Project Name : Production of Maleic Anhydride Process Plant
Team/ Group No : Team B, Group 12
ID NO. Task Name Duration Start Finish 29/5/19 31/5/19 2/6/19 4/6/19 6/6/19 8/6/19 10/6/19 12/6/19 14/6/19 16/6/19 18/6/19 20/6/19 22/6/19 24/6/19 26/6/19 28/6/19 30/6/19 2/7/19 4/7/19 6/7/19 8/7/19 10/7/19 12/7/19 14/7/19 16/7/19 18/7/19 20/7/19 22/7/19 24/7/19 26/7/19 28/7/19 30/7/19 1/8/19 3/8/19 5/8/19 7/8/19 9/8/19 11/8/19 13/8/19 15/8/19 17/8/19 19/8/19 21/8/19 23/8/19 25/8/19 27/8/19 1 1 Assignment 2: Feasibility Study on Process Plant 24 days 1/6/19 24/6/19 2 1.1 Introduction of the process design 5 days 1/6/19 5/6/19 All 3 1.2 Marketing and business studies 6 days 5/6/19 10/6/19 4 1.2.1 Current and future demand of Maleic Anhydride 3 days 5/6/19 7/6/19 V, JX 5 1.2.2 Current supply of Maleic Anhydride 3 days 5/6/19 7/6/19 JS 6 1.2.3 Current and future pricing of Maleic Anhydride 3 days 5/6/19 7/6/19 V, JX 7 1.2.4 Application of Maleic Anhydride 4 days 7/6/19 10/6/19 JY, S ,JS 8 1.2.5 Top companies that produce Maleic Anhydride 4 days 7/6/19 10/6/19 JY,S 9 1.3 Determination of plant capacity 3 days 10/6/19 12/6/19 S 10 1.4 Objective of the Plant 3 days 10/6/19 12/6/19 JS 11 1.5 Finalise the reaction pathway 7 days 10/6/19 16/6/19 12 1.5.1 The advantages and disavantages of different pathways 4 days 10/6/19 13/6/19 V 13 1.5.2 Production cost 4 days 10/6/19 13/6/19 JX 14 1.5.3 Gross profit and payback period 4 days 10/6/19 13/6/19 JY 15 1.5.4 Conversion, selectivity and yield 4 days 10/6/19 13/6/19 JX, V 16 1.5.5 Environmental issues and Sustainability 4 days 10/6/19 13/6/19 JY 17 1.5.6 Feasibility and justification 3 days 14/6/19 16/6/19 JX, JY, V 18 1.6 Plant and process safety consideration 6 days 12/6/19 17/6/19 19 1.6.1 SDS data for identified chemicals 2 days 12/6/19 13/6/19 S, JS 20 1.6.2 Analyse the chemicals properties and associated hazards 2 days 13/6/19 14/6/19 S, JS 21 1.6.3 Possible consequences for identified hazards 3 days 14/6/19 16/6/19 S, JS 22 1.6.4 Safety Precaution and alternative chemicals 2 days 16/6/19 17/6/19 S, JS 23 1.7 Plant location 5 days 18/6/19 22/6/19 24 1.7.1 Market Region 3 days 18/6/19 20/6/19 S, JX, JY 25 1.7.2 Map 3 days 18/6/19 20/6/19 V, JS 26 1.7.3 Transportation availability and accessibility 3 days 20/6/19 22/6/19 JX,JY 27 1.7.4 Government provision 3 days 20/6/19 22/6/19 V,JS 28 1.7.5 Supply of raw material 3 days 20/6/19 22/6/19 S 29 1.8 Checking, Correction, Compilation of Task 1 day 23/6/19 23/6/19 All 30 1.9 Submission 1 day 24/6/19 24/6/19 V 31 32 2 Assignment 3: Preliminary Process Synthesis and Heuristics 35 days 25/6/19 29/7/19 33 2.1 Introduction 3 days 25/6/19 27/6/19 S, JS 34 2.2 Reactors: 13 days 25/6/19 7/7/19 35 2.2.1 Preliminary database 5 days 25/6/19 29/6/19 JX, JY, V 36 2.2.2 Specification of raw materials and products 5 days 25/6/19 29/6/19 JX, JY, V 37 2.2.3 Desired reactions pathway in the process plant 3 days 30/6/19 2/7/19 JX, JY, V 38 2.2.4 Side reaction involved 3 days 30/6/19 2/7/19 JX, JY, V 39 2.2.5 Flowsheet 2 days 3/7/19 4/7/19 V 40 2.2.6 Process heuristic 2 days 3/7/19 4/7/19 JY,JX 41 2.2.7 Types of reactors 3 days 5/7/19 7/7/19 V 42 2.2.8 Material of reactors 3 days 5/7/19 7/7/19 JY,JX 43 2.3 Separator: 8 days 4/7/19 11/7/19 44 2.3.1 Placement of Separation equipment 2 days 4/7/19 5/7/19 S, JS 45 2.3.2 Flowsheet 2 days 6/7/19 7/7/19 JS 46 2.3.3 Process heuristic 2 days 6/7/19 7/7/19 S 47 2.3.4 Types of Separation equipment 4 days 8/7/19 11/7/19 S 48 2.3.5 Material of Separation equipment 4 days 8/7/19 11/7/19 JS 49 2.4 Pumps, Compressors, Heat Exchangers, Other Equipment:11 days 11/7/19 21/7/19 50 2.4.1 Placement 2 days 11/7/19 12/7/19 All 51 2.4.2 Flowsheet 3 days 13/7/19 15/7/19 S, JX 52 2.4.3 Process heuristic 3 days 13/7/19 15/7/19 JY, JS, V 53 2.4.4 Types of Pumps, Compressors, Heat Exchangers, Other 6 days 16/7/19 21/7/19 S,JY 54 2.4.5 Equipment Material of Pumps, Compressors, Heat Exchangers, 6 days 16/7/19 21/7/19 JX,JS,V 55 2.5 Other Block Equipment flow diagram (BFD): 6 days 22/7/19 27/7/19 56 2.5.1 Drawing of BFD 3 days 22/7/19 24/7/19 S, JX 57 2.5.2 Identification of Core systems 3 days 25/7/19 27/7/19 All 58 2.6 Checking, Correction, Compilation of Task 1 day 28/7/19 28/7/19 All 59 2.7 Submission 1 day 29/7/19 29/7/19 S 60 61 3 Assignment 4: HYSYS Simulation 16 days 29/7/19 13/8/19 62 3.1 Property package 2 days 29/7/19 30/7/19 JS 63 3.2 Reaction Model 2 days 29/7/19 30/7/19 JS 64 3.3 Spefication of the operating condition 3 days 31/7/19 2/8/19 S, JY 65 3.4 State all assumptions 3 days 2/8/19 4/8/19 JS, V 66 3.5 Estimation and Adjustment 4 days 5/8/19 8/8/19 67 3.5.1 Pipe size 4 days 5/8/19 8/8/19 S, JX,JS 68 3.6 Checking, Correction, Compilation of Task 4 days 9/8/19 12/8/19 All 69 3.7 Submission 1 day 13/8/19 13/8/19 JX 70 71 4 Assignment 5: Manual Calculation on Material and Energy 16 days 29/7/19 13/8/19 72 4.1 Balances Manual calculation for core system 9 days 29/7/19 6/8/19 73 4.1.1 Core system 1 9 days 29/7/19 6/8/19 V 74 4.1.2 Core system 2 9 days 29/7/19 6/8/19 S 75 4.1.3 Core system 3 9 days 29/7/19 6/8/19 JS 76 4.1.4 Core system 4 9 days 29/7/19 6/8/19 JX 77 4.1.5 Core system 5 9 days 29/7/19 6/8/19 JY 78 4.2 Comparison between manual calcuation and hysys 3 days 9/8/19 11/8/19 79 4.2.1 simulation data Percentage Error 3 days 9/8/19 11/8/19 All 80 4.3 Checking, Correction, Compilation of Task 1 day 12/8/19 12/8/19 All 81 4.4 Submission 1 day 13/8/19 13/8/19 JS 82 83 5 Assignment 6: Process Flow Diagram (PFD) 8 days 14/8/19 21/8/19 84 5.1 Legend 4 days 14/8/19 17/8/19 S,JY,V 85 5.2 Construction of a Process Flow Diagram 2 days 18/8/19 19/8/19 JS, JX 86 5.3 Preparation of stream tables for PFD 2 days 18/8/19 19/8/19 S,JY 87 5.4 Checking, Correction, Compilation of Task 1 day 20/8/19 20/8/19 All 88 5.5 Submission 1 day 21/8/19 21/8/19 JY 89 90 6 Presentation 7 days 17/8/19 23/8/19 91 6.1 Prepare presentation slide 4 days 17/8/19 20/8/19 All 92 6.2 Rehersal 2 days 21/8/19 22/8/19 All 93 6.3 Presentation date 1 day 23/8/19 23/8/19 All
1 Sharon Lim Siew Che (S) Khor Jia Xuan (JX) Thum Jia-Yi (JY) Vincent Loo Lien Kai (V) Ong Jen Shyang (JS) Task Milestone Main/Sub task Progress