit the reason for the deferment within a
week.
DTPS representative told that the outage of DTPS unit - 2 is cancelled due
to non availability of spares.
NTPC Vindhyachal representative informed that outage of units 11 and 7
is being postponed and it will be availed in the month of Sept 2017.
The finalised list of maintenance programme of generating units for the
months June & July 2017 is given in Annexure 3.1.
The Sub-Committee noted as above.

3.2 Outage programme of Transmission Lines/Elements.


List of finalised proposals for transmission elements outage to be availed
during the month of July 2017 is given in Annexure 3.2.
MS, WRPC informed to the forum about the existing provisions in IEGC
related to planning and review of transmission lines outages. He further added
that the existing practice of seeking WRPC secretariat consent for any post OCC
line outage does not exist in IEGC presently and due to this reason, procedure
of D-3 should be stopped with immediate effect. He informed that in case of
emergencies, the constituents can approach directly to WRLDC or respective
SLDCs and outages may be availed subject to real time conditions. On this
context, GM, WRLDC and other representatives from WRLDC informed to the
forum that WRLDC has been giving the line outages to the constituents in
deserving cases of emergent situation as per the arrangement made under
IEGC.
CE, SLDC, Gujarat was also of the opinion that the practice of post OCC
outages should be discouraged as there is no provision for the same in the
codes. The representatives from Gujarat, MP and Maharashtra were of the view
that complete discontinuation of existing approval of post OCC outages would
escalate the hardships to the officials working in the fields. In response, MS,
WRPC advised all the constituents to give more stress in planning process so
that instances of seeking consent for post OCC outages could be made zero. He
further requested WRLDC to submit the detailed status of the outages availed in
actual against those planned in last OCC meeting for onward submission to
CERC (as per the existing regulations).
The Sub-Committee noted as above.

3.3 Anticipated power supply position for the months – June 2017
& July – 2017
Details of anticipated restricted & un-restricted demands for the months
of June & July, 2017 are given in Annexure 3.3.
WRPC asked for justification to be submitted by MP for higher deviations.
The justification from MP is still awaited. The modified data is incorporated in
Annexure 3.3.
The Sub-Committee noted the information.

█ Item no. 4: Operational Statistics for the month of May 2017


The details of actual generation, demand, drawl of power from grid;
exchanges etc. are given in the following Annexure:
Annexure 4.1 - Actual Generation and Requirement for May, 2017.
Annexure 4.2 - Peak Demand: Schedule Vs Actual for May, 2017.
Annexure 4.3 - Integrated Operation of the System and Operation of Inter
State Tie lines for May, 2017.
Annexure 4.7 – Details of level of Major Reservoirs in Western Region for
May, 2017
The Sub-Committee noted the information.

█ Item no. 5: System Disturbances in Western Region


There was no major grid disturbance in the Western Region during the
month of May, 2017. However the details of minor incidences during the month
received from WRLDC are enclosed at Annexure-5.
The Sub-Committee noted.

█ Item no. 6: Healthiness status of SERs/DRs of equipment


in the system.
Following Constituents have furnished the status of healthiness of
SER/DRs in their systems.
S.l. No. Name of Constituent Date of Receipt
1 PGCIL,WRTS-I 06.06.2017
2 PGCIL,WRTS-II 06.06.2017
3 MPPTCL 13.06.2017
4 NTPC 05.06.2017
5 CSPTCL 03.06.2017
6 GETCO 13.06.2017
7 MSETCL 06.06.2017
8 DD/DNH
9 GOA 11.06.2017
10 NPCIL
11 NCA/SSP
12 NHDC
13 Jindal PL 12.05.2017
14 CGPL 05.06.2017
15 DB POWER
16 KWPCL
17 ACBIL/TRN ENERGY 05.06.2017
18 KSK
19 GMR CHHATTISHGARH
20 JNSTPS 08.05.2017
21 MB POWER
22 SASAN UMPP 12.05.2017
23 NSPCL 12.05.2017
24 RGPPL
25 SUGEN 08.05.2017
26 RKM POWER
27 ESSAR POWER 08.05.2017
28 BDTCL/JTCL/RTCL 12.05.2017
29 RELIANCE TRANSMISSION 12.05.2017
30 ADANI POWER 03.05.2017
31 JHABUA POWER 11.05.2017
32 EPTCL 08.05.2017
33 TPGL 11.05.2017
All other utilities were reminded to submit the status regularly well before
the issue of OCCM agenda.
The Sub-Committee noted as above.

█ Item No. 7: Status of completion of ongoing schemes for


commissioning of Reactors, Transmission lines
and Generating units in WR
7.1 Status of completion of ongoing Schemes for Commissioning of
Reactors
The present status regarding schedule and commissioning of Reactors:
Sl. 400 kV Size Implementing Expected date of
No. Sub/Stn. (MVAr) agency commissioning
1 Nanded 125 MSETCL June – 2017
2 Sholapur 125 MSETCL Dec – 2017
3 Kolhapur 125 MSETCL Dec – 2017
4 Akola 125 MSETCL June – 2017
5 ISP 125 NHDC June – 2017
(Tendering done)
6 Satpura 50 MPPGCL Dec-2017
Chief Engineer, SLDC Maharashtra informed following during the meeting:
a. Commissioning of 125 MVAR shunt reactor at Karad, Kolhapur,
Solapur, by MSETCL –Tender are floated for above 3 Number
substation.
b. Planning of additional shunt reactors in south Maharashtra – shunt
reactors are planned under phase- II by MSETCL. Proposed 125 MVAR
Bus reactors are at following 400 KV substations:-
1. Chandrapur-II
2. Koradi-II
3. Khaparkheda
4. Bhusawal-II
5. Lonikand-II
6. Chakan
7. Kudus
He further informed that MSETCL is under process to avail grant through
PSDF to install Phase-II reactors.
Sub-Committee requested the implementing agencies to expedite the
commissioning of reactors well within the original dates given by the utilities.
The Sub-Committee agreed with the same.

7.2 Status of completion of 765/400 kV and above ongoing


Transmission schemes being executed/implemented by
Transmission agencies
The updated status on various ongoing transmission schemes for the
current year as per the current information available is as follows: -
Sl. Name of the Line Ckt Target Remarks
No. km Completio
n
Date
Powergrid
1 400 kV Vapi – Kudus D/C 234 Dec -17 ROW/Forest
Line problem
2 765 kV Wardha Nizamabad- 577 July 17 765 kV Wardha
Hyderabad D/C +486 Nizamabad
commissioned in
March-17.
765 kV
Nizamabad-
Hyderabad D/C –
expected in July
2017.
3 400 kV Aurangabad – 690 Sept -17
Boisar line D/C line
4 765 kV Aurangabad (PG) – 570 Dec -17
Padghe (PG) D/C
5 800 kV Champa – 2574 One pole test
Kurukshetra Bipole charged on
25.01.2017
Pole two expected
at end of July
2017.
6 400 kV MOUDA – 393 July -17
BETUL PG LINES
7 800 kV Raigarh-Pugalur 3676 Nov-19 4 out of 10
HVDC Bipole packages
awarded
8 400 kV Lara-Champa 224 July 17
9 765kV Bhuj-Banaskamta DC 583 July 18
10 400 kV Mundra UMPP – Bhuj 190 Dec 18
DC
Chhattishgarh
1 400 kV DCDS Raipur (Raita)- Commissioned on
Jagdalpur(DCDS) 26.05.2017
2 LILO of 220 kV Raigarh- July -17
Budipadar at 400 kV PGCIL
S/s Raigarh. Idle charged on
11.8.2015 for anti theft
reason
Gujarat
1 400 kV D/C Vadinar-Amreli 116.85 Dec -17
line
2 400kV APL-Hadala LILO to 89.40 Oct -17
Halvad
3 400 kV D/C Amreli-Kasor 160.95 March -18
line(Part-1)
4 400 kV D/C Amreli-Kasor 164.34 March -18
line(Part-2)
5 400 kV D/C Amreli-Kasor 145.26 March -18
line(Part-3)
6 400 kV Varsana-Halvad 143.39 March -18
7 400 kV Wanakbori-Soja DC 213.17 May 17
8 400 kV Soja-Zerda DC 268.92 Nov 18
9 400 kV Hadala-Shapar D/c 124.34 Mar 19
10 400 kV Bhogat- Kalawad D/C 260.57 Mar 20
11 400 kV Bhachuunda-Varsana 276.16 June 20
D/c
Madhya Pradesh

Maharashtra (STU)
1 400 kV Bableshwar-Kudus July -18 Forest clearance
D/C (Quad) awaited, severe
ROW problem
Adani Transmission Ltd
1 765 kV switching station at - June’2017
Rajnandgaon.
2 Raipur Pool - Rajnandgaon 40 Completed
765 kV D/C line.
3 Rajnandgaon – new pooling 266 Mar’2018
station at near Warora 765 kV
D/C line.
4 400 / 220 kV Substation at - Dec’2017
Morena.
5 Gwalior 765 /400 kV – Morena 48 Jun’2017
400 kV D/C
6 Vindhyachal-IV&V STPP - 27 Dec’2017
Vindhyachal
Pool 400 kV D/C (Quad)
2nd line.
7 2-Nos 400 kV Line bays at - Dec’2017
Vindhyachal
IV. STPP Switchyard.
8 1-No 765 kV line bay at Sasan - Dec’2017
UMPP.
9 Sasan UMPP - Vindhyachal 6 Dec’2017
Pooling station 765 kV S/C
line.
10 LILO of one circuit of 64 Mar’2018
Aurangabad – Padghe 765 kV
D/C line at Pune.
11 Raigarh (Kotra) – Champa 94 Dec’2017
(Pool) 765 kV 2nd S/C Line.
12 Champa (Pool) – 49 Dec’2017
Dharamjaygarh 765 kV
2nd S/C line.
13 Bilaspur pooling station – 162 Dec’2017
Rajnandgaon
765 kV D/C line.
14 Sipat – Bilaspur Pooling Dec’2017
station 3rd 765 kV S/C line.
15 1 No 765 kV Line bay at Sipat Completed &
STPPS of NTPC. Charged on
30.05.2017
The Sub-Committee noted the above information.
7.3 Commissioning of new Generating units in Western Region and
the capacity expected to be commissioned during the current
year 2016-17.
The status of Generating units, commissioned /expected to be
commissioned during the current year according the available information is as
follows:
Name of the Power Projects Unit Capacity Date of Commissioning
No. (MW) /Schedule Date
Gujarat
NIL
Chhattisgarh
NIL
Maharashtra
CHANDRAPUR 8 500 COD on 04.06.2016

CHANDRAPUR 9 500 Commissioned on


21.03.2016. COD done on
24.11.2016
Madhya Pradesh

Essar Power MP Ltd(Mahan) 2 600 July -17


BLA 2 45 Commissioned on
20.03.2017
Central sector/IPP

KSK 3 600 Dec -2017


KSK 4 600 Dec – 2017
RKM 3 360 Sept 2017
RKM 4 360 December 2017
TRN Energy 2 300 COD on 01.05.2017
SKS 1 300 Expected by June 2017
SKS 2 300 Expected by July 2017
Rattan India 3 270 Achieved full load on
14.04.2017
NTPC Mouda 4 660 August 2017
NTPC Lara 1 800 Dec 2017
NTPC Solapur 1 660 July 2017
NTPC Solapur 2 660 April 2018

The Sub-committee noted the above information.


█ Item no. 8: Miscellaneous Operational items
8.1: Quarterly review of Crisis Management Plan and Physical &
Cyber Security(P&CS) in power sector
The current status of submission of CMP and P&CS report (constituent
wise) for the fourth quarter (January 2017 to March 2017) is given below:
Sr Name of CMP Status P&CS Status
No Constituents
1 NTPC I & II NTPC I Submitted on 11.04.2017
NTPC II Submitted on __
08.03.2017

2 PGCIL I & II PGCIL I Submitted status on


11.04.2017 __
PGCIL II Submitted status on
07.03.2017
3 WRLDC Report Submitted on 02.05.2017 Report
Submitted
4 GUJARAT Report Submitted on 05.06.2017 on
5 MAHARASHTRA Submitted status by SLDC 02.05.2017
Maharashtra

6 CHHATTISGARH
7 MADHYA PRADESH Submitted status by SLDC MP
8 DD/DNH
9 GOA
10 NPCIL
11 NCA
12 NHDC
13 Jindal PL
14 CGPL Status Submitted on 05.05.2017
15 DB POWER
16 KWPCL
17 ACBIL/TRN
18 ENERGY
KSK
19 GMR
20 CHHATTISHGARH
JNSTPS Status Submitted on 03.05.2017
21 MB POWER
22 SASAN UMPP Status Submitted on 29.04.2017 Status
Submitted
on
23 NSPCL 29.04.2017
24 RGPPL
25 SUGEN/DGEN Status Submitted on 06.05.2017
26 RKM POWER
27 ESSAR POWER
28 BDTCL/JTCL/RTCL
29 RELIANCE
30 TRANSMISSION
ATIL Status Submitted on 14.06.2017
31 JHABUA POWER
32 EPTCL
SE(O), WRPC informed that PLF division of CEA in consultation with
various Power Companies, prepared sector wise generic documents which
comprises of format of report, nodal officers details etc. He requested utilities to
consult CEA for smooth implementation of CMP & cyber security programme.
MS, WRPC informed that a meeting would be conducted shortly on this issue at
WRPC Mumbai by CEA. Therefore he reiterated that all other constituents must
submit the Status report positively.
Sub-committee noted as above.
8.2: Monitoring of schemes funded from PSDF
Background:
In the 6th meeting of NPC held on 19th December 2016 at Bengaluru, it
was decided that all the RPCs in the monthly OCC meetings may follow up with
the utilities to expedite the completion of schemes by giving due priority. The
implementation of most of the schemes are based on the recommendation of the
enquiry committee on grid disturbance of July 2012 headed by Chairperson,
CEA. Therefore timely implementation of these schemes would enhance the grid
security and reliability. Accordingly the details of grant sanctioned from PSDF
for the schemes of Western Region is enclosed at Annexure-8.2A for the
deliberation in the meeting. The NPC has further directed that the status of
implementation of above schemes (physical as well as financial progress) may be
reviewed and the utilities be requested to expedite implementation of the
schemes. The utilities were advised to furnish the information in the format
enclosed at Annexure–8.2B by first week of every month on regular basis to
Member Convener, PSDF project monitoring group (AGM, NLDC, POSOCO) with
a copy to NPC & WRPC division.
Gujarat & Madhya Pradesh have submitted progress/status in prescribed
format (Annexure 8.2C1 and C2).
Chief Engineer, SLDC, Gujarat requested to disburse the final instalment
for Automatic Demand Management Scheme of GETCO and first and second
stage of fund for Wind generation forecasting and in the State of Gujarat
WRPC requested all other utilities to which the grants have been
sanctioned, to update on the progress of the schemes at the earliest as per
format at Annexure 8.2B.
The Sub-Committee noted as above.
8.3: Phasing out of Generating Units which do not have a space for
installation if FGD for compliance of new MoEF norms of SOx emissions
Background:
[ A Special TCC meeting of WRPC was held on 05.04.2017 at WRPC,
Mumbai to discuss a single point agenda of Phasing out of generating units
which do not have a space for installation of FGD for compliance of new MOEF
norms of SOX emissions.
During the meeting it was decided that the generating units have to
initiate the process of installation of FGD at the earliest. The progress of
installation would be monitored in OCC forum regularly. As the Environmental
Norms have to be complied by December 2017. The generators are required to
place the supply order by December 2017 and submit a copy to WRPC. In this
matter progress in this direction may be furnished during the meeting. The list
of generating units which have been finalised for FGD installation / phasing
out by CEA is enclosed at Annexure 8.3, for status update in OCC meeting. In
special TCC, it was also decided that those generator who comply the new
environmental norms shall submit the compliance report from respective State
Pollution Control Board regularly on quarterly basis to CEA /WRPC. .
In 495th OCC meeting, General Manager Torrent Power, Ahmedabad
stated that AMGEN is supplying power to capital city of Gujarat i.e. Ahmedabad
and Gandhinagar. Presently there are technical constraints in terms of limited
import points and capacity of the above cities which necessitates continued
running of AMGEN at least for next 5 years, till necessary infrastructure is put
in place to ensure sustained power supply. Along with above technical
constraint, AMGEN is also exploring all technically feasible and commercially
viable options to comply to revised SO2 norms by commissioning of P-FGD. (all
other norms are already complied including SPM).
Chief Engineer, SLDC Gujarat informed that progress in the direction of
installation of FGD viz. feasibility study, tendering status, award of tender etc.
shall be submitted by December 2017, as per the decision taken.
In 495th OCC meeting, Member Secretary (I/c), WRPC informed that
scope of OCC is to update the status of progress of FGD installation on monthly
basis. However any matter related to implementation/exemption shall directly
taken up with CEA/MOEF. He further requested all the generating stations to
submit an update status on the above issue to WRPC regularly.
In regard to the statement that some generating stations are already
compliant with norms and FGD is not required, OCC recommended that such
generating companies may take up the matter with the respective environment
board and get NOC and submit the same to CEA / WRPC on regular basis. ]
In the meeting, the OCC forum observed that there was no
significant progress in this direction and requested for a DO letter to be
sent from WRPC Secretariat to individual generating station for quicker
action in this regard. MS, WRPC assured to send DO letter to individual
generating station.
The Sub-Committee noted as above.

8.4 RGMO/FGMO compliance by Generators in the region


Chief (Engineering), CERC informed vide letter dated 05.06.2017 (letter
attached as Annexure 8.4) directed the WRPC /WRLDC to obtain the status of
availability of RGMO/FGMO response from the generators (ISGS as well as
intra-state generators) in its region. This is as per the provisions made under
Central Electricity Regulatory Commission (IEGC) Regulation, 2010 at 5.2 (f).
Also as per provision made under regulation 5 (h) to IEGC dated
12.04.2017, RLDCs /SLDCs shall not schedule the generating station or unit(s)
beyond ex-bus generation corresponding to 100 % of the installed capacity of
the generating stations or unit(s).
The concern generators may submit the same on monthly basis to WRPC
/WRLDC regularly and also concern RLDCs /SLDCs may comply regulation 5
(h) while scheduling .
WRPC requested for timely submission of RGMO/FGMO response from
the generators (ISGS as well as intra-state generators) in WR and also requested
RLDC/SLDCs for not scheduling the generating station or unit(s) beyond ex-bus
generation corresponding to 100 % of the installed capacity of the generating
stations or unit(s).
The Sub- Committee noted as above.

8.5 Establishing pump mode operation at SSP


Background:
Chief Engineer, SLDC Vadodara, Gujarat vide email dated 29.05.2017
informed that a meeting of committee for studying Hydro Pump Storage and
Wind Power Projects in the Country was held on 18.05.17 at Ministry of Power,
New Delhi.
The Chief Engineer, SLDC had represented all the concerns regarding
establishment of pump mode operation at SSP during above meeting. It has
been represented that in this issue the following two parts are involved:
1. Construction of Garudeswar weir (will take at least one year)
2. Up-gradation of RBPH Units. (will take at least one and half years)
The construction work of weir is awarded in May – 2012. Presently,
approx. 35% of Construction work of Garudeshwar Dam is completed.
For pumping mode operation of 6 x 200 MW RBPH Units, the supply,
installation and commissioning of isolated phase bus ducts, Static Frequency
converter and phase reversal switch along with all require accessories will be
required.
The SSNNL has prepared estimates amounting around 68 Crore Rupee for
equipment required for operating RBPH in pumping mode and submitted to
CWC/CEA for their scrutiny and then same will be submitted to Planning
Commission by SSNNL.
The necessary approval in principle may be given by NCA to SSNNL.
In 111th meeting of PSC of SSCAC held on 26.07.16, Member, NCA
recommended installation of all above during the meeting.
Looking to versatile benefits of pump storage plant, it is utmost necessary
that the funding for up gradation of RBPH units (for establishing pump mode
operation) shall be taken up from PSDF (Power System Development Fund,
Government of India) by NCA. For the same, DPR shall be submitted with
recommendation of WRPC to the Nodal Agency (PSDF) within couple of months
so that up gradation of RBPH units shall be completed with completion target of
Garudeswar weir.
In this issue, as per request made by Gujarat, NCA may update the status
of DPR to be submitted to WRPC for its recommendation.
CE, SLDC Gujarat reiterated that up-gradation of RBPH Units (for
establishing pump mode operation) is a very needed project and it will be helpful
for sorting out the problems of all three associated states of Gujarat, MP and
Maharashtra.
Representative from MP informed that approval for above project has to be
taken from Govt of MP.
GM, WRLDC suggested that since the project will be funded from PSDF,
there will not be any financial burden on any state. He also suggested that a
high level meeting involving Gujarat, MP, Maharashtra and NCA can be
convened and the project can be carried ahead.
The Sub- Committee noted.
8.6 Requirement of 400/220 KV, 500 MVA ICT at KAPP
Background:
Chief Engineer, SLDC-Gujarat vide its letter No.
SLDC/CE/MIS/WRPC/1809 dated 14.04.17 informed that the 400 KV D/C
KAPP NPP - Navsari (PG) and 400 KV D/C KAPP NPP - Vapi (PG) have been
planned for KAPP Unit 3 & 4 (2x700 MW) near village Vyara in Surat District,
Gujarat.
The existing power project is having 220 KV D/C KAPP – Haldarva, 220
KV D/C KAPP – Vav and 220 KV D/C KAPP – Vapi lines.
At present, KAPP Unit No 1 & 2 of existing project are under forced outage
since long and likely to be restored in December – 2018. Also, most of the gas
based plants in South – Gujarat are not falling in Merit order dispatch criteria.
Therefore, it is utmost necessary to plan interconnection between existing
and new project at KAPP by installing 400/220 KV, 500 MVA ICT.
It would also help for extending power supply to New KAPP project during
large scale blackout as Kawas, Jhanor, GPEC and Ukai Hydro plants are having
black start facility.
Hence, it is requested that the proposal of interconnection between
existing KAPP and New KAPP plant by putting 400/220 KV, 500 MVA ICT at
KAPP shall be taken up in Standing Committee of CEA by WRPC.

CE, SLDC Gujarat explained regarding usefulness of the 500 MVA ICT at
KAPS. On query from WRPC, representative from KAPS 1&2 informed that exact
status of commissioning of KAPS 3&4 will be submitted before next OCC
meeting.
The Sub- Committee noted as above.

8.7 High voltage problem at SSP – regarding actions to be taken to


ensure availability of 400 KV D/C SSP - Rajgad and SSP - Dhule line
Chief Engineer, SLDC Vadodara, Gujarat vide email dated 29.05.2017
informed that one circuit of 400 KV SSP – Rajgadh and SSP – Dhule lines
remains off to control grid voltage most of the times. In 32 nd WRPC meeting held
at Pune, it has been suggested that the reactors at Dhule end are old and to be
replaced by 125 MVA CSR. In 494th OCC meeting held at Mumbai on 12.04.17,
MSETCL was requested to install 125 MVAs reactors at Dhule S/S as the
installed CSR are of less rating and are not working properly.
To ensure adequate availability of 400 KV network associated with SSP
during Monsoon season, it is essential that the existing reactors at Dhule end
shall be replaced by 125 MVAR at the earliest. Also, as a long term measure,
one 125 MVAR bus reactor shall be commissioned at SSP.
Till the time if require, SSP units shall be kept on condenser mode to keep
all connectivity with SSP in service to improve system reliability.
CE, SLDC Maharashtra told that even after the installation of 125 MVAR
reactor at Dhule end, voltage profile will not improve significantly.
Representative from WRLDC informed that the installation of 125 MVAR
reactor at SSP is not possible due to space constraint at SSP. Further WRLDC
urged for installation of 125 MVAR reactor at Dhule end to see whether
improvement is observed in voltage profile.
The Sub- Committee noted as above.

8.8 Installation of new busbar protection scheme for 400 KV


switchyard at Vadavi s/s – regarding keeping busbar protection out at
400 KV switchyard at Vadavi s/s for 30 days w.e.f. 15.07.17
Chief Engineer, SLDC Vadodara, Gujarat vide email dated 29.05.2017
informed that GETCO Corporate office has sought permission for keeping
busbar protection out for about thirty days at 400 KV Switchyard at Vadavi
substation for replacement of existing busbar protection scheme.
SLDC-Gujarat intends to allow permission keeping 400 KV busbar
protections out from 03.07.17 with following conditions:
a. Busbar arrangements at 400 KV Kansai S/S would be as under
during busbar protection scheme will remain out:
400 KV Bus - 1 400 KV Bus - 2
400/220 KV, 315 MVA ICT - 3 400/220 KV, 315 MVA ICT-1
400/220 KV, 315 MVA ICT - 4 400/220 KV, 315 MVA ICT-2
400 KV Dehgam – Vadavi -2 400 KV Dehgam-Vadavi-1
400 KV TBC/125MVAR Reactor 400 KV, 50 MVAR Bus Reactor
400 KV Vadavi – Halvad - 1 400 KV Kansari-Vadavi-1
400 KV Vadavi - Halvad - 2 400 KV Chorania-Vadavi-1
400 KV Kansari – Vadavi - 2 400 KV Bhachau-Vadavi-1
400 KV Chorania – Vadavi - 2
400 KV Bhachau-Vadavi-2

b. 400 KV / 220 KV Bus couplers at Vadavi S/S will remain close.


c. No 400/220 KV, ICT outages will be permitted at Soja, Chorania &
Kansari S/S.
d. No outages 400 KV lines connected to Soja and Kansari S/S will be
permitted.
Before facilitating Bus Bar protection relay outage at Vadavi S/S, SLDC –
Gujarat will confirm following:
1. Zone 4 timing of all the Lines to be reduced to 200 ms.
2. Checking of healthiness of all the carrier protection of lines.
3. Zone 4 timer reset also will be checked in all the relays as its
function needs to be proper.
4. For all ICTs, Backup over current Protection to be made sensitive in
order to clear the bus fault immediately.
5. Bus Coupler over current protection setting to be made lower.
6. Re-trip feature if available in LBB should also be enabled to take one
more attempt of breaker opening.
7. Healthiness of all Protection i.e. both Main and Backup shall be
ensured.
The following outages will require for integrating all feeders in new bus
bar protection scheme:
Sr. Name of Outage From To
No. equipment/Transformer date (Hrs) (Hrs)
1 400/220 KV 315 MVA ICT.01 15.7.17 14:00 18:00
2 400/2202 KV 315 MVA ICT.02 16.7.17 08:00 12:00
3 400/220 KV 315 MVA ICT.03 16.7.17 14:00 18:00
4 400/2202 KV 315 MVA ICT.04 17.7.17 08:00 12:00
5 400 KV Vadavi-Dehgam-1 17.7.17 14:00 18:00
6 400 KV Vadavi-Dehgam-2 18.7.17 08:00 12:00
7 400 KV B/C 18.7.17 14:00 18:00
8 400 KV 50 MVAR Reactor 19.7.17 08:00 12:00
9 400 KV 125 MVAR Reactor 19.7.17 14:00 18:00
10 400 KV Vadavi-Halvad-1 20.7.17 08:00 12:00
11 400 KV Vadavi-Halvad-2 20.7.17 14:00 18:00
12 400/220 KV 315 MVA ICT.01 29.7.17 08:00 18:00
13 400 KV Vadavi-Kansari-1 29.7.17 08:00 18:00
14 400/220 KV 315 MVA ICT.02 30.7.17 08:00 18:00
15 400 KV Vadavi-Kansari-2 30.7.17 08:00 18:00
16 400/220 KV 315 MVA ICT.03 31.7.17 08:00 18:00
17 400 KV Vadavi-Choraniya-1 31.7.17 08:00 18:00
18 400/220 KV 315 MVA ICT.04 01.8.17 08:00 18:00
19 400 KV Vadavi-Choraniya-2 01.8.17 08:00 18:00
20 400 KV Vadavi-Halvad-1 Bay 02.8.17 08:00 18:00
21 400 KV Vadavi-Bhachau-1 02.8.17 08:00 18:00
22 400 KV Vadavi-Halvad-2 Bay 03.8.17 08:00 18:00
23 400 KV Vadavi-Bhachau-2 03.8.17 08:00 18:00
24 400 KV Vadavi-Dehgam-1 04.8.17 08:00 18:00
25 400 KV Vadavi-Dehgam-2) 05.8.17 08:00 18:00
26 400 KV 50 MVAR Reactor 07.8.17 08:00 18:00
400 KV 125 MVAR Reactor/TBC
27 08.8.17 08:00 18:00
Bay
28 400 KV Bus-Coupler Bay 09.8.17 08:00 18:00

In the meeting, WRPC informed that above proposed outages for 30 days
may have significant impact on grid operation. He requested CE, SLDC Gujarat
to squeeze out the outage duration.
CE, SLDC Gujarat informed that they will try to reduce the outage period
from their side and requested for giving the outage as listed above.
The Sub- Committee noted.

8.9 Review of existing outage procedure


Background:
Chief Engineer, SLDC Vadodara, Gujarat vide email dated 29.05.2017
informed that as per the existing procedure, the important elements outages
which are not taken up OCCM i.e. post OCC outages shall have to be placed in
Google sheet of WRLDC Reliability at least three days in advance and sent for
consent of WRPC as well as WRLDC. After consenting by WRPC, WRLDC is
confirming / denying the outages.
Many times, field offices are requesting outages one or two days in
advance for only three to four hours stating various reasons like testing, hot
point attending, construction work, OEM confirmation for particular job etc.
These outages are to be confirmed on a day ahead basis. Many outages are
Intra State outages and not affecting ATC between Intra State / Inter State.
Some time, field officers are requesting outages to put auto reclose on non-auto
mode for safety purpose. In this regard, SLDC Gujarat is suggesting
WRPC/WRLDC to take initiative by creating and sharing Google sheet
especially for Post OCC outages having following features:
1. Sr. No.
2. Name of element
3. Whether Intra State / Inter State element
4. From Date / Time
5. To date / Time
6. Requesting Agency
7. Reason
8. Contingency plan by concerned SLDC
9. Requirement of deferment of OCC approved outages by concerned
SLDC
10. WRPC consent (Yes / No)
11. WRLDC consent
The above requirement of outages shall be processed by WRPC /WRLDC
on day ahead before 14:00 Hrs. It will save time of communication / ambiguity
created between SLDC CR – WRLDC CR. Also, it helps to facilitate outages
timely in real-time without any delay.
In view of discontinuing the practice of availing post-OCC approval outage
from WRPC secretariat as given in item no. 3.2, the suggestion in this item can
be deferred.
The Sub- Committee noted.

8.10 Tripping of 400 KV Kotra - Lara line 1&2 and subsequent power
failure at NTPC Lara
Background:
AGM, NTPC Raipur informed that on 27/05/2017 at 18:34:51:511 hours
(GPS synchronized) 400 KV Kotra-Lara Line 1 CB (403 & 402) Y-Phase opened
at Lara End on Zone 1 fault (Y-ph to Earth, 0.68 KA at 13.6 KM). DR & SOE at
Lara end is enclosed. As informed, 400 KV Kotra-Lara Line 1 Y – Phase also
opened at the same time at Kotra End on Z1 Fault (Y-ph to Earth, around 50KA
at 3.6 KM). Subsequently auto reclosing was in process, meanwhile both the
400 KV Kotra – Lara Lines 1 & 2 tripped at Kotra End on overvoltage stage 2,
resulting in total power failure at NTPC, Lara 400 KV Switchyard. At Lara End
CB 403 & 402 got Tripped (DT received) and CB 401, 404, 405, 406, 410, 411 &
412 remained in closed condition. It is to mention here that presently NTPC,
Lara is being fed from 02 number of 400KV lines namely Kotra-Lara line 1 & 2.
Our both the construction power feeders (33 KV from Kotra & Jhalmala S/S of
CSPDCL) also tripped at source.
For the occurrence as above, in case of a single phase to earth fault,
tripping of both the 400 KV lines at Kotra end is a serious concern as it led to
total power failure at NTPC, Lara. Due to this all commissioning activity was
affected at NTPC, Lara.

In the meeting, GM, WRLDC informed that it was one of the rarest of rare
cases happened and ensured that it will not happen in future. He further
informed that after commissioning of 400 kV Lara-Champa D/c line, reliability
will further be improved.
OCC forum opined that the detailed analysis of the events shall be carried
out in ensuing PCM. The forum suggested for submission of tripping details
from PGCIL to NTPC.
The Sub- Committee noted.
8.11 Technical minimum scheduling
Background:
AGM, NTPC Raipur informed that as per Clause 6.3B of IEGC 4th
amendment, “The technical minimum for operation in respect of a unit or
units of a Central Generating Station of inter-State Generating Station
shall be 55% of MCR loading or installed capacity of the unit of at
generating station.” The technical minimum level is determined taking into
account stability, reliability and safety of units operation at partial load.
But it is observed that RLDC considers technical minimum as 55% of DC
declared by the generator instead of 55% of gross generation less normative AEC
of the units.
Whenever due to equipment problem, coal or ash handling problem or wet
coal issue, DC declared by the generator is less than normative DC, technical
minimum running of the units (i.e. 55% of gross generation less normative AEC)
will not change.
Technical minimum of a 500MW unit is as follow:
Unit gross gen=500 MW,
Normative Aux Energy Consumption = 5.75%
EX-bus technical min = 500*(1-5.75/100)*0.55 = 259 MW
(The level of technical minimum will not change with DC declared
by Generator)
Thus technical minimum of the unit is constant, is not depending on DC
declared by Generator. The same technical minimum may please be
incorporated in case of lowering of schedule of Generating station in the
software of POSOCO.
In the meeting, GM, WRLDC clarified that technical minimum considered
by WRLDC is 55% of normative DC only and not the DC declared by Generator.
He further told that lowering of schedule of Generating station in the software of
POSOCO is based on normative DC of generator as well as real time situation of
the demand and generation in the region.
OCC forum suggested to take up the matter in forthcoming CCM for detail
discussion.
The Sub- Committee noted.
8.12 Declaration of declared capacity of generator
AGM, NTPC, Vindhyachal informed that with the implementation of new
regulations of CERC in relations to technical minimum scheduling, it is
instructed to generators by M/S POSOCO to declare DC limited up to 100% of
normative DC. Accordingly generators had started declaring DC up to 100% of
normative level.
In regulation of CERC, it is mentioned that respected SLDC / RLDC had
to restrict scheduling up to normative level so that generators can have
sufficient margin to raise load when RGMO operation come into vogue. Thus it
may be concluded that CERC does not restrict generator to limit their respective
DC up to normative level .
General Manager, WRLDC clarified that DC declaration is in purview of
generator, where as WRLDC can schedule only up to 100% of normative DC.
OCC forum suggested to take up the matter in forthcoming CCM for detail
discussion.
The Sub- Committee noted.

8.13 Requirement of additional 765kV , 3x80 MVAr Bus Reactor at


765KV Durg PS
AGM, PGCIL Raipur informed that the 765kV Durg PS has connected with
following transmission elements
a) 765kV D/c Durg-Kotra line with Non –Switchable 3x80MVAr LR
b) 765kV D/c Durg-Champa line with Non –Switchable 3x80MVAr LR
c) 765kV D/c Durg-Wardha-1&2 line with Switchable 3x80MVAr LR
d) 765kV D/c Durg-Wardha-3&4 line with Switchable 3x80MVAr LR
e) 2 nos , 1500MVA ICTs
f) 1 no 3x80MVAr Bus Reactor
The 765kv Bus voltage is continuously high even after switching off some
Line and taking L/R as Bus reactor, the 765kV Bus Voltage & frequency graphs
is shown below for last 12 days
Keeping in view of continuously high voltage, which is detrimental to
equipment , it is proposed to install an additional 765kV, 3x80MVAr Bus
Reactor at Durg PS to control the high Voltage.
The sub-committee recommended for feasibility study of installation of
additional 765kV, 3x80MVAr Bus Reactor at Durg PS to control the high Voltage
by PGCIL and submit the report to WRPC/WRLDC for discussion in next OCC
meeting.
The Sub- Committee noted.

8.14 Request for considering Outages required for constructions


works from the date of present OCC to next OCC date
Background:
AGM, PGCIL Vadodara informed that presently the outages required for
succeeding month for various ongoing constructions works of Substations and
Transmission lines are planned on tentative dates in advance and same got
approved in current OCC meeting. However, in many cases, these OCC
approved outages are not being availed in real time due to various constraints.
Also some construction related shutdown cannot be conceived well in advance.
Hence, it is proposed the outages required for constructions works shall be
considered from the date of present OCC to next OCC meeting to facilitate
proper utilisation of approved outages.
OCC forum suggested that since the construction activities are more
planned activities, therefore the outages under construction category shall be
planned in OCC on Monthly basis.
The Sub- Committee noted.
█ Item no.9: WRLDC agenda items
1. STM-1 communication link between WRLDC and Asoj
Providing STM-1 communication link between WRLDC and Asoj is being
continuously taken up by WRLDC in OCC forum and URTDSM meeting from
last 3 months. In 494thOCCM,WRTS-I assured that efforts will be made for
commissioning STM-1 by 30th April 17 but so far no significant progress is
achieved in providing STM-1. As discussed in 495thOCCM, GM WRLDC took up
the matter directly with top management of BSNL and it emerged that LOA
placed on BSNL Faridabad was a surprise to BSNL Faridabad as they had never
given any feasibility confirmation. Subsequently it was found that feasibility was
given by BSNL Baroda. GM WRLDC directly talked to BSNL Baroda who
confirmed that if order is given to them they will immediately provision. Demand
letter has been issued by BSNL Baroda and same made available to
POWERGRID on 2nd June 17.
Representative from PGCIL ensured to expedite the same.
The Sub-committee noted as above.

2. Hot line voice communication between WRLDC and


Substations/Generating Stations
Status of integration of Orange Hotline phones at major stations in WR with
WRLDC is being discussed in OCC forums from 493rd OCC. The previous OCCM
(495th OCC) status and present status of integration of hotline phones is given
below.

Status as per 495th OCC


Status as on 1st June 17
In WR-1working hotline phones to POWERGRID and IPP substations
improved from 10 to 12 & 1 to 2.
Goa SLDC at Madgaon started functioning from 1st June 2017 but
hot line phone is not working.
Representative from PGCIL informed the VoIP Phones / Analog Phones
have been installed at Wide Band Locations /ISTS Point where communication
Equipment are readily installed under Master Communication Plan.
Further, Analog/VoIP Channels have been created from Wide Band
Node/ISTS Point upto WRLDC and Extns. have been created in M/s Orange
EPABX Exchange for those IPPs & Stations not covered on OPGW
Network/MCP. IPPs/ISTS Stations are requested to extend the Voice from their
Switchyards/Control Rooms to nearest Wide Band Node.
Some sites are pending where there is long distance between Control
Room and Communication Equipment (like JPL Stg – II, Sasan UMPP,
Kakrapara, Kawas), VoIP Phones have been handed over to Site Constituent and
informed that OFC Cable to be laid between Control Room and Communication
Equipment.
In Process Sites like Bhatapara, Betul, Vadodara Pooling, Mauda STPP,
Solapur STPP, CGPL & Vadodara Pooling, Dehgam, Pirana, M/s Orange will
starts working from 19.06.2017 and will be completed within 2 Weeks.
Latest Status of VoIP Phones in Western Region is given at Annexure- 9.2.
The Sub-committee noted as above.

3. Primary Response by Generators

The primary response of WR generating units for last three Grid Events
was discussed in the 495th OCC. The primary response of KWPCL, KSK, RKM
and DB Power was NIL. The response of CGPL was very sluggish. The matter
was subsequently followed up with the concerned generating stations. Summary
is as below:
Generating Remarks Status
Station
KWPCL Primary response was NIL. KWPCL was advised to
correct the logic as per
IEGC. KWPCL informed
that their units are under
shutdown and the RGMO
logic shall also be corrected.
Representative from
KWPCL/ Adani informed
that on 22.05.2017
KWPCL Generator was
tripped at 22:12 Hrs. on
stator earth
fault. Generator will not be
available for 4 to 5 months.
KSK Primary response was NIL. KSK was advised to correct
KSK informed that they have the logic as per IEGC.
inhibited the generating units Representative from KSK
from responding between informed that present
49.90 to 50.05 Hz. status of fine tuning of
RGMO logic is under
progress.
RKM Primary response was positive RKM to update the reason
but inadequate. The increase for inadequate response.
in generation during the No representative from RKM
frequency dip was inadequate. was present.
DB Power Primary response was NIL. DB DB Power was advised that
Power informed that response IEGC 5th amendment
was poor due to deterioration prohibit generating units to
in coal quality and operation be operated with VWO.
in Valve Wide Open (VWO). DB Power to intimate
actions being taken.
CGPL Primary Response is very Informed that issue was
sluggish. taken up with OEM and
fine tuning of RGMO will be
done by Sept’17.
Sasan Primary Response calculated Sasan to apprise actions
using WRLDC SCADA data being taken to address the
was seen to be negligible. SCADA related issue.
However response calculated
using data submitted by
Sasan was around 15%. After
deliberation it was understood
that the SCADA data
transmitted from Sasan to
WRLDC only when the change
is greater than a certain
threshold.
The Sub-committee noted as above.

4. Extension of RGMO status to SLDC / WRLDC

Out of 26 generating stations covering 80 units, 24 generating stations


covering 74 units have been mapped at WRLDC. With the support of generating
stations, so far WRLDC integrated 93% of generators RGMO status in WRLDC
SCADA. The snapshot of RGMO status in SCADA as on 31 th May-17 is shown
below.
Generating stations whose signal integration is still pending are tabulated
below.

S.No Station No. of Current Remarks


Units Status
1 GMR Warora Unit 2 1 Pending Informed that the
signal extension
shall be done in
June’17
2 MCCPL 1 Pending Signal extended up
to ACBIL gateway.
However signal was
not configured in
Gateway.
3 BALCO 4 Pending Informed that the
signal configuration
was done and signal
extension shall be
completed by end of
May’17.

Generating stations MCCPL and BALCO shall give the plan for integrating
RGMO status to WRLDC.
Extending RGMO Status signal to SLDC/WRLDC is been a regular agenda
from 491 OCC. State SLDCs may apprise OCC, the number of state generating
units whose RGMO signal was extended to SLDCs.
The sub-committee noted as above.
5. CERC Regulations for Communication System for Inter-State
transmission of Electricity, 2017
On 15th May, 2017 CERC notified regulations for “Communication System for
Inter-State transmission of Electricity”. These regulations shall come into force
w.e.f. 1st July 2017.
These regulations lay down the rules, guidelines and standards to be
followed by various persons and participants in the system for continuous
availability of data for system operation and control including market
operations. Further, the regulations deal with the planning, implementation,
operation and maintenance and up-gradation of reliable communication system
for all communication requirements including exchange of data for integrated
operation of National Grid.
Few highlights of these regulations are quoted below
Quote
“SCOPE and APPLICABILITY:
(i) These regulations shall apply to the communication infrastructure to be
used for data communication and tele -protection for the power system at
National, Regional and inter-State level and shall also include the power
system at the State level till appropriate regulation on Communication is
framed by the respective State Electricity Regulatory Commissions.
(ii) All Users, SLDCs, RLDCs, NLDC, CEA, CTU, STUs, RPCs, REMC, FSP
and Power Exchanges shall abide by the principles and procedure as
applicable to them in accordance with these regulations.”
Unquote
Quote
“Role of National Power Committee (NPC) and Regional Power
Committee (RPC):
(i) NPC shall be responsible for issuance of the guidelines with the
approval of the Commission on “Availability of Communication System” in
consultation with RPCs, RLDCs, CTU, CEA and other stakeholders within
a period of two months from the date of notification of these regulations.
(ii) The RPC Secretariat shall certify the availability of communication
equipment for CTU, ISGS, RLDCs, NLDC, SLDCs based on the data
furnished by RLDC.
(iii) The RPC Secretariat shall monitor instances of non-compliance of
these regulations as amended from time to time and make endeavor to
sort out the issues in the respective region in such a way that cases of
non-compliance are prevented in future. Unresolved issues and non-
compliance of any of the provisions of these regulations shall be reported
by the Member Secretary of respective RPC to the Commission.
(iv) The RPC Secretariat shall be responsible for outage planning for
communication system in its region. RPC Secretariat shall process outage
planning such that uninterrupted communication system is ensured.”
Unquote
Quote
“COMMUNICATION SYSTEM AVAILABILITY:
All users of CTU, NLDC, RLDCs, SLDCs, STUs shall maintain the
communication channel availability at 99.9% annually:
Provided that with back up communication system, the availability of
communication system should be 100%.”
Unquote
The Sub-committee noted as above.

6. Telemetry issues

Details of utilities whose data is reporting to WRLDC via unreliable


communication links and whose data is highly intermittent is given below.
These utilities may appraise OCC actions being initiated to ensure 100 % data
availability to WRLDC.

Sr. Node Constraints Remarks


no.
1 BALCO Communication link is GPRS In 495th OCC,
since commissioning even after BALCO intimated
permanent connectivity. that reliable
Primary FO link up to communication
Dharamjaygarh as per link shall be
connectivity agreement to be provided by end of
expedited. May’17 or first
Secondary path through PLCC week of June’17.
needs to be established.
2 JP Nigrie Communication link is GPRS JP Nigrie informed
since commissioning even after that primary link
permanent connectivity. up to Satna shall
Primary link up to Satna as per be established by
connectivity agreement to be 2nd week of
expedited. July’17.
Secondary path needs to be
established.
3 LANCO Primary link up to Bilaspur as No representative
per connectivity agreement was present
through PLCC was established.
Secondary path is not yet
established.
4 RKM Primary link FO up to Kotra as No representative
per connectivity agreement was present
established
Secondary path through PLCC
also established.
However both the channels are
reporting to single gate way.
6 IEPL The telemetry is highly No representative
intermittent was present
7 400kV No telemetry since No representative
Lonikhand II commissioning was present
8 Tillari The telemetry of 220kV Tillari No representative
which have interfacing line with was present
Goa grid is not available
causing problems in drawl
calculations of Goa and
Maharashtra
9 Goa The telemetry needs to be No representative
validated with actual field was present
values for Ponda, Verna,
Xeldem, Kadamba, Tivim,
Cuncolim. The telemetry of
Amona not available
10 DNH The telemetry of DNH not No representative
available since long was present

There are 22central sector765 kV substations in WR. Out of 22


substations only 8 substations (Aurnagabad, Solapur, Bilaspur, Seoni, Bhopal-
BDTCL, Dhule-BDTCL, Sipat and Sasan) are having primary as well as
secondary communication channels. Importance of ensuring continuity of
SCADA data of 765 kV nodes to WRLDC via secondary communication channel
in case of failure of primary communication channel is discussed in 495 th
OCCM. Further considering power flow and connectivity, list of important 765
kV nodes whose secondary channel to be established on upfront basis was given
in 495th OCCM.
Sr. Node Constraints Status as per 495 OCCM
no.
1 Champa Primary communication Informed that secondary
HVDC channel is Telecom. channel shall be established
by mid-June’17.
No secondary
communication Channel.
2 Wardha Primary Communication Informed that secondary
channel is Raipur- channel through PLCC shall
Wardha PLCC link. be established within 1
Month.
No secondary
communication Channel.
3 Vadodara Secondary link is GPRS. Informed that secondary
channel shall be established
by June’17.
4 Jabalpur Primary communication Informed that secondary
Pooling link is fibre. channel shall be established
by July’17.
No secondary
communication Channel.
The Sub-committee noted as above.

7. Telemetry of RES

With the support of Wind developers and Maharashtra SLDC, in the


month of May’17 the observability of RES in Maharashtra has drastically
improved.
Following Wind developers are sending pooling data to WLRDC via FTP:

S.No Wind developer Installed capacity of Wind whose


data is being pooled through FTP
(As informed by Wind Developer)
1 Suzlon 1662 MW
2 Regen 508 MW
3 Continum 120 MW
3 Gamesha 80 MW
4 Panama 72 MW
Total 2442 MW
Following Wind developer’s data are in pipeline for pooling data to WLRDC
via FTP:
1. Senvion
2. TS Wind
3. Wind World
4. Westas
5. Shri Maruthi
6. Enercon
7. Inox
The present status of Telemetred RES at WRLDC is as follows:

State/Region RES Installed Telemetered % of RES


Capacity RES Capacity at Visibility/Observab
(Wind+Solar) WRLDC ility at
in MW (Wind+Solar) in SLDC/WRLDC
MW
Gujarat 5740 5734 99
(4622+1118) (4616+1118)
Maharashtra 5052 2832 (2442+390) 56
(4662+390)
Madhya 3036 2564 (2076+488) 84
Pradesh (2239+797)
Chhattisgarh 76 (0+76) 66 (0+66) 87
Diu 9 (0+9) 0 0
Daman 1 (0+1) 0 0
WR 13838 8326 60
(11523+2315)

Chief Engineer, SLDC Maharashtra informed that after first REIF


meeting, there is significant improvement in RES Telemetry in
Maharashtra System.
The sub-committee noted as above.

8. Compliance to Low Voltage Ride Through (LVRT) by Wind Generators

Compliance to LVRT by wind generators is being deliberated in OCC


forums from 493rd OCC. In 494th OCC, Maharashtra, Gujarat and Madhya
Pradesh SLDC’s agreed to submit LVRT compliance in prescribed format given
by WRLDC.
Till now only DJ Energy private limited in MP has confirmed LVRT
Compliance for 170 MW wind power project at Daloda substation.
WRLDC requested Maharashtra, Gujarat and Madhya Pradesh SLDC’s
for:
1. Present status of compilation of LVRT compliance details and submission
to WRPC and WRLDC
2. The present methodology of checking LVRT compliance in vogue for giving
clearance to wind generators for integration into grid.
Sub-Committee noted as above.

9. Staggering of loads in Maharashtra during load change-over in Evening


Hours
Almost every day in the evening hours there is a load change-over in
Maharashtra system. The load during this exercise is reduced by 1500-3500
MW within two hours. Typical plot of demand vs Maharashtra generation,
Schedule vs Actual Drawl of Maharashtra is shown below.
It was observed that during several time blocks the demand is ramping
down at the rate of 26-70 MW/Min, whereas the internal generation is ramping
down at the rate of 2 - 8 MW/Min only and the drawal schedule is ramping
down at 7-16 MW/min. Many a time the generation is increased even while
there is a downward trend in demand and vice versa. Thus there is a mismatch
between instantaneous demand and generation of Maharashtra. This is
resulting in deviation of Maharashtra drawal by 800-1200 MW.
Imbalance in the grid causes large variation in grid frequency and voltages
and consequential tripping of EHV lines on Over-voltage. For instance on 21st
May 17, 765 kV Wardha-Aurangabad-I tripped on high voltage at 18:03 Hrs
even while ckt-II and Ckt-IV were already kept manually open to regulate
voltage. Such incidents are a threat to grid security.
The large variation in Maharashtra demand has a major influence on the
Regional demand profile. The WR regional demand ramps down between 16 Hrs
to 1830 Hrs and then increases between 19-20 Hrs. Regional Demand ramp
down rate is in the range of 600-850 MW/Time Block (15 Mins) whereas ramp
up rate of demand is in the range 300-600 MW/Time Block. This results in large
variation in grid frequency as illustrated below.
In view of the above, disconnection /connection of loads in Maharashtra
may be carried out in a staggered manner and the internal generation may be
regulated suitably to avoid large variations in grid parameters. Other measures
such as demand forecasting and reliable telemetry of drawl also need to be
established for better monitoring and resource scheduling at SLDC.
WRLDC requested SLDC Maharashtra to take up te following measures:
 Disconnection /connection of loads in Maharashtra in staggered
manner
 Regulation of internal generation to avoid large deviation from schedule
and variations in grid parameters.
 Measures like demand forecasting, reliable telemetry of drawl and
resource scheduling being taken
SLDC Maharashtra agreed as above.
The sub-committee noted as above.

10. VAR regulation by Wind Generators to control voltage in South


Maharashtra
It was observed that upon start of monsoon demand in Maharashtra
reduces by 4000-5000 MW and demand during night hours is around 12000-
13000 MW. Further high penetration of wind generation is observed at Karad,
Kolhapur and Lamboti areas. There are instances where large number of EHV
lines tripped on over voltage in South Maharashtra resulting in blackout at
Kolhapur, Karad and Mapusa substations and partial blackout in Goa system.
In past, even after initiating all actions like taking bus reactors into
service, condenser mode of operation at Koyna and opening lightly loaded lines,
high voltages are faced at400 kV Solapur, Kolhapur, Parli, Pune GIS, Lamboti,
Girwali, Mapusa and 765/400 kV Solapur PG substations in night hours.

In view of above Maharashtra SLDC may instruct all the wind generators
in south Maharashtra to absorb VAR and avoid injecting VAR at point of
connection to contain high voltages.
AGM, WRLDC informed that there is penalty mechanism in Intra-ABT
in Maharashtra system for absorbing VARs.
CE, SLDC Maharashtra endorsed the same.
The sub-committee noted as above.

11. Performance review of MVAR absorption by Generating Stations to


Control High voltage
It was observed that during the monsoon, demand in WR reduces by
4000-5000 MW. In the past, even after taking all Switchable Shunt Reactors in
service and opening lightly loaded lines, high voltages are observed at most of
the EHV nodes during night hours. In view of inadequate shunt reactive
compensation, the generating units are being advised to contribute in voltage
regulation by operating their units in under-excited mode (absorb Reactive
Power) within the capability curve. The issue was discussed by WRLDC in 494 th
OCCM and WRLDC vide letter dated 21st Mar 17 had advised generators not to
inject reactive power into the grid even when the bus voltage is above nominal.
The MW, MVAR and Voltage of generating units was analyzed for the
month of May 2017 with the help of SCADA data available at WRLDC. The list of
generators injecting MVAR into the grid even when the bus voltage is above
nominal are given below.
1. IPP : DB Power, Essar Mahan, KSK Mahanadi, RKM
2. ISGS: KSTPS-I
3. Generators under the control of Gujarat SLDC
a. Essar Vadinar (U#1 & U#2)
b. Wanakbori (U#4, U#5 & U#6)
4. Generators under the control of Maharashtra SLDC
a. Koradi (U#8 & U#9)
b. Bhuswal (U#4 & U#5)
c. Jaigad (U#3 & U#4)
5. Generators under the control of Madhya Pradesh SLDC
a. Satpura (U#10 & U#11)
b. Singhaji (U#1 & U#2)
6. Generators under the control of Chhattisgarh SLDC
a. Korba West (U#3 & U#4)
It was observed that almost the same list of generators mentioned in 494 th
OCCM are continuing to inject MVAR into grid even when voltage is above
nominal.
GM, WRLDC requested all concern Generating Stations to not inject
MVAR into grid when there is over voltage and advised SLDCs to take proper
action actions for grid security.
The sub-committee noted as above.

12. Review of ICT taps for better voltage regulation& operation of


multiple units in synchronous condenser mode at Koyna /SSP/Ghatghar
Due to seasonal variations the demand pattern changes. Due to low
demand in monsoon and high penetration of wind generation MVAr injections
are observed from 220 kV to 400 kV side resulting in persistent high voltage at
EHV nodes. In past MVAr injection from 220kV to 400 kV side are observed at
following locations
 Kolhapur (3x315 MVA)
 Karad (3x315 MVA)
 Nanded(2x500 MVA)
 Chandrapur (2x315 MVA)
 Pune(PG) (3x315 MVA)

All SLDCs are advised to monitor MVAr injection from 220 kV to 400
kV side and explore/review ICT tap positions to avoid high voltages in
Grid.
SLDC Maharashtra to review ICT tap positions at above mentioned
locations.
SLDC Maharashtra and NCA to explore operating of all machines at
Koyna, Ghatghar and SSP in condenser mode during night hours,
particularly at high voltage conditions.
The sub-committee noted the same.
13. Status of compliance of IEGC 5.2 by Gas Stations

As per IEGC 5th amendment notified by CERC on 12th April 2017, allgas
turbines of capacity more than 50 MW each shall be operated under restricted
governor mode of operation with effect from the date 01.10.2017. The central
gas generating stations in WR are given below
1. RGPPL (2x205+1x230)+(2x213+237.54)+(2x213+237.55): 1967.08 MW
2. Kawas (4x106+2x116): 656.20 MW
3. Gandhar (3x144.3+1x224.49): 657.39 MW
4. DGEN (3x400): 1200 MW
Above generating stations to apprise OCC regarding actions being taken to
comply with IEGC regulations
All SLDCs to apprise status of state gas generating stations regarding
operation of gas turbines under restricted governor mode of operation
The sub-committee noted the same.

14. Status of prolonged outage of Grid Elements


As per information available at WRLDC as on 1st June 2017, following EHV
elements are under prolonged outage.

S.N Element Name Outage


Owner
o Date Time Reason
1 50 MVAR LR of 400 MSETCL 30-10-2015 19:10 Fire
kV PARLI(MS)- Accident in
LONIKAND (NEW)-2 L/R.
at PARLI (MS)
2 240 MVAR BR at 765 ATIL 21-03-2016 20:40 Oil leakage
kV TIRODA and Testing
works
3 400 kV RAIPUR- PGCIL 06-07-2016 07:48 Fire in
RAIGARH-II FSC TCSC
AND TCSC
4 400 kV RAIPUR- PGCIL 08-07-2016 12:06 Main
RAIGARH-I TCSC Control
System
Computer
Failure
5 50 MVAR LR of 400 PGCIL 05-09-2016 20:45 Gases and
kV KANSARI- Moisture
BHINMAL-1 at Observed in
KANSARI Reactor

6 125 MVAR BR at 400 GCEL 25-10-2016 14:22 Buchholz


kV GMR-Raipur relay
protection
operated
7 400 kV BUS II at BALCO 13-12-2016 19:54 CB
Balco refurbishme
nt work
8 400/1200 kV ICT-2 PGCIL 12-03-2017 06:31 Buchholz
AT BINA(PG) relay
protection
operated
9 50 MVAR LR of 400 PGCIL 20-04-2017 10:28 Replacemen
kV BHADRAWATI- t of gaskets,
RAIPUR-1 at offline oil
BHADRAWATI filtration,
painting,
cleaning
and testing.
10 315 MVA ICT-2 at BALCO 18-05-2017 06:19 For Bus2
BALCO rectification
work at
BALCO.
Concern utilities are agreed for early restoration of the elements.
The sub-committee noted as above.

15. Availing EHV Element Outages in Emergency due to insulator failures


It was observed that utilities are requesting for emergency outage on EHV
elements frequently. In most of the cases the reason for availing emergency
outage is failure of insulators or insulator flashover. Failure of insulators or
insulator flash over can be avoided through proper planning of outages and
maintenance.
Recently MSETCL and DB Power are requesting for emergency outages on
1. 500 kV Chandrapur-Padghe Pole-I & II to rectify failure of insulators on
18th May and 22nd May 17
2. 400 kV DB power-Kotra-I & II for replacement of broken insulators on
30th and 31st May 17
All utilities agreed to plan the outages in advance for maintenance
activities like insulators replacements such that availing the outage in
emergency may not arise.
The Sub-committee noted as above.
Additional Agenda:
█ SA-1. Gujarat additional agenda items
Chief Engineer, SLDC Gujarat vide mail dated 09.06.17 requested to
discuss the following additional points in the Agenda of 496th OCCM being
held on 13.6.17.
1. For implementation of automatic switching “OFF” 400 KV bus reactors in
the PGCIL S/S in Gujarat network wherever in service based on voltage
level (405 KV).
2. 400 KV ICTs Tap changing as per system requirement at all the Power
Grid owned S/S in Gujarat system to maintain downstream voltage.
3. In/Out status indication in SCADA of the A/R switch of all the interstate
lines is to be integrated in SCADA for monitoring purpose.
4. URTDSM project – it is observed that under this project, PMU’S are being
installed on 400 KV system only. GETCO’S requirement PMU on 220 KV
system for analysis of incident in 220 KV system. Matter shall be taken
up with implementing Nodal agency.
Representative from PGCIL informed that they will explore the feasibility
of issues given at serial nos. 1 & 2 given above.
OCC recommended for detailed discussion of item nos. 3 & 4 in SCADA
Committee/ URTDSM project meeting.
The Sub-committee noted as above.

█ SA-2.: Mapping of feeders wired under AUFLS in SCADA-item from


NPC
Background:
In the 4th, 5th & 6th NPC meetings, the feeders/lines mapping of the
Feeders / Lines covered under AUFLS, on SCADA systems of SLDC's/RLDC's
was discussed, wherein NPC have desired that monitoring of the feeders / loads
under the AUFLS shall be done at SLDC's / RLDC's, so as to ascertain that the
desired results are ensured during the events, frequency falling below the
AUFLS frequency settings.
In the 6th NPC meeting it was informed that SR has already achieved
mapping of 84% of loads/ feeders on the SCADA system & online feedback of
tripping of these feeders during frequency falling below the AUFLS settings, is
available at SRLDC. In NR the exercise/process of mapping such feeders into
the SCADA system has started. In the 6th NPC meeting it was therefore desired
that all the loads/feeders wired under the AUFLS is monitored in Western
Region also and the progress be submitted to NPC.
A list of feeders/loads implemented under AUFLS in WR was compiled at
WRPC in 2014 and same was uploaded on website of WRPC under news section
and PCM Minutes section. Constituents / States were requested to initiate the
process of mapping these feeders in the SCADA System & the data should be
made available to WRLDC. States were requested to update the list of feeders
under AUFLS and intimate the feeders which have already been mapped in their
SCADA System and are being monitored on line by them. Also constraints, if
any, faced in mapping AUFLS feeders in their SCADA System may be intimated.
In 493rd OCC meeting it was decided that list of feeders connected with
AUFLS, available with WRPC/WRLDC be sent to all SLDC’s by WRPC. SLDCs
shall update the same and send the updated list of AUFLS feeders to
WRPC/WRLDC. Based on the updated list of AUFLS feeders the States shall
intimate the feeders that are already telemetered and the feeders that can be
telemetered and made available on WRLDC SCADA. Further SLDCs shall
identify such substation where SCADA communication is available and AUFLS
feeders emanates from these sub stations and take up mapping of these feeders
for monitoring through SCADA in first phase by providing necessary hardware.
All other AUFLS feeders emanating from substations where SCADA
communication is not available shall be taken up for monitoring on SCADA
system thereafter in second phase.
The update on above shall be compiled by SLDCs and submitted to
WRPC/WRLDC at the earliest.
Subsequently WRPC sent the list of feeders connected with AUFLS,
available with WRPC/WRLDC on 15.03.17. The matter was further discussed
during 494th OCC meeting & SLDCs agreed to update. The updated list from
SLDC’s was not received. Hence SLDCs were again requested to expedite the
same.
495th OCC:
Member Secretary (I/c), WRPC informed that in OCC held in Dec 2016 at
Dahanu TPS, following was decided:
 If there is a SCADA coverage at sub stations where AUFLS feeders are
connected , tripping bit can be telemetered to SLDC/RLDC.
 Where existing SCADA telemetry is not there then, utilities may plan for
providing the necessary hardware and map the feeders for SCADA
telemetry.
Thereafter he queried the progress on same.
CE,SLDC,MSETCL informed that SCADA coverage in Maharashtra
network is only upto 220 kV ring. 132 kV and below network is not under
SCADA coverage. Majority of loads are in 11 kV side for AUFLS. Hence unless
there is a complete coverage of 132 kV/66 kV/33 kV networks, this availability
of AUFLS data on SCADA network is not possible. However, very few loads are
at 220 kV substation (on lower kV like 33 kV/11 kV) and SCADA, if exists, at
such 220 kV substation can be mapped to control room.
Gujarat, MP, Chhattisgarh SLDC representatives endorsed the news of
CE,SLDC,MSETCL.
Therefore OCC recommended the following:
(1). Data of feeder wise AUFLS mapping is available and sent to WRPC.
Changes are periodically modified. As such NPC requirement is fulfilled.
(2). Fibre optic connectivity for all stations upto 132 kV level for states is
being prepared at national level for which states have sent the data for
DPR. Once that project is implemented, AUFLS real time feeder wise
positions can be captured in SCADA.
WRPC requested all SLDC’s to furnish the details of feeder under AUFLS.
The Sub-committee noted the same.

█ SA-3.: Inspection of AUFLS


Member Secretary (I/c), WRPC stated that as decided in the 31st WRPC
meeting held on 30.03.2016, at item no 11, the aspect of testing/inspections of
the AUFLS was discussed and no compliance from Discoms/SLDCs have been
received. He requested that SLDCs shall collect the data of self certification by
Discoms/STUs and inspection carried out by intra-circles of Discoms/STUs and
submit to WRPC immediately (within 15 days). Also as decided in 478th OCC
meeting, the STUs were required to self certify the healthiness of the UFRs
under their jurisdiction and submit the same to WRPC. He requested SLDCs to
co-ordinate for the same and submit the data to WRPC.
In current scenario of scarcity of Officers at WRPC, Secretariat, WRPC suggested
to carry out the AUFLS inspection for at least 10-20 % by WRPC Secretariat &
others shall be self-certified by S/s in-charge.
The Sub-committee noted the same.
█ SA-4. Web portal on weather information for power sector
As per the MoU signed between Earth System Science Organisation-India
Metrological Dept. (ESSO-IMD), Ministry of Earth Sciences and Power System
Operation Corporation Ltd.(POSOCO), Weather Website of Western Region has
been made operational w.e.f 01.06.17.
The Link is http://amssdelhi.gov.in/WRLDC/MAIN/MAIN.html
The objective of MoU was to use the weather information provided by
ESSO-IMD by Power System Operators across India for better management of
Indian Power System and for the purpose of analysis. The data available is
useful for both real time load management (radar imagery) as well day ahead
and term ahead load/Generation planning (through meteograms).
Representative from WRLDC informed that the compiled meteorological
data/information is available at the above site, which can be very useful to
know the RE generation pattern & also useful for the purpose of load
forecasting in the State.
The Sub-committee noted as above.

█ SA-5. Multiple transmission line tripping on bad weather condition


on 05-06-17
GM, WRLDC informed vide email dated 09.06.2017 on 5.6.17 due to
severe weather condition multiple lines tripping has occurred near Bina area as
given below:-.
Sl Outage Revival Reason
Element Voltage
No Type Owner Dat Dat /
Name Level Time Time
e e Remarks
1 Champa- Line 800 kV PGCIL 05- 16:49 05- 18:43 due to
Kurukshetra HVDC 06- 06- CLD
Pole-I 17 17 protection
in DMR
2 Jabalpur(PS)- Line 765 kV PGCIL 05- 14:04 05- 14:47 R-E fault
Bina(PG)-I 06- 06-
17 17
3 Bina(PG)- Line 765 kV PGCIL 05- 14:42 05- 15:15 Y-E fault
Gwailor(PG)-III 06- 06-
17 17
4 Bina(PG)- Line 765 kV PGCIL 05- 15:02 05- 19:20 R-E fault
Indore(PG)- 06- 06-
S/C 17 17
5 Jabalpur(PS)- Line 765 kV Sterlite 05- 15:02 * * Y-B Ph to
Bina(PG)-III 06- Ph fault
17
6 Bina(PG)- Line 765 kV PGCIL 05- 15:03 05- 15:48 Y-E fault
Gwailor(PG)-II 06- 06-
17 17
7 Jabalpur(PS)- Line 765 kV Sterlite 05- 15:15 05- 15:45 B-E fault
Bhopal(BDTCL 06- 06-
)-S/C 17 17
8 Seoni(PG)- Line 765 kV PGCIL 05- 15:24 05- 15:54 B-E fault
Wardha(PG)-I 06- 06-
17 17
9 Bhopal(BDTCL Line 765 kV Sterlite 05- 17:21 05- 22:24 R-B
)-Indore(PG)- 06- 06- FAULT
S/C 17 17
10 Aurangabad- Line 765 kV PGCIL 05- 18:58 05- 19:30 R-E fault
Wardha-II 06- 06-
17 17
11 Bina(PG)- Line 765 kV PGCIL 05- 22:24 * * R-B fault
Gwailor(PG)-III 06-
17
12 ITARSI- Line 400 kV PGCIL 05- 14:47 06- 00:15 B-E fault
INDORE(MP)-II 06- 06-
17 17
13 BINA(PGCIL)- Line 400 kV PGCIL 05- 15:02 05- 19:04 R-B Ph to
SUJALPUR-I 06- 06- Ph fault
17 17
14 BINA(MP)-JP Line 400 kV JAYPEE 05- 15:02 05- 15:52 B-E fault
BINA(BPSCL) 06- 06-
S/C 17 17
15 BINA(PGCIL)- Line 400 kV PGCIL 05- 15:02 05- 15:54 R-B Ph to
SUJALPUR-II 06- 06- Ph fault
17 17
16 BHILAI(KHEDA Line 400 kV PGCIL 05- 15:09 05- 16:03 B-E fault
MARA)- 06- 06-
KORADI S/C 17 17
17 RAIPUR- Line 400 kV PGCIL 05- 15:18 05- 16:42 R-E fault
DURG-II 06- 06-
17 17
18 RAIPUR- Line 400 kV PGCIL 05- 15:20 05- 16:27 B-E fault
DURG-I 06- 06-
17 17
19 BHILAI(KHEDA Line 400 kV CSPTCL 05- 15:32 05- 20:48 R-E fault
MARA)-RAITA- 06- 06-
II 17 17
20 Sujalpur(PG)- Line 400 kV Sterlite 05- 17:34 05- 19:04 Y-E fault
RAPP(NPCIL)-I 06- 06-
17 17
21 KATNI- Line 400 kV MPPTC 05- 19:01 05- 21:41 B-E fault
BIRSINGPUR-I L 06- 06-
17 17
22 JPNIGRI- Line 400 kV JAYPEE 05- 22:03 05- 22:29 Y-E fault
SATNA-I-I 06- 06-
17 17
23 JPNIGRI- Line 400 kV JAYPEE 05- 22:20 05- 23:09 B-E fault
SATNA-II-II 06- 06-
17 17
24 Bina(PG)- Line 220 kV MPPTC 05- 15:45 05- 16:24 R-E fault
Shivpuri-S/C L 06- 06-
17 17

All lines except 765kV Jabalpur-Bina-3 and 765kV Bina-Gwalior-III were


restored immediately. It was reported by M/s Sterlite that towers have
collapsed/partially damaged at 5 locations and is yet to assess the damage in
totality and tentative restoration plan of this line is to yet be received from
Sterlite . PGCIL intimated that tower collapsed in one location and 765kV Bina-
Gwalior-3 will be restored within a week and tentatively expected by 13.06.17 .
PGCIL and Sterlite are requested to submit the plan and expedite the
restoration of the lines.
Though there has not been any load generation loss reported, considering
the severity of tripping, the incidents may be deliberated and members may give
their opinion for taking precautionary steps to ensure future preparedness for
such natural calamities.
Member Secretary, WRPC informed that there is a committee in CEA
which make detailed analysis of equipment failure & he requested concern
agencies to report to CEA. He further suggested that the matter of incidence
shall be discussed in forthcoming PCM.
The Sub-committee noted the same.

█ Item no. 10: Date and Venue of next OCC meeting


497th OCC meeting will be held on 20th July 2017 at WRPC Mumbai.
The Sub- Committee noted.
****************************
Annexure-A
LIST OF PARTICIPANTS OF 496 th OCC MEETING OF WRPC HELD AT WRPC, MUMBAI ON 13.06.17

Sl.No. Organisation, Name & Designation Mobile No. E-mail Address

WRPC
1 Shri A. Balan, M.S. 9483540528 ms-wrpc@nic.in
2 Shri J.K. Rathod, S.E. 9987410799 jkrathod77@yahoo.com
3 Shri L.K.S. Rathore, D.D. 9833371844 lksr_ies@nic.in
4 Shri P.D.Lone, D.D. 9867622823 comml-wrpc@nic.in
5 Shri D.N. Gawali, D.D. 9930666765 comml-wrpc@nic.in
6 Shri Sachin K. Bhise, D.D. 9819156260 sachinkbhise@gmail.com
7 Shri Ratnesh Kumar Yadav, Asst. Dir.-I 9969948089 ratneshkumar7437@gmail.com
8 Shri Vikas Mundotia, A.D.-I 9011022577 comml-wrpc@nic.in

II MSETCL / MSEDCL/MahaGenco/MSPGCL
9 Shri Sanjay S. Kulkarni, C.E. 9819363329 drsanjaykulkarni@gmail.com
10 Shri D.K. Rokade, S.E. 9167831551 dkrokade@gmail.com
11 Shri Bulbule Arvind U., S.E. 9833383882 selmkalwa@gmail.com
12 Shri D.J. Kolhe, E.E. 9820981115 deepakkolhe@yahoo.com
13 Shri Sandeep S. Patil, E.E. 9833980238 selmkalwa@gmail.com
14 Shri Ashish Tadwar, A.E. 9833929934 ashishtadwar@gmail.com

III MPPTCL / MPPGCL


15 Shri Shankar Chakraborty, E.E. 9425805249 s.chakraborty.jbp@gmail.com

IV CSPTCL
16 Shri A.K. Shrivastava, Addl.C.E. 9827177466 ashokdivyashrivastava@yahoo.co.in

V GETCo. / GSECL
17 Shri B.B. Mehta, C.E. 9879200736 celd@gebmail.com
18 Shri G.J. Mistry, D.E. 9925213180 emisldc.getco@gebmail.com

VI WRLDC POSOSCO
19 Shri Vinay Kumar Shrivastav, G.M. 9869450221 vks@posoco.in
20 Shri Abhimanyu Gartia, Addl.G.M. 9869088058 agartia@posoco.in
21 Smt. Pushpa S., Asst. G.M. 9869404482 pushpa@posoco.in
22 Smt. Sachala Mishra, Asst.G.M. 9869450223 sachalamishra@posoco.in
23 Shri Vivek Pandey, C.M. 9869404673 vivek.pandey@posoco.in
24 Shri S.S. Raghuwanshi, C.M. 9427615762 satyendra@posoco.in
25 Ms. Chitrankshi Ghangrekar, Mgr. 9869004892 chitrankshi@posoco.in
26 Shri M. Venkateswara Rao, Engr. 8452928806 venkyminnakuri@posoco.in
27 Shri Ch. Jagadeesh, Engr. 9869469376 jagadeesh537@gmail.com
28 Shri Rajkumar A., Dy. Mgr. 9869459106 rajkumar@posoco.in
29 Shri Chandan Kumar, Sr.Engr. 9869251460 chandan@posoco.in
30 Shri Akhil Gupta 9574077727 akhil.gupta@posoco.in
31 Shri Absar Ahmad, Engr. 8080484278 absarahmad@posoco.in

POWERGRID
32 Shri Kuleshwar Sahu, Asst.G.M. 9425294214 kuleshwar@powergridindia.com
33 Shri Manoj Kumar Tripathi, Asst. G.M. 8275025586 tripaim@powergridindia.com
34 Shri D. Bruhananda, C,M. 9428504279 dbruhanandad@powergridindia.com
35 Shri Nageswara Rao M., Dy. Mgr. 9423044126 nrao@powergridindia.com
VII NTPC
36 Shri P. Sreenivas, G.M. 9004677573 psreenivas@ntpc.co.in
37 Shri Baishnaba Charan Mahanta, A.G.M 9425823414 bcmahanta@ntpc.co.in
38 Shri Sanjib Kr. Saha, A.G.M. 9650998625 sksaha01@ntpc.co.in

VIII NSPCL
39 Shri P.M. Chandrakar, Sr. Supdt.(O&M) 9425553638 pm.chandrakar@nspcl.co.in

IX NPCIL
40 Shri J.S. Chaubey 9428821915 jschaube@npcil.co.in

X RELIANCE ADA
41 Shri S.G. Zirpe, Asst. V.P. 9322607630 sachin.zirpe@relianceada.com
42 Shri Ghanashyam A. Raut, G.M. 9325119787 ghanashyam.raut@relianceada.com
43 Shri Murthi Thandavaran, G.M. 9324574491 murthi.thandavaran@relianceada.com
44 Shri Mayank Gupta, G.M. 9320930718 mayank.m.gupta@relianceada.com
45 Shri Vijay Chavan, Sr. Mgr. 9320167746 vijay.chavan@relianceada.com

XI APML
46 Shri Manoj Taunk, G.M. 9099005517 manoj.taunk@adani.com
47 Shri Rakesh Bhalerao, Asst. Mgr. 7045953823 rakesh.bhalerao@adani.com

XII TATA POWER


48 Shri Prakash Gadave, Head Grid. Opr. 9223553341 prgadave@tatapower.com
49 Shri Brajesh Singh, Chief (O & M) 9099995744 brajesh.singh@tatapower.com

XIII STERLITE POWER


50 Shri Shivendra Singh 7694006536 shivendra.singh@sterlite.com

XIV KSK MAHANADI POWER CO. LTD.


51 Ramakant Upadhyay, Dy. Mgr. 7869916080 ramakant.u@ksk.co.in

XV JHABUA POWER LTD.


52 Shri Ashish Khare, D.G.M. 9826140246 ashish.kharl@avanthapower.com

XVI GMR
53 Shri Bharat Pinjarkar, G.M. 8390903659 bharat.pinjarkar@gmrgroup.in

XVII Torrent Power


54 Shri Vinit Shah, A.G.M. 9227518420 vinitshah@torrentpower.com
55 Shri P.G. Patel, GM 9824370005 pramodpatel@torrentpower.com
56 Shri Ronak Naik, Mgr. 9227410210 ronaknaik@torrentpower.com

XVIII JINDAL POWER LTD.


57 Shri Satish Shinde, D.G.M. 7898905276 satishshinde@jindalpower.com

XIX ESSAR POWER CO.LTD.


58 Shri Ashish Kakroo 9687668725 ashish.kakroo@essar.com

XX M.B. POWER
59 Shri Gajanan Jagtap, Sr. Mgr. 9644009817 gajanan.jagtap@hpppl.in

XXI ACB INDIA LTD.


60 Shri Subhajit Mahato, Dy. Mgr. 9753388999 switehyand.270@acbindia.com
Anaulagnak 2.1

maah ma[- 2017 maoM AavaRi%t ko AaMkD,aoM ka ivavarNa


( piScama xao ~ Baar p`oYaNa kond` kI AavaRi%t irpaoT- ko AaQaar pr )
FREQUENCY PARTICULARS DURING MAY 2017
(AS PER FREQUENCY REPORT OF WRLDC)
1. INTEGRATED OVER AN-HOUR
ek GaMTo maoM samaakilat
1.1 MAXIMUM FREQUENCY 50.18 Hz. BETWEEN 1700 Hrs & 1800 Hrs Hrs. ON 21.05.2017
AiQaktma AavaRi%t
1.2 MINIMUM FREQUENCY 49.78 Hz. BETWEEN 2200 Hrs & 2300 Hrs Hrs. ON 02.05.2017
nyaUnatma AavaRi%t
1.3 AVERAGE FREQUENCY 49.99 Hz.
AaOsat AavaRi%t
2. INSTANTANEOUS ta%kailak
2.1 MAXIMUM FREQUENCY 50.26 Hz. AT 18:07:00 Hrs. ON 21.05.2017
AiQaktma AavaRi%t

2.2 MINIMUM FREQUENCY 49.64 Hz. AT 15:11:40 hrs Hrs. ON 11.05.2017


nyaUnatma AavaRi%t

3. %AGE OF TIME WHEN FREQUENCY WAS MAY 2017 APRIL 2017 MARCH 2017
AavaRi%t ka samaya p`itSat maoM
3.1 BELOW 48.5 Hz. 0.00 0.00 0.00
48.5 hT\ja ko naIcao
3.2 BETWEEN 48.5 Hz. AND 48.8 Hz. 0.00 0.00 0.00
48.5 hT\ja AaOr 48.8 hT\ja ko baIca
3.3 BETWEEN 48.8 Hz. AND 49.2 Hz. 0.00 0.00 0.00
48.8 hT\ja AaOr 49.2 hT\ja ko baIca
3.4 BETWEEN 49.2 Hz. AND 49.5 Hz. 0.00 0.00 0.00
49.2 hT\ja AaOr 49.5 hT\ja ko baIca
3.5 BETWEEN 49.5 Hz. AND 49.7 Hz. 0.00 0.00 0.00
49.5 hT\ja AaOr 49.7 hT\ja ko baIca
3.6 BETWEEN 49.7 Hz. AND 49.9 Hz. 9.09 9.05 8.95
49.7 hT\ja AaOr 50.2 hT\ja ko baIca
3.7 BETWEEN 49.9 Hz. AND 50.05 Hz. 71.45 74.49 73.56
49.9 hT\ja AaOr 50.05 hT\ja ko baIca
3.8 BETWEEN 50.05 Hz. AND 51.5 Hz. 19.46 16.45 17.50
50.05 hT\ja AaOr 51.5 hT\ja ko baIca
3.9 ABOVE 51.5 Hz. 0.00 0.00 0.00
51.5 hT\ja ko }pr
4.1 NO. OF TIMES FREQUENCY 0 0 0
TOUCHED 48.80 Hz. AavaRi%t 48.80 hT\ja kao CUhI
4.2 NO. OF TIMES FREQUENCY 0 0 0
TOUCHED 48.60 Hz. AavaRi%t 48.60 hT\ja kao CUhI
4.3 NO. OF TIMES FREQUENCY 0 0 0
TOUCHED 51.00 Hz. AavaRi%t 51.00 hT\ja kao CUhI
मई
2017
Voltage Profile during the month of May'2017 Annex-2.3
भोपाल खंडवा इटारसी दमोह नागदा इंदौर रायपुर रायगढ़
Date Bhopal Khandwa Itarsi Damoh Nagda Indorer Gwalior Raipur Raigarh
400kV 400kV 400kV 400kV 400kV 400kV 400kV 400kV 400kV

Max Min Max Min Max Min Max Min Max Min Max Min Max Min Max Min Max Min

1 415 400 421 405 412 396 417 403 415 401 415 400 410 384 416 409 422 416
2 413 402 419 405 411 400 416 401 414 402 413 402 411 393 414 406 420 413
3 413 401 419 404 409 396 414 402 415 403 414 402 412 393 415 409 420 414
4 414 402 418 406 408 396 413 402 415 402 414 400 407 390 415 406 420 414
5 417 402 420 405 410 396 416 402 416 403 415 401 412 393 414 406 420 415
6 415 403 421 403 409 396 417 404 418 402 417 400 410 390 418 409 424 416
7 423 400 427 409 417 397 422 405 422 407 422 404 415 384 420 410 425 418
8 418 402 424 406 412 395 418 403 419 401 419 401 414 391 416 407 422 415
9 420 401 424 406 414 397 421 404 420 402 419 402 417 392 417 408 423 416
10 416 402 421 404 411 395 418 403 414 399 415 399 408 393 416 407 423 417
11 414 401 420 406 409 396 418 404 415 399 414 399 415 390 418 409 424 417
12 414 401 419 407 409 396 416 403 414 400 413 400 410 391 416 409 423 417
13 414 403 421 407 411 398 416 405 414 400 414 401 411 392 417 410 423 416
14 418 406 423 410 414 402 419 407 417 406 418 405 416 392 418 411 425 418
15 414 400 421 408 411 397 416 403 416 402 414 401 414 389 416 409 422 416
16 414 400 421 408 411 397 416 403 416 402 414 401 414 389 416 409 422 416
17 415 400 422 407 410 397 418 403 416 402 415 400 409 391 417 407 423 415
18 416 402 422 406 412 396 418 405 413 401 414 400 410 393 415 408 422 416
19 417 402 424 410 411 396 419 404 414 401 414 401 411 394 418 410 423 417
20 415 401 423 410 411 396 418 405 415 402 414 400 416 396 417 410 422 415
21 419 401 428 408 415 397 422 406 419 404 418 403 417 394 421 413 425 417
22 415 402 421 408 409 397 414 404 418 403 416 402 406 391 419 400 421 411
23 418 401 423 404 412 394 415 406 416 397 416 398 410 394 424 400 426 416
24 415 399 421 406 410 395 419 405 416 401 414 399 408 390 418 412 422 415
25 414 397 423 409 410 396 412 406 417 403 416 402 408 391 420 411 424 415
26 416 398 425 408 412 396 415 400 417 402 416 401 416 391 422 412 427 416
27 417 398 423 407 412 395 418 404 417 402 415 399 409 389 422 411 423 414
28 421 404 427 412 417 401 419 403 419 406 419 404 413 394 423 416 426 414
29 419 400 424 384 414 400 426 389 417 405 416 403 416 393 422 384 425 386
30 414 399 423 407 410 397 419 406 417 401 414 398 412 394 422 414 422 415
423 397 428 384 417 394 426 389 422 397 422 398 417 384 424 384 427 386
धुले बोईसर कलवा कराड़ असोज दे हगाम
Date Bhilai Wardha Dhule Parli Boisar Kalwa Karad Dehgam
Asoj
400kV 400kV 400kV 400kV 400kV 400kV 400kV 400kV 400kV

Max Min Max Min Max Min Max Min Max Min Max Min Max Min Max Min Max Min

1 413 406 419 409 425 403 419 395 417 404 425 407 430 410 412 398 422 409
2 411 403 418 406 425 400 415 390 419 393 426 394 425 402 411 397 421 409
3 412 405 417 409 426 406 415 392 413 393 422 394 425 398 411 397 423 409
4 412 403 417 407 424 401 419 395 411 392 418 393 426 401 411 397 422 408
5 411 404 418 408 425 402 418 390 410 397 418 399 427 400 412 397 423 408
6 415 405 422 405 426 402 419 388 412 395 421 393 428 400 411 394 421 406
7 417 407 423 412 430 408 423 396 416 400 421 402 429 407 414 401 422 413
8 412 403 422 409 426 404 420 392 414 391 419 390 427 400 411 395 422 406
9 414 404 423 407 428 401 418 389 408 386 419 388 400 400 413 397 419 408
10 412 404 423 409 428 401 420 388 410 387 416 386 422 385 412 395 420 406
11 415 406 420 412 425 404 419 392 409 389 414 389 425 401 410 396 420 385
12 413 405 421 413 426 406 421 392 411 396 417 396 427 398 410 395 420 405
13 414 406 422 414 428 405 421 390 411 396 416 396 430 403 409 395 418 406
14 415 408 423 413 425 405 424 396 414 399 421 402 431 407 411 399 421 411
15 412 405 422 413 426 406 426 396 414 395 422 395 430 408 411 396 422 406
16 412 405 422 413 426 406 426 396 414 395 422 395 430 408 411 396 422 406
17 413 403 423 411 425 401 421 394 414 389 422 390 426 401 410 396 421 400
18 412 404 421 410 424 403 420 394 412 391 417 392 426 399 409 395 420 406
19 414 407 424 413 428 404 423 387 409 394 417 396 426 397 409 395 420 382
20 413 406 422 415 428 408 421 396 408 393 417 397 427 401 409 393 421 381
21 418 410 427 415 429 406 425 397 413 395 422 398 428 400 414 399 422 400
22 415 408 422 414 426 404 418 396 412 393 420 394 426 408 415 396 427 406
23 419 409 425 414 427 401 421 395 416 391 419 390 426 400 412 394 423 406
24 414 408 421 413 426 404 421 390 411 393 420 395 426 400 413 397 424 405
25 415 407 427 415 427 408 421 399 415 397 422 398 426 385 412 400 422 408
26 418 407 426 412 428 407 423 392 417 398 425 398 427 400 412 396 420 405
27 418 407 424 414 427 404 422 398 412 394 420 398 427 400 410 396 419 405
28 420 412 425 415 429 406 423 397 413 394 423 403 432 408 412 400 419 409
29 419 410 426 387 429 401 423 398 410 391 417 394 425 400 412 398 420 400
30 419 410 425 415 428 406 424 400 411 392 423 398 427 400 412 395 424 409
420 403 427 387 430 400 426 387 419 386 426 386 432 385 415 393 427 381
कासोर जेतपुर वापी मापुसा कला मगरवाड़ा हज़ीरा
Date Kasor Jetpur Amreli Vapi Mapusa Kala Magarwada Hazira
400kV 400kV 400kV 400kV 400kV 400kV 400kV 400kV

Max Min Max Min Max Min Max Min Max Min Max Min Max Min Max Min

1 419 408 410 401 415 406 416 401 426 398 414 404 400 400 416 400
2 418 409 412 400 418 406 418 390 425 390 415 389 400 400 417 397
3 418 409 411 401 414 406 413 392 424 390 411 390 408 395 418 397
4 418 409 411 402 415 407 412 391 424 393 409 389 413 393 416 396
5 418 409 412 403 416 406 412 396 431 392 410 393 413 397 416 394
6 419 409 413 401 418 406 413 393 436 396 411 391 414 396 414 393
7 419 410 409 401 415 408 414 399 435 404 412 397 416 401 416 395
8 419 407 410 401 416 407 414 390 431 402 412 388 414 391 415 391
9 418 409 410 401 416 406 409 387 422 391 406 389 408 388 414 395
10 416 408 409 401 414 407 409 384 421 392 407 384 409 387 412 390
11 417 408 411 400 416 407 408 389 420 393 405 387 409 388 411 393
12 417 408 411 401 416 406 410 394 425 392 408 392 410 393 411 391
13 415 407 411 398 416 403 410 394 429 397 407 391 408 393 410 388
14 417 408 411 402 416 407 415 397 432 399 413 394 414 399 413 392
15 418 408 410 400 415 405 413 395 429 401 411 393 411 394 415 395
16 418 408 410 400 415 405 413 395 429 401 411 393 411 394 415 395
17 419 408 411 403 416 408 413 389 427 399 411 387 413 391 412 388
18 417 408 410 402 415 407 412 390 427 390 411 389 412 392 412 387
19 418 409 411 404 414 407 409 393 426 391 408 392 412 394 412 394
20 418 408 411 402 417 407 410 394 426 395 408 392 410 394 413 392
21 420 410 411 403 415 408 414 396 429 393 413 394 415 397 417 393
22 420 409 413 402 418 400 413 394 428 393 411 392 413 396 417 393
23 420 407 411 402 415 405 416 392 427 399 415 391 417 395 416 391
24 420 408 411 402 416 406 414 393 427 400 412 392 414 394 413 389
25 419 408 412 402 416 406 417 398 426 396 414 395 417 399 415 395
26 419 408 413 402 418 405 416 397 426 395 413 394 414 397 414 392
27 417 408 412 399 418 404 414 396 424 395 411 393 413 394 413 393
28 418 410 410 401 415 397 414 395 426 396 411 392 413 395 414 391
29 418 410 411 401 417 404 412 395 425 394 409 393 411 395 411 390
30 420 408 411 401 415 405 413 392 430 402 410 388 413 391 414 386
420 407 413 398 419 397 418 384 436 390 415 384 417 387 418 386
सासन सतना तमनार कोटरा वडोदरा बीना इंदौर
Date Sasan Satna Tamnar Kotra Vadodara Durg Gwalior Sipat Seoni Wardha Bina Indore
765Kv 765Kv 765Kv 765Kv 765Kv 765Kv 765Kv 765Kv 765Kv 765Kv 765Kv 765Kv

Max Min Max Min Max Max Max Min Max Min Max Min Max Min Max Min Max Min Max Min Max Min Max Min
1 770 755 777 748 800 789 801 789 785 758 793 784 790 745 770 759 788 767 801 776 783 751 777 750
2 771 761 778 758 796 783 796 782 782 755 793 782 788 753 769 757 786 764 801 771 781 758 781 751
3 770 758 775 760 797 785 797 785 783 757 791 782 788 756 766 755 784 765 802 775 780 758 780 751
4 769 757 776 755 797 785 796 784 782 758 792 779 786 755 765 754 783 765 797 779 780 757 775 755
5 769 754 781 754 800 789 799 789 785 755 796 783 792 759 770 756 791 766 803 775 786 759 787 757
6 768 756 774 753 806 791 807 791 785 750 801 786 786 753 774 763 791 766 808 772 782 757 790 754
7 780 754 792 750 807 794 807 793 792 764 801 791 798 746 774 761 798 772 810 782 797 752 793 754
8 774 759 782 757 803 790 803 790 785 753 797 787 791 758 769 756 793 763 808 774 788 761 789 751
9 779 756 791 757 803 790 804 790 797 758 806 787 799 762 771 757 792 764 804 774 793 757 799 754
10 775 759 787 763 805 791 806 792 793 750 797 787 792 764 773 758 792 765 806 775 789 766 790 754
11 771 754 779 753 805 794 805 793 786 756 803 792 793 755 775 762 788 766 799 779 787 762 786 756
12 767 754 777 754 803 794 803 793 782 756 796 793 791 755 773 762 785 768 800 779 785 762 785 757
13 775 761 784 761 803 790 803 789 783 753 796 787 791 760 775 764 789 770 799 778 788 766 782 758
14 778 763 789 763 807 793 808 792 786 762 805 791 799 757 774 761 791 771 802 776 794 767 788 766
15 777 758 785 756 799 789 799 789 784 755 796 784 792 755 771 759 787 765 799 761 787 759 783 757
16 777 758 785 756 799 789 799 789 784 755 796 784 792 755 771 759 787 765 799 778 787 759 783 757
17 771 755 779 753 801 787 802 786 783 755 802 783 790 755 771 757 787 764 803 772 783 759 785 757
18 773 756 779 756 801 790 801 789 780 757 794 784 788 757 772 759 790 765 799 775 785 762 788 756
19 778 762 787 763 802 792 802 791 781 755 796 787 796 763 774 762 791 766 803 775 787 762 784 755
20 773 761 780 762 801 792 801 791 783 752 796 787 793 765 773 762 788 768 798 780 786 762 781 751
21 782 761 794 762 806 787 807 787 791 761 805 781 805 763 775 763 798 771 808 781 796 759 790 753
22 772 755 775 753 795 787 795 786 783 758 791 788 784 756 773 764 787 772 799 779 782 761 789 757
23 774 760 784 761 809 787 810 786 785 749 809 790 792 764 776 764 796 770 807 778 792 764 788 752
24 770 755 777 753 797 784 798 784 789 757 799 780 789 756 773 759 789 766 797 772 786 756 786 749
25 772 756 780 752 801 784 803 784 789 763 799 788 789 758 775 759 791 769 809 777 787 759 788 752
26 777 759 789 759 809 787 809 787 788 754 807 787 803 759 779 764 802 773 809 777 794 762 784 751
27 777 754 783 751 798 781 799 781 785 756 796 787 791 754 775 759 791 765 802 774 787 756 781 748
28 777 758 787 758 807 784 809 785 791 765 805 774 799 763 773 758 796 772 805 772 794 765 789 758
29 780 756 790 758 800 785 801 727 786 758 799 732 803 761 773 758 795 772 806 729 797 763 782 755
30 772 758 784 761 796 783 797 783 785 752 798 780 796 763 769 755 790 767 802 774 789 763 776 747
782 754 794 748 809 781 810 727 797 749 809 732 805 745 779 754 802 763 810 729 797 751 799 747
ANNEXURE-2.5
Power Cut/Restrictions in Western Region for the month of May-2017
k : gaujarat Gujarat
1 ]VaoogaaoM ko ilayao ivaVut kTaOityaaM
1 Power Cut/ Restriction on Industries
a) All industries are allowed to run their units on all days of week & if they want to avail staggered holiday,
then they will have to staggered on notified day only & cannot avail as per their choice.
b) All industries are required to keep their recess timings staggered.

2 kRiYa va ga`amaINa xao~aoM kao ivaVut AapUit-


2. Power supply to Agricultural & Rural Sectors
a) 08 Hrs. power supply in staggered form in rotation of day & night is given to Ag. Single Phase supply given during
rest of 16 Hrs by providing LSTC.

b) Jyotigram Yojana 24 hrs.

3 Anya jaanakarI
3. Any other information: NIL.
K : maQya p`doSa Madhya Pradesh
1 ]VaoogaaoM ko ilayao ivaVut kTaOityaaM / pabMaidyaaM , rajya maoM Baar inayamana Aaid
1 Power Cut/ Restriction on Industries, Load Shedding in the state etc
ivavarNa Details ivaVut kTaOtI kI maa~a pabandI ka samaya p`it idna kula }jaa- kTaOtI
Quantum of Restriction Timing Total Energy Cut
power cut (MW) sao From tk To (MUs /day
(a) Power Restrictions(Evening SaUnya Nil SaUnya Nil SaUnya Nil SaUnya Nil
peak Hour) on non continuous
process HT/LT IndustriesM
(b) Baar inayamana Load Shedding SaUnya Nil SaUnya Nil SaUnya Nil SaUnya Nil
(c) Anya jaanakarI Other information
1.Weekly Off SaUnya Nil SaUnya Nil SaUnya Nil SaUnya Nil
2.Staggering of power supply SaUnya Nil SaUnya Nil SaUnya Nil SaUnya Nil

2 kRiYa xao~ kao ivaVut AapUit-


2. Power supply to Agricultural Sector: -
ivavarNa Details sao From tk To p`it idna AapUit- GaMTo Supply Hours per day
idnaaMk Date idnaaMk Date Max. (Hrs) Min. (Hrs) Average (Hrs)
2.1 Three-Phase 01.05.2017 31.05.2017 23:19 21:49 22:57
Supply(DLF)
2.1 Three-Phase 01.05.2017 31.05.2017 23:32 22:41 23:16
Supply(Irrigation)
2.1 Three-Phase 01.05.2017 31.05.2017 09:49 09:16 09:41
Supply(Mixed)
3 Anya jaanakarI
3. Any other information
SahrI xao~aoM maoM inayamana ivaVut kTaOityaaM Scheduled Power cuts in Urban Areas
ivavarNa Details sao From tk To idnaaMk Aaosat p`itidna Average Supply
idnaaMk Date Date AapUit- GaMTo Hours per day
Max. Min. (Hrs) Average (Hrs)
(Hrs)
3.1 Commissionary H. Qtrs. 01.05.2017 31.05.2017 23:52 23:17 23:41
3.2 District Head Qtrs. 01.05.2017 31.05.2017 23:54 23:25 23:45
3.3 Tehsil Head Qtrs. 01.05.2017 31.05.2017 23:49 23:11 23:38
ga : maharaYT/ Maharashtra
1 ]QyaaogaaoM ko ilayao ivaVut kTaOityaaM / pabMaidyaaM , rajya maoM Baar inayamana Aaid
1. Power Cut/ Restriction on Industries, Load Shedding in the state etc
ivavarNa Details ivaVut kTaOtI kI maa~a pabandI ka samaya p`it idna kula }jaa- kTaOtI
Quantum of Restriction Timing Total Energy Cut
(MUs /day
power cut (MW) From To
(a) Power Cuts/Restriction on HT/ SaUnya Nil SaUnya Nil SaUnya Nil SaUnya Nil
LT Industries
(b) Load Shedding
@ 0-1115 MW 00.00 24.00 @ 0.95MUs/day
From 01.05.17 to 31.05.17

(c) Any other information


1.Weekly Off
2. Staggering of power supply SaUnya Nil SaUnya Nil SaUnya Nil SaUnya Nil
Industrial Staggering LS
withdrawn from 03/02/2012

2 kRiYa xao~ kao ivaVut AapUit-


2. Power supply to Agricultural Sector
ivavarNa Details sao From tk To p`it idna AapUit- GaMTo Supply Hours per day
idnaaMk Date idnaaMk Date
Max. (Hrs) Min. (Hrs) Average (Hrs)
2.1 Three-Phase Supply 01.05.2017 31.05.2017 10:00 8:00 09:00
2.2 Single-Phase Supply 01.05.2017 31.05.2017 18:00 18:00 18:00

3 Anya jaanakarI Any other information:


There is no load shedding on industrial feeders in Maharashtra
Ga : C%tIsagaZ, Chhattisgarh:
1 ]QyaaogaaoM ko ilayao ivaVut kTaOityaaM / pabMaidyaaM , rajya maoM Baar inayamana Aaid
1 Power Cut/ Restriction on Industries, Load Shedding in the state etc

ivavarNa Details ivaVut kTaOtI kI maa~a pabandI ka samaya p`it idna kula
Quantum of power cut (MW) Restriction Time }jaa- kTaOtI
sao From tk Total
To Energy Cut
(MUs /day)
(A) Scheduled
(a) (i) Power Cuts/ 00.00(Av) - - -
Restriction on HT Industries
(ii) Power Cuts/Restriction
on LT Industries 00.00(Av) - - -
(iii) Power Cuts/Restriction
on Rural 00.00 (Av) - - -
(iv) Agriculture pump* 00.00 (Av) 00.00 00.00 0.00
(v)Urban/ Sub-Urban 00.00(Av) - - -
(iv)Town feeders(C-1to C-6) 00.00 (Av) - - -

(B) Un-Scheduled
(a) Load Shedding 1.Rural NIL. - - -
2.Town Feeders (C-1to C-6 & X) : 0.00(Av)
- -
0.00
3. Industries NIL
Total Energy Cut/day 0.00
( b) Any other information
1.Weekly Off/staggering of - - - -
power supply

2 kRiYa xao~ kao ivaVut AapUit-


2. Power supply to Agricultural Sector

ivavarNa Details sao From tk To p`it idna AapUit- GaMTo Supply Hours per day
idnaaMk Date idnaaMk Date Max. (Hrs) Min. (Hrs) Average (Hrs)
2.1 Three-Phase Supply 01.05.2017 to 31.05.2017 18.00
2.2 Single-Phase Supply - - - - -
2.3 Remarks/Note/ - - - - -

3 Anya jaanakarI / Any other information: SaUnya Nil


Annex-2.6

मई2017
Details of forced unit outages during the month ofMay.2017

अनु संघटक मता सo सo कारण


Unit Constituent/IPP मेगावॉट From From Reason

Sl.No Cap.MW
Time Date Time Date
1. उकाईUkai-2 GSECL 120 16:00 09-04-2016 Still out Still out Long restoration period

2. उकईUkai 1 GSECL 120 03:18 07-05-2016 Still out Still out Excitation problem

3. STPS 2 GSECL 120 13:05 24-09-2016 Still out Still out Bunker problem

4. STPS 1 GSECL 120 18:00 26-09-2016 Still out Still out RSD

5. उकईUkai 4 GSECL 200 19:49 02-12-2016 05:49 21-05-2017 RSD

6.
जीआईपीसीएल GSECL 145 14:08 10-03-2017 02:42 30-05-2017 RSD
GIPCL STG 1
7. जीपेक GPEC 2 GSECL 218 00:00 21-03-2017 00:22 04-05-2017 PSD(Planned Shutdown)

8. डीजीबीपी DGBP 1 GSECL 107 02:10 08-04-2017 Still out Still out
RSD
9. उकईUkai 3 GSECL 200 01:14 14-04-2017 17:18 02-05-2017 BTL

10. जीपीपीसी GPPC 1 GSECL 351 17:22 24-04-2017 23:19 03-05-2017 Desynchronized

11. जीपेक GPEC 1 GSECL 218 09:52 28-04-2017 14:54 06-05-2017 RSD

12. जीपीपीसी GPPC 2 GSECL 351 14:05 29-04-2017 16:29 01-06-2017 RSD

13. जीपेक GPEC 2 GSECL 218 01:36 04-05-2017 23:00 10-05-2017 RSD

14. जीपेक GPEC 3 GSECL 218 02:33 04-05-2017 23:27 10-05-2017 RSD

15. जीपीपीसी GPPC 1 GSECL 351 17:52 04-05-2017 06:50 17-05-2017 RSD

16. एसएलपीपी SLPP 2 GSECL 125 23:00 04-05-2017 05:02 08-05-2017 BTL

17. हाजीराHazira(Extn) GSECL 351 23:28 04-05-2017 Still out Still out RSD

18. ALTPS 2 GSECL 125 16:12 06-05-2017 18:52 13-05-2017 BTL

19. जीपेक GPEC 1 GSECL 218 17:41 06-05-2017 03:32 11-05-2017 RSD

20. उतरण UTRAN STG II 1 GSECL 375 18:42 07-05-2017 13:51 11-05-2017 RSD

21. एसएलपीपी SLPP 2 GSECL 125 14:32 08-05-2017 09:04 15-05-2017 BTL

22. एसएलपीपी SLPP 1 GSECL 125 07:00 09-05-2017 22:30 12-05-2017 BTL
बीईसीएल BECL 1
Main steam temperature
23. GSECL 250 13:40 10-05-2017 21:16 13-05-2017
high
24. जीपेक GPEC 3 GSECL 218 16:06 11-05-2017 07:22 22-05-2017
RSD
25. जीपेक GPEC 2 GSECL 218 16:35 12-05-2017 00:00 16-05-2017 RSD

26. उतरन UTRAN STG II 1 GSECL 375 08:58 13-05-2017 08:56 26-05-2017 RSD

27. डीजीबीपी DGBP 3 GSECL 375 23:34 13-05-2017 Still out Still out Taken in RSD

28. Wanakbori 2 GSECL 210 14:20 15-05-2017 13:21 25-05-2017 RSD

29. Wanakbori 6 GSECL 210 09:55 16-05-2017 16:45 24-05-2017 RSD

30. जीपेक GPEC 2 GSECL 218 09:47 17-05-2017 18:47 23-05-2017 RSD

31. Wanakbori 4 GSECL 210 15:23 18-05-2017 03:58 23-05-2017 RSD

32. Wanakbori 1 GSECL 210 12:45 19-05-2017 02:28 24-05-2017 Merit order dispatch

33. जीपीपीसी GPPC 1 GSECL 351 03:44 23-05-2017 Still out Still out RSD costly generation

34. जीपेक GPEC 3 GSECL 218 07:46 26-05-2017 05:45 30-05-2017 RSD

35. जीपेक GPEC 2 GSECL 218 08:32 26-05-2017 02:07 30-05-2017 RSD

36. बीईसीएल BECL 1 GSECL 250 17:57 26-05-2017 08:58 31-05-2017 Combustion problem

37. उरण UTRAN STG II 1 GSECL 375 00:14 27-05-2017 07:46 30-05-2017 RSD

38. GTPS 3 GSECL 210 10:55 27-05-2017 22:54 01-06-2017 RSD/ Merit order dispatch

39. एसएलपीपीSLPP 2 GSECL 125 00:00 30-05-2017 21:24 02-06-2017 BTL


132kv side string flash over
40. Torrent Power 120 18:03 22-05-2017 07:25 29-05-2017 observed(132KV Narangpura
Torrent Power F line)
41. कोराडी Koradi-6 MAHAGENCO 210 01:02 20-03-2015 Still out Still out R & M Work

42. Parli 4 MAHAGENCO 210 19:47 05-07-2015 Still out Still out Economic Shutdown

43. Parli 5 MAHAGENCO 210 14:55 06-07-2015 Still out Still out Economic Shutdown
44. WPCL 1 MAHAGENCO 135 17:03 16-02-2016 Still out Still out No PPA
45. WPCL 2 MAHAGENCO 135 21:46 29-02-2016 Still out Still out No PPA

46. भुसावलBhusawal 2 MAHAGENCO 210 19:35 14-06-2016 Still out Still out Economic Shutdown

47. Chandrapur 7 MAHAGENCO 500 19:32 25-01-2017 15:18 20-05-2017 No Schedule

पायोनीर
Zero Schedule by
48. MAHAGENCO 388 17:45 07-02-2017 Still out Still out MSEDCL from
PIONEER(262+127) 1 01.06.2017
49. WPCL 3 MAHAGENCO 135 00:01 16-04-2017 23:21 08-05-2017 Gas formation in GT

50. PARLI 8 MAHAGENCO 250 07:52 25-04-2017 12:53 11-05-2017 Coal Shortage

51. जयगडJaigad 2 MAHAGENCO 300 00:29 27-04-2017 23:32 03-05-2017 NO Schedule


Zero Schedule by
52. Chandrapur 6 MAHAGENCO 500 19:31 29-04-2017 02:20 05-05-2017 MSEDCL from
09.06.2017 at 01:39 hrs
Zero Schedule by
53. Chandrapur 4 MAHAGENCO 210 16:39 30-04-2017 07:30 03-05-2017 MSEDCL from
09.06.2017 at 00:20 Hrs
54. कोराडी Koradi-2 MAHAGENCO 660 00:08 03-05-2017 14:41 09-05-2017 Swaping with unit 5

55. WPCL 4 MAHAGENCO 135 05:10 09-05-2017 22:36 14-05-2017 Flame Failure

उरणUran 6
Decommissioned on
56. MAHAGENCO 108 17:23 09-05-2017 00:25 13-05-2017
01.04.2016
57. जयगढ़Jaigad 2 MAHAGENCO 300 05:35 11-05-2017 20:58 20-05-2017 R & M Work

58. WPCL 3 MAHAGENCO 135 02:43 15-05-2017 21:05 05-06-2017 Economic Shutdown
59. कोराडी KoradI-2 MAHAGENCO 660 15:30 22-05-2017 08:22 29-05-2017 Economic Shutdown
Decommissioned on
60. PARLI 8 MAHAGENCO 250 22:54 24-05-2017 01:41 28-05-2017
01.04.2016
61. खापरखेड़ाKhaparkheda 5 MAHAGENCO 500 19:42 26-05-2017 19:46 29-05-2017 No PPA

62. NASIK3 MAHAGENCO 210 11:30 29-05-2017 Still out Still out No PPA
63. वीआईपीएल VIPL 2 MAHAGENCO 300 23:51 29-05-2017 Still out Still out Economic Shutdown

कोराडीKoradi 7
Decomissioned on
64. MAHAGENCO 210 14:22 31-05-2017 09:46 03-06-2017
02.03.2017
65. PARLI 8 MAHAGENCO 250 21:58 31-05-2017 Still out Still out No Schedule
Zero Schedule by
66. जयगढ़Jaigad 2 MAHAGENCO 300 23:58 31-05-2017 Still out Still out MSEDCL from
01.06.2017

67.
आरजीपीपीएल RGPPL 320 23:00 31-03-2014 Still out Still out Gas formation in GT
RGPPL-1B

68.
आरजीपीपीएल RGPPL 320 13:30 8-07-2014 Still out Still out Coal Shortage
RGPPL-1A

69.
आरजीपीपीएल RGPPL 230 17:17 10-04-2017 09:07 02-06-2017 NO Schedule
RGPPL 2B
आरजीपीपीएल
Zero Schedule by
70. RGPPL 230 15:57 12-04-2017 13:28 05-05-2017 MSEDCL from
RGPPL 2A 09.06.2017 at 01:39 hrs
आरजीपीपीएल
Zero Schedule by
71. RGPPL 230 18:02 05-05-2017 14:29 18-05-2017 MSEDCL from
RGPPL 3A 09.06.2017 at 00:20 Hrs

72.
आरजीपीपीएल RGPPL 230 18:05 18-05-2017 Still out Still out Swaping with unit 5
RGPPL 2A
अमरावती RATTAN POWER
73. AMRAVATI 270 08:59 15-04-2017 10:47 05-06-2017 Flame Failure
INDIA LTD
TPP(INDIABULL)-5
अमरावती RATTAN POWER Decommissioned on
74. AMRAVATI 270 12:08 15-04-2017 14:32 24-05-2017
INDIA LTD 01.04.2016
TPP(INDIABULL)-4
अमरावती RATTAN POWER
75. AMRAVATI 270 19:30 19-04-2017 18:12 03-05-2017 R & M Work
INDIA LTD
TPP(INDIABULL)-3
अमरावती RATTAN POWER
76. AMRAVATI 270 03:27 24-05-2017 Still out Still out Economic Shutdown
INDIA LTD
TPP(INDIABULL)-1
77. एमबीपावरMB Power 2 MPPGCL 600 20:12 16-05-2016 21:30 09-05-2017 Flame failure

78. सातपुराSatpura III 8 MPPGCL 210 11:42 27-12-2016 02:46 05-05-2017 RSD

79. सातपुराSatpura II 6 MPPGCL 200 11:50 21-02-2017 Still out Still out Deaerator Problem

80. सातपुराSatpura II 7 MPPGCL 210 15:00 10-03-2017 Still out Still out RSD

81. Singaji 2 MPPGCL 600 19:30 11-03-2017 20:11 02-05-2017 RSD

82. Singaji 1 MPPGCL 600 14:19 30-03-2017 09:28 13-05-2017 BTL

83. सातपुराSatpura III 9 MPPGCL 210 11:30 22-04-2017 18:55 03-05-2017 BTL

84. Singaji 2 MPPGCL 600 12:01 03-05-2017 01:42 06-05-2017 BTL

85. सातपुराSatpura III 9 MPPGCL 210 20:34 07-05-2017 Still out Still out RSD

86. सातपुराSatpura III 8 MPPGCL 210 18:17 08-05-2017 Still out Still out RSD
Ash handling plant
87. SGTPS 1 MPPGCL 210 14:30 13-05-2017 15:00 29-05-2017
problem
88. SGTPS 2 MPPGCL 210 10:24 18-05-2017 02:44 24-05-2017 BTL
89. Singaji 1 MPPGCL 600 19:00 20-05-2017 11:02 02-06-2017 RSD/ Merit order dispatch

90. Singaji 2 MPPGCL 600 18:50 29-05-2017 Still out Still out RSD

91. CSPTCL 500 13:18 15-05-2017 04:51 18-05-2017 BTL


Marwa TPS 1
92. सीजीपीएल CGPL 10 CGPL 830 03:43 17-04-2017 04:46 02-05-2017 BTL

93. सीजीपीएलCGPL 50 CGPL 830 02:29 28-04-2017 08:19 31-05-2017 Metal Temp Problem

94. सीजीपीएल CGPL 10 CGPL 830 02:43 05-05-2017 23:06 09-05-2017 Metal Temp Problem
HP Heater & Bottom ash

95. सीजीपीएल CGPL 30 CGPL 830 01:34 18-05-2017 Still out Still out

hopper Problem
96. सीजीपीएल CGPL 10 CGPL 830 11:57 22-05-2017 10:11 26-05-2017 Spray line problem

97. सीजीपीएल CGPL 10 CGPL 830 21:58 28-05-2017 19:25 06-06-2017 CRH line leakage.

98.
एपीएमएल मुँदरा Adani Power Ltd 660 02:58 27-04-2017 Still out Still out
Critical Coal Stock
APL Mundra 6 Position

99.
एपीएल मुँदरा 660 02:46 03-05-2017 Still out Still out
Deterioration in coal stock
APL Mundra 5 Adani Power Ltd position

100.
एपीएल मुँदरा 660 04:00 03-05-2017 04:13 11-05-2017
Deterioration in coal stock
APL Mundra 8 Adani Power Ltd position

101.
एपीएल मुँदरा 330 00:47 08-05-2017 14:09 24-05-2017 Critical coal stock position
APL Mundra 1 Adani Power Ltd

102.
एपीएल मुँदरा 660 05:06 18-05-2017 06:32 26-05-2017 Pre-Heater leakage
APL Mundra 8 Adani Power Ltd

103.
एपीएमएल ितरोड़ा 330 22:35 21-05-2017 15:45 29-05-2017 Coal shortage.
APML Tiroda 4 Adani Power Ltd

104.
एपीएल मुँदरा 330 02:04 25-05-2017 Still out Still out Capital overhauling
APL Mundra 4 Adani Power Ltd
Due to delayed E/F
105.
एपीएमएल ितरोड़ा Adani Power Ltd
660 18:09 28-05-2017 Still out Still out
protection stage 1 operated
APML Tiroda 5 (765kV Koradi-Tirora-1
tripped at 18:09hrs).

106. ACBIL 300 04:23 19-03-2017 06:05 17-05-2017 ID fan problem


TRN Energy 1
No schedule/COD at
107. ACBIL 300 00:00 01.05.2017 17:44 16-05-2017
TRN Energy 2 00:00hrs/01-05-2017.
Technical problem in Ash
108. ACBIL 300 01:45 19-05-2017 Still out Still out evacuation system of the
TRN Energy 1 plant
Technical problem in Ash
109. ACBIL 300 15:24 20-05-2017 Still out Still out evacuation system of the
TRN Energy 2 plant
110. जेपीएल JPL Stg-II 3 JPL 600 09:54 17-06-2016 Still out Still out Less schedule/RSD

111. जेपीएल JPL Stg-II 4 JPL 600 13:59 11-12-2016 Still out Still out Taken out after COD test

112. जेपीएल JPL Stg-II 2 JPL 600 01:02 08-04-2017 08:15 30-04-2017 Schedule Constraints

113. जेपीएलJPL Stg-II 1 JPL 600 13:30 30-04-2017 03:36 27-05-2017 Ash evacuation problem.
2017 due to heavy gland
114. जेपीएलJPL Stg-II 2 JPL 600 07:46 27-05-2017 Still out Still out leakage in Boiler Main
Steam Stop Valve-1.
115. जेपीएल JPL Stg-I 4 JPL 250 00:00 31-05-2017 19:44 04-06-2017 Low schedule

116.
बालको BALCO 300 04:58 23-05-2017 04:40 26-05-2017 Ash handling problem
BALCO(300 MW) 4
117. Dhariwal-1 DHARIWAL 300 2:27 28-May-14 19:23 06-05-2017 High vibration problem.
118. उनोसुजनUNOSUGEN-1 TPGL 382 21:55 04-03-2016 Still out Still out RSD

119. डीजीईएन DGEN-52 2 TPGL 400 20:00 25-11-2016 Still out Still out No schedule

120. डीजीईएन DGEN-51 TPGL 400 19:28 02-12-2016 Still out Still out No schedule

121. डीजीईएन DGEN-53 TPGL 400 19:12 23-12-2016 Still out Still out Low schedule

122. GMR 685 01:10 02-08-2016 Still out Still out No Schedule
GMR CHHATISGARH 2
Due to turbine bearing no-
123. GMR 300 22:09 22-04-2017 Still out Still out
GMR_CHHATISGARH 1 5 vibration high

124.
आरकेएम पावर RKMPPL 360 14:45 10-05-2017 10:10 15-05-2017 BTL
RKM Power 1
125. Lanco 1 LANCO 300 00:00 10-05-2017 14:15 13-05-2017 BTL

126. ससान Sasan 4 SASAN 660 13:33 09-05-2017 11:21 12-05-2017 PA Fan Problem

127. ससान Sasan 4 SASAN 660 14:19 13-05-2017 12:56 16-05-2017 feed water pump problem
Boiler license renewal; the
झाबुआ पावर
unit is in the process of
128. JHABUA 600 23:36 19-05-2017 00:00 30-05-2017 withdrawal at 24:00hrs but
Jhabua Power 1 tripped at 23:36hrs on
flame failure

129.
झाबुआ पावर JHABUAP 600 16:43 30-05-2017 Still out Still out CW Pump trip
Jhabua Power 1

130. KMPCL 600 00:04 21-05-2017 15:55 05-06-2017 Bottom ash problem
KSK Mahanadi 1

131. KMPCL 600 14:18 22-05-2017 14:27 01-06-2017 BTL


KSK Mahanadi 2
Stator earth fault
132. KWPCL 1 KWPCL 600 22:12 22-05-2017 Still out Still out
protection operated
133.
डीबी पावर DBPL 600 23:06 24-05-2017 Still out Still out
Generator Transformer
DB Power 2 Problem
134. KAPS 2 NPCIL 220 14:09 01-07-2015 Still out Still out Nuclear reactor side problem

135. KAPS 1 NPCIL 220 08:52 11-03-2016 Still out Still out Reactor side problem

136. टॅ TAPS 2 NPCIL 160 20:21 30-04-2017 12:12 03-05-2017 Maintenance Works

137. बालकोBALCO- 1 BALCO 300 05:09 31.05.2017 Still out Still out Low schedule

138. ईपीजीएल EPGL 2 ESSAR 600 14:46 16-03-2017 00:19 21-05-2017 BTL

139. ईपीजीएल EPGL 2 ESSAR 600 11:59 29-05-2017 Still out Still out Coal Shortage

140. ससानSasan 4 SASAN 660 19:36 16-05-2017 Still out Still out Turbine valve Problem

141. कावासKawas ST 2C NTPC 116 16:27 22-01-2017 15:07 27-04-2017 Low schedule/Change over

142. कावासKawas GT 2A NTPC 106 08:21 29-03-2017 09:59 27-04-2017 Withdrawn on low schedule

143. कावासKawas GT 2B NTPC 106 20:21 29-03-2017 16:08 27-04-2017 RSD

144. गांधारGandhar GT ST 2 NTPC 219 04:08 01-04-2017 Still out Still out RSD
Tripped during Over speed
145. SIPAT I 1 NTPC 660 21:01 27-04-2017 00:12 02-06-2017
test./AOH from 22:00hrs
146. गांधारGandhar GT ST 3 NTPC 219 23:00 29-04-2017 Still out Still out Unit withdrawn

147. कावासKawas GT 1A NTPC 106 17:28 27-04-2017 07:55 12-05-2017 RSD

148. गांधारGandhar GT ST 2 NTPC 219 03:06 04-05-2017 17:19 10-05-2017 RSD


Heavy furnace
149. मौदाMOUDA 3 NTPC 660 17:58 06-05-2017 Still out Still out
disturbance.
Due to non-operation of
150. कावासKawas GT 1A NTPC 106 16:46 12-05-2017 00:00 15-05-2017 Damper closing after
tripping of ST-1C

151.
कावास NTPC 106 13:17 16-05-2017 15:20 01-06-2017 RSD
Kawas GT 1B
152. Gandhar GT ST 1 NTPC 219 01:11 23-05-2017 12:54 01-06-2017 RSD/Less schedule
fire on Y phase GT
153. VSTPS 8 NTPC 500 17:43 23-05-2017 07:01 03-06-207 transformer of VSTPS
Unit no 8
Testing works on
154. KSTPS 3 NTPC 200 02:00 25-05-2017 22:35 28-05-2017 completion of R & M
,outage for 3 days

Note: Units out for more than 72 hrs are only included.
Annex-2.7

मई2017
Details of planned unit outages during the month of May.2017
अनु संघटक मता सo सo कारण
Unit Constituent/IPP मेगावॉट From From Reason

Sl.No Cap.MW
Time Date Time Date

1. TPC 500 00:00 06-03-2016 Still out Still out Economic Shutdown
TROMBAY 6

2.
एसएसपी SSP 200 09:00 15-03-2017 11:00 17-04-2017
AOH for 30
SSP(RBPH) 1 Days(upto 14.04.17)

3.
एमसीसीपीएलMCC ACBIL 300 23:59 06-05-2017 21:43 27-05-2017 AOH
PL 1
ANNEXURE 3.1
DETAILS OF MAINTENANCE PROGRAM OF GENERATING UNITS PROPOSED DURING JUNE 2017 AND JULY 2017

S. No. Unit No. Capacity Outage as per Annual Reason


Maintenance Plan
(MW) From To
1 GUJARAT
1.1 WTPS 3 210 1-Jul-17 8-Oct-17 COH
1.2 STPS 3 250 1-Jul-17 30-Jul-17 AOH
1.3 SLPP 3 125 7-Jul-17 27-Jul-17 AOH
1.4 ALTPS 1 125 24-Jul-17 7-Aug-17 AOH
1.5 KLTPS 3 75 25-Jul-17 23-Aug-17 AOH
1.6 GTPS 5 210 30-Jul-17 28-Aug-17 AOH
2 MADHYAPRADESH
2.1 SATPURA 8 210 1-Jul-17 25-Jul-17 AOH
2.2 SATPURA 11 250 1-Jul-17 19-Aug-17 AOH
2.3 SANJAY GANDHI 3 210 15-Jul-17 08-Aug-17 AOH
2.4 SANJAY GANDHI 5 500 15-Jun-17 15-Jul-17 AOH

3 CHHATTISHGARH
3.1 Korba West-2 2 210 30-Jul-2017 22-Aug-2017 AOH
4 MAHARASHTRA
4.1 PARAS Unit 4 250MW 1/Jul/2017 24/Jul/2017 AOH
4.2 BHUSAWAL Unit 5 500MW 1/Jul/2017 26/Jul/2017 AOH
4.3 CHANDRAPUR Unit 5 500MW 5/Jul/2017 30/Jul/2017 AOH
4.4 Khaperkheda Unit 2 210MW 1/Jul/2017 26/Jul/2017 AOH
4.5 PARAS Unit 4 250MW 1/Jun/2017 24/Jun/2017 AOH
4.6 NASIK Unit 3 210MW 1/Jul/2017 30/Aug/2017 AOH
DTPS REPRESENTATIVE INFORMED THAT AS NO
DTPS Unit 2 250MW 10/Jul/2017 8/Aug/2017 SPARE PARTS AVAILBALE, OUTAGES PROGRAMME
4.7 DEFER
4.7 TROMBAY Unit 7 180MW 22/Jul/2017 30/Jul/2017
5 Central Sector
5.1 U#7 500 25-Jun-17 19-Jul-17
NTPC Korba BLR +RETROFIT OF 100 KW & MORE MODULES
5.2 U#5 500 27-Jul-17 25-Aug-17
NTPC Korba BLR+HPT+IPT
5.3 NTPC Vindhyachal U#11 500 03-Jul-17 27-Jul-17 Boiler +LPT+Condensor chemical cleaning
5.4 NTPC Vindhyachal U#3 500 25-Jul-17 28-Aug-17 Boiler modification + CW duct
5.5 NTPC SIPAT U#3 660 01-Jul-17 14-Aug-17 BOILER+LPT+GEN
5.6 40 24-Jun-17 23-Jul-17
CGPL REPRESENTATIVE INFORMED THATOUTAGES
PROGRAMME DEFER IN SEPTEMBER 2017
CGPL 800
5.7 Sasan Power Ltd 1 660 10-Jul-17 08-Aug-17 AOH
5.8 Sasan Power Ltd 2 660 25-Jun-17 24-Jul-17 AOH
LIST OF TRANSMISSION ELEMENTS OUTAGES PROPOSALS FOR THE MONTH OF JULY 2017
ANNEXURE 3.2
From To
SN Line / Element Basis Reason System Agency Type
Date Time Date Time
WR_NR TTC may
To facilitate the testing & commissioning of 800KV HVDC Pole-2 (under construction) at
1 800 Champa Kurukshetra HVDC Pole-I 22/Jun/17 9:00 24/Jun/17 18:00 Daily NRPC NRPC be Reduced by
Kurukshetra.
1500MW.
2 400 400KV Bus 1 at Bhachau 1/Jul/17 8:00 4/Jul/17 18:00 Daily RTV Coating of 400KV BUS 1 BPI & Bus1 Isolators of all feeders. POWERGRID WR-II C
3 765 765KV Bus-I at Jabalpur PS 1/Jul/17 10:00 2/Jul/17 18:00 Daily For Vindhyachal Bay Extension work at Pooling station,Jabalpur POWERGRID WR-II C
4 400 50MVAR Bina-I Line Reactor at Shujalpur 1/Jul/17 10:00 15/Jul/17 18:00 Continuous Construction of Reactor Switching Scheme By M/S Godrej Ltd. POWERGRID WR-II C
5 765 Sasan - Satna Ckt-I 1/Jul/17 6:00 31/Jul/17 18:00 Daily Online replacement of E/W with OPGW. A/R shall be kept in non auto mode POWERGRID WR-II C
6 765 Satna - Gwalior Ckt-I 1/Jul/17 6:00 31/Jul/17 18:00 Daily Online replacement of E/W with OPGW. A/R shall be kept in non auto mode POWERGRID WR-II C
7 220 Chhegeon – Khandwa # 1,2 1/Jul/17 6:00 31/Jul/17 18:00 Daily Online replacement of E/W with OPGW. A/R shall be kept in non auto mode MPPTCL WR-II C
8 220 Barwaha –Chhegeon (MPPTCL) # 1,2 1/Jul/17 6:00 31/Jul/17 18:00 Daily Online replacement of E/W with OPGW. A/R shall be kept in non auto mode MPPTCL WR-II C
9 220 Seoni- Seoni ( MPPTCL) 1/Jul/17 6:00 31/Jul/17 18:00 Daily Online replacement of E/W with OPGW. A/R shall be kept in non auto mode MPPTCL WR-II C
10 400 Mundra-Jetpur Ckt 1 1/Jul/17 6:00 31/Jul/17 18:00 Daily Online replacement of E/W with OPGW. A/R shall be kept in non auto mode POWERGRID WR-II C
11 400 Dehgam- Nagda Ckt 1 1/Jul/17 6:00 31/Jul/17 18:00 Daily Online replacement of E/W with OPGW. A/R shall be kept in non auto mode POWERGRID WR-II C
12 765 Indore PG - Bina-S/c 1/Jul/17 6:00 31/Jul/17 18:00 Daily Online replacement of E/W with OPGW. A/R shall be kept in non auto mode POWERGRID WR-II C
13 220 400kV Bina(MPPTCL)-220 kV Bina (MPPTCL) 1/Jul/17 6:00 31/Jul/17 18:00 Daily Online replacement of E/W with OPGW. A/R shall be kept in non auto mode MPPTCL WR-II C
14 220 Gwalior(PG)-Malanpur(MPPTCL) D/C 1/Jul/17 6:00 31/Jul/17 18:00 Daily Online replacement of E/W with OPGW. A/R shall be kept in non auto mode MPPTCL WR-II C
15 220 Bina(PG)-Shivpuri ckt-1 1/Jul/17 6:00 31/Jul/17 18:00 Daily Online replacement of E/W with OPGW. A/R shall be kept in non auto mode MPPTCL WR-II C
16 400 400KV, 125 MVAr BR-II at Indore 1/Jul/17 10:00 1/Jul/17 18:00 Daily AMP OF BUS REACTOR POWERGRID WR-II R
17 765 765KV ICT#2 Tie Bay (705 Bay) at Satna 1/Jul/17 9:00 1/Jul/17 18:00 Daily For Attending Isolator problem POWERGRID WR-II C
Power line crossing of 765KV S/C Dharmajaigarh Pooling Station - Champa at Tower No.
18 765 kV 765KV S/C Dharmajaigarh Pooling Station - Champa 1/Jul/17 8:00 1/Jul/17 19:00 Daily PGCIL CWRTL
97 & 98 by 765 kV S/C Champa-Dharamjaigarh line at Loc. No. 14/0-15/0
19 400 Jejuri - Koyna Stage -IV 1/Jul/17 7:00 31/Jul/17 19:00 Daily Taking Auto Reclose in Non AR Mode for stringing of OPGW work MSETCL MSETCL
Jhabua Power
20 400 400 KV Jhabua line # 01; Bay 403Main & tie Bay 402 1/Jul/17 9:00 1/Jul/17 18:00 daily For bellow checking of 402 CT -R Phase & tightness Checking of 403 Bay Jhabua Power
Switchyard
21 400kV 400 KV Dabhol -Nagothane CKt 2 1/Jul/17 8:00 5/Jul/17 18:00 Daily For hill cutting of line area. MSETCL MSETCL
22 220 Wardha PG - Pusad Line 1/Jul/17 10:00 31/Jul/17 18:00 Daily For PID Work, Shifting of auto reclose switch to non auto mode. MSETCL MSETCL
23 400KV Babhaleshwar-Padghe-Ckt-1 @BBLR 1/Jul/17 9:00 1/Jul/17 17:00 Daily Routine Maintenance & Servicing and allignment of PG isolators work MSETCL MSETCL
24 400 Lonikand - Koyna Stage-IV 1/Jul/17 7:00 31/Jul/17 19:00 Daily Taking Auto Reclose in Non AR Mode for stringing of OPGW work MSETCL MSETCL
25 400 Lonikand - Jejuri 1/Jul/17 7:00 31/Jul/17 19:00 Daily Taking Auto Reclose in Non AR Mode for stringing of OPGW work MSETCL MSETCL
26 400 Babhaleshwar -Dhule I & II 1/Jul/17 7:00 31/Jul/17 19:00 Daily Taking Auto Reclose in Non AR Mode for stringing of OPGW work MSETCL MSETCL
27 400 Babhaleshwar - Aurangabad 1/Jul/17 7:00 31/Jul/17 19:00 Daily Taking Auto Reclose in Non AR Mode for stringing of OPGW work MSETCL MSETCL
i) PG Isolator Scissor Replacement of R Ph PG Isolator Bus I ii)Erection of New Hanger
28 400KV 400kV Main Bus-I at 400kV Khadka 1/Jul/17 8:30 2/Jul/17 17:30 Continuous MSETCL MSETCL
Rod of PG isolator for newly commisioned 400 kV Bus Reactor Bay
400/220k
29 315 MVA ICT-3 at 400kV Khadka to be shifted on TBC 1/Jul/17 8:30 2/Jul/17 17:30 Continuous i) PG Isolator Scissor Replacement of R Ph PG Isolator Bus I MSETCL MSETCL
V
30 400 400KV BIRSINGHPUR-KATNI - I 1/Jul/17 9:00 1/Jul/17 17:00 daily FOR LINE / BAY MAINTENANCE WORK MPPTCL MPPTCL R
31 400 400KV ISP MAIN BUS-A AT 400KV ISP HPS 1/Jul/17 7:00 1/Jul/17 12:00 daily ANNUAL MAINTENANCE & RELAY TESTING WORK NHDC NHDC R
32 400 400KV ISP MAIN BUS-B AT 400KV ISP HPS 1/Jul/17 12:00 1/Jul/17 18:00 daily ANNUAL MAINTENANCE & RELAY TESTING WORK NHDC NHDC R
400KV D/C Sundargarh-Raigarh (CKT-1&)Rourkela-Raigarh for Overhead Stringing of U/C 400KV D/C OPGC- Sundargarh(IB Thermal) Transmission
33 400 1/Jul/17 7:00 2/Jul/17 17:00 Daily PGCIL OGPTL C
(CKT 2) line(of OGPTL) at OGPTL Location numbers AP 23/0- AP24/0(PGCIL tower Nos: 797-798)
34 765 765kV Bus_1 at Aurangabad 1/Jul/17 8:00 1/Jul/17 18:00 Daily For construction of new Solapur bays WRTS-I WRTS-I C
35 400 Korba - Birsingpur - II 1/Jul/17 6:00 31/Jul/17 18:00 Daily Online OPGW work. A/R to be kept in Non auto mode WRTS-II WRTS-I C
36 400 400kV WARDHA-PARLI- I 1/Jul/17 9:00 31/Jul/17 18:00 Daily Auto Recloser of Wardha-Parli #1 to be kept in non Auto Mode for ONLINE OPGW works. WRTS-I WRTS-I C
Ckt ID to be
37 400 RKM  Bay No:438 at 765/400 KV pooling Station New Kotra 1/Jul/17 8:00 2/Jul/17 18:00 Daily CT Sample Oil Collect for DGA Purpose RKMPPL RKMPPL mentioned/Main or
tie by.
For Diversion/ modification of multi curcuit line in between 220kv Budhipadhar -Korba S/C
from Loc 29 to 39 and 400Kv D/C Rourkela-Raigarh line III &IV from 385 to 375 for
38 220 220Kv BudhiPadhar -Korba S/C Line 1/Jul/17 9:00 14/Aug/17 18:00 Continuous ERPC ERPC
construction of dedicated MGR (Rail Line) at Village Belpahar,Amdhara & Chualiberna (
Depositary works on behalf of OPGC)
39 400 400kV BHILAI-BHADRAVATI I 2/Jul/17 9:30 2/Jul/17 17:30 Daily Relay testing and AMP work at Bhilai S/S WRTS-I WRTS-I R
40 400 400KV SOLAPUR-KOLHAPUR#1 2/Jul/17 6:00 2/Jul/17 19:00 DAILY For Power line crossing stringing works in 400kV NTPC-PG Line #3&4 Reliance WRTS-1 C
41 400 400KV SOLAPUR-KOLHAPUR#2 2/Jul/17 6:00 2/Jul/17 19:00 DAILY For Power line crossing stringing works in 400kV NTPC-PG Line #3&4 Reliance WRTS-1 C
42 400 J P NIGRIE-SATNA-1 2/Jul/17 9:00 2/Jul/17 17:00 Daily Fixing of missing Arcing Horns,Twin Spacers & Rigid Spacers JP NIGRIE JP NIGRIE
43 400KV Kalwa -Padgha I@ Kalwa 2/Jul/17 9:00 2/Jul/17 18:00 Daily Routine Maintenance & testing work MSETCL MSETCL
TTC may be
44 765 765kV Raichur-Solapur-1 2/Jul/17 8:00 2/Jul/17 18:00 Daily AMP SRPC SRPC reduced by 1200
MW.
765KV RANCHI #02 MAIN BAY(728) AT
45 765 3/Jul/17 9:00 3/Jul/17 18:00 Daily AMP WORKS OF BAY WRTS-I WRTS-I R
DHARAMJAYGARH(KORBA) SS
Replacement of Conventional Insulators with Polymer insulators in major crossings line
46 400 400KV Khandwa-Dhule Ckt-I 3/Jul/17 9:00 7/Jul/17 18:00 Daily Power, River, N.H., S.H., Railway Crossings for public safety. AR in Non Auto Mode for WRTS-II WRTS-I C
other ckt will be required during above period
47 400 412,Shujalpur-2 Main bay at Bina 3/Jul/17 9:30 3/Jul/17 18:00 Daily For AMP works POWERGRID WR-II R
48 220 ICT2 (201 Bay )CB at Damoh 3/Jul/17 9:00 3/Jul/17 18:00 Daily Repeat test of DCRM on 201-52 as per recommended by RHQ, Vadodara POWERGRID WR-II R
49 765 765KV Bus-II at Jabalpur PS 3/Jul/17 10:00 6/Jul/17 18:00 Daily For Urai Bay Extension work at Pooling station,Jabalpur POWERGRID WR-II C
50 220 220KV Vapi-Khadoli 3/Jul/17 9:00 3/Jul/17 16:00 Daily Main-2 relay replacement work POWERGRID WR-II C
51 765 BAY 712 (MAIN BAY FOR 765KV BR-II) at Indore 3/Jul/17 10:00 4/Jul/17 18:00 Daily BAY AMP POWERGRID WR-II R
52 400 Itarsi-Jabalpur#2 Main Bay at Itarsi 3/Jul/17 9:00 3/Jul/17 17:00 Daily AMP works POWERGRID WR-II R
53 400 Aurangabad Reactor-I at Boisar 3/Jul/17 9:00 4/Jul/17 18:00 Daily 145KV CB Erection Work for implementation of NGR bypass system POWER GRID WR-II R
54 400 315 MVA, Gwalior ICT # 2 at Gwalior 3/Jul/17 10:00 3/Jul/17 18:00 Daily AMP WORKS POWERGRID WR-II R
Load manage on
55 400 KV 400KV NEW KOYANA-I @ KARAD 3/Jul/17 10:00 3/Jul/17 17:00 Daily Quarterly. Maint. work MSETCL MSETCL 400 kV NEW
KOYANA 2
56 400KV 400KV Dhule-SSNNL Ckt-I & II 3/Jul/17 9:00 4/Jul/17 17:00 Daily PID testing MSETCL MSETCL
765 kV Koradi-III Akola-II Line-1 non switchable reactor at For changeover of Rph Line reactor against Spare reactor of 765 kV Koradi-III Akola-II
57 765 kV 3/Jul/17 7:00 3/Jul/17 15:00 Daily MEGPTCL MEGPTCL
MEGPTCL 765/400KV Akola-II SS Line-1 main bay 706 at MEGPTCL-765/400KV Akola-II Substation
Replacement of bolted type clamp by crimping clamp at LILO tower loc. No. 02 &
58 400KV GCR Chandrapur - Chandrapur 2 Ckt-2 3/Jul/17 8:00 3/Jul/17 17:00 Daily MSETCL MSETCL
Replacement of broken / damaged disc insulators
400/220k
59 501 MVA, ICT 3 @ Talandge 3/Jul/17 9:00 3/Jul/17 18:00 Daily Quarterly Maintenance work and Back Up relay retrofitting work MSETCL MSETCL
V
60 400 400KV S/S BHOPAL - 315MVA XMER - 3 3/Jul/17 9:00 3/Jul/17 17:00 daily FOR MAINTENANCE AND TESTING WORK MPPTCL MPPTCL R
61 400 400 KV S/S NAGDA MAIN CB ICT-II 3/Jul/17 9:00 15/Jul/17 18:00 cont. FOR REPLACEMENT OF MAIN CIRCUIT BREAKER AND 3 NOS MAIN CTS MPPTCL MPPTCL R
62 220 220KV SEONI(PG)-CHHINDWARA - II 3/Jul/17 10:00 3/Jul/17 16:00 daily FOR CVT ERECTION COMMISSIONING & TESTING WORK MPPTCL MPPTCL R
63 220 220 KV RAJGARH-I/C - I 3/Jul/17 9:00 3/Jul/17 17:00 daily FOR LINE / BAY MAINTENANCE WORK MPPTCL MPPTCL R
64 400 Korba Vindhyachal-2 3/Jul/17 8:30 3/Jul/17 17:30 Continuous For annual maintenance of bay equipments and hot spot attending & LA replacememt NTPC NTPC
65 765 KV 765KV Sipat-Bharari-1 Tie Bay-19 at Sipat 3/Jul/17 9:00 5/Jul/17 18:00 Continuous For Annual maint works NTPC NTPC
66 765 765kV ICT-1 Main bay-703 at Aurangabad 3/Jul/17 9:00 3/Jul/17 18:00 Daily For AMP Works at Aurangabad WRTS-I WRTS-I R
Replacement of Conventional Insulators with Polymer insulators in major crossings line
67 400 400 kV Bhadrawati - Parli # 01. 3/Jul/17 8:00 3/Jul/17 18:00 Daily Power, River, N.H., S.H., Railway Crossings for public safety. AR in Non Auto Mode for WRTS-I WRTS-I C
other ckt will be required during above period
68 765 765/400KV ICT-4 at Champa PS 3/Jul/17 9:00 3/Jul/17 17:30 Daily Spare ICT normalisation WRTS-I WRTS-I C
69 765 765 kVKotra #2 Main bay 813 at Durg PS 3/Jul/17 8:00 3/Jul/17 18:00 Daily AMP of bay WRTS-I WRTS-I R
765KV RANCHI #01 MAIN BAY(731) AT
70 765 3/Jul/17 9:00 3/Jul/17 18:00 Daily AMP WORKS OF BAY WRTS-I WRTS-I R
DHARAMJAYGARH(KORBA) SS
71 220 SEONI1_LINE_BAY_204L at Seoni 3/Jul/17 8:00 3/Jul/17 18:00 Daily For AMP testing work MPPTCL WRTS-I R
72 400 SOLAPUR_BAY 418_MAIN BAY_KOLHAPUR#2 at Solapur 3/Jul/17 9:00 3/Jul/17 18:00 DAILY AMP WORKS WRTS-1 WRTS-1 R
73 765 ICT4_765/400kv_TAMNAR PS 3/Jul/17 10:00 3/Jul/17 18:00 Daily For commissioning of CSD OF ICT4 through 765 kV Main and Tie Bays WRTS-I WRTS-I C
Replacement of Conventional Insulators with Polymer insulators in major crossings line
74 400 400 KV Wardha Akola Line 1 3/Jul/17 9:00 3/Jul/17 18:00 daily Power, River, N.H., S.H., Railway Crossings for public safety. AR in Non Auto Mode for WRTS-I WRTS-I C
other ckt will be required during above period
765 KV Wardha-Aur'bad # 2 Switchable Line Reactor 716R
75 765 3/Jul/17 9:00 8/Jul/17 18:00 Daily All 6 poles CB Mechanism Boxes Replacement Work. Line will be in service. WRTS-I WRTS-I R
at wardha
FOR SCHEDULE MAINTENANCE/juMPER TIGHTENING/SPACER/DAMPER
76 400 EMCO-BHADRAWATI-I 3/Jul/17 9:00 8/Jul/17 18:00 DAILY EMCO EMCO
INSTALLATION
Ckt ID to be
RKM  Bay No:439 & 440 at 765/400 KV pooling Station New
77 400 3/Jul/17 8:00 4/Jul/17 18:00 Daily CT Sample Oil Collect for DGA Purpose RKMPPL RKMPPL mentioned/Main or
Kotra
tie by.
78 400 kV 400 kV Akola- Bhusawal Line 4/Jul/17 12:00 6/Jul/17 18:00 Daily PID testing of insulator strings by Hot line Uint Akola. A/R shall be kept in non auto mode. MSETCL MSETCL
400 KV Chandrapur II ckt N0. II ( bay 416) & Tie bay 415 at
79 400KV 4/Jul/17 8:00 4/Jul/17 17:00 Daily Rotuine bay maintanince work at 400 KV S/stn. Warora.. MSETCL MSETCL
Warora.
80 400 400 KV S/S KATNI 400/220KV 315MVA BHEL XMER - 1 4/Jul/17 9:00 5/Jul/17 17:00 cont. FOR MAINTENANCE AND TESTING WORK MPPTCL MPPTCL R
81 400 400 KV Bus-I at Parli 4/Jul/17 10:00 4/Jul/17 18:00 Daily For AMP works at Parli WRTS-I WRTS-I R
Line reactor will be out of service for 5 days from 03.07.2017 to 08.07.2017 for O-rings
82 400 L/R of 400kV RAIPUR-BHADRAVATI II at Raipur 4/Jul/17 8:00 9/Jul/17 18:00 Continuous WRTS-I WRTS-I R
replacement work of Reactor Bushing at Raipur SS. Line will be in service.
83 400 405,Bina-1 & 400KV/220KV ICT tie bay at Bina 4/Jul/17 9:30 4/Jul/17 18:00 Daily For AMP works POWERGRID WR-II R
84 220 220KV BUS-1 at Damoh 4/Jul/17 9:00 4/Jul/17 18:00 Daily Extension work of 400/220KV substation by M/s Techno electric POWERGRID WR-II C
85 400 Nagda-Dehgam#1 4/Jul/17 9:00 4/Jul/17 17:00 Daily Retrofitting of REL 521 Distance Relay with REL 670 POWERGRID WR-II C
86 400 500 MVA ICT-3 at Navsari 4/Jul/17 8:00 4/Jul/17 19:00 Daily FO tempertaure sensing work POWERGRID WR-II R
87 765 Vadodara-Dhule Line 4/Jul/17 10:00 4/Jul/17 18:00 Daily For RTV Coating on 765 kV Trench Make Bushings of Line Reactor STERLITE WR-II C
88 220 220KV Vapi-Sayali 4/Jul/17 9:00 4/Jul/17 16:00 Daily Main-2 relay replacement work POWERGRID WR-II C
89 400 Itarsi-Jabalpur#2 Tie Bay at Itarsi 4/Jul/17 9:00 4/Jul/17 17:00 Daily AMP works POWERGRID WR-II R
90 220 220kV Bus-1 at Gwalior 4/Jul/17 10:00 4/Jul/17 17:00 Daily AMP WORKS POWERGRID WR-II R
91 765 765KV ICT#2 at Satna 4/Jul/17 9:00 4/Jul/17 18:00 Daily For Attending Isolator problem POWERGRID WR-II C
92 400 Satna - Bina Ckt.1 4/Jul/17 8:00 4/Jul/17 18:00 Daily AMP of line and bay terminal equipment POWERGRID WR-II R
93 400 400 KV UKAI-1 Main + Tie bay Kosamba 4/Jul/17 8:00 4/Jul/17 18:00 Daily Half Yearly maintenance & testing activity
94 400 400 KV Transfer Bus Soja 4/Jul/17 8:00 4/Jul/17 18:00 Daily Maintenance work
95 400 500MVA, 400/220 KV ICT No. 1 Asoj 4/Jul/17 8:00 4/Jul/17 18:00 Daily Condition monitoring
96 400 400 KV Chorania - Asoj - 1 4/Jul/17 8:00 4/Jul/17 18:00 Daily CVT Tan Delta Testing work
400/220/33 kV 315
400/220/3
97 315 MVA ICT- 2 at 400 kV Akola 4/Jul/17 9:00 4/Jul/17 18:00 Daily Routine Maintenance, testing and painting work of New ICT MSETCL MSETCL MVA ICT-I will be
3KV
in service
Load manage on
98 400 KV 400KV Bus Coupler @ KARAD 4/Jul/17 10:00 4/Jul/17 17:00 Daily Quarterly. Maint. work MSETCL MSETCL
BUS I& II
99 400 400KV S/S BHOPAL - 315MVA XMER - 3 4/Jul/17 9:00 4/Jul/17 17:00 daily FOR MAINTENANCE AND TESTING WORK MPPTCL MPPTCL R
100 400 400KV BINA-BHOPAL -I 4/Jul/17 9:00 4/Jul/17 17:00 daily FOR LINE / BAY MAINTENANCE WORK MPPTCL MPPTCL R
101 220 220KV SEONI(PG)-CHHINDWARA - I 4/Jul/17 10:00 4/Jul/17 16:00 daily FOR CVT ERECTION COMMISSIONING & TESTING WORK MPPTCL MPPTCL R
102 220 220 KV RAJGARH-I/C - II 4/Jul/17 9:00 4/Jul/17 17:00 daily FOR LINE / BAY MAINTENANCE WORK MPPTCL MPPTCL R
103 220 220KV DAMOH-SAGAR (PGCIL) - II 4/Jul/17 8:00 4/Jul/17 18:00 daily FOR LINE / BAY MAINTENANCE WORK MPPTCL MPPTCL R
VINDH BAY NO 412 VINDHYACHAL POOLING LINE-I
104 400KV 4/Jul/17 9:00 5/Jul/17 18:00 Continuous HOTSPOT ATTEND (Bus shutdown required for attending the Hot spot) NTPC NTPC
STAGE-IV ALONG WITH BUS 7(stage IV)
105 765 765kV WARDHA - AURANGABAD(PG) IV 4/Jul/17 8:00 4/Jul/17 18:00 Daily For AMP works of line & S/S WRTS-I WRTS-I R
765KV RANCHI #01 TIE BAY(732) AT
106 765 4/Jul/17 9:00 4/Jul/17 18:00 Daily AMP WORKS OF BAY WRTS-I WRTS-I R
DHARAMJAYGARH(KORBA) SS
107 400 SOLAPUR_BAY 417_TIE BAY_KOLHAPUR#2 AT SOLAPUR 4/Jul/17 9:00 4/Jul/17 18:00 DAILY AMP WORKS WRTS-1 WRTS-1 R
108 400 400 KV ICT # 2 at Wardha 4/Jul/17 9:00 4/Jul/17 18:00 Daily for variable frequency tan delta measurement WRTS-I WRTS-I R
Replacement of Conventional Insulators with Polymer insulators in major crossings line
109 400 400 KV Wardha Akola Line 2 4/Jul/17 9:00 4/Jul/17 18:00 daily Power, River, N.H., S.H., Railway Crossings for public safety. AR in Non Auto Mode for WRTS-I WRTS-I C
other ckt will be required during above period
110 400 HVDC Pole-1 at BVT 4/Jul/17 9:00 5/Jul/17 18:00 Daily Six monthly AMP WRTS-I WRTS-I R
Replacement of broken insulator, rectification of Spacer cum damper, Installation of Arcing
111 765 765kV D'JAIGARH-RANCHI I 4/Jul/17 9:00 6/Jul/17 18:00 Daily WRTS-I WRTS-I R
horn
112 400 Bus-Sectionalizer BS-1& Bus-1 at JPL Stage-1 4/Jul/17 9:00 4/Jul/17 18:00 Daily Annual Bay Maintenance JPL JPL
113 400 400KV Sundergarh-Raigarh- I 4/Jul/17 8:00 5/Jul/17 18:00 ODB For replacemet of Porceline insulator at various crossing span by CLR polymer ERPC ERPC
Diagnostic Testing , Replacement of bolted type clamp by crimping clamp at LILO tower
114 400KV Chandrapur 2- Kubhargaon ( Nanded) ckt - 2 5/Jul/17 8:00 5/Jul/17 17:00 Daily MSETCL MSETCL
loc. No. 02 & Replacement of broken / damaged disc insulators
Line reactor will be out of service for Tan delta Measurement of Reactor Bushings at Akola
115 400 L/R of 400 KV Akola-Aurangabad# 2, At Akola 5/Jul/17 9:00 5/Jul/17 18:00 Daily WRTS-I WRTS-I R
SS. Line will be in service without LR.
116 400 400KV Bus 2 at Bhachau 5/Jul/17 8:00 8/Jul/17 18:00 Daily RTV Coating of 400KV BUS 2 BPI & Bus 2 Isolators of all feeders. POWERGRID WR-II C
117 400 404, Bina-1 main bay at Bina 5/Jul/17 9:30 5/Jul/17 18:00 Daily For AMP works POWERGRID WR-II R
118 220 220KV BUS-2 at Damoh 5/Jul/17 9:00 5/Jul/17 18:00 Daily Extension work of 400/220KV substation by M/s Techno electric POWERGRID WR-II C
119 400 Nagda-Dehgam#2 5/Jul/17 9:00 5/Jul/17 17:00 Daily Retrofitting of REL 521 Distance Relay with REL 670 & AMP of Terminal Equipments POWERGRID WR-II C
120 400 JBP POOLING-1 TIE BAY(411) at Jabalpur 5/Jul/17 9:00 5/Jul/17 17:00 Daily AMP WORK POWERGRID WR-II R
Shifting of 220 D/C Kawas-Navsari line between loc.no. 96-98 to facilitate clearance for
121 220 Kawas -Navsari 1&2 5/Jul/17 9:00 10/Jul/17 18:00 Continuous POWERGRID WR-II C
DFCCI Railway line corrioder
122 400 400KV Vapi-Sugen line 5/Jul/17 9:00 5/Jul/17 16:00 Daily Main-1 relay replacement work POWERGRID WR-II C
123 765 BAY 715(MAIN BAY FOR INDORE-VADODARA LINE) 5/Jul/17 10:00 6/Jul/17 18:00 Daily BAY AMP POWERGRID WR-II R
124 400 Khandwa #2-Satpur Tie Bay at Itarsi 5/Jul/17 9:00 5/Jul/17 17:00 Daily AMP works POWERGRID WR-II R
125 400 Aurangabad Reactor-II at Boisar 5/Jul/17 9:00 6/Jul/17 18:00 Daily 145KV CB Erection Work for implementation of NGR bypass system POWER GRID WR-II R
126 400 Bus-II at Vindhyachal PS 5/Jul/17 7:00 5/Jul/17 18:00 Daily FOR ICT-3 Commissioning work POWER GRID WR-II C
127 765 (713 LR) Satna#1 Line Reactor Bay at Gwalior 5/Jul/17 10:00 5/Jul/17 17:00 Daily AMP WORKS POWERGRID WR-II R
128 400 Pirana Vadodara-1 line 5/Jul/17 8:00 5/Jul/17 18:00 Daily AMP of terminal equipment POWERGRID WR-II R
129 400 Vindhyachal - Jabalpur Ckt.1 5/Jul/17 8:00 6/Jul/17 18:00 Daily AMP of line and bay terminal equipment and providing insulatrion in TP tower jumpers POWERGRID WR-II R
130 400 Satna - Bina Ckt.2 5/Jul/17 8:00 5/Jul/17 18:00 Daily AMP of line and bay terminal equipment POWERGRID WR-II R
131 400 KV Thaptitanda - Waluj @ Taptitanda 5/Jul/17 10:00 5/Jul/17 17:00 Daily Routine Maintenance & Dignostic testing work MSETCL MSETCL
Reactor will be out
132 400kV 400kV Parli-Chandrapur ckt 3 5/Jul/17 9:00 7/Jul/17 17:00 Daily Reactor painting work. MSETCL MSETCL
for three days.
133 400kV 400kv Parli-Chandrapur ckt-3 bay @ Girwali 5/Jul/17 9:00 5/Jul/17 17:00 Daily Routine Maintenance & Dignostic testing work(CB DCRM & Timing measurement) MSETCL MSETCL
765 kV Aurangabad-III Akola-II Line-1 non switchable reactor For changeover of Spare reactor against Rph- Line reactor of 706 bay of 765 kV
134 765 kV 5/Jul/17 10:00 5/Jul/17 18:00 Daily MSETCL MEGPTCL
at MSETCL 765/400KV Aurangabad-III Ektuni SS Aurangabad-III Akola- at MSETCL 765/400KV Aurangabad-III Ektuni SS
Load will be shifted
422-Bay (Main Bay of Station Transformer-1) at 400KV
135 400 KV 5/Jul/17 9:00 5/Jul/17 18:00 Daily TAN DELTA MEASUREMENT OF 422 LINE CT MSETCL MSETCL to Station
Koradi-2
Transformer -2
136 400KV TBC @ Talandge 5/Jul/17 9:00 5/Jul/17 18:00 Daily Quarterly Maintenance work PGCIL MSETCL
137 400 400 KV S/S NAGDA 400KV 125 MVAR BUS REACTOR - II 5/Jul/17 8:00 5/Jul/17 17:00 daily FOR MAINTENANCE AND TESTING WORK MPPTCL MPPTCL R
138 400 400KV BINA-BHOPAL - II 5/Jul/17 9:00 5/Jul/17 17:00 daily FOR LINE / BAY MAINTENANCE WORK MPPTCL MPPTCL R
139 220 220KV SEONI-CHHINDWARA - II 5/Jul/17 10:00 5/Jul/17 16:00 daily FOR CVT ERECTION COMMISSIONING & TESTING WORK MPPTCL MPPTCL R
140 220 220 KV DHAR - RAJGARH (PGCIL) 5/Jul/17 9:00 5/Jul/17 16:00 daily FOR LINE / BAY MAINTENANCE WORK MPPTCL MPPTCL R
400KV D/C DCDS Khedmara-Korba(West) and Khedamara- for Overhead Stringing of U/C 765KV D/C Raipur- Sundargarh Transmission line(of
141 400 5/Jul/17 7:00 6/Jul/17 17:00 Daily CSPTCL OGPTL C
Marwa PH Circuit of CSPTCL OGPTL) at OGPTL Location numbers AP12/0-AP13/0.(CSPTCL Tower nos 554-555)
142 400 KV ICT # 1 at Wardha 5/Jul/17 9:00 5/Jul/17 18:00 Daily for variable frequency tan delta measurement WRTS-I WRTS-I R
143 765 765kV Wardha-4 Main Bay 721 at Aurangabad 5/Jul/17 9:00 5/Jul/17 18:00 Daily For AMP Works at Aurangabad WRTS-I WRTS-I R
144 765 Seoni#2_707_Main Bay at Bilaspur PS 5/Jul/17 9:00 5/Jul/17 18:00 Daily AMP works (CB Timings and CT tan delta meas.) WRTS-I WRTS-I R
145 765 765 kV Champa #2 Main bay 819 at Durg PS 5/Jul/17 8:00 5/Jul/17 18:00 Daily AMP of bay WRTS-I WRTS-I R
146 400 400 KV BUS-1 at Talegaon 5/Jul/17 9:00 5/Jul/17 18:00 Daily For AMP works WRTS-I WRTS-I R
147 765 765KV D'JAIGARH- CHAMPA 5/Jul/17 9:00 5/Jul/17 17:30 Daily 715-89L Line Isolator (R-Ph) replacement work. WRTS-I WRTS-I R
148 765 ICT1_765/400kv_SEONI 5/Jul/17 8:00 5/Jul/17 18:00 Daily For AMP testing work WRTS-I WRTS-I R
149 400 400Kv SOLAPUR(NTPC)-SOLAPUR(PG)_1 5/Jul/17 6:00 5/Jul/17 19:00 DAILY For Power line crossing stringing works in 400kV NTPC-PG Line #3&4 WRTS-1 WRTS-1 C
150 400 400Kv SOLAPUR(NTPC)-SOLAPUR(PG)_2 5/Jul/17 6:00 5/Jul/17 19:00 DAILY For Power line crossing stringing works in 400kV NTPC-PG Line #3&4 WRTS-1 WRTS-1 C
151 400 TRN Line 1 (403) Main Bay at Tamnar PS 5/Jul/17 10:00 5/Jul/17 18:00 Daily For AMP Works of TRN line 1 (403) Main Bay WRTS-I WRTS-I R
152 400 400 KV Bus Reactor at Wardha 5/Jul/17 9:00 5/Jul/17 18:00 Daily AMP works WRTS-I WRTS-I R
Replacement of Conventional Insulators with Polymer insulators in major crossings line
153 400 400 KV Wardha Akola Line 1 5/Jul/17 9:00 5/Jul/17 18:00 daily Power, River, N.H., S.H., Railway Crossings for public safety. AR in Non Auto Mode for WRTS-I WRTS-I C
other ckt will be required during above period
154 400 Tie Bay of Akola-A'Bad #2 406 at Akola 5/Jul/17 9:00 5/Jul/17 18:00 Daily AMP works related to Bay WRTS-I WRTS-I R
155 220 D/C Korba-Budipadar CKT-I & II 5/Jul/17 8:00 6/Jul/17 18:00 Continuous Power line Crossing of U/C 765 KV D/C Jharsuguda-Korba Line-II of POWERGRID WRTS-I CSPTCL C
156 220 S/C Korba-Budipadar CKT-III 5/Jul/17 8:00 6/Jul/17 18:00 Continuous Power line Crossing of U/C 765 KV D/C Jharsuguda-Korba Line-II of POWERGRID WRTS-I WRTS-I C
157 400 400 KV Bus 1 at wardha 5/Jul/17 9:00 6/Jul/17 18:00 Continuous Bus extension for Aurangabad bays WRTS-I WRTS-I C
WR_NR TTC may
To facilitate the testing & commissioning of 800KV HVDC Pole-2 (under construction) at
158 800 Champa Kurukshetra HVDC Pole-I 5/Jul/17 9:00 7/Jul/17 18:00 Daily NRPC NRPC be Reduced by
Kurukshetra.
1500MW.
159 400kV 400kV Bus -I @ New Koyna 6/Jul/17 8:00 6/Jul/17 18:00 Daily For the replacement of faulty CVT of BUS -I MSETCL MSETCL
160 765 Seoni#1_704_Main Bay at Bilaspur PS 6/Jul/17 9:00 6/Jul/17 18:00 Daily AMP works (CB Timings and CT tan delta meas.) WRTS-I WRTS-I R
161 400 500MVA, 400/220KV ICT No. 2 Asoj 6/Jul/17 8:00 6/Jul/17 18:00 Daily Condition monitoring
162 400kV 400 KV Dabhol -Nagothane CKt 1 6/Jul/17 8:00 13/Jul/17 18:00 Daily For Insulator String replacement of Line. MSETCL MSETCL
163 765 706,ICT-2 Main bay at Bina 6/Jul/17 9:30 6/Jul/17 18:00 Daily For AMP works DCRM & Timing POWERGRID WR-II R
164 400 ICT#3 at Damoh 6/Jul/17 9:00 6/Jul/17 18:00 Daily Extension work of 400/220KV substation by M/s Techno electric POWERGRID WR-II C
165 765 Main Bay of Vadodar Indore line (bay 704) at Vadadara GIS 6/Jul/17 10:00 6/Jul/17 17:00 Daily for CB AMP POWERGRID WR-II C
166 400 400KV Vapi-Boisar line 6/Jul/17 9:00 6/Jul/17 16:00 Daily Main-1 relay replacement work POWERGRID WR-II C
167 400 Bus Reactor #3 Main Bay at Itarsi 6/Jul/17 9:00 6/Jul/17 17:00 Daily AMP works POWERGRID WR-II R
168 220 220kV Gwalior-Sithouli line 6/Jul/17 10:00 6/Jul/17 17:00 Daily AMP WORKS POWERGRID WR-II R
400 KV Chorania line No. 1 LINE + MAIN +
169 400 6/Jul/17 9:00 6/Jul/17 18:00 Daily Half Yearly maintenance & testing activity
TIE BAY + Line Reactor at Kosamba end
170 400 315MVA, 400/220KV ICT No. 3 Asoj 6/Jul/17 8:00 6/Jul/17 18:00 Daily Condition monitoring
171 400 400 KV Chorania - Asoj - 2 6/Jul/17 8:00 6/Jul/17 18:00 Daily CT/CVT Tan Delta Testing work
400/220
172 105 MVA Spare ICT @Chakan 6/Jul/17 9:00 6/Jul/17 18:00 Daily Routine Maintenance & Dignostic testing work MSETCL MSETCL
KV
Load will be on
400/220k
173 501 MVA, ICT 2 @ Jejuri 6/Jul/17 9:00 6/Jul/17 18:00 Daily Maintenance work MSETCL MSETCL 400/220 KV 501
V
MVA ICT 1
Diagnostic Testing ,Replacement of broken / damaged disc insulators & tighting of
174 400KV Chandrapur - Khaperkheda 6/Jul/17 8:00 6/Jul/17 18:00 Daily MSETCL MSETCL
conductor & earthwire hardware
175 400 400KV S/S BHOPAL - 315MVA XMER - 1 6/Jul/17 9:00 6/Jul/17 17:00 daily FOR MAINTENANCE AND TESTING WORK MPPTCL MPPTCL R
176 400 400 KV S/S INDORE 3X105MVA 400/220KV XMER-II 6/Jul/17 10:00 7/Jul/17 17:00 cont. FOR 400KV CT REPLACEMENT WORK MPPTCL MPPTCL R
400 KV S/S NAGDA 400KV TIE CB OF 400KV RAJGARH-1
177 400 6/Jul/17 8:00 6/Jul/17 17:00 daily FOR LINE / BAY MAINTENANCE WORK MPPTCL MPPTCL R
FEEDER & ICT-IV
178 220 220 KV MALANPUR-AOURIYA 6/Jul/17 9:00 6/Jul/17 17:00 daily FOR LINE / BAY MAINTENANCE WORK MPPTCL MPPTCL R
179 220 220 KV PITHAMPUR - RAJGARH PGCIL 6/Jul/17 9:00 6/Jul/17 16:00 daily FOR LINE / BAY MAINTENANCE WORK MPPTCL MPPTCL R
180 765 765kV WARDHA - AURANGABAD(PG) III 6/Jul/17 8:00 6/Jul/17 18:00 Daily For AMP works of line & S/S WRTS-I WRTS-I R
181 765 765kV Wardha-3 Tie Bay 717 at Aurangabad 6/Jul/17 9:00 6/Jul/17 18:00 Daily For construction of new Solapur-2 main bay 716 WRTS-I WRTS-I C
182 400 400kv TIE BAY (402)Chakan & Kharghar Line at Talegaon 6/Jul/17 9:00 6/Jul/17 18:00 Daily For AMP works WRTS-I WRTS-I R
183 400 TRN Line 1 (402) Tie Bay at Tamnar PS 6/Jul/17 10:00 6/Jul/17 18:00 Continuous For AMP Works of TRN line 1 (402) Tie Bay WRTS-I WRTS-I R
184 765 765 KV ICT #2 Main Bay 706 at wardha 6/Jul/17 9:00 6/Jul/17 18:00 Daily AMP works related to Bay WRTS-I WRTS-I R
Replacement of Conventional Insulators with Polymer insulators in major crossings line
185 400 400 KV Wardha Akola Line 2 6/Jul/17 9:00 6/Jul/17 18:00 daily Power, River, N.H., S.H., Railway Crossings for public safety. AR in Non Auto Mode for WRTS-I WRTS-I C
other ckt will be required during above period
Non auto mode of Line II- for replacement of broken insulator in Ranchi # I D/C Portion i.e.
186 765 765kV D'JAIGARH-RANCHI II 6/Jul/17 9:00 6/Jul/17 18:00 Daily WRTS-I WRTS-I R
Tower No. 12
187 400 SOLAPUR_400KV BUS#2 6/Jul/17 9:00 7/Jul/17 18:00 DAILY STATCOM CONSTRUCTION WORKS WRTS-1 WRTS-1 C
188 765 D/C Champa -Durg 6/Jul/17 7:00 8/Jul/17 19:00 Daily Non Auto Mode of T/L for Tower top patrolling WRTS-I WRTS-I R
Replacement of Conventional Insulators with Polymer insulators in major crossings line
189 400 400KV Khandwa-Dhule Ckt-II 6/Jul/17 9:00 10/Jul/17 18:00 Daily Power, River, N.H., S.H., Railway Crossings for public safety. AR in Non Auto Mode for WRTS-II WRTS-I C
other ckt will be required during above period
Powerline crossing works of 400kV D/C LILO of both ckts of Wardha - Parli TL (LOOP IN)
190 400 Wardha - Warora (Quad) Line 6/Jul/17 9:00 6/Jul/17 18:00 Continuous MSETCL WRTS-I C
between tower location Nos10/0 & 11/0 (400kV Wardh - Warora line tower nos. 112&113)
191 400 JBP POOLING-1 MAIN BAY(410) at Jabalpur 7/Jul/17 9:00 7/Jul/17 17:00 Daily AMP WORK POWERGRID WR-II R
For Jumpering of Reactor NGR Breaker & Wiring of Single Phase Breaker for Switching
192 765 765KV Sasan-Satna#1 Line at Satna SS 7/Jul/17 9:00 7/Jul/17 18:00 Daily POWERGRID WR-II C
scheme.
193 400 400 KV BUS-2 at Talegaon 7/Jul/17 9:00 7/Jul/17 18:00 Daily For AMP works WRTS-I WRTS-I R
194 765 Seoni - Bina ckt -1 7/Jul/17 8:00 8/Jul/17 18:00 Daily LINE AMP WRTS-II WRTS-I R
195 400 Sipat - Ranchi # 1 7/Jul/17 8:00 12/Jul/17 18:00 cont. basis For Redctification of Bend C-leg at Tower No 664, on permanent basis WRTS-I WRTS-I R
196 400 Sipat - Ranchi # 2 7/Jul/17 8:00 12/Jul/17 18:00 cont. basis For Redctification of Bend C-leg at Tower No 664, on permanent basis WRTS-I WRTS-I R
197 765 S/C Bilaspur- Dharamjaigarh 7/Jul/17 7:00 7/Jul/17 19:00 Daily AMP of transmission Line WRTS-I WRTS-I R
198 765 KV 765KV Sipat-Bharari-2 Tie Bay-14 7/Jul/17 9:00 9/Jul/17 18:00 Continuous For Annual maint works NTPC NTPC
For confirmation of tan delta of B-ph bushing of 400KV Katni line L/R as per recommended
199 400 400KV Damoh-Katni line#1 7/Jul/17 9:00 7/Jul/17 18:00 Daily MPPTCL WR-II R
by RHQ, Vadodara. Matter is to be taken up with MPPTCL
200 400 ITARSI-4 MAIN BAY(412) at Jabalpur 7/Jul/17 9:00 7/Jul/17 17:00 Daily AMP WORK POWERGRID WR-II R
201 400 Pirana Vadodara-2 line 7/Jul/17 8:00 7/Jul/17 18:00 Daily AMP of terminal equipment POWERGRID WR-II R
202 400 Kala Magarwada                   7/Jul/17 9:00 7/Jul/17 18:00 Daily AMP work POWERGRID WR-II R
203 400 Vindhyachal -Jabalpur Ckt.2 7/Jul/17 8:00 8/Jul/17 18:00 Daily AMP of line and bay terminal equipment and providing insulatrion in TP tower jumpers POWERGRID WR-II R
For 400KV Bus Conductor replacement at Padghe S/stn . HVDC Flow will be restricted
204 400KV Padgha -BBLR Ckt 1&2 on 400KV Bus 1 at Padgha S/stn. 7/Jul/17 8:00 9/Jul/17 18:00 Continuous MSETCL MSETCL
upto 1000MW
For 400KV Bus Conductor replacement at Padghe S/stn . HVDC Flow will be restricted
205 400KV HVDC Tie 1 & Tie 2 lines on 400KV Bus 1 at Padgha S/stn. 7/Jul/17 8:00 9/Jul/17 18:00 Continuous MSETCL MSETCL
upto 1000MW
400 KV Chorania line No. 1 LINE + MAIN +
206 400 7/Jul/17 9:00 7/Jul/17 18:00 Daily Half Yearly maintenance & testing activity
TIE BAY + Line Reactor at Kosamba end
207 400 500MVA, 400/220KV ICT No. 4 Asoj 7/Jul/17 8:00 7/Jul/17 18:00 Daily Condition monitoring
208 400 400 KV Chorania - Hadala 7/Jul/17 8:00 7/Jul/17 18:00 Daily Breaker DCRM testing done
Jhabua Power
209 400 400 KV Jhabua line # 02; Bay 409Main & tie Bay 408 7/Jul/17 9:00 7/Jul/17 18:00 daily Preventive maintenace of Line #02 & tightness checking of Bay 409 Jhabua Power
Switchyard
210 400KV Babhaleshwar-Padghe-Ckt-2 @BBLR 7/Jul/17 9:00 7/Jul/17 17:00 Daily Routine Maintenance & Servicing and allignment of PG isolators work MSETCL MSETCL
Load will be
211 400/220k 315MVA , ICT 3 Bay @ Lonikand 7/Jul/17 9:00 7/Jul/17 17:00 Daily Routine Maintenance work MSETCL MSETCL managed by other
V 400 kV ICT's.
212 400KV Station - 4A at 400kV Deepnagar 7/Jul/17 8:00 7/Jul/17 17:00 Daily Routine Maintenance & Dignostic testing work MSETCL MSETCL
213 400KV Babhaleshwar-Aurangabad @BBLR 7/Jul/17 9:00 7/Jul/17 17:00 Daily Routine Maintenance & Servicing and allignment of PG isolators work MSETCL MSETCL
400/220/3 1) For Measurement of Tan delta & capacitance of Bushings and Windings. 2) Routine
214 315 MVA, NGEF make ICT-I @400KV S/S Chandrapur 7/Jul/17 8:00 7/Jul/17 18:00 Daily MSETCL MSETCL
3KV, maintenance of the bay.
400 kV Main Bay 413 ( Main bay of Nandgaon Line) at 400
215 400KV 7/Jul/17 9:00 7/Jul/17 17:00 Daily Routine Maintenance & testing work MSETCL MSETCL
kV Akola SS
216 400kV 80MVAr Bus Reactor @ Talandage 7/Jul/17 9:00 7/Jul/17 18:00 Daily Qurterly Maint.Work MSETCL PGCIL
217 400 400KV S/S BHOPAL - 315MVA XMER - 1 7/Jul/17 9:00 7/Jul/17 17:00 daily MAINTENANCE WORK MPPTCL MPPTCL R
218 400 400KV SEONI-SARNI 7/Jul/17 9:00 7/Jul/17 18:00 daily FOR LINE / BAY MAINTENANCE WORK MPPTCL MPPTCL R
219 220 220 KV MAHEGAON-AOURIYA 7/Jul/17 9:00 7/Jul/17 17:00 daily FOR LINE / BAY MAINTENANCE WORK MPPTCL MPPTCL R
For attending hot spot at Bus-4 gantry above Transfer Bus Coupler (TBC)-2 and Tie
KORBA Bus-4 S/D with TBC-2 SD followed by Tie
220 400 7/Jul/17 8:30 7/Jul/17 17:30 Continuous Transformer-02, Buscoupler-2 (between bus-3 & 4 which shall be in SD due to outage of NTPC NTPC
Transformer-02 in TBC-2 after TBC-2 bay normalization
bus-4). All other loads of bus-4 shall be shifted to bus-3.
221 765 Seoni#2_708_Tie Bay at Bilaspur PS 7/Jul/17 9:00 7/Jul/17 18:00 Daily AMP works (CB Timings and CT tan delta meas.) WRTS-I WRTS-I R
For attending DC earth fault in reactor Buchholz relay and AMP of line terminal equipment
222 400 400kV WARDHA-PARLI- II 7/Jul/17 9:00 7/Jul/17 18:00 Daily WRTS-I WRTS-I R
at Parli.
223 765 765/400KV ICT-1 at Champa PS 7/Jul/17 9:00 7/Jul/17 17:30 Daily Providing insulation sleev to ICT tertiary connected jumpers WRTS-I WRTS-I C
765KV BUS REACTOR #01 MAIN BAY(707) AT
224 765 7/Jul/17 9:00 7/Jul/17 18:00 Daily AMP WORKS OF BAY WRTS-I WRTS-I R
DHARAMJAYGARH(KORBA) SS
225 400 400kV WARDHA- II Main Bay (404) at Parli 7/Jul/17 9:00 7/Jul/17 18:00 Daily For AMP works at Parli WRTS-I WRTS-I R
403 Bay (Main bay of 400KV Talegaon Kharghar Line) at
226 400 7/Jul/17 9:00 7/Jul/17 18:00 Daily For AMP works WRTS-I WRTS-I R
Talegaon
227 400 TRN Line 2 (406) Main Bay at Tamnar PS 7/Jul/17 10:00 7/Jul/17 18:00 Daily For AMP Works of TRN line 2 (406) Main Bay WRTS-I WRTS-I R
228 765 765 KV Wardha - Nbad #2 Main bay 704 at wardha 7/Jul/17 9:00 7/Jul/17 18:00 Daily AMP works related to Bay WRTS-I WRTS-I R
229 400 ICT1_400/220kv_SEONI 7/Jul/17 8:00 7/Jul/17 18:00 Daily For AMP testing work WRTS-I WRTS-I R
Replacement of Conventional Insulators with Polymer insulators in major crossings line
230 400 400 KV Wardha Akola Line 1 7/Jul/17 9:00 7/Jul/17 18:00 daily Power, River, N.H., S.H., Railway Crossings for public safety. AR in Non Auto Mode for WRTS-I WRTS-I C
other ckt will be required during above period
Powerline crossing works of 400kV D/C LILO of both ckts of Wardha - Parli TL (LOOP
231 400 Wardha - Warora (Quad) Line 7/Jul/17 9:00 7/Jul/17 18:00 Continuous OUT) between tower location Nos15/0 & 16/0 (400kV Wardh - Warora line tower nos. MSETCL WRTS-I C
109&110)
Powerline crossing works of 400kV D/C LILO of both ckts of Wardha - Parli TL (LOOP IN)
232 400 IEPL - Warora (Quad)  Line 7/Jul/17 9:00 7/Jul/17 18:00 Continuous MSETCL WRTS-I C
between tower location Nos10/0 & 11/0 (400kV Wardh - Warora line tower nos. 112&113)
Powerline crossing works of 400kV D/C LILO of both ckts of Wardha - Parli TL (LOOP
233 400 IEPL - Warora (Quad)  Line 7/Jul/17 9:00 7/Jul/17 18:00 Continuous OUT) between tower location Nos15/0 & 16/0 (400kV Wardh - Warora line tower nos. MSETCL WRTS-I C
109&110)
234 765 765 KV BUS II at Satna SS 8/Jul/17 9:00 8/Jul/17 18:00 Daily For shortening the Jumper POWERGRID WR-II C
235 400 INDORE-INDORE CKT1 8/Jul/17 10:00 8/Jul/17 18:00 Daily For checking auto reclosing scheme in TBC bay at MPPTCL, Indore POWERGRID WR-II C
236 400 400KV Damoh-Bhopal line#1 8/Jul/17 9:00 8/Jul/17 18:00 Daily AMP Work POWERGRID WR-II R
237 765 Tie Bay of Vadodar Indore line (bay 705) at Vadodara GIS 8/Jul/17 10:00 8/Jul/17 17:00 Daily for CB AMP POWERGRID WR-II C
400/220k
238 501MVA, ICT 3 @ BBLR 8/Jul/17 9:00 8/Jul/17 17:00 Daily Routine Maintenance & Servicing and allignment of PG isolators work MSETCL MSETCL
V
239 400 400KV BIRSINGHPUR-KATNI - II 8/Jul/17 8:00 8/Jul/17 18:00 daily FOR LINE / BAY MAINTENANCE WORK MPPTCL MPPTCL R
240 765 765kV WARDHA - AURANGABAD(PG) I 8/Jul/17 8:00 8/Jul/17 18:00 Daily For AMP works of line & S/S WRTS-I WRTS-I R
241 765 765kV Wardha-1 Tie Bay 714 at Aurangabad 8/Jul/17 9:00 8/Jul/17 18:00 Daily For construction of new Solapur-1 main bay 713 WRTS-I WRTS-I C
765KV BUS REACTOR #01 TIE BAY(708) AT
242 765 8/Jul/17 9:00 8/Jul/17 18:00 Daily AMP WORKS OF BAY WRTS-I WRTS-I R
DHARAMJAYGARH(KORBA) SS
243 400 400kv Tie bay (411) of GIS # 4 & ict # 2 at Talegaon 8/Jul/17 9:00 8/Jul/17 18:00 Daily For AMP works WRTS-I WRTS-I R
Replacement of Conventional Insulators with Polymer insulators in major crossings line
244 400 400 KV Wardha Akola Line 2 8/Jul/17 9:00 8/Jul/17 18:00 daily Power, River, N.H., S.H., Railway Crossings for public safety. AR in Non Auto Mode for WRTS-I WRTS-I C
other ckt will be required during above period
245 400 BUS-2 at Navsari 9/Jul/17 9:00 9/Jul/17 20:00 Daily Trip logic implimenation for kapp bays for LOW gas pressure in compartments POWERGRID WR-II R
246 400 400 KV Bus 1 Jetpur 9/Jul/17 8:00 9/Jul/17 18:00 Daily For Bus routine maint work Gujarat Gujarat
247 400 Mundra Bhachau Line-1 9/Jul/17 8:00 10/Jul/17 20:00 Daily Protection testing and trials PGCIL CGPL
248 765 765 KV Satna-Gwalior 1 Line 9/Jul/17 9:00 9/Jul/17 18:00 Daily For Attending line Isolator problem POWERGRID WR-II C
249 400 INDORE-INDORE CKT2 9/Jul/17 10:00 9/Jul/17 18:00 Daily For checking auto reclosing scheme in TBC bay at MPPTCL, Indore POWERGRID WR-II C
Power line crossing of 765 KV S/C Sasan - Vindhyachal Pooling Station at Tower No. 16 &
250 765 kV 765 KV S/C Sasan - Vindhyachal Pooling Station 9/Jul/17 8:00 9/Jul/17 19:00 Daily PGCIL CWRTL
17 by 765 kV S/C Sasan - UMPP - Vindhychal pool line at Loc. No. AP 11/0 - AP 12/0
251 400 J P NIGRIE-SATNA-2 9/Jul/17 9:00 9/Jul/17 17:00 Daily Fixing of missing Arcing Horns,Twin Spacers & Rigid Spacers JP NIGRIE JP NIGRIE
252 400KV ICT III @ Kalwa 500 MVA 9/Jul/17 9:00 9/Jul/17 18:00 Daily Routine Maintenance & testing work MSETCL MSETCL
Replacement of Conventional Insulators with Polymer insulators in major crossings line
253 400 400 KV Wardha Akola Line 1 9/Jul/17 9:00 9/Jul/17 18:00 daily Power, River, N.H., S.H., Railway Crossings for public safety. AR in Non Auto Mode for WRTS-I WRTS-I C
other ckt will be required during above period
254 765 Bus-II at Vindhyachal PS 10/Jul/17 7:00 10/Jul/17 18:00 Daily FOR ICT-3 Commissioning work POWER GRID WR-II C
For Rectification/placement of Conductor, Spacers and Tightening of Jumper, VD and
255 400 400Kv PARLI-PUNE(GIS)_1 10/Jul/17 8:00 10/Jul/17 18:00 Daily Corona ring,etc. (400Kv AURANGABAD(MSETCL)-PUNE(GIS) II, Outage also required on WRTS-I WRTS-I R
the same day in view of M/c Towers).
For Rectification/placement of Conductor, Spacers and Tightening of Jumper, VD and
256 400 400Kv AURANGABAD(MSETCL)-PUNE(GIS) II 10/Jul/17 8:00 10/Jul/17 18:00 Daily Corona ring,etc. (400Kv PARLI-PUNE(GIS)_1, Outage also required on the same day in WRTS-I WRTS-I R
view of M/c Towers).
257 765 707,Satna-1 main bay at Bina 10/Jul/17 9:30 10/Jul/17 18:00 Daily For AMP works DCRM & Timing POWERGRID WR-II R
258 400 VINDHYACHAL -4 TIE BAY(408) at Jabalpur 10/Jul/17 9:00 10/Jul/17 17:00 Daily AMP WORK POWERGRID WR-II R
259 400 315MVA ICT-I at Shujalpur 10/Jul/17 10:00 11/Jul/17 18:00 Continuous Replacement and testing of 2 Nos. Relays & AMP works POWERGRID WR-II C
260 220 220KV Vapi-Vapi 10/Jul/17 9:00 10/Jul/17 16:00 Daily Main-1 relay replacement work POWERGRID WR-II C
261 765 INDORE-BINA LINE 10/Jul/17 10:00 10/Jul/17 18:00 Daily CHECKING OF NGR BYPASS SCHEME POWERGRID WR-II C
262 765 702-Bay at Vindhyachal PS 10/Jul/17 9:00 10/Jul/17 18:00 Daily FOR AMP WORK POWER GRID WR-II R
263 765 704 Bay (Jaipur#1 Main bay) at Gwalior 10/Jul/17 10:00 11/Jul/17 18:00 Daily AMP WORKS POWERGRID WR-II R
264 400 Boisar Magarwadd 10/Jul/17 9:00 10/Jul/17 18:00 Daily AMP work POWERGRID WR-II R
265 400 Jaypee - Bina MPPTCL 10/Jul/17 6:00 10/Jul/17 17:00 Daily Outage required to attend low clearnace problem due heavy induction during execution. JAYPEE WR-II R
For attending electircal clearance problem in crossing span of 400kV Jaypee-Bina & 765kV
266 765 Bina - Indore 10/Jul/17 6:00 11/Jul/17 17:00 Daily POWERGRID WR-II R
Bina-Indore lines.
267 400 400kV Main Bus-I at CGPL 10/Jul/17 9:00 11/Jul/17 18:00 Daily Main Bus-1 isolator maintenance CGPL CGPL
Load manage on
268 400 KV NEW KOYANA-II @ KARAD 10/Jul/17 10:00 10/Jul/17 17:00 Daily Quarterly. Maint. work MSETCL MSETCL 400 kV NEW
KOYANA 1
269 400KV 400KV Dhule-SSNNL Ckt-I & II 10/Jul/17 9:00 11/Jul/17 17:00 Daily PID testing MSETCL MSETCL
270 400 kV Waluj - Bhusawal @ Waluj 10/Jul/17 10:00 10/Jul/17 17:00 Daily Annual Maintenance MSETCL MSETCL
271 220kV 220kV PGCIL Deoli - Badnera at 220kV Badnera 10/Jul/17 9:00 10/Jul/17 17:00 Daily Quarterly routine maintenance of bay equipments. MSETCL MSETCL
272 400KV (3*105) MVA ICT-II & It's Bay @400KV S/S Chandrapur 10/Jul/17 8:00 18/Jul/17 18:00 Continuous Replacement of B- ph ICT-II By repaired 105 MVA Spare ICT. MSETCL MSETCL
273 400 kV 400 kV Akola- Nandgaonpeth Line 10/Jul/17 12:00 12/Jul/17 18:00 Daily PID testing of insulator strings by Hot line Uint Akola. A/R shall be kept in non auto mode. MSETCL MSETCL
Main Bay 414 ( Main Bay of Yelwan CKt-I) at 400 kV Akola
274 400KV 10/Jul/17 9:00 10/Jul/17 17:00 Daily Routine Maintenance & testing work MSETCL MSETCL
SS
275 400 400 KV S/S NAGDA 315MVA ICT-III 400/220/33 KV 10/Jul/17 8:00 12/Jul/17 18:00 cont. FOR MAINTENANCE AND REPLACEMENT OF DISC INSULATORS MPPTCL MPPTCL R
276 400 400KV S/S BHOPAL - 315MVA XMER - 3 Main CB 10/Jul/17 9:00 15/Jul/17 17:00 cont. FOR CB REPLACEMENT WORK MPPTCL MPPTCL R
277 400 400 KV S/S NAGDA 400 KV MAIN BUS-I 10/Jul/17 8:00 12/Jul/17 18:00 cont. FOR MAINTENANCE AND REPLACEMENT OF DISC INSULATORS MPPTCL MPPTCL R
278 400 KV 400KV Sipat-Raipur-3 LINE 10/Jul/17 9:00 12/Jul/17 18:00 Continuous For Annual maint works NTPC NTPC
279 765 765kV WARDHA - AURANGABAD(PG) II 10/Jul/17 8:00 10/Jul/17 18:00 Daily For AMP works of line & S/S WRTS-I WRTS-I R
280 765 765kV Wardha-2 Tie Bay 711 at Aurangabad 10/Jul/17 9:00 10/Jul/17 18:00 Daily For AMP Works at Aurangabad WRTS-I WRTS-I R
Replacement of Conventional Insulators with Polymer insulators in major crossings line
281 400 400 kV Dhariwal TPP- Parli # 02. 10/Jul/17 8:00 10/Jul/17 18:00 Daily Power, River, N.H., S.H., Railway Crossings for public safety. AR in Non Auto Mode for WRTS-I WRTS-I C
other ckt will be required during above period
282 765 Sipat#1_709_Main Bay at Bilaspur PS 10/Jul/17 9:00 10/Jul/17 18:00 Daily AMP works (CB Timings and CT tan delta measurement) WRTS-I WRTS-I R
283 400 MAIN BUS 1_KOTRA PS 10/Jul/17 9:00 10/Jul/17 18:00 Daily AMP 2017 - 2018 WRTS-I WRTS-I R
284 400 400kV main bay (416)of Kalwa at Talegaon 10/Jul/17 9:00 10/Jul/17 18:00 Daily For AMP works WRTS-I WRTS-I R
285 400 400kV RAIPUR-DURG I 10/Jul/17 9:30 10/Jul/17 17:30 Daily Relay testing and AMP work at Raipur WRTS-I WRTS-I R
286 220 SOLAPUR_220KV BUS#2 10/Jul/17 8:00 10/Jul/17 18:00 DAILY AMP WORKS WRTS-1 WRTS-1 R
287 400 TRN Line 2 (405) Tie Bay at Tamnar PS 10/Jul/17 10:00 10/Jul/17 18:00 Daily For AMP Works of TRN line 2 (405) Tie Bay WRTS-I WRTS-I R
Replacement of Conventional Insulators with Polymer insulators in major crossings line
288 400 400 KV Wardha Akola Line 2 10/Jul/17 9:00 10/Jul/17 18:00 daily Power, River, N.H., S.H., Railway Crossings for public safety. AR in Non Auto Mode for WRTS-I WRTS-I C
other ckt will be required during above period
289 400 400kV BHATAPARA-KORBA 10/Jul/17 9:00 10/Jul/17 18:00 Daily Rectification of open spacer cum damper, Installation of Arcing horn, WRTS-I WRTS-I R
290 765 765/400KV ICT-5 at Champa PS 10/Jul/17 9:00 11/Jul/17 17:30 Daily AMP/Warranty Tests WRTS-I WRTS-I R
291 765 D/C Champa -Durg 10/Jul/17 7:00 12/Jul/17 19:00 Daily Non Auto Mode of T/L for Tower top patrolling WRTS-I WRTS-I L
292 765 765 KV Wardha-Aur'bad # 2 Main Bay at wardha 10/Jul/17 9:00 15/Jul/17 18:00 Daily All 6 poles CB Mechanism Boxes Replacement Work WRTS-I WRTS-I R
293 400 400KV Mundra Bhachau 1 Line 10/Jul/17 8:00 10/Jul/17 18:00 Daily RTV coating of Line Main bay & Tie Bay isolators, CB & CT. POWERGRID WR-II C
FOR SCHEDULE MAINTENANCE/juMPER TIGHTENING/SPACER/DAMPER
294 400 EMCO-BHADRAWATI-II 10/Jul/17 9:00 15/Jul/17 18:00 DAILY EMCO EMCO
INSTALLATION
295 400 BUS-1 at Navsari 11/Jul/17 9:00 11/Jul/17 18:00 Daily Trip logic implimenation for kapp bays for LOW gas pressure in compartments POWERGRID WR-II R
Power line crossing of 400 KV D/C Sasan- Vindhychal Pooling Station line at Tower No.20
296 400 KV 400 KV D/C Sasan- Vindhychal Pooling Station 11/Jul/17 8:00 11/Jul/17 19:00 Daily PGCIL CWRTL
& 21 by 765 kV S/C Sasan - UMPP - Vindhychal pool line at Loc. No. AP 10/0- AP 11/0
297 400 400KV Mundra Bhachau 2 Line 11/Jul/17 8:00 11/Jul/17 18:00 Daily RTV coating of Line Main bay & Tie Bay isolators, CB & CT. POWERGRID WR-II C
765KV Satna-Gwalior Line#2 Main Bay (715 Bay) at Satna
298 765 11/Jul/17 9:00 12/Jul/17 18:00 Daily For AMP work POWERGRID WR-II R
SS
299 765 711,Bus reactor & Gwalior-1 tie bay at Bina 11/Jul/17 9:30 11/Jul/17 18:00 Daily For AMP works DCRM & Timing POWERGRID WR-II R
300 400 63 MVAR BUS REACTOR MAIN BAY (409) at Jabalpur 11/Jul/17 9:00 11/Jul/17 17:00 Daily AMP WORK POWERGRID WR-II R
301 400 Khandwa -Rajgarh -Ckt.1 11/Jul/17 9:00 11/Jul/17 18:00 Daily Line Terminal Equipment maintenance work.AMP POWERGRID WR-II R
302 220 Navsari- Navsari GETCO 2 11/Jul/17 9:00 11/Jul/17 18:00 Daily AMP work and DCRM testing POWERGRID WR-II R
303 400 Asoj-Indore Ckt#1 at Asoj (GETCO) end 11/Jul/17 10:00 10/Jul/17 17:00 Daily PLCC Panel ETL41 Retrofitting POWERGRID WR-II C
304 220 220KV Vapi-Bhilad-1 11/Jul/17 9:00 11/Jul/17 16:00 Daily Main-1 relay replacement work POWERGRID WR-II C
305 765 INDORE-BHOPAL LINE 11/Jul/17 10:00 11/Jul/17 18:00 Daily CHECKING OF NGR BYPASS SCHEME STERLITE WR-II C
306 220 220 kv Bus -1 at Pirana 11/Jul/17 8:00 11/Jul/17 18:00 Daily AMP work POWERGRID WR-II R
307 400 Jaypee - Bina (PGCIL) 11/Jul/17 6:00 11/Jul/17 17:00 Daily Outage required to attend low clearnace problem due heavy induction during execution. JAYPEE WR-II R
400 KV Chorania-2 Line+Main+Tie Bay+Line Reactor at
308 400 11/Jul/17 8:00 11/Jul/17 18:00 Daily Half Yearly maintenance & testing activity
Kosamba end
309 400 400 KV Bus - 2 Chorania 11/Jul/17 8:00 11/Jul/17 18:00 Daily CVT Tan Delta Testing work
PGCIL ckt (Bay420) Tie bay 421 & 400 KVFuture ckt II
310 400KV 11/Jul/17 8:00 11/Jul/17 17:00 Daily Rotuine bay maintanince work at 400 KV S/stn. Warora. MSETCL MSETCL
(bay422) at Warora
311 400KV Talandge - Karad 2 @ Talandge 11/Jul/17 9:00 11/Jul/17 18:00 Daily Qurterly Maint.Work MSETCL MSETCL
312 400 400KV ISP-NAGDA 11/Jul/17 9:00 11/Jul/17 18:00 daily FOR LINE / BAY MAINTENANCE WORK MPPTCL MPPTCL R
313 220 220 KV GWALIOR(PGCIL)-MALANPUR - I 11/Jul/17 9:00 11/Jul/17 17:00 daily FOR LINE / BAY MAINTENANCE WORK MPPTCL MPPTCL R
HOTSPOT ATTEND AND BAY MAINTENANCE(Bus shutdown required for attending the
314 400KV VINDHYACHAL-SATNA#1 LINE ALONGWITH BUS-4 11/Jul/17 9:00 12/Jul/17 18:00 Continuous NTPC NTPC
Hot spot)
315 400KV VINDHYACHAL-SATNA#1 LINE REACTOR 11/Jul/17 9:00 13/Jul/17 18:00 Continuous REACTOR MAINTENANCE NTPC NTPC
for Overhead Stringing of U/C 765KV D/C Raipur- Sundargarh Transmission line(of
316 400 400KV S/C Korba- Bhilai-I 11/Jul/17 7:00 12/Jul/17 17:00 Daily PGCIL OGPTL C
OGPTL) at OGPTL Location numbers AP 22/0- AP23/0(PGCIL tower Nos: 406-407)
Replacement of Conventional Insulators with Polymer insulators in major crossings line
317 400 400 kV Bhadrawati - Parli # 01. 11/Jul/17 8:00 11/Jul/17 18:00 Daily Power, River, N.H., S.H., Railway Crossings for public safety. AR in Non Auto Mode for WRTS-I WRTS-I C
other ckt will be required during above period
318 400 MAIN BUS 1_KOTRA PS 11/Jul/17 9:00 11/Jul/17 18:00 Daily AMP 2017 - 2018 WRTS-I WRTS-I R
319 400 400kv Tie bay (417)of Kalwa & ict # 3 at Talegaon 11/Jul/17 9:00 11/Jul/17 18:00 Daily For AMP works WRTS-I WRTS-I R
320 765 765kV PUNE(GIS)-SOLAPUR 11/Jul/17 8:00 11/Jul/17 18:00 Daily For attending Tightening of Jumper, VD, Corona, etc. WRTS-I WRTS-I R
321 765 Main bay of Bus reactor #2 712 at wardha 11/Jul/17 9:00 11/Jul/17 18:00 Continuous AMP works related to Bay WRTS-I WRTS-I R
Replacement of Conventional Insulators with Polymer insulators in major crossings line
322 400 400 KV Wardha Akola Line 1 11/Jul/17 9:00 11/Jul/17 18:00 daily Power, River, N.H., S.H., Railway Crossings for public safety. AR in Non Auto Mode for WRTS-I WRTS-I C
other ckt will be required during above period
323 765 765kV D'JAIGARH-BILASPUR 11/Jul/17 9:00 11/Jul/17 18:00 Daily For attending open spacer cum damper, Arcing horn, bird nest etc. WRTS-I WRTS-I R
324 400 HVDC Pole-2 at BVT 11/Jul/17 9:00 12/Jul/17 18:00 Daily Six monthly AMP WRTS-I WRTS-I R
325 400 Bus-Sectionalizer BS-2 at JPL Stage-1 11/Jul/17 9:00 11/Jul/17 18:00 Daily Annual Bay Maintenance JPL JPL
326 400 Mundra Bhachau Line-2 11/Jul/17 9:00 12/Jul/17 18:00 Daily Protection testing and trials PGCIL CGPL
327 765 712,Gwalior-1 main bay at Bina 12/Jul/17 9:30 12/Jul/17 18:00 Daily For AMP works DCRM & Timing POWERGRID WR-II R
328 400 VINDHYACHAL -2 TIE BAY(405) at Jabalpur 12/Jul/17 9:00 12/Jul/17 17:00 Daily AMP WORK POWERGRID WR-II R
329 400 Khandwa -Rajgarh -Ckt.2 12/Jul/17 9:00 12/Jul/17 18:00 Daily Line Terminal Equipment maintenance work.AMP POWERGRID WR-II R
330 220 Navsari- Navsari GETCO 1 12/Jul/17 9:00 12/Jul/17 18:00 Daily AMP work POWERGRID WR-II R
331 400 315MVA ICT-II at Shujalpur 12/Jul/17 10:00 13/Jul/17 18:00 Continuous Replacement and testing of 2 Nos. Relays & AMP works POWERGRID WR-II C
332 220 220KV Vapi-Bhilad-2 12/Jul/17 9:00 12/Jul/17 16:00 Daily Main-1 relay replacement work POWERGRID WR-II C
333 765 INDORE - VADODARA LINE 12/Jul/17 10:00 12/Jul/17 18:00 Daily CHECKING OF NGR BYPASS SCHEME POWERGRID WR-II C
334 765 703 bay at Vindhyachal PS 12/Jul/17 9:00 12/Jul/17 18:00 Daily FOR AMP WORK POWER GRID WR-II R
335 400 400kV Main Bus-II at CGPL 12/Jul/17 9:00 13/Jul/17 18:00 Daily Main Bus-2 isolator maintenance CGPL CGPL
400 KV Chorania-2 Line+Main+Tie Bay+Line Reactor at
336 400 12/Jul/17 8:00 12/Jul/17 18:00 Daily Half Yearly maintenance & testing activity
Kosamba end
Jhabua Power
337 400 400 KV GT main & tie bay 401 & 402 at Jhabua 12/Jul/17 9:00 12/Jul/17 18:00 daily Preventive Maintenance of Generator transformer Jhabua Power
Switchyard
338 400 kV Thaptitanda - Ektuni -I @ Taptitanda 12/Jul/17 10:00 12/Jul/17 17:00 Daily Routine Maintenance & Dignostic testing work MSETCL MSETCL
339 400kV Parli-Solapur @ Parli 12/Jul/17 9:00 12/Jul/17 17:00 Daily Dignostic Testing Work (C & Tan Delta measurement of CTs) MSETCL MSETCL

340 400/220/2 3*100MVA, ICT-1 @KORADI-1 12/Jul/17 9:00 12/Jul/17 17:00 Daily Diagnostic testing & maintenance work MSETCL MSETCL
0KV
Diagnostic Testing & Replacement of broken / damaged disc insulatorsFitting & tighting of
341 400KV Chandrapur 2 - Warora Ckt-1 12/Jul/17 8:00 12/Jul/17 18:00 Daily MSETCL MSETCL
jumper cone bolts, conductor and earthwire hardware.
STATION T/F 8A (Main Bay 410 & TIE Bay 411) at 400 KV
342 400KV 12/Jul/17 9:00 12/Jul/17 18:00 Daily Routine Maintenance & Dignostic testing work MSETCL MSETCL element not clear
Switching Substation
343 220 220 KV GWALIOR(PGCIL)-MALANPUR - II 12/Jul/17 9:00 12/Jul/17 17:00 daily FOR LINE / BAY MAINTENANCE WORK MPPTCL MPPTCL R
344 220 220KV DAMOH-TIKAMGARH (PGCIL) - I 12/Jul/17 8:00 12/Jul/17 18:00 daily FOR LINE / BAY MAINTENANCE WORK MPPTCL MPPTCL R
345 765/400 765kV ICT-1 at Aurangabad 12/Jul/17 8:00 12/Jul/17 18:00 Daily for RTV coating on Trench Bushings WRTS-I WRTS-I C
Replacement of Conventional Insulators with Polymer insulators in major crossings line
346 400 400 kV Dhariwal TPP- Parli # 02. 12/Jul/17 8:00 12/Jul/17 18:00 Daily Power, River, N.H., S.H., Railway Crossings for public safety. AR in Non Auto Mode for WRTS-I WRTS-I C
other ckt will be required during above period
347 765 ICT#2_721_Main Bay at Bilaspur PS 12/Jul/17 9:00 12/Jul/17 18:00 Daily AMP works (CB Timings and CT tan delta measurement.) WRTS-I WRTS-I R
348 400 MAIN BUS 2_KOTRA PS 12/Jul/17 9:00 12/Jul/17 18:00 Daily AMP 2017 - 2018 WRTS-I WRTS-I R
349 220 220kV Main bay (208) of Urse-2 at Talegaon. 12/Jul/17 9:00 12/Jul/17 18:00 Daily For AMP works WRTS-I WRTS-I R
350 765 SOLAPUR_765KV BUS#2 12/Jul/17 8:00 12/Jul/17 18:00 DAILY AMP WORKS WRTS-1 WRTS-1 R
351 400 765/400 kV ICT #1 Main bay 404 at wardha 12/Jul/17 9:00 12/Jul/17 18:00 Daily AMP works related to Bay WRTS-I WRTS-I R
Replacement of Conventional Insulators with Polymer insulators in major crossings line
352 400 400 KV Wardha Akola Line 2 12/Jul/17 9:00 12/Jul/17 18:00 daily Power, River, N.H., S.H., Railway Crossings for public safety. AR in Non Auto Mode for WRTS-I WRTS-I C
other ckt will be required during above period
353 765 765 kV Wardha# 3 L/R at Durg PS 12/Jul/17 8:00 13/Jul/17 18:00 Daily NGR Bypassing WRTS-I WRTS-I C
354 400 400kV Ranchi-Sipat I 12/Jul/17 8:00 12/Jul/17 17:00 Daily replacement of insulator,VD,CC etc. ERPC ERPC
355 400 400Kv Sundargarh-Raigarh -II 12/Jul/17 8:00 12/Jul/17 18:00 ODB For Tree/Bamboos cutting in the span of 426-427 by providing local administration / police ERPC ERPC
Online permit for installation of Bird divertors on earthwire as per the directions of Bird
356 400 Bachau - Ranchodpura Ckt.1 13/Jul/17 8:00 13/Jul/17 20:00 Daily POWERGRID WR-II R
Sanctuary authorities. A/R of Ckt-1to be kept in non auto mode during outage period
357 765 765kV Sasan - Vchal line 13/Jul/17 9:00 13/Jul/17 18:00 Daily For replacement of defective LA at Vchal POWER GRID WR-II C
358 400 400 KV S/S NAGDA 400KV INDORE LINE MAIN CB 13/Jul/17 9:00 27/Jul/17 18:00 cont. FOR REPLACEMENT OF MAIN CB & MAIN CT MPPTCL MPPTCL R
359 765 765kV Gwalior-Bina#3 Line 13/Jul/17 10:00 13/Jul/17 16:00 Daily AMP work of Line reactor POWERGRID WR-II R
360 400 Bus 2 at Raipur SS 13/Jul/17 9:30 13/Jul/17 17:30 Daily Relay testing and AMP work at Raipur WRTS-I WRTS-I R
361 765 715,Gwalior-2 main bay at Bina 13/Jul/17 9:30 13/Jul/17 18:00 Daily For AMP works DCRM & Timing POWERGRID WR-II R
765KV Jabalpur-Bina#1 switchable Reactor along with
362 765 13/Jul/17 10:00 13/Jul/17 18:00 Daily Erection of Circuit Breaker & BPI for implementation of NGR Bypass Scheme POWERGRID WR-II C
Reactor bay(815 Reactor Bay) at Jabalpur PS
363 400 Asoj-Indore Ckt#2 at Asoj (GETCO) end 13/Jul/17 10:00 13/Jul/17 17:00 Daily PLCC Panel ETL41 Retrofitting POWERGRID WR-II C
364 220 220KV Vapi-Bhilad-3 13/Jul/17 9:00 13/Jul/17 16:00 Daily Main-1 relay replacement work POWERGRID WR-II C
365 220 220kv Bus -2 at Pirana 13/Jul/17 8:00 13/Jul/17 18:00 Daily AMP work POWERGRID WR-II R
Power line crossing of 400 KV S/C Vindhyachal-Korba line Ckt-II at Tower No.51 & 52 by
366 400 kV 400 KV S/C Vindhyachal-Korba line Ckt-II 13/Jul/17 8:00 13/Jul/17 19:00 Daily PGCIL CWRTL
765 kV S/C Sasan - UMPP - Vindhychal pool line at Loc. No. AP3/0 - AP 4/0
367 400 kV A Bus and bus coupler @ chakan 13/Jul/17 9:00 13/Jul/17 18:00 Daily Routine Maintenance & Dignostic testing work MSETCL MSETCL
Load will be on 400
368 400KV Jejuri-Lonikand I @ Jejuri 13/Jul/17 9:00 13/Jul/17 17:00 Daily Routine Maintenance & Dignostic testing work MSETCL MSETCL KV Jejuri-Koyna ST
IV line
400/220K
369 315MVA ICT-2 @ Girwali 13/Jul/17 9:00 13/Jul/17 17:00 Daily Dignostic Testing Work MSETCL MSETCL
V
408-Bay & 409-Bay (Main Bay and Tie Bay of Chandrapur
370 400KV 13/Jul/17 11:00 13/Jul/17 14:00 Daily Quarterly Maintenance of bays equipment MSETCL MSETCL
Line-2) at Kumbhargaon
371 400KV 400 KV Parli- Lonikand-1 Line 13/Jul/17 10:00 13/Jul/17 17:00 Daily Routine Line Maintenance Maintenance by Lamboti Line S/dn. MSETCL MSETCL
372 400KV Babhaleshwar-Dhule-Ckt-1 @BBLR 13/Jul/17 9:00 13/Jul/17 17:00 Daily Routine Maintenance & Servicing and allignment of PG isolators work MSETCL MSETCL
373 400 400KV INDORE-NAGDA 13/Jul/17 7:00 13/Jul/17 18:00 daily FOR LINE / BAY MAINTENANCE WORK MPPTCL MPPTCL R
374 220 220 KV BADOD-KOTA LINE 13/Jul/17 9:00 13/Jul/17 18:00 daily FOR LINE / BAY MAINTENANCE WORK MPPTCL MPPTCL R
375 220 220KV PANDURAN-KALMESHWAR 13/Jul/17 9:00 13/Jul/17 18:00 daily FOR LINE / BAY MAINTENANCE WORK MPPTCL MPPTCL R
376 400 KV 400KV Sipat-Raipur-3 TIE BAY-5 at Sipat 13/Jul/17 9:00 14/Jul/17 18:00 Continuous For Annual maint works NTPC NTPC
377 765/400 765kV ICT-2 at Aurangabad 13/Jul/17 8:00 13/Jul/17 18:00 Daily for RTV coating on Trench Bushings WRTS-I WRTS-I C
Replacement of Conventional Insulators with Polymer insulators in major crossings line
378 400 400 kV Bhadrawati - Parli # 01. 13/Jul/17 8:00 13/Jul/17 18:00 Daily Power, River, N.H., S.H., Railway Crossings for public safety. AR in Non Auto Mode for WRTS-I WRTS-I C
other ckt will be required during above period
379 400 MAIN BUS 2_KOTRA PS 13/Jul/17 9:00 13/Jul/17 18:00 Daily AMP 2017 - 2018 WRTS-I WRTS-I R
380 765 ICT4_765/400kv_TAMNAR PS 13/Jul/17 10:00 13/Jul/17 18:00 Daily For commissioning of CSD of ICT4 through 400 kV Main and Tie Bays WRTS-I WRTS-I C
381 400 765/400 kV ICT #3 Main bay 410 at wardha 13/Jul/17 9:00 13/Jul/17 18:00 Daily AMP works related to Bay WRTS-I WRTS-I R
Replacement of Conventional Insulators with Polymer insulators in major crossings line
382 400 400 KV Wardha Akola Line 1 13/Jul/17 9:00 13/Jul/17 18:00 daily Power, River, N.H., S.H., Railway Crossings for public safety. AR in Non Auto Mode for WRTS-I WRTS-I C
other ckt will be required during above period
383 400 400kV KUDGI 2 MAIN BAY (404) AT KOLHAPUR 13/Jul/17 10:00 13/Jul/17 18:00 Daily For bay AMP works. WRTS-I WRTS-I R
384 765 765KV Champa-Kotra Main Bay (718) at Champa PS 13/Jul/17 9:00 14/Jul/17 17:30 Daily AMP/Warranty Tests WRTS-I WRTS-I R
385 400 Bhachau -Ranchodpura 1 Line 13/Jul/17 8:00 13/Jul/17 18:00 Daily RTV coating of Line Main bay & Tie Bay isolators, CB & CT. POWERGRID WR-II C
Online permit for installation of Bird divertors on earthwire as per the directions of Bird
386 400 Bachau - Ranchodpura Ckt.2 14/Jul/17 8:00 14/Jul/17 20:00 Daily POWERGRID WR-II R
Sanctuary authorities. A/R of Ckt-2 to be kept in non auto mode during outage period
387 765 765KV Vchal-Satna Line#1 Main Bay (713 Bay) at Satna SS 14/Jul/17 9:00 15/Jul/17 18:00 Daily For AMP work POWERGRID WR-II R
388 400kV NewKoyna-Dabhol -Ckt-1 14/Jul/17 8:00 14/Jul/17 18:00 Daily Routine Maintenance work & Relay testing Work MSETCL MSETCL
389 400 400KV BUS#1 AT INDORE 14/Jul/17 10:00 15/Jul/17 18:00 Daily FOR EQUIPMENT ERECTION WORK NEAR BUS POWERGRID WR-II C
765KV Jabalpur-Bina#2 switchable Reactor along with
390 765 14/Jul/17 10:00 14/Jul/17 18:00 Daily Erection of Circuit Breaker & BPI for implementation of NGR Bypass Scheme POWERGRID WR-II C
Reactor bay(818 Reactor Bay) at Jabalpur PS
391 765 765kV Bus Reactor at Gwalior 14/Jul/17 10:00 14/Jul/17 18:00 Daily AMP work POWERGRID WR-II R
392 765 765KV Vchal-Satna Line#1 Tie Bay (717 Bay) at Satna SS 14/Jul/17 9:00 15/Jul/17 18:00 Daily For AMP work POWERGRID WR-II R
Shifting of 220 Vapi- Magarwada D/C line between loc.no. 62-65 to facilitate clearance for
393 220 Vapi - Magarwada Ckt.1&2 14/Jul/17 6:00 19/Jul/17 15:00 Continuous POWERGRID WR-II C
DFCCI Railway line corrioder
394 400 400 KV Ukai-3 Main+Tie Bay Kosamba S/S 14/Jul/17 8:00 14/Jul/17 18:00 Daily Half Yearly maintenance & testing activity
395 400KV Station - 4B at 400kV Deepnagar 14/Jul/17 8:00 14/Jul/17 17:00 Daily Routine Maintenance & Dignostic testing work MSETCL MSETCL
396 220 Kv Chitegaon- Chitepimpalgaon Ckt II @Chitegaon 14/Jul/17 8:00 14/Jul/17 18:00 Daily Testing , Maintenance of Line Isolator MSETCL MSETCL
397 400 kV 315MVA , ICT I @ Waluj 14/Jul/17 8:00 14/Jul/17 17:00 Daily Annual Maintenance & Diagonostic Testing MSETCL MSETCL
398 400KV Babhaleshwar-Dhule-Ckt-2 @BBLR 14/Jul/17 9:00 14/Jul/17 17:00 Daily Routine Maintenance & Servicing and allignment of PG isolators work MSETCL MSETCL
During the proposed outage following works will be carried out :-
399 400 KV KORADI-KHAPERKHEDA I 14/Jul/17 8:00 14/Jul/17 17:00 Daily Line signature test, broken disc replacement work,tightning and fixing of jumper nutbolts & MSETCL MSETCL
hardwares on line and earthwire
Diagnostic Testing & Replacement of broken / damaged disc insulatorsFitting & tighting of
400 400KV Chandrapur 2 - Warora Ckt-2 14/Jul/17 8:00 14/Jul/17 18:00 Daily MSETCL MSETCL
jumper cone bolts, conductor and earthwire hardware.
400 kV Tie Bay 415 (Tie Bay of Yelwan CKt- I) at 400 kV
401 400KV 14/Jul/17 9:00 14/Jul/17 17:00 Daily Routine Maintenance & testing work MSETCL MSETCL
Akola SS
402 220 220 KV BADOD-MODAK LINE 14/Jul/17 9:00 14/Jul/17 18:00 daily FOR LINE / BAY MAINTENANCE WORK MPPTCL MPPTCL R
403 765 765kV Padghe-1 switchable LR at Auranagabad 14/Jul/17 8:00 14/Jul/17 18:00 Daily for RTV coating on Trench Bushings WRTS-I WRTS-I C
404 400 400kV Raipur-2 Main Bay at BVT 14/Jul/17 9:00 14/Jul/17 18:00 Daily AMP WRTS-I WRTS-I C
Replacement of Conventional Insulators with Polymer insulators in major crossings line
405 400 400 kV Dhariwal TPP- Parli # 02. 14/Jul/17 8:00 14/Jul/17 18:00 Daily Power, River, N.H., S.H., Railway Crossings for public safety. AR in Non Auto Mode for WRTS-I WRTS-I C
other ckt will be required during above period
406 765 ICT#1_724_Main Bay at Bilaspur PS 14/Jul/17 9:00 14/Jul/17 18:00 Daily AMP works (CB Timings and CT tan delta meas.) WRTS-I WRTS-I R
407 765 ICT1_765/400_D'JAIGARH 14/Jul/17 9:00 14/Jul/17 18:00 Daily RTCC checking from SAS WRTS-I WRTS-I C
408 400 Bus 3 at Raipur SS 14/Jul/17 9:30 14/Jul/17 17:30 Daily Relay testing and AMP work at Raipur WRTS-I WRTS-I R
Replacement of Conventional Insulators with Polymer insulators in major crossings line
409 400 400 KV Wardha Akola Line 2 14/Jul/17 9:00 14/Jul/17 18:00 daily Power, River, N.H., S.H., Railway Crossings for public safety. AR in Non Auto Mode for WRTS-I WRTS-I C
other ckt will be required during above period
410 765 765kV Aurangabad-Solapur-2 14/Jul/17 8:00 15/Jul/17 18:00 Continuous For swapping of 765kV Solapur line in solapur bays and pending construction points WRTS-I WRTS-I C
411 765 765 kV Wardha# 4 L/R at Durg PS 14/Jul/17 8:00 15/Jul/17 18:00 Daily NGR Bypassing WRTS-I WRTS-I C
412 400 Bhachau Ranchodpura 2 Line 14/Jul/17 8:00 14/Jul/17 18:00 Daily RTV coating of Line Main bay & Tie Bay isolators, CB & CT. POWERGRID WR-II C
For adjustment of rigid spacer in the span of 63-64 of 765KV Sundergarh-Dharamjaygarh-I
413 765 765KV Sundergarh-Dharamjaygarh-I 14/Jul/17 9:00 14/Jul/17 18:00 ODB ERPC ERPC
and jumper tightening
414 400 400 KV Bus 2 at wardha 15/Jul/17 9:00 16/Jul/17 18:00 Continuous Bus extension for Aurangabad bays WRTS-I WRTS-I C
765KV Jabalpur-Bina#3 switchable Reactor along with
415 765 15/Jul/17 10:00 15/Jul/17 18:00 Daily Erection of Circuit Breaker & BPI for implementation of NGR Bypass Scheme STERLITE WR-II C
Reactor bay(821 Reactor Bay) at Jabalpur PS
416 765 Main Bay of 765 kV ICT#2 (Bay 706) at Vadodara GIS 15/Jul/17 10:00 15/Jul/17 17:00 Daily for CB AMP POWERGRID WR-II C
417 400 BAY 415 (MAIN BAY FOR BR-II) at Indore 15/Jul/17 10:00 15/Jul/17 18:00 Daily BAY EQUIPMENT AMP POWERGRID WR-II C
418 400 400/220 KV 315 MVA ICT-1 at Vadavi 15/Jul/17 14:00 15/Jul/17 18:00 Daily Dismentaling of old busbar protection panel
419 400 400 KV S/S NAGDA 315MVA ICT-II 400/220/33 KV 15/Jul/17 8:00 15/Jul/17 17:00 daily FOR MAINTENANCE AND TESTING WORK MPPTCL MPPTCL R
420 765kV Solapur-2 Main Bay 710 at Aurangabad 15/Jul/17 9:00 15/Jul/17 18:00 Daily For AMP Works at Aurangabad WRTS-I WRTS-I R
765KV BUS REACTOR #02 MAIN BAY(710) AT
421 765 15/Jul/17 9:00 15/Jul/17 18:00 Daily AMP WORKS OF BAY WRTS-I WRTS-I R
DHARAMJAYGARH(KORBA) SS
422 400 400KV Bhachau Versana 2 Line 15/Jul/17 8:00 15/Jul/17 18:00 Daily RTV coating of Line Main bay & Tie Bay isolators, CB. POWERGRID WR-II C
423 400 ACBIL-PGCIL (Bilaspur)-CKT# 1 15/Jul/17 7:00 22/Jul/17 18:00 Daily AMP ACBIL ACBIL
JP Nigri not to bid
424 400 J P NIGRIE-SATNA-1 15/Jul/17 8:00 22/Jul/17 18:00 Daily Fixing of additional Pilot String in DD type angle Towers JP NIGRIE JP NIGRIE
on PX
425 400 50MVAR Bina-II Line Reactor at Shujalpur 16/Jul/17 10:00 31/Jul/17 18:00 Continuous Construction of Reactor Switching Scheme By M/S Godrej Ltd. POWERGRID WR-II C
426 400 63MVAR Bus Reactor-I at Shujalpur 16/Jul/17 10:00 17/Jul/17 18:00 Continuous Replacement and testing of 2 Nos. Relays & AMP works POWERGRID WR-II C
427 765 765KV Vchal-Satna Line#2 Main Bay (716 Bay) at Satna SS 16/Jul/17 9:00 17/Jul/17 18:00 Daily For AMP work POWERGRID WR-II R
For converting Indore #2 Line Reactor to a Switchable Reactor under Western Region
Strengthening Scheme-17. Due to space constraints, all the existing terminal equipemnt
428 400 Itarsi-Indore #2 Line 16/Jul/17 9:00 16/Aug/17 17:00 Continouse POWERGRID WR-II C
shall be shifted towards bus side to faciliate space for new bay for switchable reactor at
Itarsi.
Bus will be
429 400kV Bus Coupler @ BBLR 16/Jul/17 9:00 16/Jul/17 17:00 Daily Routine Maintenance & Servicing and allignment of PG isolators work MSETCL MSETCL
seperated
430 400 400 KV S/S BINA 400 KV MAIN BUS-I 16/Jul/17 9:00 16/Jul/17 17:00 daily FOR MAINTENANCE AND TESTING WORK MPPTCL MPPTCL R
765KV Jabalpur-Bhopal switchable Reactor along with
431 765 16/Jul/17 10:00 16/Jul/17 18:00 Daily Erection of Circuit Breaker & BPI for implementation of NGR Bypass Scheme STERLITE WR-II C
Reactor bay(824 Reactor Bay) at Jabalpur PS
432 400 400/220 KV 315 MVA ICT-2 Vadavi 16/Jul/17 8:00 16/Jul/17 12:00 Daily Dismentaling of old busbar protection panel
433 400 400/220 KV 315 MVA ICT-3 Vadavi 16/Jul/17 14:00 16/Jul/17 18:00 Daily Dismentaling of old busbar protection panel
434 400 J P NIGRIE-SATNA-1 16/Jul/17 9:00 16/Jul/17 17:00 Daily Fixing of missing Arcing Horns,Twin Spacers & Rigid Spacers JP NIGRIE JP NIGRIE
Replacement of Conventional Insulators with Polymer insulators in major crossings line
435 400 400 KV Wardha Akola Line 2 16/Jul/17 9:00 16/Jul/17 18:00 daily Power, River, N.H., S.H., Railway Crossings for public safety. AR in Non Auto Mode for WRTS-I WRTS-I C
other ckt will be required during above period
436 400 400KV Bhachau-Versana 1 Line 16/Jul/17 8:00 16/Jul/17 18:00 Daily RTV coating of Line Main bay & Tie Bay isolators, CB. POWERGRID WR-II C
LILO of Mundra - Limbdi & Mundra Mansar lines at Bhachau SS. Outage required for
437 400 Mundra - Limbdi & Mundra - Mansar 17/Jul/17 8:00 23/Jul/17 18:00 Continuous dismantling of existing towers and erections new towers at LILO point for making line POWERGRID WR-II C
tapping.
438 400 Mundra Mansar Line 17/Jul/17 9:00 17/Jul/17 18:00 Daily Bay connection tightness PGCIL CGPL
Online permit for installation of Bird divertors on earthwire as per the directions of Bird
439 400 Mundra - Mansar 17/Jul/17 8:00 18/Jul/17 20:00 Daily POWERGRID WR-II R
Sanctuary authorities. A/R of Ckt-2 to be kept in non auto mode during outage period
Replacement of Conventional Insulators with Polymer insulators in major crossings line
440 400 400 KV Wardha Akola Line 1 17/Jul/17 9:00 17/Jul/17 18:00 daily Power, River, N.H., S.H., Railway Crossings for public safety. AR in Non Auto Mode for WRTS-I WRTS-I C
other ckt will be required during above period
441 765 718,Gwalior-3 main bay at Bina 17/Jul/17 9:30 17/Jul/17 18:00 Daily For AMP works DCRM & Timing POWERGRID WR-II R
765KV Jabalpur-DMJY#1 Line along with Reactor at Jabalpur
442 765 17/Jul/17 10:00 17/Jul/17 18:00 Daily Erection of Circuit Breaker & BPI for implementation of NGR Bypass Scheme POWERGRID WR-II C
PS
443 220 Kakrapar-Haldarwa 1 17/Jul/17 9:00 19/Jul/17 18:00 Continuous Circuit Breaker all three ploe overhauling Work AT haldarwa end POWERGRID WR-II R
444 400 400KV BUS#2 AT INDORE 17/Jul/17 10:00 18/Jul/17 18:00 Daily FOR EQUIPMENT ERECTION WORK NEAR BUS POWERGRID WR-II C
445 765 Bus-I at Vindhyachal PS 17/Jul/17 9:00 17/Jul/17 18:00 Daily FOR AMP WORK POWER GRID WR-II R
446 765 712 LRB (Bina#1 L/R Bay) at Gwalior 17/Jul/17 10:00 17/Jul/17 18:00 Daily AMP WORKS and NGR LA Replacement POWERGRID WR-II C
447 765 765KV Bus Reactor#2 Main Bay (718 Bay) at Satna SS 17/Jul/17 9:00 18/Jul/17 18:00 Daily For AMP work POWERGRID WR-II R
Providing 66KV HV Insulation on Gandhar - Kosamba & Gandhar- Navsari line between
448 400 Gandhar - Navsari Ckt.2 17/Jul/17 8:00 17/Jul/17 18:00 Daily loc.no. 92-93, to maintain electrical clearance at the crossing point of 220kV Gavasad - POWERGRID WR-II C
Mangrol GETCO line.
Providing 66KV HV Insulation on Gandhar - Kosamba & Gandhar- Navsari line between
Gujarat to consent
449 220 Gavasad - Mangrol D/C 17/Jul/17 8:00 18/Jul/17 18:00 Daily loc.no. 92-93, to maintain electrical clearance at the crossing point of 220kV Gavasad - POWERGRID WR-II
requried
Mangrol GETCO line. Outage required due to heavy induction during execution
450 400 400/220 KV 315 MVA ICT-4 Vadavi 17/Jul/17 8:00 17/Jul/17 12:00 Daily Dismentaling of old busbar protection panel
451 400 400 KV Dehgam - Vadavi line No. 1 17/Jul/17 12:00 17/Jul/17 18:00 Daily Dismentaling of old busbar protection panel
452 400KV 400KV Dhule-BBLR Ckt-I & II 17/Jul/17 9:00 18/Jul/17 17:00 Daily PID testing MSETCL MSETCL
80MVAR Reactor I
453 400kV 80MVAR Reactor 2 @ BBLR 17/Jul/17 9:00 17/Jul/17 17:00 Daily Routine Maintenance & Servicing and allignment of PG isolators work MSETCL MSETCL
will be in service
Diagnostic test, Replacement of broken / damaged disc insulators & tighting of conductor &
454 400KV Chandrapur - Parli Ckt-3 17/Jul/17 8:00 17/Jul/17 18:00 Daily MSETCL MSETCL
earthwire hardware
455 400 kV 400 kV Koradi- Bhusawal Line 17/Jul/17 12:00 19/Jul/17 18:00 Daily PID testing of insulator strings by Hot line Uint Akola. A/R shall be kept in non auto mode. MSETCL MSETCL
400 kV Main Bay 417 (Main Bay of Yelwan CKt- II) at 400
456 400KV 17/Jul/17 9:00 17/Jul/17 17:00 Daily Routine Maintenance & testing work MSETCL MSETCL
kV Akola SS
457 400KV Bus Coupler @ Talandge 17/Jul/17 9:00 17/Jul/17 18:00 Daily Qurterly Maint.Work MSETCL MSETCL
458 400 400 KV S/S BINA 400 KV MAIN BUS-II 17/Jul/17 9:00 17/Jul/17 17:00 daily FOR MAINTENANCE AND TESTING WORK MPPTCL MPPTCL R
HOTSPOT ATTEND AND BAY MAINTENANCE(Bus shutdown required for attending the
459 400KV VINDHYACHAL-SATNA#2 LINE ALONGWITH BUS-4 17/Jul/17 9:00 18/Jul/17 18:00 Continuous NTPC NTPC
Hot spot)
460 400KV VINDHYACHAL-SATNA#2 LINE REACTOR 17/Jul/17 9:00 19/Jul/17 18:00 Continuous REACTOR MAINTENANCE NTPC NTPC
461 400 KV 400KV Sipat-KORBA LINE 17/Jul/17 9:00 19/Jul/17 18:00 Continuous For Annual maint works NTPC NTPC
462 765 765kV Padghe-2 switchable LR at Aurangabad 17/Jul/17 9:00 17/Jul/17 18:00 Daily for RTV coating on Trench Bushings WRTS-I WRTS-I C
Replacement of Conventional Insulators with Polymer insulators in major crossings line
463 400 400 kV Dhariwal TPP- Parli # 02. 17/Jul/17 8:00 17/Jul/17 18:00 Daily Power, River, N.H., S.H., Railway Crossings for public safety. AR in Non Auto Mode for WRTS-I WRTS-I C
other ckt will be required during above period
464 765 765/400 kV ICT#2 at Bilaspur PS 17/Jul/17 11:00 17/Jul/17 13:00 Daily Bushing DGA sampling WRTS-I WRTS-I R
465 765 765 kV Durg- Champa# 1 17/Jul/17 8:00 17/Jul/17 13:00 Daily for CSD commissioning WRTS-I WRTS-I C
765KV ICT #01 MAIN BAY(713) AT
466 765 17/Jul/17 9:00 17/Jul/17 18:00 Daily AMP WORKS OF BAY WRTS-I WRTS-I R
DHARAMJAYGARH(KORBA) SS
467 400 Tamnar 2 Tie Bay at Raipur SS 17/Jul/17 9:30 17/Jul/17 17:30 Daily AMP work at Raipur WRTS-I WRTS-I R
468 765 BILASPUR2-AT3_TIE_BAY_717 at seoni 17/Jul/17 8:00 17/Jul/17 18:00 Daily For AMP testing work WRTS-I WRTS-I R
469 400 Main Bay of Akola #2 416 at wardha 17/Jul/17 9:00 17/Jul/17 18:00 Daily AMP works related to Bay WRTS-I WRTS-I R
Replacement of Conventional Insulators with Polymer insulators in major crossings line
470 400 400 KV Wardha Akola Line 1 17/Jul/17 9:00 17/Jul/17 18:00 daily Power, River, N.H., S.H., Railway Crossings for public safety. AR in Non Auto Mode for WRTS-I WRTS-I C
other ckt will be required during above period
471 765 765KV Champa-Kotra Tie Bay (719) at Champa PS 17/Jul/17 9:00 18/Jul/17 17:30 Daily AMP/Warranty Tests WRTS-I WRTS-I R
ATC/TTC revision
472 765 765kV Aurangabad-Solapur-1 17/Jul/17 8:00 20/Jul/17 18:00 Continuous For swapping of 765kV Solapur line in solapur bays and pending construction points WRTS-I WRTS-I
in West-South
473 765 721,Jabalpur-3 main bay at Bina 18/Jul/17 9:30 18/Jul/17 18:00 Daily For AMP works DCRM & Timing POWERGRID WR-II R
765KV Jabalpur-DMJY#2 Line along with Reactor at Jabalpur
474 765 18/Jul/17 10:00 18/Jul/17 18:00 Daily Erection of Circuit Breaker & BPI for implementation of NGR Bypass Scheme POWERGRID WR-II C
PS
475 765 701LRB (Jaipur#2 L/R Bay) at Gwalior 18/Jul/17 10:00 18/Jul/17 17:00 Daily AMP work POWERGRID WR-II R
Providing 66KV HV Insulation on Gandhar - Kosamba & Gandhar- Navsari line between
476 400 Gandhar - Kosambha 18/Jul/17 8:00 18/Jul/17 18:00 Daily loc.no. 92-93, to maintain electrical clearance at the crossing point of 220kV Gavasad - POWERGRID WR-II C
Mangrol GETCO line.
477 400 400 KV Ukai-3 Main+Tie Bay Kosamba S/S 18/Jul/17 9:00 18/Jul/17 18:00 Daily Half Yearly maintenance & testing activity
478 400 400 KV Dehgam - Vadavi line No. 2 18/Jul/17 8:00 18/Jul/17 12:00 Daily Dismentaling of old busbar protection panel
479 400 400 KV BUS COUPLER Vadavi 18/Jul/17 14:00 18/Jul/17 18:00 Daily Dismentaling of old busbar protection panel
Jhabua Power
480 400 400 KV ST main & tie bay 404 & 405 18/Jul/17 9:00 18/Jul/17 18:00 daily Preventive Maintenance of Generator transformer Jhabua Power
Switchyard
TAN DELTA MEASUREMENT OF ICT2 BUSHING
400/220/3 Load will be shifted
481 501MVA ICT-1 at 400KV Koradi-2 Substation 18/Jul/17 9:00 19/Jul/17 18:00 Daily COOLING SYSTEM TRIAL MSETCL MSETCL
3KV to ICT-2
TAN DELTA MEASUREMENT OF 205CT
482 400KV Talandge - Karad 2 @ Talandge 18/Jul/17 9:00 18/Jul/17 18:00 Daily Qurterly Maint.Work MSETCL MSETCL
483 220 220KV SEONI - SEONI (PGCIL) - I 18/Jul/17 10:00 18/Jul/17 16:00 daily FOR JUMPER CONNECTION TO NEW CVT AND MAINTENANCE WORK MPPTCL MPPTCL R
for Overhead Stringing of U/C 765KV D/C Raipur- Sundargarh Transmission line(of
484 400 400KV S/C Kedhmara-RAITA(Raipur) Line 18/Jul/17 7:00 19/Jul/17 17:00 Daily CSPTCL OGPTL C
OGPTL) at OGPTL Location numbers AP 16/0- AP 17/0(CSPTCL tower Nos: 455-456)
485 765 765kV Solapur-1 Tie bay 708 at Aurangabad 18/Jul/17 9:00 18/Jul/17 18:00 Daily For AMP Works at Aurangabad WRTS-I WRTS-I R
486 400 400kV EMCO -1 Main bay at BVT 18/Jul/17 9:00 18/Jul/17 18:00 Daily AMP WRTS-I WRTS-I R
487 400 400 kV Bus#1 at Bilaspur PS 18/Jul/17 9:00 18/Jul/17 18:00 Daily AMP works WRTS-I WRTS-I R
765KV ICT #01 TIE BAY(714) AT
488 765 18/Jul/17 9:00 18/Jul/17 18:00 Daily AMP WORKS OF BAY WRTS-I WRTS-I R
DHARAMJAYGARH(KORBA) SS
489 400 400/220 KV ICT #1 Main Bay 421 at wardha 18/Jul/17 9:00 18/Jul/17 18:00 Daily AMP works related to Bay WRTS-I WRTS-I R
Replacement of Conventional Insulators with Polymer insulators in major crossings line
490 400 400 KV Wardha Akola Line 2 18/Jul/17 9:00 18/Jul/17 18:00 daily Power, River, N.H., S.H., Railway Crossings for public safety. AR in Non Auto Mode for WRTS-I WRTS-I C
other ckt will be required during above period
491 400 1001,Bina-4 main bay at 400KV MPPTCL Bina 19/Jul/17 9:30 19/Jul/17 18:00 Daily For AMP works POWERGRID WR-II R
765KV Jabalpur-DMJY#3 Line along with Reactor at Jabalpur
492 765 19/Jul/17 10:00 19/Jul/17 18:00 Daily Erection of Circuit Breaker & BPI for implementation of NGR Bypass Scheme STERLITE WR-II C
PS
493 220 Kakrapar-Vapi#1 19/Jul/17 9:00 19/Jul/17 18:00 Daily For balance Ins Replacement Work POWERGRID WR-II C
494 765 704LRB (Jaipur#1 L/R Bay) at Gwalior 19/Jul/17 10:00 19/Jul/17 17:00 Daily AMP work POWERGRID WR-II R
495 765 765KV Bus Reactor#2 at Satna 19/Jul/17 9:00 19/Jul/17 18:00 Daily For AMP work POWERGRID WR-II R
496 400 400 KV 50MVAR BUS REACTOR at Vadavi 19/Jul/17 8:00 19/Jul/17 12:00 Daily Dismentaling of old busbar protection panel
497 400 400 KV TBC/125MVAR REACTOR Vadavi 19/Jul/17 14:00 19/Jul/17 18:00 Daily Dismentaling of old busbar protection panel
400/220k
498 501MVA, ICT 1 @ LAMBOTI. 19/Jul/17 10:00 19/Jul/17 18:00 Daily Routine Maintenance & Dignostic testing work MSETCL MSETCL
V
499 400 KV 167 MVA, Spare ICT Unit Khaperkheda 19/Jul/17 10:00 19/Jul/17 16:00 Daily Maintenance and predictive testing work. MSETCL MSETCL
500 400 400kV Wardha-2 Main Bay 410 at Autrangabad 19/Jul/17 9:00 19/Jul/17 18:00 Daily For AMP Works at Aurangabad WRTS-I WRTS-I R
501 765 765kV WARDHA-AURANGABAD IV 19/Jul/17 8:00 20/Jul/17 18:00 Daily Line maintenance works for removing of conductor twist. WRTS-I WRTS-I R
502 765 765 kV Durg - Champa# 2 19/Jul/17 8:00 19/Jul/17 13:00 Daily for CSD commissioning WRTS-I WRTS-I C
765KV CHAMPA MAIN BAY(715) AT
503 765 19/Jul/17 9:00 19/Jul/17 18:00 Daily AMP WORKS OF BAY WRTS-I WRTS-I R
DHARAMJAYGARH(KORBA) SS
504 400 400kV RAIPUR-BHADRAVATI I 19/Jul/17 9:30 19/Jul/17 17:30 Daily Relay testing and AMP work at Raipur WRTS-I WRTS-I R
505 765 SOLAPUR_BAY 710_MAIN BAY OF AURANGABAD -2 19/Jul/17 9:00 19/Jul/17 18:00 DAILY AMP WORKS WRTS-1 WRTS-1 R
Replacement of Conventional Insulators with Polymer insulators in major crossings line
506 400 400 KV Wardha Akola Line 1 19/Jul/17 9:00 19/Jul/17 18:00 daily Power, River, N.H., S.H., Railway Crossings for public safety. AR in Non Auto Mode for WRTS-I WRTS-I C
other ckt will be required during above period
400kV MAPUSA I & KUDGI- II TIE BAY (405) AT
507 400 19/Jul/17 10:00 19/Jul/17 18:00 Daily For bay AMP works. WRTS-I WRTS-I R
KOLHAPUR
508 400 Mundra Mansar Line Reactor 19/Jul/17 8:00 20/Jul/17 20:00 Daily Reactor Maintenance and Testing CGPL CGPL
509 400 125MVAr Bus Reactor at Bhachau 20/Jul/17 8:00 20/Jul/17 18:00 Daily RTV coating of Reactor Main bay & Tie Bay isolators, CB. POWERGRID WR-II C
510 400 1002,Bina-4 tie bay at 400KV MPPTCL Bina 20/Jul/17 9:30 20/Jul/17 18:00 Daily For AMP works POWERGRID WR-II R
765KV Jabalpur-DMJY#4 Line along with Reactor at Jabalpur
511 765 20/Jul/17 10:00 20/Jul/17 18:00 Daily Erection of Circuit Breaker & BPI for implementation of NGR Bypass Scheme STERLITE WR-II C
PS
512 220 Kakrapar-Vapi#1 20/Jul/17 9:00 20/Jul/17 18:00 Daily For balance Ins Replacement Work POWERGRID WR-II C
513 400 RAPP#2 Main Bay(418) at Shujalpur 20/Jul/17 10:00 20/Jul/17 18:00 Daily For commissioning of CSD & SAS works POWERGRID WR-II C
514 400 400KV BUS#1 at MPPTCL, Indore 20/Jul/17 10:00 21/Jul/17 18:00 Continuous RETROFITTING OF BUS#1 ISOLATOR IN ITARSI #2 POWERGRID WR-II C
515 220 220Kv Bus-2 at Gwalior 20/Jul/17 10:00 20/Jul/17 17:00 Daily AMP WORKS POWERGRID WR-II R
516 765 765KV ICT#2 Main Bay (704 Bay) at satna ss 20/Jul/17 9:00 21/Jul/17 18:00 Daily For AMP work POWERGRID WR-II R
Replacement of all porcelain disc insulator strings with CLR Polymer insulators in complete
517 400 Navsari - Magarwada Ckt.2 20/Jul/17 8:00 22/Jul/17 18:00 Daily line to avoid tripping due to heavy pollution. A/R of Ckt.1 to be kept in non auto mode POWERGRID WR-II C
during outage period.
518 400 400 KV Bus Reactor Main+Tie Bay at Kosamba 20/Jul/17 8:00 20/Jul/17 18:00 Daily Half Yearly maintenance & testing activity
519 400 400 KV Vadavi-Halvad 1 (Line is under commissioning) 20/Jul/17 8:00 20/Jul/17 12:00 Daily Dismentaling of old busbar protection panel
520 400 400 KV Vadavi-Halvad 2 (Line is under commissioning) 20/Jul/17 14:00 20/Jul/17 18:00 Daily Dismentaling of old busbar protection panel
Load manage on
521 400 KV 400KV JAIGAD -II @ KARAD 20/Jul/17 10:00 20/Jul/17 17:00 Daily Quarterly. Maint. work MSETCL MSETCL
400 kV JAIGAD -1
Load will be on 400
522 400KV Jejuri-Koyna ST IV @ Jejuri 20/Jul/17 9:00 20/Jul/17 17:00 Daily Routine Maintenance & Dignostic testing work MSETCL MSETCL KV Jejuri-Lonikand
line
407-Bay & 406-Bay (Main Bay and Tie Bay of of ICT-2) at
523 400KV 20/Jul/17 11:00 20/Jul/17 16:00 Daily Quarterly Maintenance of bays equipment MSETCL MSETCL
Kumbhargaon
80MVAR Reactor II
524 400kV 80MVAR Reactor 1 @ BBLR 20/Jul/17 9:00 20/Jul/17 17:00 Daily Routine Maintenance & Servicing and allignment of PG isolators work MSETCL MSETCL
will be in service
525 400KV B Bus @Lonikand II 20/Jul/17 9:00 20/Jul/17 18:00 Daily Routine Maintenance & Dignostic testing work MSETCL MSETCL
526 400 400KV DAMOH-KATNI 20/Jul/17 8:00 20/Jul/17 18:00 daily FOR LINE / BAY MAINTENANCE WORK MPPTCL MPPTCL R
527 400 400KV NAGDA-RAJGARH - I 20/Jul/17 9:00 20/Jul/17 18:00 daily FOR LINE / BAY MAINTENANCE WORK MPPTCL MPPTCL R
528 220 220KV SEONI - SEONI (PGCIL) - II 20/Jul/17 10:00 20/Jul/17 16:00 daily FOR JUMPER CONNECTION TO NEW CVT AND MAINTENANCE WORK MPPTCL MPPTCL R
529 220 220 KV GWALIOR(PGCIL)-MAHALGAON - I 20/Jul/17 9:00 20/Jul/17 17:00 daily FOR CVT ERECTION COMMISSIONING & TESTING WORK MPPTCL MPPTCL R
530 400KV VINDHYACHAL-KORBA#1 LINE 20/Jul/17 9:00 21/Jul/17 18:00 Continuous HOTSPOT ATTEND AND BAY MAINTENANCE. NTPC NTPC
531 400KV VINDHYACHAL-KORBA#1 LINE REACTOR 20/Jul/17 9:00 22/Jul/17 18:00 Continuous REACTOR MAINTENANCE NTPC NTPC
532 400 KV 400KV Sipat-Ranchi-2 tie bay-20 20/Jul/17 9:00 21/Jul/17 18:00 Continuous For Annual maint works NTPC NTPC
533 400 400kV Wardha-2 Tie Bay 411 at Autrangabad 20/Jul/17 9:00 20/Jul/17 18:00 Daily For AMP Works at Aurangabad WRTS-I WRTS-I R
534 400 LANCO#2 _422_Main Bay at Bilaspur PS 20/Jul/17 9:00 20/Jul/17 18:00 Daily AMP works (CB Timings and CT tan delta meas.) WRTS-I WRTS-I R
765KV ICT#02 TIE BAY(717) AT
535 765 20/Jul/17 9:00 20/Jul/17 18:00 Daily AMP WORKS OF BAY WRTS-I WRTS-I R
DHARAMJAYGARH(KORBA) SS
536 400 SOLAPUR_BAY 416_MAIN BAY_PARLI#2 20/Jul/17 9:00 20/Jul/17 18:00 DAILY AMP WORKS WRTS-1 WRTS-1 R
Replacement of Conventional Insulators with Polymer insulators in major crossings line
537 400 400 KV Wardha Akola Line 2 20/Jul/17 9:00 20/Jul/17 18:00 daily Power, River, N.H., S.H., Railway Crossings for public safety. AR in Non Auto Mode for WRTS-I WRTS-I C
other ckt will be required during above period
538 765 765KV ICT-5 Main Bay (720) at Champa PS 20/Jul/17 9:00 21/Jul/17 17:30 Daily AMP/Warranty Tests WRTS-I WRTS-I R
539 220 Kota-Badod(220 kV) 20/Jul/17 7:00 20/Jul/17 18:00 Daily To carry out the annual bay maintenance of the bay equipment. NRPC NRPC
Replacement of Conventional Insulators with Polymer insulators in major crossings line
540 400 400 kV Bhadrawati - Parli # 01. 21/Jul/17 8:00 21/Jul/17 18:00 Daily Power, River, N.H., S.H., Railway Crossings for public safety. AR in Non Auto Mode for WRTS-I WRTS-I C
other ckt will be required during above period
541 400 ICT 1 at Bhachau 21/Jul/17 8:00 21/Jul/17 18:00 Daily RTV coating of ICT 1 Main bay & Tie Bay isolators, CB. POWERGRID WR-II C
765KV Jabalpur-Bina#3 switchable Reactor along with
542 765 21/Jul/17 10:00 22/Jul/17 18:00 Cont. For arrest the oil leakage from top cover & Butterfly valve of Radiator bank STERLITE WR-II R
Reactor bay(821 Reactor Bay) at Jabalpur PS
543 220 Kakrapar-Vav#2 21/Jul/17 9:00 21/Jul/17 18:00 Daily For balance Ins Replacement Work POWERGRID WR-II C
544 400 RAPP#2 Tie Bay(417) at Shujalpur 21/Jul/17 10:00 21/Jul/17 18:00 Daily For commissioning of CSD & SAS works POWERGRID WR-II C
545 400 400 KV Main Bus-1 Bay Kosamba 21/Jul/17 8:00 21/Jul/17 18:00 Daily Half Yearly maintenance & testing activity
Reactor painting work. Only reactor will be taken out of circuit. Line will be charged Reactor will be out
546 400kV 400kV Parli-Lonikand ckt I 21/Jul/17 9:00 23/Jul/17 17:00 Daily MSETCL MSETCL
subsequently. for three days.
Dignostic Testing Work ( Reactor Bushing& winding Tan Delta measurement work, CB
547 400kV 400kV Parli-Lonikand ckt I 21/Jul/17 9:00 21/Jul/17 18:00 Daily MSETCL MSETCL
DCRM & timing Test.)
548 400/220 501MVA, ICT 1 @ 400kV Deepnagar 21/Jul/17 8:00 25/Jul/17 18:00 Daily Routine Maintenance & Dignostic testing work MSETCL MSETCL
549 400KV Babhaleshwar-Ektuni-Ckt-1 @BBLR 21/Jul/17 9:00 21/Jul/17 17:00 Daily Routine Maintenance & Servicing and allignment of PG isolators work MSETCL MSETCL
400 kV Tie Bay 418 (Tie Bay of Yelwan CKt- II) at 400 kV
550 400 kV 21/Jul/17 9:00 21/Jul/17 17:00 Daily Routine Maintenance & testing work MSETCL MSETCL
Akola SS
551 400 400KV NAGDA-RAJGARH - II 21/Jul/17 9:00 21/Jul/17 18:00 daily FOR LINE / BAY MAINTENANCE WORK MPPTCL MPPTCL R
552 220 220 KV GWALIOR(PGCIL)-MAHALGAON - II 21/Jul/17 9:00 21/Jul/17 17:00 daily FOR CVT ERECTION COMMISSIONING & TESTING WORK MPPTCL MPPTCL R
553 400 ICT#1_402_Tie Bay at Bilaspur PS 21/Jul/17 9:00 21/Jul/17 18:00 Daily AMP works (CB Timings and CT tan delta meas.) WRTS-I WRTS-I R
554 765 3X500MVA ICT#1 at Durg PS 21/Jul/17 8:00 21/Jul/17 18:00 Daily CSD comm in Tie Bay WRTS-I WRTS-I C
555 400 NSPCL 1 Main Bay at Raipur SS 21/Jul/17 9:30 21/Jul/17 17:30 Daily AMP work at Raipur WRTS-I WRTS-I R
400kV_BAY 420_TIE BAY_FUTURE__NTPC#1 AT
556 400 21/Jul/17 9:00 21/Jul/17 18:00 DAILY AMP WORKS WRTS-1 WRTS-1 R
SOLAPUR
557 765 765 KV ICT#1 Main bay 703 AT WARDHA 21/Jul/17 9:00 21/Jul/17 18:00 Daily AMP works related to Bay WRTS-I WRTS-I R
Replacement of Conventional Insulators with Polymer insulators in major crossings line
558 400 400 KV Wardha Akola Line 1 21/Jul/17 9:00 21/Jul/17 18:00 daily Power, River, N.H., S.H., Railway Crossings for public safety. AR in Non Auto Mode for WRTS-I WRTS-I C
other ckt will be required during above period
Replacement of Conventional Insulators with Polymer insulators in major crossings line
559 400 400 kV Bhadrawati - Parli # 01. 22/Jul/17 8:00 22/Jul/17 18:00 Daily Power, River, N.H., S.H., Railway Crossings for public safety. AR in Non Auto Mode for WRTS-I WRTS-I C
other ckt will be required during above period
560 220 Kakrapar-Vav#1 22/Jul/17 9:00 22/Jul/17 18:00 Daily For balance Ins Replacement Work POWERGRID WR-II C
561 400 RAPP#1 Main Bay(413) at Shujalpur 22/Jul/17 10:00 22/Jul/17 18:00 Daily For commissioning of CSD & SAS works POWERGRID WR-II C
562 765 765KV Bina#2 Reactor Bay (709R Bay) at satna ss 22/Jul/17 9:00 22/Jul/17 18:00 Daily For AMP work POWERGRID WR-II R
400/220k
563 315MVA, ICT 1 @ BBLR 22/Jul/17 9:00 22/Jul/17 17:00 Daily Routine Maintenance & Servicing and allignment of PG isolators work MSETCL MSETCL
V
for providing earth switch female contacts, corona rings to line isolator and CT jumper
564 400 400kV Aurangabad(MS)-Aurangabad(PG)-1 22/Jul/17 8:00 22/Jul/17 18:00 Daily WRTS-I WRTS-I R
replacement at Msetcl, waluj SS
Replacement of Conventional Insulators with Polymer insulators in major crossings line
565 400 400 KV Wardha Akola Line 2 22/Jul/17 9:00 22/Jul/17 18:00 daily Power, River, N.H., S.H., Railway Crossings for public safety. AR in Non Auto Mode for WRTS-I WRTS-I C
other ckt will be required during above period
Replacement of Conventional Insulators with Polymer insulators in major crossings line
566 400 400 kV Dhariwal TPP- Parli # 02. 23/Jul/17 8:00 23/Jul/17 18:00 Daily Power, River, N.H., S.H., Railway Crossings for public safety. AR in Non Auto Mode for WRTS-I WRTS-I C
other ckt will be required during above period
765KV Jabalpur-Bhopal switchable Reactor along with
567 765 23/Jul/17 10:00 24/Jul/17 18:00 Daily For arrest the oil leakage from Bottom Gate Valve & Butterfly valve of Radiator bank STERLITE WR-II R
Reactor bay(824 Reactor Bay) at Jabalpur PS
Replacement of all porcelain disc insulator strings with CLR Polymer insulators in complete
568 400 Navsari - Magarwada Ckt.1 23/Jul/17 8:00 24/Jul/17 18:00 Daily line to avoid tripping due to heavy pollution. A/R of Ckt.1 to be kept in non auto mode POWERGRID WR-II C
during outage period.
569 400 ACBIL-MCCPL-CKT# 2 23/Jul/17 7:00 25/Jul/17 18:00 Daily AMP ACBIL ACBIL
JP Nigri not to bid
570 400 J P NIGRIE-SATNA-2 23/Jul/17 8:00 30/Jul/17 18:00 Daily Fixing of additional Pilot String in DD type angle Towers JP NIGRIE JP NIGRIE
on PX
Replacement of Conventional Insulators with Polymer insulators in major crossings line
571 400 400 kV Bhadrawati - Dhariwal TPP# 02. 24/Jul/17 8:00 24/Jul/17 18:00 Daily Power, River, N.H., S.H., Railway Crossings for public safety. AR in Non Auto Mode for WRTS-I WRTS-I C
other ckt will be required during above period
408-Bay AND 409-Bay (Main Bay &Tie Bay of Chandrapur
572 400KV 24/Jul/17 11:00 24/Jul/17 14:00 Daily Quarterly Maintenance of bays equipment MSETCL MSETCL
Line-1) at Kumbhargaon
Online permit for installation of Bird divertors on earthwire as per the directions of Bird
573 400 Mundra - Jetpur Ckt.1 24/Jul/17 8:00 26/Jul/17 20:00 Daily POWERGRID WR-II R
Sanctuary authorities. A/R of Ckt-1 to be kept in non auto mode during outage period
574 400 63MVAr Bus Reactor at Bhachau 24/Jul/17 8:00 24/Jul/17 18:00 Daily RTV coating of Bus Reactor Main bay & Tie Bay isolators, CB & CT. POWERGRID WR-II C
Spare reactor will be taking in service without line shutdown . Line will be in service without
575 765 Gwalior-3 Line reactor at Bina (Switchable reactor) 24/Jul/17 9:30 24/Jul/17 18:00 Daily POWERGRID WR-II R
LR at Bina
576 220 Jhanor Haldarwa 1 24/Jul/17 9:00 26/Jul/17 18:00 Continuous Circuit Breaker 03 Drive overhauling Work POWERGRID WR-II C
577 400 400KV BUS#2 AT MPPTCL Indore 24/Jul/17 10:00 25/Jul/17 18:00 Continuous RETROFITTING OF BUS#2 ISOLATOR IN ASOJ#1 POWERGRID WR-II C
578 765 711 bay ( 765kV Bina#1 Tie bay) at Gwalior 24/Jul/17 10:00 24/Jul/17 18:00 Daily AMP WORKS POWERGRID WR-II R
579 765 765KV Bina#2 Main Bay (709 Bay) at satna ss 24/Jul/17 9:00 25/Jul/17 18:00 Daily For AMP work POWERGRID WR-II R
Shifting of 220 Vapi-Sayali & Vapi-Khadoli lines between loc.no. 56-61 to facilitate
580 220 Vapi - Sayali & Vapi - Khadoli 24/Jul/17 6:00 29/Jul/17 18:00 Continuous POWERGRID WR-II C
clearance for Sayali Sports complets of PWD-Silvassa under DNH
Shifting / modifiction of 400lV D/C Jablapur-Itarsi Ckt.3&4 towers for four lanning of
581 400 Jabalpur-Itarsi Ckt.3&4 24/Jul/17 8:00 31/Jul/17 18:00 Continuous POWERGRID WR-II R
Obedullaganj - Betul (NH-69)
Load manage on
582 400 KV 400/220KV 315 MVA ICT-I @ Karad 24/Jul/17 10:00 24/Jul/17 17:00 Daily Quarterly. Maint. work MSETCL MSETCL
other Two ICT'S
583 400 400KV Dhule-BBLR Ckt-I & II 24/Jul/17 9:00 25/Jul/17 17:00 Daily PID testing MSETCL MSETCL
584 400kV 400kV Parli- PGCIL ckt II @ Girwali 24/Jul/17 9:00 24/Jul/17 18:00 Daily Dignostic Testing Work (CB DCRM & timing Test. & C & Tan Delta measurement of CVTs) MSETCL MSETCL
585 220KV Talandge - Chikodi @ Talandge 24/Jul/17 9:00 24/Jul/17 18:00 Daily Quarterly Maintenance work MSETCL MSETCL
586 400 400KV RAJGARH SSP - I 24/Jul/17 7:00 24/Jul/17 19:00 daily FOR LINE / BAY MAINTENANCE WORK MPPTCL MPPTCL R
587 220 220KV ANNUPUR-KOTMIKALA - I 24/Jul/17 10:00 24/Jul/17 17:00 daily FOR LINE / BAY MAINTENANCE WORK MPPTCL MPPTCL R
588 400 VINDH BUS SECTION#3 24/Jul/17 9:00 25/Jul/17 18:00 Continuous HOTSPOT ATTEND AND BAY MAINTENANCE NTPC NTPC
589 400 400kV Bus_1 at Aurangabad 24/Jul/17 8:00 24/Jul/17 18:00 Daily For STATCOM works at Aurangabad WRTS-I WRTS-I C
590 765 3X500MVA ICT#2 at Durg PS 24/Jul/17 8:00 24/Jul/17 18:00 Daily CSD commissioing WRTS-I WRTS-I C
591 220 Urla Bay(20452) at Raipur SS 24/Jul/17 9:30 24/Jul/17 17:30 Daily AMP work at Raipur WRTS-I WRTS-I R
592 400 SOLAPUR_BAY 421_MAIN BAY_NTPC#1 AT SOLAPUR 24/Jul/17 9:00 24/Jul/17 18:00 DAILY AMP WORKS WRTS-1 WRTS-1 R
593 765 765 KV Tie bay of ICT #3 708 at wardha 24/Jul/17 9:00 24/Jul/17 18:00 Daily AMP works related to Bay WRTS-I WRTS-I R
594 400 400kV KOLHAPUR 1 MAIN BAY (407) AT KOLHAPUR 24/Jul/17 10:00 24/Jul/17 18:00 Daily For bay AMP works. WRTS-I WRTS-I R
595 765 765/400KV ICT-6 at Champa PS 24/Jul/17 9:00 25/Jul/17 17:30 Daily AMP/Warranty Tests WRTS-I WRTS-I R
Tower location No. 454 main legs are damaged due to flood, it is required to shift to safe
596 400 400kV KORBA-RAIPUR III 24/Jul/17 9:00 29/Jul/17 18:00 Continuous WRTS-I WRTS-I C
place.
Tower location No. 454 main legs are damaged due to flood, it is required to shift to safe
597 400 400kV KORBA-RAIPUR IV 24/Jul/17 9:00 29/Jul/17 18:00 Continuous WRTS-I WRTS-I C
place.
Replacement of Conventional Insulators with Polymer insulators in major crossings line
598 400 400 kV Bhadrawati - Parli # 01. 25/Jul/17 8:00 25/Jul/17 18:00 Daily Power, River, N.H., S.H., Railway Crossings for public safety. AR in Non Auto Mode for WRTS-I WRTS-I C
other ckt will be required during above period
599 400 400KV INDORE-ASOJ#1 25/Jul/17 10:00 25/Jul/17 18:00 Daily RETROFITTING OF BUS#2 ISOLATOR IN ASOJ#1 & PLCC POWERGRID WR-II C
600 765 713 bay ( 765kV Satna#1 Main bay) at Gwalior 25/Jul/17 10:00 25/Jul/17 18:00 Daily AMP WORKS POWERGRID WR-II R
Replacement of all porcelain disc insulator strings with CLR Polymer insulators in complete
601 400 Navsari - Magarwada Ckt.1&2 25/Jul/17 8:00 26/Jul/17 18:00 Daily line to avoid tripping due to heavy pollution. Outage required in both circuits to replace in POWERGRID WR-II C
Multi Circuit towers due to heavy induction.
602 400 400 KV Main Bus-2 Bay Kosamba 25/Jul/17 8:00 25/Jul/17 18:00 Daily Half Yearly maintenance & testing activity
765 kV Aurangabad-III Akola-II Line-1 non switchable reactor For changeover of Rph- Line reactor against Spare reactor of 706 bay of 765 kV
603 765 25/Jul/17 10:00 25/Jul/17 18:00 Daily MSETCL MEGPTCL
at MSETCL 765/400KV Aurangabad-III Ektuni SS Aurangabad-III Akola- at MSETCL 765/400KV Aurangabad-III Ektuni SS
604 400 400KV HVDC ckt. No.-I bay @400KV S/S Chandrapur 25/Jul/17 8:00 25/Jul/17 18:00 Daily 1) Attending the hot spot on PG Isolators. 2) Routine maintenance of the bay. MSETCL MSETCL
605 400 400KV RAJGARH SSP - II 25/Jul/17 7:00 25/Jul/17 19:00 daily FOR LINE / BAY MAINTENANCE WORK MPPTCL MPPTCL R
606 220 220KV DAMOH-DAMOH (PGCIL) - I 25/Jul/17 8:00 25/Jul/17 18:00 daily FOR LINE / BAY MAINTENANCE WORK MPPTCL MPPTCL R
607 220 220 KV BINA(PGCIL)-SHIVPURI 25/Jul/17 9:00 25/Jul/17 17:00 daily FOR LINE / BAY MAINTENANCE WORK MPPTCL MPPTCL R
608 400 Korba-Raipur Line-3 25/Jul/17 8:30 25/Jul/17 17:30 Continuous For annual maintenance of bay equipments and hot spot attending NTPC NTPC
for Overhead Stringing of U/C 765KV D/C Raipur- Sundargarh Transmission line(of
609 400 400KV D/C Korba-Raipur CKT 3&4 25/Jul/17 7:00 26/Jul/17 17:00 Daily PGCIL OGPTL C
OGPTL) at OGPTL Location numbers AP 25/0- AP 26/0(PGCIL tower Nos: 464-465)
610 765 765kV Wardha-3 Main Bay 718 at Aurangabad 25/Jul/17 9:00 25/Jul/17 18:00 Daily For AMP Works at Aurangabad WRTS-I WRTS-I R
611 400 LANCO#2 _423_Tie Bay at Bilaspur PS 25/Jul/17 9:00 25/Jul/17 18:00 Daily AMP works (CB Timings and CT tan delta meas.) WRTS-I WRTS-I R
SOLAPUR__LINE REACTOR_BAY_713R (Switchable LR of RTV COATING OF TRENCH MAKE BUSHINGS AND SPARE REACTOR
612 765 25/Jul/17 8:00 26/Jul/17 18:00 DAILY WRTS-1 WRTS-1 C
Raichur - 2) COMMISSIONING WORKS
613 400 Korba 2 Main bay at Bhilai (Khedamara) SS 25/Jul/17 9:30 31/Jul/17 17:30 Continuous CT replacement work at Bhilai ss WRTS-I WRTS-I R
Dismantling of Tower Loc 375 and erection of New Tower in place of NEW foundation and
614 400 400Kv Sundargarh-Raigarh -II 25/Jul/17 9:00 14/Aug/17 18:00 Continuous ERPC ERPC
Stringing through Multi Ckt with 220kv Budhi Padhar Korba Line .
Dismantling of Tower Loc 375 and erection of New Tower in place of NEW foundation and
615 400 400kv Sterlite -Raigarh-II 25/Jul/17 9:00 14/Aug/17 18:00 Continuous ERPC ERPC
Stringing through Multi cKt with 220kv Budhi Padhar Korba Line .
Replacement of Conventional Insulators with Polymer insulators in major crossings line
616 400 400 kV Dhariwal TPP- Parli # 02. 26/Jul/17 8:00 26/Jul/17 18:00 Daily Power, River, N.H., S.H., Railway Crossings for public safety. AR in Non Auto Mode for WRTS-I WRTS-I C
other ckt will be required during above period
617 400 ICT 2 at Bhachau 26/Jul/17 8:00 27/Jul/17 18:00 Daily RTV coating of ICT 2 Main bay & Tie Bay isolators, CB. POWERGRID WR-II C
618 400 400KV INDORE-ASOJ#2 26/Jul/17 15:00 26/Jul/17 17:00 Daily RETROFITTING OF PLCC PANEL POWERGRID WR-II C
619 400 404 bay ( 400kV B/R-1 Main bay) at Gwalior 26/Jul/17 10:00 26/Jul/17 18:00 Daily AMP WORKS POWERGRID WR-II R
620 400 400KV Nigri#1 Main Bay (401 Bay) at Satna SS 26/Jul/17 9:00 26/Jul/17 18:00 Daily For AMP work POWERGRID WR-II R
GT#8 will be
621 400 KV 425-Bay (Main Bay of GT#8) at 400KV Koradi-2 Substation 26/Jul/17 9:00 26/Jul/17 18:00 Daily DCRM TIMING CRM & IR of CB 425-Q52 MSETCL MSETCL operation through
Tie Bay 426
Chandrapur II-Switching-Ckt-2(Bay 404 & 405) @
622 400KV 26/Jul/17 9:00 26/Jul/17 18:00 Daily Routine Maintenance & Dignostic testing work MSETCL MSETCL
Chandrapur- II S/S
623 400 ICT#1 _401_Main Bay at Bilaspur PS 26/Jul/17 9:00 26/Jul/17 18:00 Daily AMP works (CB Timings and CT tan delta meas.) WRTS-I WRTS-I R
624 400 400 kV Main Bay 418 of Raipur # 1 at Durg PS 26/Jul/17 8:00 26/Jul/17 18:00 Daily AMP of Bay WRTS-I WRTS-I R
625 400 MCCPL-PGCIL (Bilaspur)-CKT# 1 26/Jul/17 7:00 31/Jul/17 18:00 Daily AMP ACBIL ACBIL
626 400KV Chandrapur 2 - Nanded Ckt-I 27/Jul/17 8:00 27/Jul/17 18:00 Daily Diagnostic Testing & Replacement of broken / damaged disc insulators MSETCL MSETCL
To attend opened spacer dampers with non auto operation of Auto reclosure of Mundra -
627 400 Mundra - Jetpur Ckt.2 27/Jul/17 8:00 27/Jul/17 18:00 Daily POWERGRID WR-II R
Jetpur ckt-1
Replacement of Conventional Insulators with Polymer insulators in major crossings line
628 400 400 kV Dhariwal TPP- Parli # 02. 27/Jul/17 8:00 27/Jul/17 18:00 Daily Power, River, N.H., S.H., Railway Crossings for public safety. AR in Non Auto Mode for WRTS-I WRTS-I C
other ckt will be required during above period
629 400 Mundra Jetpur-2 Line Reactor 27/Jul/17 9:00 27/Jul/17 18:00 Daily Reactor Maintenance and Testing CGPL CGPL
Spare reactor will be out off service without line shutdown . Line will be in service without
630 765 Gwalior-3 Line reactor at Bina (Switchable reactor) 27/Jul/17 9:30 27/Jul/17 18:00 Daily POWERGRID WR-II R
LR at Bina
Replacement of all porcelain disc insulator strings with CLR Polymer insulators in complete
631 400 Ukai-Navsari 27/Jul/17 9:00 27/Jul/17 18:00 Daily POWERGRID WR-II C
line to avoid tripping due to heavy pollution
400KV Side of 765 kV ICT#1 Main Bay (403 Bay) at Satna
632 400 27/Jul/17 9:00 27/Jul/17 18:00 Daily For AMP work POWERGRID WR-II R
SS
633 400 426 (Bhachau-2 Tie breaker) bay at CGPL 27/Jul/17 8:00 27/Jul/17 14:00 Daily 426 CT testing CGPL CGPL
634 400 408 (GT20 Tie breaker) bay at CGPL 27/Jul/17 15:00 27/Jul/17 20:00 Daily 408 CT testing CGPL CGPL
635 400KV Spare line -III @Chakan 27/Jul/17 9:00 27/Jul/17 18:00 Daily Routine Maintenance & Dignostic testing work MSETCL MSETCL
ICT 1 will remain in
636 400KV 401-Bay (Main Bay ICT 1) at 400 KV Jejuri 27/Jul/17 9:00 27/Jul/17 17:00 Daily Annual Maintenance of bays equipment MSETCL MSETCL service through Tie
CB 402
637 400kV 400kV Parli- PGCIL ckt I @ Girwali 27/Jul/17 9:00 27/Jul/17 17:00 Daily Dignostic Testing Work (C & Tan Delta measurement of CVTs) MSETCL MSETCL
638 400kV TBC @ BBLR 27/Jul/17 9:00 27/Jul/17 17:00 Daily Routine Maintenance & Servicing and allignment of PG isolators work MSETCL MSETCL TBC is free
639 400 400KV ISP-INDORE - I 27/Jul/17 9:00 27/Jul/17 16:00 daily FOR LINE / BAY MAINTENANCE WORK MPPTCL MPPTCL R
HOTSPOT ATTEND AND BAY MAINTENANCE(Bus shutdown required for attending the
640 400KV VINDHYACHAL-JABALPUR LINE#4 ALONGWITH BUS-2 27/Jul/17 9:00 28/Jul/17 18:00 Continuous NTPC NTPC
Hot spot)
641 765 765kV B/R Main Bay 701 at Aurangabad 27/Jul/17 9:00 27/Jul/17 18:00 Daily For AMP Works at Aurangabad WRTS-I WRTS-I R
642 400 ICT#2_404_Main Bay at Bilaspur PS 27/Jul/17 9:00 27/Jul/17 18:00 Daily AMP works (CB Timings and CT tan delta meas.) WRTS-I WRTS-I R
643 400 400KV Parli-Pune-2 (Reliance) Line with Reactor 27/Jul/17 10:00 27/Jul/17 18:00 Daily For AMP works of line terminating equipments at Parli WRTS-I WRTS-I R
644 400 ICT3_400/220kv_SOLAPUR 27/Jul/17 9:00 27/Jul/17 18:00 DAILY CSD COMMISSIONING WORKS WRTS-1 WRTS-1 C
Replacement of Conventional Insulators with Polymer insulators in major crossings line
645 400 400 kV Bhadrawati - Parli # 01. 28/Jul/17 8:00 28/Jul/17 18:00 Daily Power, River, N.H., S.H., Railway Crossings for public safety. AR in Non Auto Mode for WRTS-I WRTS-I C
other ckt will be required during above period
Replacement of Conventional Insulators with Polymer insulators in major crossings line
646 400 400 kV Bhadrawati - Parli # 01. 28/Jul/17 8:00 28/Jul/17 18:00 Daily Power, River, N.H., S.H., Railway Crossings for public safety. AR in Non Auto Mode for WRTS-I WRTS-I C
other ckt will be required during above period
Replacement of Conventional Insulators with Polymer insulators in major crossings line
647 400 400 kV Dhariwal TPP- Parli # 02. 28/Jul/17 8:00 28/Jul/17 18:00 Daily Power, River, N.H., S.H., Railway Crossings for public safety. AR in Non Auto Mode for WRTS-I WRTS-I C
other ckt will be required during above period
648 400 400KV Essar -1 Line Reactor including Line 28/Jul/17 8:00 29/Jul/17 18:00 Daily RTV coating of Essar 1 Line & Line Reactor Main bay & Tie Bay isolators, CB & CT. POWERGRID WR-II C
649 765 BAY 707 (MAIN BAY FOR BR-1) at Indore 28/Jul/17 10:00 29/Jul/17 18:00 Daily AMP OF BAY EQUIPMENT POWERGRID WR-II R
650 400 400KV Vchal#2 Main Bay (412 bay) at Satna SS 28/Jul/17 9:00 28/Jul/17 18:00 Daily For AMP work POWERGRID WR-II R
651 400 416 (Limbdi-1 Main brekaer) at CGPL 28/Jul/17 8:00 28/Jul/17 14:00 Daily 416 CT Testing CGPL CGPL
652 400 422 (Jetpur-1 Main breaker) at CGPL 28/Jul/17 15:00 28/Jul/17 20:00 Daily 422 CT Testing CGPL CGPL
400/220k
653 501MVA, ICT 2 @ 400kV Deepnagar 28/Jul/17 8:00 28/Jul/17 18:00 Daily Routine Maintenance & Dignostic testing work MSETCL MSETCL
V
654 400KV Babhaleshwar-Ektuni-Ckt-2 @BBLR 28/Jul/17 9:00 28/Jul/17 17:00 Daily Routine Maintenance & Servicing and allignment of PG isolators work MSETCL MSETCL
Line signature test, broken disc replacement work,tightning and fixing of jumper nutbolts &
655 400 KV KORADI-KHAPERKHEDA II 28/Jul/17 8:00 28/Jul/17 17:00 Daily MSETCL MSETCL
hardwares on line and earthwire
656 400KV 400KV HVDC ckt. No.-II bay @400KV Chandrapur 28/Jul/17 8:00 28/Jul/17 18:00 Daily 1) Attending the hot spot on PG Isolators. 2) Routine maintenance of the bay. MSETCL MSETCL
657 220 220KV ANNUPUR-KOTMIKALA - II 28/Jul/17 10:00 28/Jul/17 17:00 daily FOR LINE / BAY MAINTENANCE WORK MPPTCL MPPTCL R
658 220 220KV DAMOH-DAMOH (PGCIL) - II 28/Jul/17 8:00 28/Jul/17 18:00 daily FOR LINE / BAY MAINTENANCE WORK MPPTCL MPPTCL R
659 400 400 kV Main Bay 419 of GMR # 1 at Durg PS 28/Jul/17 8:00 28/Jul/17 18:00 Daily AMP of Bay WRTS-I WRTS-I R
660 400 SOLAPUR_BAY 415_ KOLHAPUR#1 AT SOLAPUR 28/Jul/17 9:00 29/Jul/17 18:00 CONTINUOUS SF6 LEAKGAE RECTIFICATION WORKS WRTS-1 WRTS-1 R
661 400 400kV Bus_2 at Aurangabad 29/Jul/17 8:00 29/Jul/17 18:00 Daily For STATCOM works at Aurangabad WRTS-I WRTS-I C
662 400 400KV Bina#1 Tie Bay (414 bay) at Satna SS 29/Jul/17 9:00 29/Jul/17 18:00 Daily For AMP work POWERGRID WR-II R
663 400 423 (Jetpur-1 Tie breaker) at CGPL 29/Jul/17 8:00 29/Jul/17 14:00 Daily 423 CT Testing CGPL CGPL
664 400 425 (Bhachau-2 Main breaker) at CGPL 29/Jul/17 15:00 29/Jul/17 20:00 Daily 425 CT Testing CGPL CGPL
665 400 400/220 KV 315 MVA ICT-1 at Vadavi 29/Jul/17 8:00 29/Jul/17 18:00 Daily Termination of connecttion in new busbar protection panel
666 400 400 KV Kansari-Vadavi-1 at vadavi 29/Jul/17 8:00 29/Jul/17 18:00 Daily Termination of connecttion in new busbar protection panel
667 400/220 315MVA, ICT 2 @ BBLR 29/Jul/17 9:00 29/Jul/17 17:00 Daily Routine Maintenance & Servicing and allignment of PG isolators work MSETCL MSETCL
for providing earth switch female contacts, corona rings to line isolator and CT jumper
668 400 400kV Aurangabad(MS)-Aurangabad(PG)-2 29/Jul/17 8:00 29/Jul/17 18:00 Daily WRTS-I WRTS-I R
replacement at Msetcl, waluj SS
669 400 400KV Parli-Pune-1 (Reliance) Line with Reactor 29/Jul/17 10:00 29/Jul/17 18:00 Daily For AMP works of line terminating equipments at Parli WRTS-I WRTS-I R
670 400 400KV Sipat-Ranchi-2 LINE 30/Jul/17 9:00 31/Jul/17 18:00 Continuous For Annual maint works NTPC NTPC
671 400 400KV Essar -2 Line Reactor including Line 30/Jul/17 8:00 31/Jul/17 18:00 Daily RTV coating of Essar 2 Line & Line Reactor Main bay & Tie Bay isolators, CB & CT. POWERGRID WR-II C
672 400 400/220 KV 315 MVA ICT-2 at vadavi 30/Jul/17 8:00 30/Jul/17 18:00 Daily Termination of connecttion in new busbar protection panel
673 400 400 KV Kansari-Vadavi-2 30/Jul/17 8:00 30/Jul/17 18:00 Daily Termination of connecttion in new busbar protection panel
674 400 J P NIGRIE-SATNA-2 30/Jul/17 9:00 30/Jul/17 17:00 Daily Fixing of missing Arcing Horns,Twin Spacers & Rigid Spacers JP NIGRIE JP NIGRIE
675 400KV 400KV Bus Coupler Bay @ 400KV S/S Chandrapur 30/Jul/17 8:00 30/Jul/17 18:00 Daily 1) Measurement of Tan delta & capacitance of CT's. 2) Testing & maintenance of CB. MSETCL MSETCL
676 400 400KV ISP-INDORE - II 30/Jul/17 9:00 30/Jul/17 16:00 daily FOR LINE / BAY MAINTENANCE WORK MPPTCL MPPTCL R
677 400 400kV Bhilai bay at Koradi(MSETCL) 30/Jul/17 9:00 30/Jul/17 18:00 Daily AMP works related to Bay, Line will be in service through TBC WRTS-I WRTS-I R
678 220 220kV ICT-2 Main Bay (201 bay) at Satna SS 31/Jul/17 9:00 31/Jul/17 18:00 Daily For AMP work POWERGRID WR-II R
679 400 426 (Bhachau-2 Tie breaker) at CGPL 31/Jul/17 8:00 31/Jul/17 14:00 Daily 426 CT Testing CGPL CGPL
680 400 428 (Bhachau-1 Main breaker) at CGPL 31/Jul/17 15:00 31/Jul/17 20:00 Daily 428 CT Testing CGPL CGPL
681 400 400/220 KV 315 MVA ICT-3 at vadavi 31/Jul/17 8:00 31/Jul/17 18:00 Daily Termination of connecttion in new busbar protection panel
682 400 400 KV Chorania-Vadavi-1 31/Jul/17 8:00 31/Jul/17 18:00 Daily TERMINATION OF NEW BUSBAR PANEL CONNECTION
683 400 400 kV Main Bay 420 of GMR # 1 at Durg PS 31/Jul/17 8:00 31/Jul/17 18:00 Daily AMP of Bay WRTS-I WRTS-I R
684 400 400 KV Parli (PG)-2 Main Bay(412) at MSETCL Girawli 31/Jul/17 10:00 31/Jul/17 18:00 Daily For Bay AMP works at MSETCL Girawli WRTS-I WRTS-I R
Anaulagnak 3.3

jaUna 2017 AaOr jaulaa[- 2017 maah ko ilayao Apoixat maMaga evMa }jaa- kI AavaSyakta

ANTICIPATED DEMAND AND ENERGY REQUIREMENT FOR JUNE 2017 AND JULY 2017

maaMga }jaa- kI AavaSyakta


rajya State DEMAND ENERGY REQUIREMENT
maogaavaaT (MW) imailayana yauinaTsa (MUs)
jaUna 2017 jaulaa[- 2017 jaUna 2017 jaulaa[- 2017
JUNE 2017 JULY 2017 JUNE 2017 JULY 2017

1 gaujarat GUJARAT

saIimat RESTRICTED 15750 15000 9775 8675


AsaIimat UNRESTRICTED 15800 15050 9800 8700

2 maQya p`doSa MADHYA PRADESH

saIimat RESTRICTED 7495 6800 2820 4540


AsaIimat UNRESTRICTED 7495 6800 2820 4540

3 C<aIsagaZ, CHHATISGARH

saIimat RESTRICTED 3569 3720 1935 1980


AsaIimat UNRESTRICTED 3569 3720 1935 1980

4 maharaYT/ MAHARASHTRA

saIimat RESTRICTED 21000 18300 12200 12000


AsaIimat UNRESTRICTED 21050 18350 12250 12050

5 gaaovaa GOA

saIimat RESTRICTED 550 565 350 340


AsaIimat UNRESTRICTED 550 565 350 340

6 dmana dIva DD

saIimat RESTRICTED 305 310 208 210


AsaIimat UNRESTRICTED 305 310 208 210

7 DI ena eca DNH

saIimat RESTRICTED 765 750 510 505


AsaIimat UNRESTRICTED 765 750 510 505

8 piScama xao~ WESTERN REGION

saIimat RESTRICTED 50400 50500 32150 32200


AsaIimat UNRESTRICTED 50450 50550 32250 32300
Anaulagnak 4.1
maah ma[- 2017 kI yaaojanaabaQd banaama vaastivak ]%padna evaM ]plabQata
ACTUAL GENERATION & AVALABILITY FOR MAY 2017
Schedule yaaojanaa Actual vaastivak
k`maaMk sToSana ka naama }jaa- carma }jaa- carma Auxillary
Sr. Station Name Energy Peak Energy Peak Consumption
No. (Gwh) (Mw) (Gwh) (Mw) (Gwh)
k (A) gaujarat GUJARAT
jalaIya HYDRO
1. ]k[- Ukai - 1 0.00 0
]k[- Ukai - 2 3.25 76
]k[- Ukai - 3 40.81 76
]k[- Ukai - 4 13.04 76
]k[- Ukai (Total) 42 150 57.10 227 0.000
2. ]k[- ela baI saI eca Ukai LBCH - 1 1.27 2
]k[- ela baI saI eca Ukai LBCH - 2 1.08 2
]k[- ela baI saI eca Ukai LBCH (Total) 2 3 2.35 4 0.000
3. kDanaa Kadana - 1 0.00 0 0.000
kDanaa Kadana - 2 0.00 0 0.000
kDanaa Kadana - 3 0.36 53
kDanaa Kadana - 4 0.99 57 0.282
kDanaa Kadana (Total) 16 120 1.35 60 0.282
4. pnama PANAM & Madhuban Dam 1 & 2 0 0 1.88 6 0.026
6. kula jalaIya TOTAL(H) 60 273 62.69 225 0.752
tapIya THERMAL
1 TaoronT pavar ilaimaToD yauinaT saI 42 60 12.90 17 0.091
2 TaoronT pavar ilaimaToD yauinaT DI 85 120 78.03 118 6.917
3 TaoronT pavar ilaimaToD yauinaT [- 0 0 83.38 124 6.914
4 TaoronT pavar ilaimaToD yauinaT ef 74 121 76.41 124 6.864
5 TaoronT pavar ilaimaToD yauinaT jaI TI 1 0.00 0
6 TaoronT pavar ilaimaToD yauinaT jaI TI 2 0 0 0.00 0
7 TaoronT pavar ilaimaToD yauinaT esa TI jaI 0.00 0
8 Qauvarna tapIya Dhuvaran - 5 0 0 0.00 0 0.000
9 Qauvarna tapIya Dhuvaran - 6 0 0 0.00 0 0.734
10 Qauvarna tapIya Dhuvaran - GT 1 0.00 0 2.499
11 Qauvarna tapIya Dhuvaran - GT 2 0 0 0.00 0 2.352
12 Qauvarna tapIya Dhuvaran - STG 65.87 98
13 ]ka[- yauinaT 1 Ukai -1 70 100 0.00 0 0.118
14 ]ka[- yauinaT 2 Ukai -2 70 100 0.00 0 0.042
15 ]ka[- yauinaT 3 Ukai -3 36 200 125.66 203 12.821
16 ]ka[- yauinaT 4 Ukai -4 140 200 32.32 200 4.308
17 ]ka[- yauinaT 5 Ukai -5 19 50 132.98 213 12.132
18 ]ka[- yauinaT 6 Ukai -6 307.29 507 17.023
19 gaaMQaInagar 1 Gandhinagar - 1 70 100 0.00 0 0.000
20 gaaMQaInagar 2 Gandhinagar - 2 70 100 0.00 0 0.000
21 gaaMQaInagar 3 Gandhinagar - 3 136 210 98.32 217 10.603
22 gaaMQaInagar 4 Gandhinagar - 4 145 210 98.18 216 10.774
23 gaaMQaInagar 5 Gandhinagar - 5 37 210 143.33 215 13.695
24 vaNakbaaorI 1 Wanakbori - 1 0 0 111.24 215 0.000
25 vaaNakbaaOrI 2 Wanakbori - 2 145 210 76.69 213
26 vaaNakbaaOrI 3 Wanakbori - 3 145 210 129.94 212
27 vaaNakbaaOrI 4 Wanakbori - 4 89 150 105.02 213
28 vaaNakbaaOrI 5 Wanakbori - 5 145 210 119.74 213
29 vaaNakbaaOrI 6 Wanakbori - 6 145 210 97.28 212
30 vaaNakbaaOrI 7 Wanakbori - 7 145 210 138.44 215
31 ]%trna Utran GT 1 0 0 0.00 0 0.000
32 ]%trna Utran GT 2 0 0 0.00 0 0.000
33 ]%trna UTRAN - GT- 3 0 0 0.00 0 0.000
34 ]%trna UTRAN - GT-4 0 0 16.89 229 1.556
35 ]%trna UTRAN - STG-I 0 0 0.00 0 0.000
36 ]%trna UTRAN - STG-II 0 0 12.46 145 0.000

Schedule yaaojanaa Actual vaastivak


k`maaMk sToSana ka naama }jaa- carma }jaa- carma Auxillary
Sr. Station Name Energy Peak Energy Peak Consumption
No. (Gwh) (Mw) (Gwh) (Mw) (Gwh)
37 isa@ka Sikka - 1 70 110 0.00 0 0.162
38 isa@ka Sikka - 2 70 110 316.71 273 28.721
39 kcC ilagnaa[-T Kutch Lignite - 1 45 70 43.56 71 9.780
40 kcC ilagnaa[-T Kutch Lignite - 2 45 70 43.55 71
41 kcC ilagnaa[-T Kutch Lignite - 3 47 75 43.05 76
42 kcC ilagnaa[-T Kutch Lignite - 4 0 0 9.23 56 3.007
43 saUrt ilagnaa[-T Surat Lignite - 1 75.18 126 7.938
173 240
44 saUrt ilagnaa[-T Surat Lignite - 2 46.03 124 5.189
45 saUrt ilagnaa[-T Surat Lignite - 3 82.05 128 7.460
46 saUrt ilagnaa[-T Surat Lignite - 4 77.27 128 8.460
47 e@rImaaoTa ilagnaa[-T Akrimota Lignite - 1 59.61 97 9.780
60 100
48 e@rImaaoTa ilagnaa[-T Akrimota Lignite - 2 51.91 102
49 jaI Aa[- pI saI ela GIPCL GT - 1 11.58 30 0.000
50 jaI Aa[- pI saI ela GIPCL GT - 2 16.39 30
95 140
51 jaI Aa[- pI saI ela GIPCL GT - 3 5.96 32
52 jaI Aa[- pI saI ela GIPCL ST - 1 19.24 32
53 jaI Aa[- pI saI ela GIPCL GT - 4 0.00 0 0.000
95 140
54 jaI Aa[- pI saI ela GIPCL ST - 2 0.00 0
55 [- esa esa e Aar ESSAR GT - 1 0.00 0 0.000
56 [- esa esa e Aar ESSAR GT - 2 0.00 0
350 480
57 [- esa esa e Aar ESSAR GT - 3 0.00 0
58 [- esa esa e Aar ESSAR STG 0.00 0
59 jaI pI [- saI GPEC GT - 1 1.64 141 0.125
60 jaI pI [- saI GPEC GT - 2 9.86 147 0.118
430 600
61 jaI pI [- saI GPEC GT - 3 6.21 144 0.116
62 jaI pI [- saI GPEC STG 2.39 68
63 jaI esa [- jaI GSEG GT - 1 0.00 0 0.000
64 jaI esa [- jaI GSEG GT - 2 90 150 0.00 0
65 jaI esa [- jaI GSEG STG 4.27 247
66 Sugen (GT 1 + GT 2) 0 0 205.85 364 11.888
67 saIpIpI sao Aayaat Imp from CPP+MUNDRA 50 100 2456.79 6110

kula tapIya Total (T) 5277 7992 6059.40 11285 487.328


kula jalaIya+tapIya Total (H+T) 6130 9359 6122.08 12333 488.080
ivaMD [najaI- Wind Energy 1430.26
kula jalaIya+tapIya+hvaa Total (H+T+Wind) 7552.35 14533
ivainamaya Exchanges (+) 2587.70
saIimat }jaa- maaMga Restricted Energy Req. 9775 10140.05
K (B) MADHYA PRADESH maQya p`doSa
jalaIya HYDRO
1 cambala pir Chambal Pr.(50%share) 50 114 1.59 88
1.1 gaaMQaI saagar Gandhi Sagar 1.69 99 0.090
1.2 raNaa p`tap sagar R.P.Sagar 0.21 43 0.030
1.3 javaahr sagar Jawahar Sagar 1.28 33 0.030
2 ponca Pench 40 75 14.68 146 0.070
3 baargaI Bargi 50 90 16.46 76 0.000
4 baargaI Bargi (LBCH) 0.00 0
5 banasaagar Toansa Bansagar-1 (Tons) 130 315 22.90 214 0.250
6 banasaagar Bansagar-2 (Deolondh) 0 0 10.53 28
7 banasaagar Bansagar-3 (Silpara) 30 60 2.59 13 0.040
8 banasaagar Bansagar-4 (Zinaha) 0 0 2.92 12 0.030
9 maoDIKoDa Medikheda 30 60 0.00 0
10 ibarisaMGapur Birsingpur 15 20 0.00 0 0.010
11 Tavaa Tawa 0 0 0.00 0
12 rajaGaaT Rajghat 20 30 0.00 0 0.060
13 Omkareshwar 210 360 78.16 390 0.436
14 [Midra saagar Indira Sagar 610 990 161.92 1022 0.742
kula jalaIya TOTAL(H) MPPGCL 1185 2114 297.07 2410 1.011

Schedule yaaojanaa Actual vaastivak


k`maaMk sToSna ka naama }jaa- carma }jaa- carma Auxillary
Sr. Station Name Energy Peak Energy Peak Consumption
No. (Gwh) (Mw) (Gwh) (Mw) (Gwh)
tapIya THERMAL
1 AmarkMTk II AMK II Unit -1 0.00 0 14.490
61 82
2 AmarkMTk II AMK II Unit -2 0.00 0
3 AmarkMTk III AMK III Unit -5 0 0 155.31 222 0
4 satpura I Satpura-I(60%Share) 50 67 0.00 0 0.000
5 satpura II Satpura-II Unit 6 0.00 0 0.790
128 163
6 satpura II Satpura-II Unit 7 0.00 0
7 satpura II Satpura-II Unit 8 14.11 194 3.870
122 163
8 satpura II Satpura-II Unit 9 15.52 196
9 satpura III Satpura-III Unit 10 156.45 266 30.280
10 satpura III Satpura-III Unit 11 52.07 187 13.820
11 esajaITIpIesa 1 SGTPS Unit - 1 52.07 187 13.820
142 191
12 esajaITIpIesa 2 SGTPS Unit - 2 77.74 196
13 esajaITIpIesa 3 SGTPS Unit - 3 114.88 178 26.140
144 194
14 esajaITIpIesa 4 SGTPS Unit - 4 109.60 192
15 esajaITIpIesa 5 SGTPS Unit - 5 291 390 309.58 509
16 SSTPS 308.73 1214 22.640
kula tapIya Total (T) 1057 1409 1632.59 2455 131.910
kula jalaIya+tapIya Total (H+T) 2572 4036 2176.64 5067 132.921
Injection from WIND 659.84 0
kula jalaIya+tapIya + ivaMD Total (H+T+WIND) 2836.48 5067
ivainamaya Exchanges (+) 2839.84
saIimat }jaa- maaMga Rest. En. Req. 5900 5676.32
ga (C) CHHATTISGARH C<aIsagaZ,
jalaIya HYDRO
1 hsadova baaMgaao Hasdeo Bango 55 120 6.48 120 0.090
2 Gangrel 6 19 0.74 10 0.020
3 Mini Micro KWB 0.00 7
kula jalaIya TOTAL(H) CSEB 61 139 7.22 137 0.110
tapIya THERMAL
1 kaorbaa (pU) Korba (E) Unit-1 30 50 27.64 0 7.110
2 kaorbaa (pU) Korba (E) Unit-2 30 50 27.64 30
3 kaorbaa (pU) Korba (E) Unit-3 30 50 27.64 42
4 kaorbaa (pU) Korba (E) Unit-4 30 50 27.84 39
5 kaorbaa (pU) Korba (E) Unit -5 71 120 36.85 120 14.100
6 kaorbaa (pU) Korba (E) Unit -6 71 120 66.82 120
7 kaorbaa (p) Korba (W) Unit -1 125 210 116.93 210 0.000
8 kaorbaa (p) Korba (W) Unit -2 125 210 116.93 210
9 kaorbaa (p) Korba (W) Unit -3 125 210 116.93 210 25.350
10 kaorbaa (p) Korba (W) Unit -4 125 210 116.93 210
11 KORBA(EB) Extn - 1 (DSPM 1) 0 250 175.68 254 13.300
12 KORBA(EB) Extn - 2 (DSPM 2 149 250 185.63 254 14.050
kula tapIya Total (T) 1900.05 1993 146.520
13 baalakao sao Aayaat BALCO Import 0.00 0
14 ijandla sao Aayaat JINDAL Import 0.00 0
kula tapIya Total (T+IPP) 911 1780 1900.05 2310
kula jalaIya+tapIya Total (H+T) 966 1900 1907.27 2447 146.630
ivainamaya Exchanges (+) 510.77 0
saIimat }jaa- maaMga Rest. En. Req. 1935 2418.04 2447
Ga (D) MAHARASHTRA maharaYT/
jalaIya HYDRO
1 kaoyanaa 1AaOr 2 Koyna 1 & 2 74 300 50.49 500 1.351
2 kaoyanaa III Koyna III 49 150 15.73 240
3 kaoyanaa IV Koyna IV 165 600 17.08 863
4 kaoyanaa DIpIeca Koyna DPH 10 20 17.34 26
5 TaTa jalaIya TATA Hydro 120 444 115.40 459 2.735
6 vaOtrNaa Vaitarna 3 60 17.67 61
7 eladarI Eldari 5 10 1.96 10
8 BaTgar AaOr vaIr Bhatgar & Vir 3 5 0.00 2
9 pOzana Paithan 0 0 1.79 27
10 itlaarI Tillari 0 0 1.42 61
11 BaIra Tola rosa Bhira Tail Race 9 80 6.76 80
12 GaTGar Ghatghar 37 250 22.96 250
13 Anya CaoTo jalaIya Small Hydro (others) 32 47 11.46 0
kula jalaIya TOTAL(H) 506 1966 302.82 459 4.086

Schedule yaaojanaa Actual vaastivak


k`maaMk sToSana ka naama }jaa- carma }jaa- carma Auxillary
Sr. Station Name Energy Peak Energy Peak Consumption
No. (Gwh) (Mw) (Gwh) (Mw) (Gwh)
tapIya THERMAL
3 naaisak 3 Nasik Unit -3 105 140 122.22 200
4 naaisak 4 Nasik Unit -4 85 115 132.68 209
5 naaisak 5 Nasik Unit -5 133 180 131.00 205
6 T/ambao 4 Trombay Unit -4 0 0 0.00 0
7 T/ambao 5 Trombay Unit -5 250 500 290.31 494
8 T/ambao 6 Trombay Unit -6 130 500 0.00 0
9 T/ambao 8 Trombay Unit -8 0 0 164.53 251
10 T/ambao 7A gaOsa Trombay -7A (Gas) 89.54 124 3.516
0 0
11 T/ambao 7ba Trombay -7B (WHR) 49.35 68
12 kaoraD,I 5 Koradi Unit -5 65 85 0.00 0
13 kaoraD,I 6 Koradi Unit -6 75 100 0.00 0
14 kaoraD,I 7 Koradi Unit -7 75 100 812.66 2038
15 Bausaavala 2 Bhusawal Unit -2 110 150 0.00 0
16 Bausaavala 3 Bhusawal Unit -3 100 135 117.98 190
17 Bausaavala 4 Bhusawal Unit -4 250 335 271.90 505
18 Bausaavala 4 Bhusawal Unit -5 0 0 295.02 505
19 parlaI 3 Parli Unit -3 0 0 0.00 0
20 parlaI 4 Parli Unit -4 0 0 0.00 0
21 parlaI 5 Parli Unit -5 0 0 0.00 0
22 parlaI 6 Parli Unit -6 155 210 170.54 254
23 parlaI 7 Parli Unit -7 40 55 234.25 488
24 KaprKoD,a 1 Khaperkheda Unit -1 80 110 115.50 195
25 KaprKoD,a 2 Khaperkheda Unit -2 100 135 118.59 195
26 KaprKoD,a 3 Khaperkheda Unit -3 350 470 115.37 200
27 KaprKoD,a 4 Khaperkheda Unit -4 106.26 191
28 KaprKoD,a 5 Khaperkheda Unit -5 135 180 265.75 550
30 parsa Paras-3 135 180 154.04 256
31 parsa Paras-4 200 430 158.08 257
32 ]rna Uran (Gas) 200 430 290.16 458
33 ]rna Uran (WHR) 100 220 0.00 0 5.592
34 caMd`pur 1 Chandrapur Unit -1 100 135 0.00 0
35 caMd`pur 2 Chandrapur Unit -2 100 135 0.00 197
36 caMd`pur 3 Chandrapur Unit -3 90 120 132.03 199
37 caMd`pur 4 Chandrapur Unit - 4 70 95 129.48 460
38 caMd`pur 5 Chandrapur Unit -5 80 110 305.39 459
39 caMd`pur 6 Chandrapur Unit -6 190 255 233.62 1431
40 caMd`pur 7 Chandrapur Unit -7 150 200 634.90 0
41 DhaNaU 1 Dahanu Unit-1 152.29 250 14.808
372 500
42 DhaNaU 2 Dahanu Unit-2 164.24 250 15.642
43 CPP 0.00 0.00 3313.16 4601.61
44 RGPPL Share 200 300 0.00 0
kula tapIya Total (T) 6290 9090 9270.83 10585 420.986
MAH. Wind + Solar Generation 677.92 0
kula jalaIya +tapIya Total (H+T+Wind) 6966 9960 10251.57 12174 464.630
ivainamaya
TOTAL (H+T) Exchanges (+) 4339.84
saIimat }jaa- maaMga Rest. En. Req. 14250 14591.41
ca (E) gaaovaa GOA
Aa[- pI pI irlaayaMsa IPP Reliance 4.19 11
ivainamaya Exchanges 352.29
saIimat }jaa- maaMga Rest. En. Req. 350 550 360.20 504
C (F) dmana AaOr dIva DAMAN & DIU 224.70 350
ja (G) dadra nagar hvaolaI DNH 525.56 779
kula DD &DNH (T) 133 242 750.25 1129

Schedule yaaojanaa Actual vaastivak


k`maaMk sToSana ka naama }jaa- carma }jaa- carma Auxillary
Sr. Station Name Energy Peak Energy Peak Consumption
No. (Gwh) (Mw) (Gwh) (Mw) (Gwh)
(H) koMd`Iya xao~ Central Sector
1. ena pI saI N.P.C.
1.1 tara`pur 1 TAPS Unit -1 80 160 0.00 160 3.233
1.2 tara`pur 2 TAPS Unit -2 80 160 0.00 160
1.3 tara`pur 3 TAPS Unit -3 300 480 406.18 540 64.780
1.4 tara`pur 4 TAPS Unit -4 300 480 0.00 0
1.5 kakrapr 1 KAPS Unit -1 125 200 0.00 540 3.147
1.6 kakrapr 2 KAPS Unit -2 125 200 0.00 0
kula ena pI saI NPC Total 1010 1680 406.18 1400
2. ena TI pI saI N.T.P.C.
2.1 kaorbaa esaTIpIesa 1 KSTPS Unit-1 127.24 214
2.2 kaorbaa esaTIpIesa 2 KSTPS Unit-2 148.31 212
2.3 kaorbaa esaTIpIesa 3 KSTPS Unit-3 129.23 214
2.4 kaorbaa esaTIpIesa 4 KSTPS Unit-4 356.17 515
2.5 kaorbaa esaTIpIesa 5 KSTPS Unit-5 352.15 517
2.6 kaorbaa esaTIpIesa 6 KSTPS Unit-6 358.80 516
2.7 kaorbaa esaTIpIesa 7 KSTPS Unit-7 368.24 514
kula kaorbaa KSTPS Total 1510 2600 1840.14 2702 116.784
2.7 ivanQa esaTIpIesa 1 VSTPS Unit-1 146.08 221
2.8 ivanQa esaTIpIesa 2 VSTPS Unit-2 147.83 216
2.9 ivanQa esaTIpIesa 3 VSTPS Unit-3 140.79 215
2.10 ivanQa esaTIpIesa 4 VSTPS Unit-4 149.10 216
2.11 ivanQa esaTIpIesa 5 VSTPS Unit-5 140.48 216
2.12 ivanQa esaTIpIesa 6 VSTPS Unit-6 147.97 218
2.13 ivanQa esaTIpIesa 7 VSTPS Unit-7 360.46 515
2.14 ivanQa esaTIpIesa 8 VSTPS Unit-8 261.72 512
2.15 ivanQa esaTIpIesa 9 VSTPS Unit-9 352.04 513
2.16 ivanQa esaTIpIesa 10 VSTPS Unit-10 358.32 514
2.17 ivanQa esaTIpIesa 11 VSTPS Unit-11 358.89 513
kula ivanQayaacala VSTPS Total 2294 4260 3283.50 #REF! 212.11
3.1 saIpt -1 -SIPAT-1 0.00 0.00
3.2 saIpt -2 -SIPAT-2 486.17 682.00
3.3 saIpt -3 -SIPAT-3 480.50 680.00
3.4 saIpt -4 -SIPAT-4 339.27 514.00
3.5 saIpt -5 SIPAT-5 363.91 517.00
kula saIpt -SIPAT TOTAL 1669.85 2393.00 125.75
4.1 kvaasa gaOsa 1e Kawas GT-1A 0.86 110
4.2 kvaasa gaOsa 1baI Kawas GT-1B 8.80 108
4.3 kvaasa esaTI 1saI Kawas ST-1C 3.59 121
4.4 kvaasa gaOsa 2e Kawas GT-2A 68.78 108
4.5 kvaasa gaOsa 2baI Kawas GT-2B 60.12 109
4.6 kvaasa esaTI 2saI Kawas ST-2C 70.46 119
kula kvaasa KGPS Total 193 630 212.61 675 6.212
5.1 gaMQaar gaOsa 1 Gandhar GT-1 64.71 147
5.2 gaMQaar gaOsa 2 Gandhar GT-2 68.75 145
5.3 gaMQaar gaOsa 3 Gandhar GT-3 78.37 146
5.4 gaMQaar esaTI 4 Gandhar ST-4 112.61 218
kula gaMQaar GGPS Total 80 630 324.44 656 7.838
6.1 maaOda 1 Mauda -1 267.98 512 0.000
6.2 maaOda 2 Mauda -2 351.57 1105 0.000
kula maaOda MAUDA Total 186 500 619.55 1617 41.760
6.1 RGPPL Block I 0.00 0
6.2 RGPPL Block II 79.10 480
6.3 RGPPL Block III 293.20 580
RGPPL TOTAL 540 750 372.30 540 10.424
7.1 esa esa pI SSP RBPH - 1 27.95 185
7.2 esa esa pI SSP RBPH - 2 5.75 184
7.3 esa esa pI SSP RBPH - 3 4.67 183
7.4 esa esa pI SSP RBPH - 4 15.34 184
7.5 esa esa pI SSP RBPH - 5 16.33 189
7.6 esa esa pI SSP RBPH - 6 10.42 185
7.7 esa esa pI SSP CHPH - 1 10.04 36
7.8 esa esa pI SSP CHPH - 2 3.36 34
7.9 esa esa pI SSP CHPH - 3 0.15 34
7.10 esa esa pI SSP CHPH - 4 2.02 34
7.11 esa esa pI SSP CHPH - 5 11.95 36
kula esa esa pI SSP Total 580 900 107.98 1284 1.080
8.1 kula poMca Pench Total 40 75 14.68 146 0.070
8.2 Jindal Injection 0.00 0
8.3 Amarkantak Lanco 0.00 0

(I) piScamaI xao~ WESTERN REGION


ga`aosa ]%padna Gross generation 31049.41
(J) ]plabQata Availability 32438.69
naoT ivainamaya Net Exchanges (+) -5830.55
]plabQa }jaa- Energy Availability 32150 26608.13
maah ma[- 2017 ko daOrana carma maaMga - yaaojanaabaQd banaama vaastivak Anaulagnak 4.2
PEAK DEMAND - SCHEDULE VS ACTUAL FOR MAY 2017 ANNEX-4.2

rajya State Anticipated vaastivak Actual (MW) idnaaMk samaya AavaRi<a


Apoixat AapUit- Date Time Frequency
(MW) Catered UNSCH LS FC SCH LS kula Total
gaujarat GUJARAT
pMjaIkRt Registered 15886 - - - 15886 26.05.2017 16:00 50.04
saIimat Restricted 15750
AsaIimat Unrestricted 15800 15886 0 -27.76 0 15858 26.05.2017 16:00 50.04
nyaUnatma pMjaIkRt maaMga Min. Registered Demand 11029 11029 22.05.2017 0300 50.04
maQya p`doSa MADHYA PRADESH
pMjaIkRt Registered 8425 - - - 8425 16.05.2017 23:00 50.01
saIimat Restricted 12200
AsaIimat Unrestricted 12200 8425 0 0.00 0 8425 16.05.2017 23:00 50.01
nyaUnatma pMjaIkRt maaMga Min. Registered Demand 5327 5327 08.05.2017 1800
C<aIsagaZ, CHHATTISGARH
pMjaIkRt Registered 3891 3891 05.05.2017 1900 49.98
saIimat Restricted 3569
AsaIimat Unrestricted 3569 3888 0 27.22 0 3915 02.05.2017 2300 49.8
nyaUnatma pMjaIkRt maaMga Min. Registered Demand 1771 1771 27.05.2017 1800 50.11
maharaYT/ MAHARASHTRA
pMjaIkRt Registered 22307 - - - 22307 24.05.2017 16:00:00 49.88
saIimat Restricted 19600
AsaIimat Unrestricted 19650 21229 1115 59.44 0 22403 06.05.2017 12:00:00 49.92
nyaUnatma pMjaIkRt maaMga Min. Registered Demand 16297 16297 07.05.2017 1900 50.03
gaaovaa *GOA
pMjaIkRt Registered 550 504 - - 504 09.05.2017 13:00 49.97
AsaIimat Unrestricted 550 504 0 0.53 - 505 09.05.2017 13:00 49.97
nyaUnatma pMjaIkRt maaMga Min. Registered Demand
essaar ESSAR(ESIL)
pMjaIkRt Registered 813 - - 813 19.05.2017 0600 49.99
AsaIimat Unrestricted 813 0 0 - 813 19.05.2017 0600 49.99
nyaUnatma pMjaIkRt maaMga Min. Registered Demand
dmana evaM dIva DD
pMjaIkRt Registered 331 - - 331 03.05.2017 15:00 49.79
AsaIimat Unrestricted 331 0 0 - 331 03.05.2017 15:00 49.79
nyaUnatma pMjaIkRt maaMga Min. Registered Demand
dadra va na hvoalaI DNH
pMjaIkRt Registered 768 - - 768 03.05.2017 19:00 49.94
AsaIimat Unrestricted 768 0 - - 768 03.05.2017 19:00 49.94
nyaUnatma pMjaIkRt maaMga Min. Registered Demand
piScama xao~ WESTERN REGION
pMjaIkRt Registered 50747 - - - 50747 24.05.2017 15:00 49.91
saIimat Restricted 50400
AsaIimat Unrestricted 50450 50747 0 160 0 50907 24.05.2017 15:00 49.91
nyaUnatma pMjaIkRt maaMga Min. Registered Demand 39447 39447 07.05.2017 1900
NOTE: LS = Load Shedding
PC/RM = Power Cuts/Regulatory Measures
FC = Frequency Correction
Registered = Actual Demand Met
Restricted = Registered + LS + FC
Unrestricted = Registered + LS + FC + PC + Holiday Staggering + Recess Staggering.
माह मई 2017 ANNEXURE 4.3
May-17
अनु. . समांतर/ PARALLEL / RADIAL OPERATION TOTAL OPERATING HOURS

1 HVDC back-to back link(WR-NR)-Pole 1 714:43:00

2 HVDC back-to back link(WR-NR)-Pole 2 741:28:00

3 HVDC back-to back link(WR-SR) 744:00:00


टाई लाईन TIE LINE

1
765 -I 765kV Seoni to Wardha-I 744:00:00

2
765 -II 765kV Seoni to Wardha-II 744:00:00

3
765 -I 765kV Seoni to Bilaspur-I 629:00:00

4
765 -II 765kV Seoni to Bilaspur-II 634:00:00

5
765 -I 765kV Durg to Wardha I 726:00:00

6
765 -II 765kV Durg to Wardha II 555:00:00

7
400 400kV Bhilai to Koradi 741:00:00
400
8 400kV Bhilai to Bhadravati 744:00:00

9
400 -I 400kV Raipur to Bhadravati-I 744:00:00

10
400 –II 400kV Raipur to Bhadravati-II 743:00:00

11
400 –III 400kV Raipur to Bhadravati-III 744:00:00

12
400 केवी सातपुरा से कोराडी 400kV Satpura to Koradi 714:04:00

13
400 केवी खंडवा से धुले-I 400kV Khandwa-Dhule-I 734:33:00

14
400 केवी खंडवा से धुले-II 400kV Khandwa-Dhule-II 743:58:00

15
400 केवी इंदौर से असोज-I 400kV Indore to Asoj-I 744:00:00

16
400 केवी इंदौर से असोज-II 400kV Indore to Asoj-II 744:00:00

17
400 केवी इंदौर से असोज-III 400kV Indore to Asoj-III 744:00:00

18
400 -I(GIS) 400kV Kolhapur-Mapusa-I(GIS) 676:09:00

19
400 -II(GIS) 400kV Kolhapur-Mapusa-II(GIS) 690:29:00

20
400 केवी वापी से बोईसर 400kV Vapi-Boisar 744:00:00

21
400 केवी रायगढ़ से आयबीईयूएल 400kV Raigarh to IBEUL 744:00:00

22
400 400kV Raigarh to Sterlight 743:22:00

23
400 400kV Sterlight to Rouerkela 744:00:00

24
400 केवी रायगढ़ से झरसुगुड़ा 400kV Raigarh to Jharsuguda 744:00:00

25
400 केवी नागदा से दे हगाम-I 400kV Nagda to Dehgam 729:29:00

26
400 केवी नागदा से दे हगाम-II 400kV Nagda to Dehgam 744:00:00

27
400 –I 400kV Raipur to Wardha-I 723:00:00

28
400 –II 400kV Raipur to Wardha-II 720:00:00

29
400 –III 400kV Raipur to Wardha-III 708:32:00

30
400 –IV 400kV Raipur to Wardha-IV 702:25:00

31 220 केवी कोरबा से -II 220kV K(E) to Budhipadar-II 734:17:00


32 221 केवी कोरबा से -III 220kV K(E) to Budhipadar-III 716:38:00

भार , WRLDC, Mumbai


Anaulagnak 4.7
Annex-4.7
maah ma[- 2017 ko AMt maoM piScama xao`~ ko mau#ya jalaaSayaaoM ko str
LEVEL OF MAJOR RESERVOIRS IN WESTERN REGION AT THE END OF MONTH OF MAY 2017

ivavarNa Particulars
gau ] iva ina ila GUVNL map`iva]kM ila MPPGCL ena eca DI saI NHDC maraiva]kM ila MSEGCL
kmaaMk

Sl. No. ]ka[- Ukai gaaMQaIsaagar Gandhisagar [Midra saagar Indira Sagar kaoyanaa Koyna

1 Levels in Mtrs. str maITr maoM

1.1 maah ko AMt maoM 94.91 394.80 249.64 625.33


At the end of the month

1.2 ipClao vaYa- [sa maah ko Anau$p AaMkD,oM


87.17 392.05 247.89 622.16
Corresponding Figure of the
month Last Year
ANNEXURE - 5
Outage Revival Outage Duration Category as per
S.No Region Name of Elements Owner/Agency Event Generation Loss (MW) Load Loss (MW) Energy Unserved (MU)
CEA standards
Date Time Date Time Time
Tripping of
1. 400kV Kolhapur(PG)-Mapusa-1
2. 400kV Kolhapur(PG)-Mapusa-2
3. 400kV Kolhapur(PG)-Kolhapur-1
1 WR 4. 400kV Kolhapur(PG)-Kolhapur-2 POWERGRID 05/05/2017 18:37 05/05/2017 18:54 0:17 Due to faults and thunder storm Nil 400 GD-1 0.025
5. 400kV Kolhapur(PG)-Kodghi-1
6. 220kV Tillari-Amona
7. 220kV Mahalaxmi-Amona
due to faults and thunder storm
Tripping of
1. 400kV Kolhapur(PG)-Mapusa-1
2 WR 2. 400kV Kolhapur(PG)-Mapusa-2 POWERGRID/MSETCL 06/05/2017 19:15 06/05/2017 19:18 0:03 Due to phase to earth faults Nil 250 GD-1 0.001
3. 220kV Tillari-Amona
4. 220kV Mahalaxmi-Amona
Tripping of Already 400 kV Jabalpur - Jhabua I is
tripped due to earth fault and tripping of
3 WR 1.400KV Jabalpur - Jhabua II Jhabua Power Limited 07/05/2017 17:36 07/05/2017 19:40 2:04
the second circuit on Earth fault leads to
550 NIL GD-1 NIL
2.600 MW Jhabua Unit 1 loss of Evacuation path

Tripping of
1. 400KV Satna-JP NIGRI circuit-I
2. 400KV Satna-JP NIGRI circuit-II
3. 765KV SATNA-GWALIOR-II
Heavy winds reported near satna area
4. 765KV SATNA BUS-II
4 WR POWERGRID/MPPTCL 09/05/2017 16:19 09/05/2017 17:06 0:47 and several 765kv/400kv/220kv lines 1083 378 GD-1 0.3087
5. 220KV SATNA-SATNA-I tripped on various single phase faults
6. 220KV SATNA-SATNA-II
7. 220KV SATNA-SATNA-III
8. JP Nigrie U#1
9. JP Nigrie U#2
Tripping of
Tripping of the 400 kV Jabalpur - Jhabua
1.400KV Jabalpur - Jhabua I
5 WR Jhabua Power Limited 12/05/2017 13:39 12/05/2017 15:04 1:25 D/C on Earth faults leads to loss of 550 NIL GD-1 NIL
2.400KV Jabalpur - Jhabua II Evacuation path
3.600MW Jhabua Unit 1
Tripping of
1.220 kV Gadchandur-Virur-I
6 WR 2. 220 kV Gadchandur-Virur-II MSETCL 13/05/2017 23:44 14/05/2017 0:20 0:36 Earth wire fallen on ckts resulting in fault Nil 60 GD-1 0.0095
3. 220 kV Gadchandur-Grav

Tripping of
1. 400 kV Aurangabad –Bhusawal S/C
2. 400 kV Aurangabad –Bableshwar S/C
Bus bar protection of Main Bus-II optd at
3. 400 kV Aurangabad –Aurangabad(PG)-II 400kV Aurangabad(MSETCL) S/S and all
4. 400 kV Aurangabad –Pune(PG)-I the connecting elements tripped due to
7 WR MSETCL 19/05/2017 10:56 19/05/2017 11:53 0:57
blasting of Y-Phase Circuit Breaker of
Nil Nil GI-2 Nil
5. 400 kV Aurangabad –Taptitanda
400kV feeder Aurangabad(MSETCL)
6. 400 kV Aurangabad –Deepnagar
–Bhusawal (MSETCL) S/C occurred.
7. 400/220 ICT-I at Aurangabad
8. 400/220 ICT-II at Aurangabad
9. 400 kV Aurangabad Main bus-II
Tripping of
1.400kV Ektuni-Bableshwar-II
2. 400kV Dhule-Bableshwar-I
3. 400kV Dhule-Bableshwar-II
4. 400kV Bableshwar-Padghe-I
5. 400kV Bableshwar-Padghe-II
Bus isolator of 400/220kV ICT-4 at
6. 400kV Bhusawal-Bableshwar S/C
8 WR MSETCL 25/05/2017 16:30 25/05/2017 17:35 1:05 Bableshwar fell down and created Bus Nil 900 GD-1 0.225
7. 400kV Aurangabad-Bableshwar S/C fault
8. 400/220kV ICT-1 at Bableshwar
9. 400/220kV ICT-2 at Bableshwar
10. 400/220kV ICT-3 at Bableshwar
11. 400/220kV ICT-4 at Bableshwar
12. 400kV Bus-1 at Bableshwar
13. 400kV Bus-2 at Bableshwar
Tripping of
1.500 MW VSTPP Unit : 8
2.500 MW VSTPP Unit : 9 Tripping of VSTPS Unit Number 8 on
Differential protection of Generator
3.500 MW VSTPP UNIT :10
9 WR NTPC / POWERGRID 23/05/2017 17:43 23/05/2017 19:02 1:09 Transformer and at the same time 1400 Nil GI-2 Nil
4.400 KV Vindhyachal – Jabalpur- I multiple trippings happened around
5.400 KV Vindhyachal – Satna- III VSTPS
6.400 KV Vindhyachal – Satna- IV
7. 500 kVHVDC Vindhyachal Block –I
Tripping of
1.220KV Raita – Gurur
2.220KV Raita - Siltara Tripping of Bhilai -Khedamara I & II
10 WR CSEB 25/05/2017 20:35 25/05/2017 20:59 0:24
causes the interupption of power
Nil 740 GD-1 0.296
3.220KV Bhilai – Khedamara I
4.220KV Bhilai – Khedamara II
5.220KV Bhilai – Raipur PG
Tripping of
1. HVDC Champa-Kurushetra Pole-1
2. 400 kV KWPCL-Raigarh PS(Kotra)-II POWERGRID / DB Tripping due to Heavy wind and bad
11 WR 27/05/2017 18:35 27/05/2017 19:15 0:40 Nil Nil GI-2 Nil
3. 400 kV Kotra(PS)-Lara-I & II Power/ NTPC /SKS weather condition at Kotra.
4. 400 kV SKS-KOTRA-II
5. 400 kV DB Power-Kotra-I & II
Tripping of
Tripping of evacuation on fault lines
12 WR 1. 400 kV Mouda-Wardha 2 (Ckt 1 already tripped) Mouda 28/05/2017 19:04 28/05/2017 19:45 0:41 580 Nil GD-1
causing blackout of Mouda
2. Mouda Unit 1 and 2 Nil
Annexure-8.2A
WESTERN REGION SCHEMES FUNDED FROM PSDF
(Amount in Rupees Crores)
( Amount in Rs. Crores) (As on 31.05.2017)
Sr. State / UT No. of Scope of Work (Scheme) Approved Grant Date of Funds % of fund Status
No. Schemes Cost Sanctioned Sanction Released Disbursed against
grant Sanctioned

1 Madhya 5 Implementation of Integrated system 4.00 3.6 17/03/2016 0 0.00 %


Pradesh for ABT, Open Access and MIS for
MP-SLDC.
Renovation and Upgradation of 103.00 92.7 17/03/2016 9.27 10.00 %
protection system of substations of
MPPTCL
Renovation Upgradation of 52.34 47.11 05/9/2016 4.71 10.00 %
protection system of substations in
MPPGCL
Installation of 125MVAR Bus Bar 6.21 5.59 05/9/2016 0.00 0.00 %
Reactors at 400kV substation of
MPPGCL(SSTPP Khandwa
substation )
Installation of 50 MVAR Line 7.45 6.71 22/05/2017 0.00 0.00 %
Reactor at 400kV substation at STPS
-MPPGCL
2 Chhattisgarh 2 Scheme for 68.52 61.67 05/9/2016 0.00 0.00 %
Replacement/renovation/Upgradation
of protection system and Switchyard
Equipment of EHV substations in
CSPTCL.
Implementation of Automatic 5.03 4.53 16/05/2017 0.00 0.00 %
Demand Management Scheme
(ADMS) by CSPTCL
3 Gujarat 8 Installation of Automatic Demand 1.67 1.5 11/5/2015 1.35 90.00 % Completed
Management System in the state of
Gujarat in order to improve grid
discipline
Load Forecasting Scheme in the state 3.70 3.7 04/08/2015 0.00 0.00 %
of Gujarat
Wind generation forecasting in the 1.62 1.62 17/03/2015 0.00 0.00 %
State of Gujarat.
Installation of Super Conducting 32.37 29.13 02/01/2017 0.00 0.00 %
Fault Current Limiter (SCFCL) at
220 kV Haldarva substation of
GETCO
Installation of automatic switched 28.39 25.55 22/05/2017 0.00 0.00 %
capacitors on 11kV Feeders of
MGVCL
Installation of automatic switched 37.51 33.76 22/05/2017 0.00 0.00 %
capacitors on 11kV Feeders of
UGVCL
Installation of automatic switched 15.77 14.19 22/05/2017 0.00 0.00 %
capacitors on 11kV Feeders of
DGVCL
Installation of automatic switched 63.32 56.99 22/05/2017 0.00 0.00 %
capacitors on 11kV Feeders of
PGVCL
4 Mharashtra 5 Replacement of existing 0.15 ACSR 46.15 34.61 16/05/2017 0.00 0.00 %
wolf conductor of 132kV Balapur-
Patur-Malegoan corridor and 0.2
ACSR wolf conductor of 132kV
Khapri-Besa (Nagpur Ring Main
Line) by High Ampacity (HTLS)
Conductor
Installation of Data Concentrators in 10.41 9.37 16/05/2017 0.00 0.00 %
MSETCL
Installation of RTUs for 132 kV 25.65 7.70 16/05/2017 0.00 0.00 %
Substations of MSETCL
Installation of Capacitor Banks at 15.72 14.15 22/05/2017 0.00 0.00 %
HV & EHV level at various EHV
subatations under Nashik & Pune
zones in MSETCL
Implementation of Automatic 32.58 29.32 22/05/2017 0.00 0.00 %
Demand Management Scheme
(ADMS) on 33/11kV HV feeders in
Maharashtra
TOATAL 20 561.41 483.5 15.33 3.17 %

***************
Annexure -8.2 B

Reporting Format to the PSDF Project Monitoring Group


1. Name of the Scheme
1.1 Name of the substation and its Location
1.2 Executing Agency
1.3 State/Region

2. Date of Sanction order


2.1 Date of Agreement of Entity with State Govt./NLDC
2.2 Total Approved Cost of the Scheme

2.3 Approved Grant by Monitoring Committee ( Rs. In Lakhs)


2.4 Date of Requisition by the Entity
2.4.a) date and Reference of LOA
2.4.b) Amount of LOA
2.5 Date of Disbursement and amount
2.5.1 : Ist Installment
2.5.2: IInd installment
2.5.3: IIIrd installment
2.6 Date of Scheduled completion of Work
2.7 Date of handing over of Site to entity (in case of turnkey projects)

Report for the Month of ____MM / YY________


Quantity
Qty. AS CUMMULATIVE
No. Supply Description Received
PER LOA PROGRESS Till date BALANCE Remarks
during Month
Sch. Act.
1 item Details
1.1
1.2
….

works as per Progress CUMMULATIVE


Erection Description Balance
LOA During Month PROGRESS Till date

2 work details
2.1
2.2
….

3 Others

Signature with seal of the Nodal Officer


ANNEXURE - 8.3
WESTERN REGION
Wheth Wheth Whet
Whet Phasing Plan
Total DT-of Age er er Whet her
Sr. Unit her for Phase
Developer Name of Project State Region Capa COMMISSIONI in FGD FGD her ESP Comments of GMSTATUS
DivisionIN 495TH OCC
No. No CFB Implementati out plan
city NG years Install space FGD retrof
C on
ed availa plan it
TRN Energy
1 Private Ltd. NAWAPARA TPP Chhatisgarh WR 1 300 14/08/2016 0 N N N N N NORMS COMPLIANT
ACB
2 (INDIA)LTD CHAKABURA TPP Chhattisgarh WR 2 30 28/03/2014 3 N Y N/A N/A N
ACB
3 (INDIA)LTD KASAIPALLI TPP Chhattisgarh WR 1 135 13/12/2011 5 N Y N/A N/A N
ACB
4 (INDIA)LTD KASAIPALLI TPP Chhattisgarh WR 2 135 21/06/2012 5 N Y N/A N/A N
ACB
5 (INDIA)LTD SWASTIK KORBA TPP Chhattisgarh WR 1 25 31/03/2015 2 N Y N/A N/A Y
Bharat
Aluminium Co.
6 Ltd. BALCO TPS Chhattisgarh WR 1 300 04/06/2015 2 N N Y Y Y FGD POSSIBLE
Bharat
Aluminium Co.
7 Ltd. BALCO TPS Chhattisgarh WR 2 300 24/03/2016 1 N N Y Y Y FGD POSSIBLE
8 CSEB MARWA TPS Chhattisgarh WR 1 500 30/03/2014 3 N N Y Y N 30/06/2021
9 CSEB MARWA TPS Chhattisgarh WR 2 500 15/07/2016 0 N N Y Y N 31/03/2021
10 CSPGCL DSPM TPS Chhattisgarh WR 1 250 30/03/2007 10 N N Y Y N FGD POSSIBLE
11 CSPGCL DSPM TPS Chhattisgarh WR 2 250 11/12/2007 9 N N Y Y N FGD POSSIBLE
12 CSPGCL KORBA-III Chhattisgarh WR 1 120 22/03/1976 41 N N N N Y 31/12/2018TO BE PHASED OUT
13 CSPGCL KORBA-III Chhattisgarh WR 2 120 05/04/1981 36 N N N N Y 31/03/2019TO BE PHASED OUT
KORBA-WEST Ext.
14 CSPGCL TPS Chhattisgarh WR 5 500 22/03/2013 4 N N Y Y N 30/09/2021
15 CSPGCL KORBA-WEST TPS Chhattisgarh WR 1 210 21/06/1983 34 N N N N Y 31/01/2020TO BE PHASED OUT
16 CSPGCL KORBA-WEST TPS Chhattisgarh WR 2 210 30/03/1983 34 N N N N Y 31/03/2020TO BE PHASED OUT
17 CSPGCL KORBA-WEST TPS Chhattisgarh WR 3 210 26/03/1985 32 N N N N Y 30/06/2020TO BE PHASED OUT
18 CSPGCL KORBA-WEST TPS Chhattisgarh WR 4 210 13/03/1986 31 N N N N Y 31/12/2020TO BE PHASED OUT
19 DB Power BARADARHA TPS Chhattisgarh WR 1 600 23/02/2014 3 N N Y Y N 30/06/2021
20 DB Power BARADARHA TPS Chhattisgarh WR 2 600 24/03/2015 2 N N Y Y N 30/09/2020
21 GMR RAIKHEDA TPP Chhattisgarh WR 1 685 24/02/2015 2 N N Y Y N 30/06/2020
22 GMR RAIKHEDA TPP Chhattisgarh WR 2 685 28/03/2016 1 N N Y Y N 30/09/2020
KORBA-WEST
23 TPS Pvt Ltd AVANTHA BHANDAR Chhattisgarh WR 1 600 31/03/2014 3 N N Y Y N 31/03/2022

KSK Mahanadi
24 Power Co Ltd AKALTARA TPS Chhattisgarh WR 1 600 13/08/2013 3 N N Y Y N 30/06/2022
KSK Mahanadi
25 Power Co Ltd AKALTARA TPS Chhattisgarh WR 2 600 22/08/2014 2 N N Y Y N 31/03/2022

M/s Lanko
26 Amarkantak Ltd, PATHADI TPP Chhattisgarh WR 1 300 04/06/2009 8 N N N N N 31/12/2020TO BE PHASED OUT

M/s Lanko
27 Amarkantak Ltd, PATHADI TPP Chhattisgarh WR 2 300 25/03/2010 7 N N N N N 31/12/2020TO BE PHASED OUT
28 M/s O.P.Jindal OP JINDAL TPS Chhattisgarh WR 1 250 02/09/2007 9 N N Y Y N 31/03/2022
29 M/s O.P.Jindal OP JINDAL TPS Chhattisgarh WR 2 250 10/02/2008 9 N N Y Y N 31/03/2022
30 M/s O.P.Jindal OP JINDAL TPS Chhattisgarh WR 3 250 06/03/2008 9 N N Y Y N 30/06/2022
31 M/s O.P.Jindal OP JINDAL TPS Chhattisgarh WR 4 250 17/06/2008 9 N N Y Y N 30/06/2022
32 M/s O.P.Jindal TAMNAR TPP Chhattisgarh WR 1 600 10/03/2014 3 N N Y Y N 31/03/2021
33 M/s O.P.Jindal TAMNAR TPP Chhattisgarh WR 2 600 30/03/2014 3 N N Y Y N 31/12/2021
34 M/s O.P.Jindal TAMNAR TPP Chhattisgarh WR 3 600 07/01/2015 2 N N Y Y N 31/03/2022
35 M/s O.P.Jindal TAMNAR TPP Chhattisgarh WR 4 600 28/03/2015 2 N N Y Y N 30/06/2022
Maruti Power
36 Limited BANDAKHAR TPP Chhattisgarh WR 1 300 31/07/2015 1 N N Y Y N 31/03/2020
37 NTPC KORBA STPS Chhattisgarh WR 1 200 28/02/1983 34 N N N N Y 31/03/2021TO BE PHASED OUT
38 NTPC KORBA STPS Chhattisgarh WR 2 200 31/10/1983 33 N N N N Y 31/03/2021TO BE PHASED OUT
39 NTPC KORBA STPS Chhattisgarh WR 3 200 17/03/1984 33 N N N N N 31/03/2021TO BE PHASED OUT
40 NTPC KORBA STPS Chhattisgarh WR 4 500 31/05/1987 30 N N N N Y 31/03/2021TO BE PHASED OUT
41 NTPC KORBA STPS Chhattisgarh WR 5 500 25/03/1988 29 N N N N Y 31/03/2021TO BE PHASED OUT
42 NTPC KORBA STPS Chhattisgarh WR 6 500 26/02/1989 28 N N N N N 31/03/2021TO BE PHASED OUT
43 NTPC KORBA STPS Chhattisgarh WR 7 500 25/11/2010 6 N N Y Y N 31/03/2022
44 NTPC SIPAT STPS Chhattisgarh WR 1 500 27/05/2007 10 N N Y Y N 31/03/2022
45 NTPC SIPAT STPS Chhattisgarh WR 2 500 13/08/2008 8 N N Y Y N 31/12/2022
46 NTPC SIPAT STPS Chhattisgarh WR 3 660 27/06/2011 6 N N Y Y N 31/03/2022
47 NTPC SIPAT STPS Chhattisgarh WR 4 660 24/12/2011 5 N N Y Y N 31/12/2022
48 NTPC SIPAT STPS Chhattisgarh WR 5 660 02/06/2012 5 N N Y Y N 31/12/2023
49 NTPC & Sail BHILAI TPS Chhattisgarh WR 1 250 20/04/2008 9 N N N N N NORMS COMPLIANT
50 NTPC & Sail BHILAI TPS Chhattisgarh WR 2 250 12/07/2009 7 N N N N N NORMS COMPLIANT

RKM Powergen
51 Private Ltd. UCHPINDA TPP Chhattisgarh WR 1 360 28/10/2015 1 N N Y Y N 31/03/2022

RKM Powergen
52 Private Ltd. UCHPINDA TPP Chhattisgarh WR 3 360 28/01/2016 1 N N Y Y N 31/12/2021
53 S V Power Ltd SVPL TPP Chhattisgarh WR 1 63 07/12/2011 5 N Y N/A N/A N

Spectrem Coal
54 & Power Ltd RATIJA TPS Chhattisgarh WR 1 50 04/02/2013 4 N Y N/A N/A N
Spectrem Coal
55 & Power Ltd RATIJA TPS Chhattisgarh WR 1 50 10/11/2016 0 N Y N/A N/A N

56 Vandana Vidyut KATGHORA TPP Chhattisgarh WR 1 35 14/02/2012 5 N Y N/A N/A Y

57 Vandana Vidyut SALORA TPP Chhattisgarh WR 1 135 10/04/2014 3 N N N N N NO PLAN GIVEN(ELECTRICALLY ISOLATED FRO
Adani Power
58 Ltd. MUNDRA TPS Gujarat WR 1 330 04/08/2009 7 N N Y Y N 31/03/2022
Adani Power
59 Ltd. MUNDRA TPS Gujarat WR 2 330 17/03/2010 7 N N Y Y N 31/03/2022
Adani Power
60 Ltd. MUNDRA TPS Gujarat WR 3 330 02/08/2010 6 N N Y Y N 31/12/2021
Adani Power
61 Ltd. MUNDRA TPS Gujarat WR 4 330 20/12/2010 6 N N Y Y N 30/09/2021
Adani Power
62 Ltd. MUNDRA TPS Gujarat WR 5 660 26/12/2010 6 N N Y Y N 30/06/2021
Adani Power
63 Ltd. MUNDRA TPS Gujarat WR 6 660 20/07/2011 5 N N Y Y N 31/03/2021
Adani Power
64 Ltd. MUNDRA TPS Gujarat WR 7 660 07/11/2011 5 Y N N/A N/A N
Adani Power
65 Ltd. MUNDRA TPS Gujarat WR 8 660 03/03/2012 5 Y N N/A N/A N
Adani Power
66 Ltd. MUNDRA TPS Gujarat WR 9 660 09/03/2012 5 Y N N/A N/A N
Bhavnagar
Energy
67 Company Ltd Bhavnagar Lignite TPP Gujarat WR 1 250 16/05/2016 1 N Y N/A N/A N
68 Essar Gujarat SALAYA TPP Gujarat WR 1 600 04/01/2012 5 N N Y Y N 30/06/2021
69 Essar Gujarat SALAYA TPP Gujarat WR 2 600 15/06/2012 5 N N Y Y N 31/03/2021
70 GIPCL SURAT LIG. TPS Gujarat WR 1 125 16/01/2000 17 N Y N/A N/A N
71 GIPCL SURAT LIG. TPS Gujarat WR 2 125 06/11/1999 17 N Y N/A N/A N
72 GIPCL SURAT LIG. TPS Gujarat WR 3 125 12/04/2010 7 N Y N/A N/A Y 30/09/2020
73 GIPCL SURAT LIG. TPS Gujarat WR 4 125 23/04/2010 7 N Y N/A N/A Y 31/12/2020
74 GMD Corpn. AKRIMOTA LIG TPS Gujarat WR 1 125 31/03/2005 12 N Y N/A N/A Y 30/09/2020
75 GMD Corpn. AKRIMOTA LIG TPS Gujarat WR 2 125 19/12/2005 11 N Y N/A N/A Y 31/12/2020
76 GSECL GANDHI NAGAR TPS Gujarat WR 3 210 20/03/1990 27 N N Y Y N PARTIAL FGD
77 GSECL GANDHI NAGAR TPS Gujarat WR 4 210 20/07/1991 25 N N Y Y N PARTIAL FGD
78 GSECL GANDHI NAGAR TPS Gujarat WR 5 210 17/03/1998 19 N N Y Y N PARTIAL FGD
79 GSECL KUTCH LIG. TPS Gujarat WR 1 70 29/03/1990 27 N N Y Y Y PARTIAL FGD
80 GSECL KUTCH LIG. TPS Gujarat WR 2 70 25/03/1991 26 N N Y Y Y PARTIAL FGD
81 GSECL KUTCH LIG. TPS Gujarat WR 3 75 31/03/1997 20 N N Y Y Y PARTIAL FGD
82 GSECL KUTCH LIG. TPS Gujarat WR 4 75 01/10/2009 7 N Y N/A N/A Y 31/12/2020
83 GSECL SIKKA REP. TPS Gujarat WR 2 120 31/03/1993 24 N N N N N 30/06/2017TO BE PHASED OUT
84 GSECL SIKKA REP. TPS Gujarat WR 3 250 29/03/2015 2 N N Y Y N FGD POSSIBLE
85 GSECL SIKKA REP. TPS Gujarat WR 4 250 25/09/2015 1 N N Y Y N FGD POSSIBLE
86 GSECL UKAI TPS Gujarat WR 3 200 21/01/1979 38 N N Y Y Y FGD POSSIBLE
87 GSECL UKAI TPS Gujarat WR 4 200 28/03/1979 38 N N Y Y Y FGD POSSIBLE
88 GSECL UKAI TPS Gujarat WR 5 210 30/01/1985 32 N N Y Y Y FGD POSSIBLE
89 GSECL UKAI TPS Gujarat WR 6 500 05/03/2013 4 N N Y Y Y 31/03/2022
90 GSECL WANAKBORI TPS Gujarat WR 1 210 23/03/1982 35 N N Y Y Y FGD POSSIBLE
91 GSECL WANAKBORI TPS Gujarat WR 2 210 15/01/1983 34 N N Y Y Y FGD POSSIBLE
92 GSECL WANAKBORI TPS Gujarat WR 3 210 15/03/1984 33 N N Y Y Y FGD POSSIBLE
93 GSECL WANAKBORI TPS Gujarat WR 4 210 09/03/1986 31 N N Y Y Y FGD POSSIBLE
94 GSECL WANAKBORI TPS Gujarat WR 5 210 23/09/1986 30 N N Y Y Y FGD POSSIBLE
95 GSECL WANAKBORI TPS Gujarat WR 6 210 18/11/1987 29 N N Y Y Y FGD POSSIBLE
96 GSECL WANAKBORI TPS Gujarat WR 7 210 31/12/1998 18 N N Y Y Y FGD POSSIBLE
Tata Power
97 (CGPL) MUNDRA UMTPP Gujarat WR 1 800 07/03/2012 5 N N Y Y N 30/06/2020
Tata Power
98 (CGPL) MUNDRA UMTPP Gujarat WR 2 800 30/07/2012 4 N N Y Y N 31/03/2021
Tata Power
99 (CGPL) MUNDRA UMTPP Gujarat WR 3 800 27/10/2012 4 N N Y Y N 30/06/2021
Tata Power
100 (CGPL) MUNDRA UMTPP Gujarat WR 4 800 21/01/2013 4 N N Y Y N 31/03/2022
Tata Power
101 (CGPL) MUNDRA UMTPP Gujarat WR 5 800 22/03/2013 4 N N Y Y N 31/03/2022

Torrent Power
102 Generation Ltd,. SABARMATI Gujarat WR 1 120 12/10/1978 38 N N Y Y N PARTIAL FGD

Torrent Power
103 Generation Ltd,. SABARMATI Gujarat WR 2 121 31/12/1984 32 N N Y Y N PARTIAL FGD

Torrent Power
104 Generation Ltd,. SABARMATI Gujarat WR 3 121 28/09/1988 28 N N Y Y N PARTIAL FGD

Torrent Power
105 Generation Ltd,. SABARMATI Gujarat WR 15 30 25/02/1962 55 N N N N N 31/12/2017TO BE PHASED OUT

Torrent Power
106 Generation Ltd,. SABARMATI Gujarat WR 16 30 19/05/1963 54 N N N N N 31/12/2017TO BE PHASED OUT

107 BLA Pvt Limited NIWARI TPP Madhya Pradesh WR 1 45 10/12/2013 3 N N N N N NORMS COMPLIANT
108 BPSCL BINA TPS Madhya Pradesh WR 1 250 12/08/2012 4 N N N N N NORMS COMPLIANT
109 BPSCL BINA TPS Madhya Pradesh WR 2 250 31/03/2013 4 N N N N N NORMS COMPLIANT
110 ESSAR power MAHAN TPP Madhya Pradesh WR 1 600 24/02/2013 4 N N Y Y N 31/12/2020
Jaipraksh
Power Venture
111 Ltd NIGRI TPP Madhya Pradesh WR 1 660 29/08/2014 2 N N Y Y N 30/06/2020
Jaipraksh
Power Venture
112 Ltd NIGRI TPP Madhya Pradesh WR 2 660 27/02/2015 2 N N Y Y N 30/09/2020
Jhabua Power
113 Ltd. SEIONI TPP Madhya Pradesh WR 1 600 22/03/2016 1 N N Y Y N 31/03/2020
114 MB Power ANUPPUR TPP Madhya Pradesh WR 1 600 20/04/2015 2 N N Y Y N 31/03/2022
115 MB Power ANUPPUR TPP Madhya Pradesh WR 2 600 30/03/2016 1 N N Y Y N 30/06/2022
AMARKANTAK EXT
116 MPPGCL TPS Madhya Pradesh WR 5 210 15/06/2008 9 N N Y Y Y PARTIAL FGD
117 MPPGCL SANJAY GANDHI TPS Madhya Pradesh WR 1 210 26/03/1993 24 N N Y Y Y PARTIAL FGD
118 MPPGCL SANJAY GANDHI TPS Madhya Pradesh WR 2 210 27/03/1993 24 N N Y Y Y PARTIAL FGD
119 MPPGCL SANJAY GANDHI TPS Madhya Pradesh WR 3 210 28/02/1999 18 N N Y Y Y 30/06/2021
120 MPPGCL SANJAY GANDHI TPS Madhya Pradesh WR 5 500 18/06/2007 10 N N Y Y Y 31/03/2021
121 MPPGCL SATPURA TPS Madhya Pradesh WR 10 250 22/03/2013 4 N N Y Y Y 30/09/2020
122 MPPGCL SATPURA TPS Madhya Pradesh WR 11 250 25/12/2013 3 N N Y Y Y 30/06/2020
123 MPPGCL SHRI SINGHAJI TPP Madhya Pradesh WR 1 600 18/11/2013 3 N N Y Y N 31/03/2020
124 MPPGCL SHRI SINGHAJI TPP Madhya Pradesh WR 2 600 15/10/2014 2 N N Y Y N 31/12/2019
125 NTPC VINDHYACHAL STPS Madhya Pradesh WR 1 210 10/10/1987 29 N N N N Y 31/03/2021TO BE PHASED OUT
126 NTPC VINDHYACHAL STPS Madhya Pradesh WR 2 210 23/07/1988 28 N N N N Y 31/03/2021TO BE PHASED OUT
127 NTPC VINDHYACHAL STPS Madhya Pradesh WR 3 210 03/02/1989 28 N N N N Y 31/03/2021TO BE PHASED OUT
128 NTPC VINDHYACHAL STPS Madhya Pradesh WR 4 210 26/12/1989 27 N N N N Y 31/03/2021TO BE PHASED OUT
129 NTPC VINDHYACHAL STPS Madhya Pradesh WR 5 210 31/03/1990 27 N N N N Y 31/03/2021TO BE PHASED OUT
130 NTPC VINDHYACHAL STPS Madhya Pradesh WR 6 210 01/02/1991 26 N N N N Y 31/03/2021TO BE PHASED OUT
131 NTPC VINDHYACHAL STPS Madhya Pradesh WR 7 500 03/03/1999 18 N N N N N 31/03/2021TO BE PHASED OUT
132 NTPC VINDHYACHAL STPS Madhya Pradesh WR 8 500 26/02/2000 17 N N N N N 31/03/2021TO BE PHASED OUT
133 NTPC VINDHYACHAL STPS Madhya Pradesh WR 9 500 27/07/2006 #### N N Y Y Y FGD POSSIBLE
134 NTPC VINDHYACHAL STPS Madhya Pradesh WR 10 500 08/03/2007 9.82 N N Y Y Y FGD POSSIBLE
135 NTPC VINDHYACHAL STPS Madhya Pradesh WR 11 500 14/06/2012 4.55 N N Y Y N FGD POSSIBLE
136 NTPC VINDHYACHAL STPS Madhya Pradesh WR 12 500 22/03/2013 3.78 N N Y Y N FGD POSSIBLE
137 NTPC VINDHYACHAL STPS Madhya Pradesh WR 13 500 06/08/2015 1.41 Y N N/A N/A N
Reliance Power
138 Ltd SASAN UMTPP Madhya Pradesh WR 1 660 30/05/2013 4 N N Y Y N 30/09/2021
Reliance Power
139 Ltd SASAN UMTPP Madhya Pradesh WR 2 660 18/12/2013 3 N N Y Y N 30/06/2021
Reliance Power
140 Ltd SASAN UMTPP Madhya Pradesh WR 3 660 21/05/2014 3 N N Y Y N 31/03/2022
Reliance Power
141 Ltd SASAN UMTPP Madhya Pradesh WR 4 660 25/03/2014 3 N N Y Y N 31/03/2022
Reliance Power
142 Ltd SASAN UMTPP Madhya Pradesh WR 5 660 24/08/2014 2 N N Y Y N 31/12/2021
Reliance Power
143 Ltd SASAN UMTPP Madhya Pradesh WR 6 660 19/03/2015 2 N N Y Y N 30/09/2021
Abhijeetb
MADC Nagpur
144 Enery P L MIHAN TPS Maharashtra WR 1 246 09/02/2012 5 N Y N/A N/A N

Adani Power
145 Maharashtra Ltd TIRORA TPS Maharashtra WR 1 660 11/09/2012 4 N N Y Y N 31/03/2022

Adani Power
146 Maharashtra Ltd TIRORA TPS Maharashtra WR 2 660 25/03/2013 4 N N Y Y N 31/12/2021

Adani Power
147 Maharashtra Ltd TIRORA TPS Maharashtra WR 3 660 10/06/2013 4 N N Y Y N 30/09/2021

Adani Power
148 Maharashtra Ltd TIRORA TPS Maharashtra WR 4 660 23/03/2014 3 N N Y Y N 30/06/2021

Adani Power
149 Maharashtra Ltd TIRORA TPS Maharashtra WR 5 660 25/09/2014 2 N N Y Y N 31/03/2021
150 BSES Pvt. DAHANU TPS Maharashtra WR 1 250 06/01/1995 22 Y N N/A N/A N
151 BSES Pvt. DAHANU TPS Maharashtra WR 2 250 29/03/1995 22 Y N N/A N/A N
Dhariwal
152 Infrastructure DHARIWAL TPP Maharashtra WR 1 300 03/11/2013 3 N N Y Y N FGD POSSIBLE
Dhariwal
153 Infrastructure DHARIWAL TPP Maharashtra WR 2 300 28/05/2014 3 N N Y Y N 31/03/2022
GMR emco
154 ENERGY ltd EMCO WARORA TPS Maharashtra WR 1 300 07/02/2013 4 N N Y Y N 31/03/2022
GMR emco
155 ENERGY ltd EMCO WARORA TPS Maharashtra WR 2 300 27/08/2013 3 N N Y Y N 31/03/2022
Gupta Energy P
156 L GEPL TPP Ph-I Maharashtra WR 1 60 28/04/2012 5 N N N N Y 31/03/2018TO BE PHASED OUT
Gupta Energy P
157 L GEPL TPP Ph-I Maharashtra WR 2 60 08/09/2012 4 N N N N Y 31/03/2018TO BE PHASED OUT
Ideal Energy
158 Projects Ltd. BELA TPS Maharashtra WR 1 270 20/03/2013 4 N N Y Y Y 31/03/2022
JSW
Energy(Ratnagir
159 i) JSW RATNAGIRI TPP Maharashtra WR 1 300 24/08/2010 6 Y N N/A N/A N
JSW
Energy(Ratnagir
160 i) JSW RATNAGIRI TPP Maharashtra WR 2 300 09/12/2010 6 Y N N/A N/A N
JSW
Energy(Ratnagir
161 i) JSW RATNAGIRI TPP Maharashtra WR 3 300 06/05/2011 6 Y N N/A N/A N
JSW
Energy(Ratnagir
162 i) JSW RATNAGIRI TPP Maharashtra WR 4 300 08/10/2011 5 Y N N/A N/A N
163 MAHAGENCO BHUSAWAL TPS Maharashtra WR 2 210 30/08/1979 37 N N Y Y Y PARTIAL FGD
164 MAHAGENCO BHUSAWAL TPS Maharashtra WR 3 210 18/09/1982 34 N N Y Y N PARTIAL FGD
165 MAHAGENCO BHUSAWAL TPS Maharashtra WR 4 500 07/03/2012 5 N N Y Y Y PARTIAL FGD
166 MAHAGENCO BHUSAWAL TPS Maharashtra WR 5 500 30/03/2012 5 N N Y Y Y PARTIAL FGD
167 MAHAGENCO CHANDRAPUR STPS Maharashtra WR 3 210 03/05/1985 32 N N Y Y N FGD POSSIBLE
168 MAHAGENCO CHANDRAPUR STPS Maharashtra WR 4 210 08/03/1986 31 N N Y Y N FGD POSSIBLE
169 MAHAGENCO CHANDRAPUR STPS Maharashtra WR 5 500 22/03/1991 26 N N Y Y N FGD POSSIBLE
170 MAHAGENCO CHANDRAPUR STPS Maharashtra WR 6 500 11/03/1992 25 N N Y Y N FGD POSSIBLE
171 MAHAGENCO CHANDRAPUR STPS Maharashtra WR 7 500 01/10/1997 19 N N Y Y N FGD POSSIBLE
172 MAHAGENCO CHANDRAPUR STPS Maharashtra WR 8 500 29/03/2015 2 N N Y Y Y 31/12/2021
173 MAHAGENCO CHANDRAPUR STPS Maharashtra WR 9 500 21/03/2016 1 N N Y Y N 31/03/2020
174 MAHAGENCO KHAPARKHEDA TPS Maharashtra WR 1 210 26/03/1989 28 N N Y Y Y FGD POSSIBLE
175 MAHAGENCO KHAPARKHEDA TPS Maharashtra WR 2 210 08/01/1990 27 N N Y Y Y FGD POSSIBLE
176 MAHAGENCO KHAPARKHEDA TPS Maharashtra WR 3 210 31/05/2000 17 N N Y Y Y FGD POSSIBLE
177 MAHAGENCO KHAPARKHEDA TPS Maharashtra WR 4 210 07/01/2001 16 N N Y Y N FGD POSSIBLE
178 MAHAGENCO KHAPARKHEDA TPS Maharashtra WR 5 500 05/08/2011 5 N N Y Y N FGD POSSIBLE
179 MAHAGENCO KORADI TPS Maharashtra WR 6 210 30/03/1982 35 N N Y Y N PARTIAL FGD
180 MAHAGENCO KORADI TPS Maharashtra WR 7 210 13/01/1983 34 N N Y Y Y PARTIAL FGD
181 MAHAGENCO KORADI TPS Maharashtra WR 8 660 30/03/2015 2 N N Y Y N FGD POSSIBLE
182 MAHAGENCO KORADI TPS Maharashtra WR 9 660 15/03/2016 1 N N Y Y N FGD POSSIBLE
183 MAHAGENCO NASIK TPS Maharashtra WR 3 210 26/04/1979 38 N N Y Y N PARTIAL FGD
184 MAHAGENCO NASIK TPS Maharashtra WR 4 210 10/07/1980 37 N N Y Y Y PARTIAL FGD
185 MAHAGENCO NASIK TPS Maharashtra WR 5 210 30/01/1981 36 N N Y Y Y PARTIAL FGD
186 MAHAGENCO PARAS TPS Maharashtra WR 3 250 31/05/2007 10 N N N N Y NORMS COMPLIANT
187 MAHAGENCO PARAS TPS Maharashtra WR 4 250 27/03/2010 7 N N N N Y NORMS COMPLIANT
188 MAHAGENCO PARLI TPS Maharashtra WR 4 210 26/03/1985 32 N N Y Y Y PARTIAL FGD
189 MAHAGENCO PARLI TPS Maharashtra WR 5 210 31/12/1987 29 N N Y Y N PARTIAL FGD
190 MAHAGENCO PARLI TPS Maharashtra WR 6 250 16/02/2007 10 N N Y Y Y PARTIAL FGD
191 MAHAGENCO PARLI TPS Maharashtra WR 7 250 10/02/2010 7 N N Y Y Y PARTIAL FGD
192 MAHAGENCO PARLI TPS Maharashtra WR 8 250 30/03/2016 1 N N Y Y N PARTIAL FGD
193 NTPC MOUDA TPS Maharashtra WR 1 500 19/04/2012 5 N N Y Y N 31/12/2021
194 NTPC MOUDA TPS Maharashtra WR 2 500 29/03/2013 4 N N Y Y Y 30/06/2021
195 NTPC MOUDA TPS Maharashtra WR 3 660 28/03/2016 1 N N Y Y Y 31/12/2020
196 Ratan Power AMARAVATI TPS Maharashtra WR 1 270 25/03/2013 4 N N Y Y N
197 Ratan Power AMARAVATI TPS Maharashtra WR 2 270 17/02/2014 3 N N Y Y N
198 Ratan Power AMARAVATI TPS Maharashtra WR 3 270 29/01/2015 2 N N Y Y N
199 Ratan Power AMARAVATI TPS Maharashtra WR 4 270 04/03/2015 2 N N Y Y N
200 Ratan Power AMARAVATI TPS Maharashtra WR 5 270 12/03/2015 2 N N Y Y N
201 Ratan Power NASIK (P) TPS Maharashtra WR 1 270 25/02/2014 3 N N Y Y N PARTIAL FGD
202 Ratan Power NASIK (P) TPS Maharashtra WR 2 270 15/02/2017 3 N N Y Y N
TATA Power
203 Co. TROMBAY TPS Maharashtra WR 5 500 25/01/1984 33 Y N N/A N/A Y
TATA Power
204 Co. TROMBAY TPS Maharashtra WR 8 250 26/03/2009 8 Y N N/A N/A N
Vidarbha
205 Industries Ltd BUTIBORI TPP Maharashtra WR 1 300 17/08/2012 4 N N Y Y N 30/06/2021
Vidarbha
206 Industries Ltd BUTIBORI TPP Maharashtra WR 2 300 19/03/2013 4 N N Y Y N 31/03/2021
WARDHA WARORA
207 Wardha P C P L TPP Maharashtra WR 1 135 05/06/2010 7 N N Y Y N 31/12/2021
WARDHA WARORA
208 Wardha P C P L TPP Maharashtra WR 2 135 10/10/2010 6 N N Y Y N 31/12/2021
WARDHA WARORA
209 Wardha P C P L TPP Maharashtra WR 3 135 21/01/2011 6 N N Y Y N 30/09/2021
WARDHA WARORA
210 Wardha P C P L TPP Maharashtra WR 4 135 30/04/2011 6 N N Y Y N 30/09/2021
ANNEXURE 9.2
WR - I WR-II
Type of
Phone Type of Phone Nearest PDH / Nearest 
Sr No Owner Station Name WRLDC Remarks POWERGRID Reply Orange Remark Sr No Owner Station Name VOIP Numbers WRLDC Remarks Phone POWERGRID Reply Orange Remark
Numbers envisaged SDH PDH/SDH
Envisaged
1 PG Raipur 400 kV 20221370 WORKING VOIP WORKING Done 1 PG Jabalpur 400 kV 20221360 WORKING VOIP WORKING Done

2 PG Bhadrwathi 20221380 WORKING VOIP WORKING Done 2 PG khandwa 20221361 WORKING VOIP WORKING Done

3 ISGS RGPPL 400 20220430 NOT INTEGRATED Analog EXTN created in Mumbai 3 PG Damoh 20221357 WORKING VOIP WORKING Done

Pending due to long distance between


4 ISGS KORBA 400 20221384 WORKING VOIP WORKING Done 4 PG Bina 20221356 WORKING VOIP
SDH to control room approx. 380 mts

Channel created from Pending due to long distance between SDH to


5 ipp LANCO 400 20220431 NOT INTEGRATED Analog Bilaspur EXTN created in Mumbai 5 PG Jabalpur 765 Kv 20221366 Working till Tejas PDH VOIP IP phone handedover
Bilaspur to WRLDC control room approx. 350 mts

6 ISGS SIPAT 400 20221368 WORKING VOIP WORKING Done 6 PG Satna 20221352 WORKING VOIP WORKING Done

Cabling done phone


Cabling Done. Phone to be Connected. Not on
7 PG BILASPUR 765 20221382 Working till Tejas PDH VOIP WORKING WORKING 7 PG Gwalior 20220401 NOT INTEGRATED VOIP has been handed over
OPGW
tosite constituent

8 PG SEONI 765 20221376 NOT WORKING VOIP WORKING Done 8 PG Indore 765 20221351 Working till Tejas PDH VOIP WORKING Done

EXTN created in
9 PG BHATAPARA 20220432 NOT INTEGRATED VoIP In Process In Process 9 ISGS SSP 20220355 WORKING Analog WORKING
Mumbai
Phone has been
10 PG RAIGARH 400 20220382 Working till Tejas PDH VOIP WORKING Done 10 PG Dehgham 20221402 NOT INTEGRATED VOIP In Process
delivered
Channel created from Raipur Phone has been
11 ipp JINDAL 400 20220433 NOT INTEGRATED Analog Raipur EXTN created in Mumbai 11 PG Pirana 20220403 NOT INTEGRATED VOIP In Process
to WRLDC delivered

Pending due to long distance between SDH to


12 PG PARLI 400 20221377 WORKING VOIP WORKING Done 12 PG Navsari 20221364 Working till Tejas PDH VOIP
control room approx. 150 mts

13 PG SHOLAPUR 400 20221359 WORKING VOIP WORKING Done 13 PG Rajgarh 20221371 Working till Tejas PDH VOIP WORKING Done

Pending due to long distance between SDH to


14 PG PUNE 400 20221375 WORKING VOIP WORKING Done 14 PG Bachhau 20221369 Working till Tejas PDH VOIP
control room approx. 120 mts
Cabling Done. No OPGW
15 PG WARDHA 765 20220434 NOT INTEGRATED VOIP Done 15 PG Sujalpur 20221363 WORKING VOIP WORKING Done
Connectivity
Channel created from Korba EXTN created in
16 ipp VANDANA 400 20220435 Analog Korba EXTN created in Mumbai 16 ists Bhopal BDTCL 20220404 NOT INTEGRATED Analog Indore Channel created from Indore to WRLDC
to WRLDC Mumbai
Channel created from
17 ipp GMR EMCO 400 20220436 NOT INTEGRATED Analog Bhadrawati EXTN created in Mumbai 17 PG Barodra pulling 20220406 NOT INTEGRATED VOIP In progress
Bhadrwathi to WRLDC
Pending due to long distance between SDH to
18 ISGS MAUDA 400 20220437 NOT INTEGRATED VOIP Wardha No OPGW Connectivity schedule on 120617 18 ISGS Gandhar 20220393 NOT INTEGRATED VOIP
control room approx. 150 mts
19 PG RAIPUR 765 (Durg) 20221394 Working till Tejas PDH VOIP WORKING Done 19 PG Itarsi 20221358 WORKING VOIP WORKING Done
Channel created from
20 ipp GMR RAIPUR 400 20220370 NOT INTEGRATED Analog Durg EXTN created in Mumbai 20 ISGS CGPL 20220374 NOT INTEGRATED VOIP In Process In progress
Bhadrwathi to WRLDC
21 PG TAMNAR 765 20221387 WORKING VOIP WORKING Done 21 PG kala 20221407 WORKING VOIP WORKING Done
22 ipp KWPCL 400 20220438 NOT INTEGRATED Analog KOTRA EXTN created in Mumbai 22 PG vapi 20221367 WORKING VOIP WORKING Done
23 PG KOTRA 765 20221373 WORKING VOIP WORKING Done 23 PG Daman 20221408 WORKING VOIP WORKING Done
EXTN created in
24 PG MAPUSA 400 20221386 WORKING VOIP WORKING Done 24 IPP Sugen 20220405 NOT INTEGRATED Analog
Mumbai
Channel created from EXTN created in
25 ipp ACB 400 20220718 Working till Tejas PDH Analog Bilaspur EXTN created in Mumbai 25 IPP Essar Hazira 20220409 NOT INTEGRATED Analog GANDHAR Channel created from Gandhar to WRLDC
Bilaspur to WRLDC Mumbai
Channel created from EXTN created in
26 ipp ESSAR MAHAN 400 20220439 NOT INTEGRATED Analog Bilaspur/korba EXTN created in Mumbai 26 IPP Dgen 20220410 NOT INTEGRATED Analog NAVSARI Channel created from Navsari to WRLDC
Bilaspur to WRLDC Mumbai
Channel created from
27 ipp BALCO 400 20220440 NOT INTEGRATED Analog Dharamjaygarh EXTN created in Mumbai 27 ISGS Vindhyachal stage 1,2 20221411 WORKING VOIP WORKING Done
Dharamjaygarh to WRLDC
IP Phone Connected.
28 ipp KSK MAHANADI 400 20220441 NOT INTEGRATED VOIP CHAMPA Integarion issue due to Done 28 ISGS Vindhyachal stage 3 20220412 NOT INTEGRATED VOIP WORKING Done
Converters
29 pg DHARAMJAIGARH 765 20221391 NOT WORKING VOIP WORKING Done 29 ISGS Vindhyachal stage 4 20220414 NOT INTEGRATED VOIP WORKING Done

PARLI Channel created from


30 ipp DHARIWAL 400 20220442 NOT INTEGRATED Analog EXTN created in Mumbai 30 ISGS Vindhyachal stage 5 20220415 NOT INTEGRATED VOIP WORKING Done
/BHARAWATI Dharamjaygarh to WRLDC

Site visited but due to special approval required


Channel created from Kotra
31 ipp SKS 400 20220443 NOT INTEGRATED Analog KOTRA EXTN created in Mumbai 31 ISGS kakarpara 220 20220417 NOT INTEGRATED VOIP to laying the cable in control room hence site IP phone handedover
to WRLDC
constituent required approx. 10 days.
Cabling Done. No OPGW Pending due to long distance between SDH to
32 PG AURANGABAD 765 20220446 NOT INTEGRATED VOIP Done 32 ISGS kawas 220 20220418 NOT INTEGRATED VOIP IP phone handedover
Connectivity control room approx. 600 mts. Not on OPGW
AURANGABAD Channel created from
33 ists DHULE 765 20220447 NOT INTEGRATED Analog EXTN created in Mumbai 33 PG BOISAR 400 20221419 WORKING VOIP WORKING Done
/Vadodara Vadodra to WRLDC
Channel created from Kotra Phone Handover to Sasan. OFC to be laid at
34 ipp RKM 400 20220448 NOT INTEGRATED Analog KOTRA EXTN created in Mumbai 34 ISGS SASAN 765 20220420 NOT INTEGRATED VOIP IP phone handedover
to WRLDC Premises by M/s Reliance
EXTN created in
35 PG CHAMPA 765 20221381 WORKING VOIP WORKING Done 35 IPP JP NIGREE 400 20220421 NOT INTEGRATED Analog SATNA Channel created from Satna to WRLDC
Mumbai
JABALPUR EXTN created in
36 ipp TRN ENERGY 400 20220385 Working till Tejas PDH VOIP TAMNAR In Process In Process 36 ipp JABUWA POWER 400 20220422 NOT INTEGRATED Analog Channel created from Jabua Power to WRLDC
POOL Mumbai
VINDHYACHAL
37 ISGS SOLAPUR NTPC 400 20220449 NOT INTEGRATED VOIP SOLAPUR In Process In Process 37 PG 20221423 WORKING VOIP WORKING Done
POOLING 765

38 PG PUNE 765 20221378 WORKING VOIP WORKING Done 38 IPP MB POWER 400 20220424 NOT INTEGRATED Analog JABALPUR Channel created from Jabua Power to WRLDC EXTN created in
POOL Mumbai
Channel created from Kotra EXTN created in
39 ipp DB POWER 20220450 NOT INTEGRATED Analog KOTRA EXTN created in Mumbai 39 ISGS tarapur 400 20220424 NOT INTEGRATED Analog Boisar Channel created from Boisar to WRLDC
to WRLDC Mumbai
VoIP Phone handed over to
EXTN created in
40 IPP JPL  STG II 20220397 Working till Tejas PDH VOIP TAMNAR M/s JPL. Distance between Done 40 ISGS tarapur 220 20220426 NOT INTEGRATED Analog
Mumbai
Control Room & Comm.
41 PG CPCC - Nagpur 20221451 WORKING VOIP WORKING Done 41 PG Betul 20220427 NOT INTEGRATED Analog KHANDWA In Process In progress
Channel created from Kotra
42 ISGS NSPCL 20220452 Analog Raipur 400 EXTN created in Mumbai 42 PG CPCC - Baroda 20221428 WORKING VOIP WORKING Done
to WRLDC
43 PG Champa hvdc 20220444 WORKING VOIP WORKING Done

You might also like