You are on page 1of 2

Tower weights for the following lines

1 220kV D/C SSNNL PS-1 to PS-2


2 220kV Shivlakha-Deodar LILO at SSNNL PS-2
3 220kV Tappar-Shivlakha LILO at SSNNL PS-3

SR NO TOWER TYPE Unit BOM Weight


Steel in kg B/N in kg
1 TANGENT TOWER-2Deg-A
a) Super.Structure 3478.98 117.668
b) Stub(N) 124.72 1.488
c) Stub(BC) 182.08 1.488
d) Template 522.08 10.984
e) 3Meter Extension 704.6 18.569
f) 6Meter Extension 1048.6 23.584
g) 9Meter Extension 1819.2 44.8
h) Stub for +9/12 Meter Ext. 224.4 1.584
i) Template for +9/12/15 Mtr Ext. 661.52 12.488
j) 12 Meter Extension 2348.24 45.867

2 SMALL ANGLE TOWER-15 Deg-B


a) Super.Structure 4835.24 141.162
b) Stub(N) 204.56 1.584
c) Stub(BC) 283.48 1.584
d) Template 709.4 11.496
e) 3Meter Extension 856.36 17.25
f) 6Meter Extension 1454.84 22.879
g) 9 Meter Extension 2338.12 44.664
h) Stub for 9/12 meter extn. 285.04 2.112
i) Template for 9/12/15 meter extn. 965.68 17.776
j) 18 Meter Extension 4660.6 72.681
k) Stub for 18 Meter Ext. 650 3
l) Template for 18 Meter Ext. 1700 51
m) 21 Meter Extension 6620.4 108
n) Stub for 21 Meter Ext. 700 4.653
o) Template for 21/25 Meter Ext. 1955 53.76
p) 25 Meter Extension 7944.5 129.6
q) Stub for 25 Meter Ext. 700 4.653

3 MEDIUM ANGLE TOWER-30 Deg-C


a) Super.Structure 5940.5 200.916
b) Stub(N) 257.16 3.336
c) Stub(BC) 340.16 3.336
d) Template 1053.32 24.92
e) 3Meter Extension 1241.44 32.68
f) 6Meter Extension 1748.48 46.488
g) 9Meter Extension 2688.9 84.669
h) Stub for +9/12 meter extension 340.88 4.512
Stub-setting template+9/12/15 meter
i) extension 1253.2 35.72
j) 12Meter Extension 4344.8 120.81
k) 15Meter Extension 7531 110.04
l) Stub for +15 Meter Ext. 402.8 2.25

4 LARGE ANGLE TOWER-60Deg/DE-D


a) Super Structure-DE 7529.39 263.825
b) Super Structure-60Deg 7648.47 272.24
c) Super Structure-90Deg 8607.53 326.88
d) Stub(N) 388.96 3.336
e) Stub(BC) 484.88 3.336
f) Template 1283.88 31.568
g) 3Meter Extension 1589.6 46.818
h) 6Meter Extension 2586.08 65.636
i) 9Meter Extension 3627.84 113.469
j) Stub for +9/12 meter extension 481.16 4.288
k) 12 meter extension 5517.28 136.566
Stub-setting template+9/12/15 meter
l) extension 1671.36 47.424
m) stub for 18 meter extension 631.2 4.544
n) 18 meter extension 8933.06 206.621
o) stub-setting template for 18 meter 1768.72 48.496
p) stub for 15 meter extension 631.2 4.544
q) 15 meter extension 7592.16 187.877
r) 21 meter extension 12764.4 296.878
s) Stub for 21 meter extension 700 4.653
t) Template for 21/25 meter extn. 2171.9 53.76
u) 25 Meter Ext. 15062.73 358.695
v) Stub for 25 Meter Ext 700 4.653

vi) Template for +28 Meter Extn. (Tentative) 2497.7 61.83


vii) Stub for +28 Meter Extn. (Tentatiove) 875 5.817
viii) 28 Meter Extension (Tentative) 18830 448.4

NOTE :- GANTRY ERECTION QUANTITY SHALL BE INCLUDED AT APPROPRIATE ITEM.

EXTRA

DA+15 3033.12 68.842


STUB DA+15 206.16 2.112
DB+12 3205.72 49.802
STUB DB+15 327.16 11.2
DB+15 4678.36 70.977

GANTRY
CPB1X 1010.33 130.94
BA1 915.3 56.32