You are on page 1of 6

Check Schedule

Item Date Checker Contact Email


Crack width 10-May-07 Tayeb Kazemi Tayeb.kazemi@stskconsulting.co.uk
Comments
first issue
Disclaimer

The originator does not guarantee the accuracy of the output or


any other information on this spreadsheet. The users take all
responsiblity for the use of this spreadsheet, modifications and
output. Should you experience any problems or like to see more
features added to this spreadsheet please contact:
tayeb.kazemi@stskconsulting.co.uk

This spreadsheet is free and you may print or download this


spreadsheet to a local hard disk for your personal and non-
commercial use only. You may transfer the spreadsheet to
individual third parties for their personal use, but only if you
acknowledge STSK Consulting Ltd or the website as the source of
the material.
DOCUMENT No.(Project / Doc) SHEET No.

© STSK Consulting Ltd Date


SUBJECT
PREPARED BY:

REF CALCULATIONS OUTPUT

BS 5400 pt 4 Crack width


C.L. 5.8.8.2 3 a cr ε m
w=
1+2( a cr −c nom )/( h−d c )
acr is distance from the point (crack) considered to the surface of the nearest bar
which controls the crack width;
Cnom is the required nominal cover
dc is the depth of the concrete in compression (if dc is 0 use BS5400 Pt 4 Eq. 26)
h is the overall depth
em is the calculated strain at the level where cracking is being considered, allowing
for the stiffening effect of the concrete in the tension zone;

3 . 8 bt h(a '−d c ) Mq
ε m=ε 1−[ ][(1− )10−9 ]
ε s A s (h−d c ) Mg
but shall not be greater than e1

e1 is the calculated strain at the level where cracking is being considered, ignoring
stiffening of the concrete in the tension zone;

bt is the width of the section at the level of the centroid of the tension steel;
a' is the distance from the compression face to the point at which the crack width is
being calculated;
Mg is the moment at the section considered due to permanent loads ;
Mq is the moment at the section considered due to live loads;
es is the calculated strain in the tension reinforcement, ignoring the stiffening effect
of the concrete in the tension zone;
As is the area of tension reinforcement b

Mg = 47.4 KNm
Mq = 164.6 KNm
Ec = 30.8 kN/mm² Short term x
Ec = 27.36 KN/mm² Intermediate value d
Es = 205 KN/mm²
b 1000 mm
Bar spacing 150 mm²
Bar dia. 25 mm
Cnom 45 mm
Cover 76 mm
Thickness 500 mm
a' 469 mm (equals h unless cover
is more than nominal)

acr =

m = Es / Ec
√ (
S 2
2
=
) +( C +
205 /
bar . dia 2 bar . dia
2
)−
27.4 =
2
7.5
= 82 mm

Taking first moment of area about the neutral axis


2
bx
= A s ×m×( d −x )
2
As = 3272.49 mm²
DOCUMENT No.(Project / Doc) SHEET No.

© STSK Consulting Ltd Date


SUBJECT
PREPARED BY:

REF CALCULATIONS OUTPUT

x = 119.64 mm (dc)
-173.9 Not acceptable
My Mm(d− x /3 )
Stress= =
I I
Second moment of area

I =I ' + I ''+ A 1 d
12

I = 3.13E+09 mm4

2.1E+08 x 7.5 x( 411.5 - 40 )


Stress(steel) = = 188.79 N/mm²
3.1E+09

σ ( a'−x) 188.79 x( 469 - 119.64 )


ε 1= × = 205000 x( 411.5 - 119.64 )
= 0.0011
E s (d−x)
em = 1.10E-03

w = 0.22703 mm

Allowable crack width = 0.25 mm

0.22703 < 0.25 O.K.


DOCUMENT No.(Project / Doc) SHEET No.

© STSK Consulting Ltd Date


SUBJECT
PREPARED BY:

REF CALCULATIONS OUTPUT

You might also like