L&T O9113-M-BM-CS-DB-0097
DOC
NO
LARSEN & TOUBRO LIMITED TIR1-EPC-CHP-DM-W-0097
APML
DATED 30.11.2010
ECC DIVISION
REV NO: A
TABLE OF CONTENTS
DOCUMENT TITLE
PREPARED GSRK/ARUN
OPERATION & CONTROL PHILOSOPHY OF Sheet 1 Of 71
CHECKED MS/NH COAL HANDLING SYSTEM FOR NLC TUTICORIN-TPP
PROJECT NLC TUTICORIN TPP-CHP
L&T O9113-M-BM-CS-DB-0097
DOC
NO
LARSEN & TOUBRO LIMITED TIR1-EPC-CHP-DM-W-0097
APML
DATED 30.11.2010
ECC DIVISION
REV NO: A
SECTION TITLE
1.0.0 SYSTEM DESCRIPTION
2.0.0 OPERATION & CONTROL PHILOSOPHY
2.0.1 COAL HANDLING PLANT CONTROL ROOM
2.0.2 STACKER / RECLAIMER CONTROL ROOM
3.0.0 SYSTEM OPERATION
3.1.0 CONVEYOR SYSTEM
3.1.1 FLAP GATES / FLOW DIVIDERS
3.1.2 METAL DETECTORS
3.1.3 INLINE MAGNETIC SEPARATOR
3.1.4 IN-LINE CONVEYOR SCALE
3.1.5 COAL SAMPLING UNIT
3.1.6 TRAVELLING TRIPPERS
3.1.7 3-D BUNKER LEVEL TRANSMITTER
3.1.8 HOISTS & CRANES
4.0.0 UTILITIES
4.0.1 SWP/PWP/CWP/WTDP/WTP/DSP/THP/PFP/DFDS SYSTEM:
4.0.2 CYCLONE TYPE DE SYSTEM
4.0.3 VENTILATION SYSTEM
4.0.4 AIR CONDITIONING SYSTEM
5.0.0 SEQUENTIAL INTER-LOCK FOR CONVEYORS & OTHER EQUIPMENTS
6.0.0 THE PERMISSIVE CONDITONS FOR OPERATION OF CHP
COAL FLOW CIRCUIT:
DOCUMENT TITLE
PREPARED GSRK/ARUN
OPERATION & CONTROL PHILOSOPHY OF Sheet 2 Of 71
CHECKED MS/NH COAL HANDLING SYSTEM FOR NLC TUTICORIN-TPP
PROJECT NLC TUTICORIN TPP-CHP
L&T O9113-M-BM-CS-DB-0097
DOC
NO
LARSEN & TOUBRO LIMITED TIR1-EPC-CHP-DM-W-0097
APML
DATED 30.11.2010
ECC DIVISION
REV NO: A
COAL HANDLING SYSTEM (CHS) is a Turnkey package including Civil, Structural, Mechanical,
Electrical, Instrumentation & Communication etc. for Stacking, Reclaiming and conveying coal to
Bunker Unit (BU).
The coal handling system shall consist of two conveying streams from unloading to coal bunkers
with one stream normally operating and the second stream as stand by. However, it shall be
possible to operate both the streams simultaneously.
The material to be handled by the proposed system is Coal. Processed coal is required to be
conveyed to Bunkers. Coal would be received at the plant boundary by Ship.
1. Coal will be received at the dedicated new jetty at the Tuticorin port. Coal will be
DOCUMENT TITLE
PREPARED GSRK/ARUN
OPERATION & CONTROL PHILOSOPHY OF Sheet 3 Of 71
CHECKED MS/NH COAL HANDLING SYSTEM FOR NLC TUTICORIN-TPP
PROJECT NLC TUTICORIN TPP-CHP
L&T O9113-M-BM-CS-DB-0097
DOC
NO
LARSEN & TOUBRO LIMITED TIR1-EPC-CHP-DM-W-0097
APML
DATED 30.11.2010
ECC DIVISION
REV NO: A
unloaded from the ships with help of shore unloaders and will be conveyed to conveyors 1A/1B.
Conveyor 1A/1B conveys coal to Conveyor 2A/B at Junction house JT-1. Two nos Metal
detectors (MD1 mounted on Conv 1A & MD2 mounted on Conv 1B) are provided for detecting
metallic materials present in the “As received” coal. Two nos In line magnetic separators (ILMS
-1 on Conveyor 1A & ILMS – 2 on Conveyor 1B) are mounted on discharge end of respective
conveyors at JT-1 for removal of metallic ferrous tramp present in the “As received “coal. Further
Conveyor 1A/1B is having facility for manual stone picking at a suitable location.
2. Conveyor 2 A/B will feed coal to either of Conv 3A1/B1 in JT-2 by means of flap gates FG
1 & 2. Conveyor 3 A1/B1 will feed coal to either of Conv 3A2/B2 in JT-2A by means of flap gates
FG 1A & 1B. Conveyor 3 A2/B2 will feed coal to either of Conv 4A/B in JT-3 by means of flap
gates FG 2A & 2B. Conveyor 4 A/B will feed coal to either of Conv 5A/B in JT-4 by means of flap
gates FG 3 & 4.
3. Two nos. Belt Weigh scale (BW-1 & BW-2) are mounted on Conv 3A2/3B2 respectively
for metering of “As Received” coal. Two nos Metal detectors (MD3 mounted on Conv 3A1 & MD4
mounted on Conv 3B2) are provided for detecting metallic materials present in the “As received”
coal.
4. Coal from each incoming conveyor 5A/5B to Crusher house will have two paths through
FG 5 & 6. 2 nos Roller Screens each of capacity 1250 MTPH (RS-1 & RS-2) are provided in one
path which permits the coal of size -50mm to their respective conveyors (6A/6B) & by pass the
oversized coal to their respective crushers each of capacity 1250 MTPH (CR-1 & CR-2) for
reducing the coal size to -50mm. The crushed coal is then allowed to fall over the respective
conveyors (6A/6B). The other path by passes the coal from conveyor 5 A/B to conveyor 6 A/B
through FG 5 & 6 if the received coal size is -50mm.
5. Two nos. In line magnetic separators (ILMS – 3 over Conv 5A & ILMS – 4 over Conv 5B)
DOCUMENT TITLE
PREPARED GSRK/ARUN
OPERATION & CONTROL PHILOSOPHY OF Sheet 4 Of 71
CHECKED MS/NH COAL HANDLING SYSTEM FOR NLC TUTICORIN-TPP
PROJECT NLC TUTICORIN TPP-CHP
L&T O9113-M-BM-CS-DB-0097
DOC
NO
LARSEN & TOUBRO LIMITED TIR1-EPC-CHP-DM-W-0097
APML
DATED 30.11.2010
ECC DIVISION
REV NO: A
are provided at the head end of respective conveyors for removal of metallic tramp from the “As
received” coal. Two nos Metal detectors (MD5 mounted on Conv 5A & MD6 mounted on Conv
5B) are provided for detecting metallic materials present in the “As received” coal.
6. Conveyor 6 A/B will feed coal to either of Conv 7A/7B by means of FG 7 & 8. Conveyor
7A/B will further discharge the coal in JT-5 through Diverter Gate DG 1 & 2 to either Conveyor
18A/B for stacking coal in the crushed coal stockyard or on to Conveyor 8A/B for onward
conveying to Boiler Bunkers. Two nos. Belt scale (BS-3 & BS-4) are mounted on Conv 7A/7B
respectively for metering of “As fired” coal.
7. Conveyor 8A/8B conveys coal to Conveyor 9A/B at Junction House JT-6 through flap
gates FG 9 & 10. Conveyor 9A/B will feed coal on to Conveyor 10A/B at JT-8 through flap gates
FG 11 & 12. Conveyor 10A/10B will feed coal on to the bunker conveyor 11 at JT-9 or Conv
12A/B at JT-9 through flap gates FG 13 & 14. Conveyor 12A/12B will feed coal on to the bunker
conveyor 13 at JT-10 or Conv 14A/B at JT-10 through flap gates FG 16 & 17. Conveyor 14A/14B
will feed coal on to the bunker conveyor 15 at JT-11 or Conv 16A/B at JT-11 through flap gates
FG 21 & 22. Conveyor 16A/16B will feed coal on to the bunker conveyor 17 at JT-12.
8. One no Coal sampling unit (CSU-1) is placed on Conv 9A/9B at JT-8 for sampling of “As
fired coal”. Two nos. In line magnetic separators (ILMS – 5 over Conv 9A & ILMS – 6 over Conv
9B) are provided at the head end of respective conveyors for removal of metallic tramp from the
“As fired” coal. Further Conveyor 9A/9B is having facility for manual stone picking at a suitable
location. Two nos Metal detectors (MD7 mounted on Conv 9A & MD8 mounted on Conv 9B) are
provided for detecting metallic materials present in the “As fired” coal.
9. Two nos. Belt scale (BS-7 & BS-8) are mounted on Conv 10A/10B respectively for
metering of “As fired” coal.
DOCUMENT TITLE
PREPARED GSRK/ARUN
OPERATION & CONTROL PHILOSOPHY OF Sheet 5 Of 71
CHECKED MS/NH COAL HANDLING SYSTEM FOR NLC TUTICORIN-TPP
PROJECT NLC TUTICORIN TPP-CHP
L&T O9113-M-BM-CS-DB-0097
DOC
NO
LARSEN & TOUBRO LIMITED TIR1-EPC-CHP-DM-W-0097
APML
DATED 30.11.2010
ECC DIVISION
REV NO: A
10. One number Travelling Tripper is mounted on each of the Bunker conveyor 11/13/15/17
(i.e. total four nos. of traveling trippers – TT-1 to TT-4) to feed the coal into Raw coal bunkers of
the boiler units (Unit 1 & 2).
11. From JT-5, Conveyor 18A/18B conveys coal to Yard Conveyor 19 & conveyor 20 A/B in
JT-13 through flap gates FG 27 & 28. Conveyor 20A/20B conveys coal to Yard Conveyor 21.
12. Two nos. unidirectional type stacker reclaimer of 2000 MTPH (stacking) / 1200 MTPH
(reclaiming) capacity are provided on Yard conveyors 19 & 21 respectively. The Stacker
Reclaimer machine operates on rails for stacking / reclaiming the coal in the stock yard area.
During reclaiming operation the reclaimed coal will be conveyed to the yard conveyors 19 & 21
by the Boom conveyor of the respective S/R machine which in turn will feed the same to
Conveyor 22A/B by means of flap gates FG 29 & 30 at JT-15 and at JT-16 respectively. Two
nos. Belt scale (BS-5 & BS-6) are mounted on Conv 19 & 21 respectively for metering of
“Stocking & Reclaiming” coal.
13. The reclaimed coal from Conv 22A/B can be fed on to Conv 9A/B at JT-7. From JT-7, the
coal can be conveyed to the raw coal bunker by Conv 9A/B, 10A/B, 12 A/B, 14 A/B 16A/B &
11/13/15/17 to the desired row of bunkers.
14. Three nos Passenger cum Goods Elevator are installed one each at Crusher house, JT-8
& JT-12 to facilitate movement of man & material in these buildings.
2 nos. Stacker Cum Reclaimer, capacity 2000 TPH (stacking) & 1200TPH (reclaiming).
DOCUMENT TITLE
PREPARED GSRK/ARUN
OPERATION & CONTROL PHILOSOPHY OF Sheet 6 Of 71
CHECKED MS/NH COAL HANDLING SYSTEM FOR NLC TUTICORIN-TPP
PROJECT NLC TUTICORIN TPP-CHP
L&T O9113-M-BM-CS-DB-0097
DOC
NO
LARSEN & TOUBRO LIMITED TIR1-EPC-CHP-DM-W-0097
APML
DATED 30.11.2010
ECC DIVISION
REV NO: A
The PLC Automation system for Coal and Handling Package shall be as per Automation System
Configuration diagram L&T Drg No. O9113-E-BM-CS-DD-300 and APML Drg. No. TIR1-EPC-CHP-DI-
F-300.
DOCUMENT TITLE
PREPARED GSRK/ARUN
OPERATION & CONTROL PHILOSOPHY OF Sheet 7 Of 71
CHECKED MS/NH COAL HANDLING SYSTEM FOR NLC TUTICORIN-TPP
PROJECT NLC TUTICORIN TPP-CHP
L&T O9113-M-BM-CS-DB-0097
DOC
NO
LARSEN & TOUBRO LIMITED TIR1-EPC-CHP-DM-W-0097
APML
DATED 30.11.2010
ECC DIVISION
REV NO: A
Operation of the following equipment of coal handling plant is controlled from the main CHP control
room.
• Conveyors, Flap gates, Scoop Type Fluid Couplings, Crushers & Screens.
DOCUMENT TITLE
PREPARED GSRK/ARUN
OPERATION & CONTROL PHILOSOPHY OF Sheet 8 Of 71
CHECKED MS/NH COAL HANDLING SYSTEM FOR NLC TUTICORIN-TPP
PROJECT NLC TUTICORIN TPP-CHP
L&T O9113-M-BM-CS-DB-0097
DOC
NO
LARSEN & TOUBRO LIMITED TIR1-EPC-CHP-DM-W-0097
APML
DATED 30.11.2010
ECC DIVISION
REV NO: A
All the above mentioned local control panels are accessible & located near their respective equipment
& will be complete with all the required controls, interlocks, and annunciations etc. Necessary controls,
indications and annunciations for all the above equipment will also be provided at main CHP control
room. In addition to the remote control of various equipments, Local stop push button stations will be
provided for all equipment.
2.0.2 Stacker / Reclaimer Control Room
The entire control & operation of Stacker Recamier machine will be from the operators’ cabin on
the machine itself.
3.0. SYSTEM OPERATION
Typical operation philosophy of the plant is mentioned below to develop the control & monitoring
scheme of plant & equipment under the package. Coal flow path selection will be done from HMI to
select any one of the following conveying paths.
• Ship Unloaders to Stock yard via Crusher House.
• Ship Unloaders to Bunker Units (BU-1, BU-2, BU-3 & BU-4) via Crusher House.
• Stock yard to Bunker Units (BU-1, BU-2, BU-3 & BU-4) via Crusher House.
• Combination of above.
Operator will select any one of the above paths from HMI located in the Control desk from CHP Control
Room in PMCC-2. The flow stream path is then selected by positioning different Flap Gates/Diverter
gates at desired positions by means of keyboard available at the control desk. Once the system is in
the operation, the gates cannot be moved from their positions and path. After the selected path is in
operation the movement of path selector will not have any effect on the system. Flap gates which do
not come in the stream in which coal flow is taking place, can be operated at any time.
The control system will be designed for “Auto” & “Manual” operation of the conveyors in the selected
path. Auto/Manual selection will be done from faceplate in HMI.
DOCUMENT TITLE
PREPARED GSRK/ARUN
OPERATION & CONTROL PHILOSOPHY OF Sheet 9 Of 71
CHECKED MS/NH COAL HANDLING SYSTEM FOR NLC TUTICORIN-TPP
PROJECT NLC TUTICORIN TPP-CHP
L&T O9113-M-BM-CS-DB-0097
DOC
NO
LARSEN & TOUBRO LIMITED TIR1-EPC-CHP-DM-W-0097
APML
DATED 30.11.2010
ECC DIVISION
REV NO: A
AUTO MODE: In the ‘auto’ mode, the conveyors and related equipment shall start sequentially when
the ‘system start’ is initiated. During stopping, when the ‘system stop’ is activated, all conveyors will
also stop sequentially (in the reverse sequence) allowing time delays for clearing the belts.
MANUAL MODE: In manual mode, the operator shall start the conveyor system, in the same sequence
as in auto mode from MMI. The operator shall also stop the conveyor system, by pressing ‘system stop’
or individual ‘stop’ command from MMI in the reverse sequence.
During ‘sequence start’ in both auto and manual modes, first the required number of hooters (3 phase
induction motor type) will be energized simultaneously for a preset time of 1 minute or so (adjustable at
site) as per the program. After the preset time, the hooters will stop and a preset time of two minutes
(adjustable at site) as per program will be allowed for the movement of the personnel and for the
permissive of the conveyor system operation. This condition shall be indicated on the panel by glowing
of lamp ‘COAL HANDLING SEQUENCE START’. The starting permissive shall be available for a
period of 5 minutes (pre-programmed and adjustable in the field). In the event the last conveyor /
equipment is not started within this preset time of 5 minutes, the start command for equipment not
activated shall be withdrawn. The system cannot be started again unless the ‘sequence start’ push
button is again pressed and the hooters sound again, as described before. Those conveyors and
equipment, which have already started, shall continue to run.
The status indication in the graphic display against all conveyors and equipment in the selected path /
stream shall start slow flickering. But all status indications against all flap gates in the selected path
shall glow steadily. Therefore, from the selected flow stream path of the flap gates, the operator will
come to know the conveyors and equipment to be started for the selected path / stream. After a
conveyor / equipment are started, the status indications against that conveyor / equipment shall change
to steady glow indicating that it is running.
Graphic display status indicators associated with a particular motor / equipment shall flicker fast in case
of fault / trip.
In addition, emergency stop push button for immediate shut down of complete plant shall be provided in
DOCUMENT TITLE
PREPARED GSRK/ARUN
OPERATION & CONTROL PHILOSOPHY OF Sheet 10 Of 71
CHECKED MS/NH COAL HANDLING SYSTEM FOR NLC TUTICORIN-TPP
PROJECT NLC TUTICORIN TPP-CHP
L&T O9113-M-BM-CS-DB-0097
DOC
NO
LARSEN & TOUBRO LIMITED TIR1-EPC-CHP-DM-W-0097
APML
DATED 30.11.2010
ECC DIVISION
REV NO: A
the CD Console.
For changeover of feed from one row of bunkers to another row of bunkers without stopping of the
CHP, provision shall be made for interlock bypass on the control panel for flap gates of all conveyors in
boiler area for the preset period. If the changeover, in above specified time, is not completed then the
entire CHP shall stop.
• Adequate numbers of Belt sway switches, at every 30m interval, are provided to protect
against the damage to the edge of the belt due to excessive sideways movement. In addition,
each conveyor is provided with one (1) no. Speed detection devices (Zero Speed Switch).
These Zero speed switches will be designed to sense belt speed. In case of speed of belt goes
below 90% of rated speed, it will trip the conveyor.
• The starting sequence of the conveyors will follow a direction opposite to that of
flow of material i.e.
In case of direct conveying of coal to boiler bunkers, start from bunker conveyor &
end up with Conveyor 1 A/ 1B.
In case of stacking of coal in stock yard, start from yard conveyor and end up with
Conveyor 1 A/ 1B. However, for yard conveyor to start, the Stacker Cum Reclaimer
should be in operation.
In case of reclamation of coal from stock yard, start from bunker conveyors and end
up with yard conveyor along with Stacker / Reclaimer.
The starting of mobile trippers are interlocked with operation of the respective bunker
bay conveyors.
Once a conveyor trips, flap gate directing coal from this conveyor shall change over
its position with a time delay and shall come back to the original position again.
• Interlocking of yard conveyor with stacker-cum-reclaimer boom conveyor is provided.
DOCUMENT TITLE
PREPARED GSRK/ARUN
OPERATION & CONTROL PHILOSOPHY OF Sheet 11 Of 71
CHECKED MS/NH COAL HANDLING SYSTEM FOR NLC TUTICORIN-TPP
PROJECT NLC TUTICORIN TPP-CHP
L&T O9113-M-BM-CS-DB-0097
DOC
NO
LARSEN & TOUBRO LIMITED TIR1-EPC-CHP-DM-W-0097
APML
DATED 30.11.2010
ECC DIVISION
REV NO: A
• Any individual equipment (belt conveyor etc.) should not be allowed to start unless the
equipment immediately following the same in the direction of flow of material is already in
operation.
• Stop / Tripping of any equipment from running condition will trip all preceding equipment
in the system, except Crushers but will not affect succeeding ones which will continue to
operate.
• Adequate no of Pull cord switches at 30m intervals are provided along the length of each
belt conveyor, which will enable the respective conveyor to be stopped immediately. Belt
Protection switches, Pull Chord Switch & Belt Sway Switch, will be identified/addressed by a
specific number in the Main Control Room.
• Means are provided to pre-warn personnel working nearby when starting any conveyor,
Stacker – cum - Reclaimer & Travelling Tripper by providing Sirens.
• Interlocking of various conveyors is achieved with Flap gate, Flow Dividers Limit
switches and Zero speed switches.
• Motors will start only when the brake/rail clamp if provided, is in ‘Not applied’ condition.
Limit switches are provided to get the signal from brake for the above purpose.
• Ring granulators are provided with Speed and vibration monitoring instruments. Ring
granulators will trip in case Speed/vibration is going beyond tolerable limits of design.
Temperature sensing devices are installed on all bearings of each of the ring granulator to trip
the same in case of temperature goes beyond limit. Audio-visual annunciation is provided in
OWS.
• Tripping of the respective conveyor is provided in case any of Travelling Trippers starts
running along with conveyor belt at speed higher than the rated speed by providing an over
speed sensing device on the equipment.
• It is possible to bunker conveyor & Yard conveyor from Travelling tripper & Stacker cum
Reclaimer respectively.
• Wherever Scoop type coupling provided for HT motors, the coasting time of respective
conveyor, thrustor brake, actuator selection and the chute size will be so selected such that
DOCUMENT TITLE
PREPARED GSRK/ARUN
OPERATION & CONTROL PHILOSOPHY OF Sheet 12 Of 71
CHECKED MS/NH COAL HANDLING SYSTEM FOR NLC TUTICORIN-TPP
PROJECT NLC TUTICORIN TPP-CHP
L&T O9113-M-BM-CS-DB-0097
DOC
NO
LARSEN & TOUBRO LIMITED TIR1-EPC-CHP-DM-W-0097
APML
DATED 30.11.2010
ECC DIVISION
REV NO: A
there is no spillage of coal from any downstream conveyors during next start.
INTER-LOCKING:
a) Plant Interlock Scheme:
The entire CHP System will have three modes of control.
• Local de-interlock mode control will be carried out by local push button station (LPBS) for each
individual equipment/mechanism.
• Remote interlocked individual drive control from the HMI at Control Room.
• Remote interlocked route wise control from the HMI at Control Room.
The following material conveying systems/sub-systems shall come under Plant Inter-Locking Schemes:
Conveyors
Crushers
Flap Gates & Flow Dividers.
In Line Magnetic Separators
Metal Detectors
In Line Belt Weigh Scale
Stacker cum Reclaimer
Travelling Tripper.
The following Systems will not come under the interlock of Conveyor scheme.
All dust suppression systems & service water system.
Ventilation systems.
Hoist(Local operation only)
Elevator(Local operation only)
Crane(Local operation only)
Sump Pump(Local operation only)
All conveyors & equipment will have local push button stations each consisting of:
DOCUMENT TITLE
PREPARED GSRK/ARUN
OPERATION & CONTROL PHILOSOPHY OF Sheet 13 Of 71
CHECKED MS/NH COAL HANDLING SYSTEM FOR NLC TUTICORIN-TPP
PROJECT NLC TUTICORIN TPP-CHP
L&T O9113-M-BM-CS-DB-0097
DOC
NO
LARSEN & TOUBRO LIMITED TIR1-EPC-CHP-DM-W-0097
APML
DATED 30.11.2010
ECC DIVISION
REV NO: A
Pos – I, Pos – II & stop button for flap gate and Pos – I, Pos – II, Pos - III &
stop button for Diverter gate.
Local Start & Emergency stop push button (Red) for other equipment.
Belt scale shall be started when relevant conveyors are started.
The dust suppression systems will be energized as soon as the conveyors at the transfer points are
energized.
Coal handling plant shall be tripped in case of detection of fire.
b) Interlock Of HT Motor:
HT motors used will continue to run on no load by disengaging the fluid coupling in case of failure of
any process interlock. The HT motors will however be tripped incase of any motor fault like O/L, high
motor winding temperature etc. In addition, in case of normal stop command, after running of the
system, motors will stop.
3.1.1 FLAP GATES/FLOW DIVIDERS
All flap gates / Flow Dividers / Diverter gates will be motorized and remote controlled from the main
control desk. Their position will be indicated on the mimic of main control room. Once a conveyor trips,
flap gate directing coal from this conveyor will change over its position with a time delay and will come
back to the original position again. This is to prevent jamming of gate.
3.1.2 METAL DETECTORS
• It is possible to start the conveyors only after energizing the metal detector and metal
detector ‘reset’ condition. Once the metal is detected, the corresponding conveyor will trip. It will
be possible to restart the conveyors, after local resetting of metal detector & putting back the
marker bag in position. Metal detector ON/OFF facilities is provided in the OWS.
• In case of tripping of conveyor system, metal detector will get de-energized after a time lag.
• Following individual indications are provided on Local Control panel
1. Metal Detector ‘ON’
2. Metal Detected
DOCUMENT TITLE
PREPARED GSRK/ARUN
OPERATION & CONTROL PHILOSOPHY OF Sheet 14 Of 71
CHECKED MS/NH COAL HANDLING SYSTEM FOR NLC TUTICORIN-TPP
PROJECT NLC TUTICORIN TPP-CHP
L&T O9113-M-BM-CS-DB-0097
DOC
NO
LARSEN & TOUBRO LIMITED TIR1-EPC-CHP-DM-W-0097
APML
DATED 30.11.2010
ECC DIVISION
REV NO: A
DOCUMENT TITLE
PREPARED GSRK/ARUN
OPERATION & CONTROL PHILOSOPHY OF Sheet 15 Of 71
CHECKED MS/NH COAL HANDLING SYSTEM FOR NLC TUTICORIN-TPP
PROJECT NLC TUTICORIN TPP-CHP
L&T O9113-M-BM-CS-DB-0097
DOC
NO
LARSEN & TOUBRO LIMITED TIR1-EPC-CHP-DM-W-0097
APML
DATED 30.11.2010
ECC DIVISION
REV NO: A
automatic operation of complete coal sampling system. In any case, local push button stations will
be provided for all individual equipment of coal sampling system near the equipment.
c. All necessary automatic controls will be provided for meeting the requirements of
ASTM-D-2234.
d. In case of primary cutter getting stuck between parking positions, preceding
conveyor will be tripped.
e. There will be protection in the primary coal sampler to trip the conveyor belt in case
primary sampler falls on running conveyor due to coupling failure etc.
OPERATIONAL WRITE UP FOR COAL SAMPLING SYSTEM -1(CSU-1) AT JT-8
DOCUMENT TITLE
PREPARED GSRK/ARUN
OPERATION & CONTROL PHILOSOPHY OF Sheet 16 Of 71
CHECKED MS/NH COAL HANDLING SYSTEM FOR NLC TUTICORIN-TPP
PROJECT NLC TUTICORIN TPP-CHP
L&T O9113-M-BM-CS-DB-0097
DOC
NO
LARSEN & TOUBRO LIMITED TIR1-EPC-CHP-DM-W-0097
APML
DATED 30.11.2010
ECC DIVISION
REV NO: A
addition to above, position indication for bunker position of tripper will be provided through limit
switches in Main control room.
Following individual indications are provided on local control panel.
Motor ON/OFF/TRIP
Brakes applied
Rail clamps applied
Flap gate position
• Indication of tripper flap gate positions is given in the main CHP control room.
• It is possible for operator to manually trip the coal feeding equipment viz paddle
feeders or Stacker / reclaimers from the tripper.
• Chute blockage switch is provided at each leg of chute & will trip the tripper conveyor in
case of blockage.
DOCUMENT TITLE
PREPARED GSRK/ARUN
OPERATION & CONTROL PHILOSOPHY OF Sheet 17 Of 71
CHECKED MS/NH COAL HANDLING SYSTEM FOR NLC TUTICORIN-TPP
PROJECT NLC TUTICORIN TPP-CHP
L&T O9113-M-BM-CS-DB-0097
DOC
NO
LARSEN & TOUBRO LIMITED TIR1-EPC-CHP-DM-W-0097
APML
DATED 30.11.2010
ECC DIVISION
REV NO: A
The hoists and cranes will be controlled through Pendent. The same will be approachable from the
floor. The pendant control panel will be provided with up / down / forward / reverse travel push buttons
and indicating lamps for operating the same.
4.0.0 UTILITIES.
DOCUMENT TITLE
PREPARED GSRK/ARUN
OPERATION & CONTROL PHILOSOPHY OF Sheet 18 Of 71
CHECKED MS/NH COAL HANDLING SYSTEM FOR NLC TUTICORIN-TPP
PROJECT NLC TUTICORIN TPP-CHP
L&T O9113-M-BM-CS-DB-0097
DOC
NO
LARSEN & TOUBRO LIMITED TIR1-EPC-CHP-DM-W-0097
APML
DATED 30.11.2010
ECC DIVISION
REV NO: A
DOCUMENT TITLE
PREPARED GSRK/ARUN
OPERATION & CONTROL PHILOSOPHY OF Sheet 19 Of 71
CHECKED MS/NH COAL HANDLING SYSTEM FOR NLC TUTICORIN-TPP
PROJECT NLC TUTICORIN TPP-CHP
L&T O9113-M-BM-CS-DB-0097
DOC
NO
LARSEN & TOUBRO LIMITED TIR1-EPC-CHP-DM-W-0097
APML
DATED 30.11.2010
ECC DIVISION
REV NO: A
storage boxes at each building and conveyor gallery. The service water pump (SWP-1A/B) located in
Pump House (near Stock pile) takes plain water (cooling tower blow down water) from the on ground
RCC storage tank-1 adjacent to the Pump House and supplies to various service water tapings nearby
surrounding buildings through network of pipe.
The service water pump (SWP-1A/B) capacity has been designed considering one tap point at each
conveyor gallery & JNT/ crusher house and toilets of MCC/control room under simultaneous operation
and each tap point consuming 12.5 lpm at 2.5 kg/cm2.
1000 ltrs. PVC water tanks shall be provided on the top of MCC/control room for storage of service
water.
P.B in Pump
Group Pump Tag No. Application Area OWS
House
As per Schematic
SWS SWP-1A/B Start & Stop Start & Stop
diagram
DOCUMENT TITLE
PREPARED GSRK/ARUN
OPERATION & CONTROL PHILOSOPHY OF Sheet 20 Of 71
CHECKED MS/NH COAL HANDLING SYSTEM FOR NLC TUTICORIN-TPP
PROJECT NLC TUTICORIN TPP-CHP
L&T O9113-M-BM-CS-DB-0097
DOC
NO
LARSEN & TOUBRO LIMITED TIR1-EPC-CHP-DM-W-0097
APML
DATED 30.11.2010
ECC DIVISION
REV NO: A
As per Schematic
PWS PWP-1A/B Start & Stop Start & Stop
diagram
DOCUMENT TITLE
PREPARED GSRK/ARUN
OPERATION & CONTROL PHILOSOPHY OF Sheet 21 Of 71
CHECKED MS/NH COAL HANDLING SYSTEM FOR NLC TUTICORIN-TPP
PROJECT NLC TUTICORIN TPP-CHP
L&T O9113-M-BM-CS-DB-0097
DOC
NO
LARSEN & TOUBRO LIMITED TIR1-EPC-CHP-DM-W-0097
APML
DATED 30.11.2010
ECC DIVISION
REV NO: A
the coal stockpile, sufficient number of sprinklers suitably installed in a header to cover the entire
tockpile area produces water spray over the stockpile. The sprinklers are of swiveling type.
The operation of the sprinklers for stock piles is automatic by means of Sequential Control Panel and
Solenoid Valves for every two sprinklers. And each stockpile shall have solenoid valve with strainer
at the header inlet. Before each sprinkler globe valve shall be provided.
P.B in Pump
Group Pump Tag No. Application Area OWS
House
As per Schematic
DS-5 DSP-1A/B/C Start & Stop Start & Stop
diagram
Programmed logic control panel is used for sprinkling system of coal stock pile. Total 128 sprinklers are
controlled by 64 solenoids. Two solenoids of opposite side sprinklers are made as pair and they get ON
together. At a time any eight sprinklers can be switch ON.
Manual Mode: Solenoid pairs can be switched ON/OFF by using Push Buttons provided. In the
Solenoid box. These push buttons are provided for Stacking & reclaiming purpose. Any sprinkler
switched ON in manual mode continues in ON status till it is switched off/mode is changed.
Corresponding indicator glows in the panel when any solenoid is ON.
Auto Mode: In auto mode control of the sprinklers are R1 to R32 can be used for this purpose.
Switching the relay R1 turns ON Solenoid 1 and 2. R2 for S3 and S4. Like wise it continues up to S128.
This is maintained type contact. Till the relays are ON solenoids remains ON. Sprinkler ON time and
sequence can be programmed as per the requirement of the client. At a time more than one relay
should not be switched ON, is the only one interlock which client has to take care. Pumps are rated for
only eight sprinklers. If more than one is switched ON at a time, required through will not be available
from the sprinklers.
DRY FOG DUST SUPRESSION SYSTEM:
DOCUMENT TITLE
PREPARED GSRK/ARUN
OPERATION & CONTROL PHILOSOPHY OF Sheet 22 Of 71
CHECKED MS/NH COAL HANDLING SYSTEM FOR NLC TUTICORIN-TPP
PROJECT NLC TUTICORIN TPP-CHP
L&T O9113-M-BM-CS-DB-0097
DOC
NO
LARSEN & TOUBRO LIMITED TIR1-EPC-CHP-DM-W-0097
APML
DATED 30.11.2010
ECC DIVISION
REV NO: A
The dry fog dust suppression system will consists of centrifugal pump (vertical) with drive motor, air
compressor with drive motor, local control panel, Flow control unit, pressure regulating unit, solenoid
valve, Nozzles, Nozzle headers, displacer operated level switch, pressure gauge, pressure switch,
duplex strainer with differential pressure gauge & differential pressure switch etc.
The pumps will start automatically. Load sensing units will be installed in the MCC, which will measure
the current consumption of each conveyor motor. When the current drawn by conveyor exceeds a
predefined set value, the load sensing unit will send signals to pumps. On receipt of signals from load
sensing unit, pumps will be operated.
The compressor will also start automatically taking signal from pressure switch (low) installed on
compressor and it will trip automatically taking signal (high) from pressure switch installed on air
receiver.
The Flow Activation Stations have provision for both manual and automatic operation. For manual
operation, the system becomes operational with selector switch in manual mode and in auto mode, the
fogging operation starts on receiving a signal either from a Respective conveyor current load monitor
or Flap gate limit switches installed at a strategic location in the material Conveyor line or potential
free contact from the drive motor of equipment as per requirements.
Each application point is provided with requisite number of spray bar assemblies with Air Atomized
Nozzles. FAS are provided at group of application points.
FAS can be connected to one or more PRU. A PRU is used to regulate the air and water pressure for a
group of headers.
Dry Fog type Dust Suppression System will be used for suppressing dust by means of air atomized
nozzles that are caused during the operation of above mentioned areas. This system is envisaged to
control the dust generated during the operation of above mentioned areas, Headers are provided at
dust generating points for respective nozzles. Water will be stored in a tank. In the makeup waterline to
the water tank Float valve will be provided. Water from the water tank shall be supplied to the spray
headers by a pump. The water pump shall be interlocked with low-level switch of the water tank to
DOCUMENT TITLE
PREPARED GSRK/ARUN
OPERATION & CONTROL PHILOSOPHY OF Sheet 23 Of 71
CHECKED MS/NH COAL HANDLING SYSTEM FOR NLC TUTICORIN-TPP
PROJECT NLC TUTICORIN TPP-CHP
L&T O9113-M-BM-CS-DB-0097
DOC
NO
LARSEN & TOUBRO LIMITED TIR1-EPC-CHP-DM-W-0097
APML
DATED 30.11.2010
ECC DIVISION
REV NO: A
prevent the pump from dry running. A pressure switch at the pump discharge line shall be provided to
bypass water to store tank in case the pressure increases above the set value. The pumping system
along with control panel is placed in a pump house near the water tank. Compressor shall be mounted
in the pump house with an air receiver.A FAS shall be provided for a group of material transfer points.
The FAS shall be interlinked with the signals for running of Conveyors and equipments to ensure that
the spray is activated only when the Conveyors are running with load. Additionally the pressure switch
at the FAS ensures that the solenoid valves at the air and water lines are switched ON only when there
is adequate air pressure at the system.Each application point shall have a set of spray bar of air and
water. The nozzles shall be fixed at the discharge hoods/suction hoods and shall be connected by
flexible tubing with the headers.Each PRU shall have air and water pressure regulators to ensure that
the medium at the required pressure is flowing through the nozzles. This in turn ensures proper
atomization of the water which is essential for the effective dust suppression.
P.B in Pump
Group Pump Tag No. Application Area OWS
House
As per Schematic
DS-6 DFP-1A/B Start & Stop Start & Stop
diagram
As per Schematic
SC-A1/A2/A3 Start & Stop Start & Stop
diagram
DOCUMENT TITLE
PREPARED GSRK/ARUN
OPERATION & CONTROL PHILOSOPHY OF Sheet 24 Of 71
CHECKED MS/NH COAL HANDLING SYSTEM FOR NLC TUTICORIN-TPP
PROJECT NLC TUTICORIN TPP-CHP
L&T O9113-M-BM-CS-DB-0097
DOC
NO
LARSEN & TOUBRO LIMITED TIR1-EPC-CHP-DM-W-0097
APML
DATED 30.11.2010
ECC DIVISION
REV NO: A
Operation: In FAS Box Electrical Controls are provided in the top compartment. An Isolation from
Mains Incomer is provided by a MCB, Solenoids operation is by both modes Manual & AUTO through
Auto/Manual Selector Switch for Dry fog Dust Suppression System.
Modes
Manual Mode: AIR Line pressure is monitored continuously through PRESSURE Switch inside
FASBox, If the pressure drops below the set point, Pressure Healthy indicator goes off. This will also
not allow switching on any Solenoid in any mode.
AIR & WATER solenoids can be switched on /off by respective Push Buttons. IN auto mode Solenoids
can be switched on by client PF (Potential Free) Signal, or UBS Signal or any other Remote system
Signal, any one of the signal will open solenoids & remain ON condition until contacts in closed
position. Terminals provided for this signal inside FAS Box is X1-3 TO X1-6.
Following Indication are provided:
Type Lamps
Control supply healthy : L1
Pressure healthy : L3
Solenoids open : L2
FLOW CONTROL UNIT (FCU)
Operation: In FCU Box Electrical Controls are provided in the top compartment.
Isolation from Mains Incomer is provided by a MCB, Solenoid operation is by both modes
Manual & AUTO through Auto/Manual selector switch for Plain water system.
Modes
Manual Mode:WATER Solenoid can be switched on /off by respective Push Buttons.
Auto Mode:In auto mode Solenoid can be switched on by client PF (Potential Free)Signal or UBS
Signal or any other remote system signal any one of the signal will open Solenoid & remain ON until
this contacts are closed. Terminals provided for this signal inside FCU Box is X1-3 TO X1-6
Following Indication are provided
DOCUMENT TITLE
PREPARED GSRK/ARUN
OPERATION & CONTROL PHILOSOPHY OF Sheet 25 Of 71
CHECKED MS/NH COAL HANDLING SYSTEM FOR NLC TUTICORIN-TPP
PROJECT NLC TUTICORIN TPP-CHP
L&T O9113-M-BM-CS-DB-0097
DOC
NO
LARSEN & TOUBRO LIMITED TIR1-EPC-CHP-DM-W-0097
APML
DATED 30.11.2010
ECC DIVISION
REV NO: A
Type Lamps
Control Supply Healthy : L1
Water solenoid open (ON) : L2
7 Discharge of Conv.6A
2
DOCUMENT TITLE
PREPARED GSRK/ARUN
OPERATION & CONTROL PHILOSOPHY OF Sheet 26 Of 71
CHECKED MS/NH COAL HANDLING SYSTEM FOR NLC TUTICORIN-TPP
PROJECT NLC TUTICORIN TPP-CHP
L&T O9113-M-BM-CS-DB-0097
DOC
NO
LARSEN & TOUBRO LIMITED TIR1-EPC-CHP-DM-W-0097
APML
DATED 30.11.2010
ECC DIVISION
REV NO: A
30 Discharge of AFD- 2
T
DOCUMENT TITLE
PREPARED GSRK/ARUN
OPERATION & CONTROL PHILOSOPHY OF Sheet 27 Of 71
CHECKED MS/NH COAL HANDLING SYSTEM FOR NLC TUTICORIN-TPP
PROJECT NLC TUTICORIN TPP-CHP
L&T O9113-M-BM-CS-DB-0097
DOC
NO
LARSEN & TOUBRO LIMITED TIR1-EPC-CHP-DM-W-0097
APML
DATED 30.11.2010
ECC DIVISION
REV NO: A
signal
Conv-2A Current load signal
31 Receipt of Conv.2A from AFD- 2 +FG signal
Conv-2B Current load signal
32 Receipt of Conv.2B from AFD- 2 +FG signal
Apron feeder -3 running
33 Discharge of AFD- 3 signal
TH- 3
DOCUMENT TITLE
PREPARED GSRK/ARUN
OPERATION & CONTROL PHILOSOPHY OF Sheet 28 Of 71
CHECKED MS/NH COAL HANDLING SYSTEM FOR NLC TUTICORIN-TPP
PROJECT NLC TUTICORIN TPP-CHP
L&T O9113-M-BM-CS-DB-0097
DOC
NO
LARSEN & TOUBRO LIMITED TIR1-EPC-CHP-DM-W-0097
APML
DATED 30.11.2010
ECC DIVISION
REV NO: A
DOCUMENT TITLE
PREPARED GSRK/ARUN
OPERATION & CONTROL PHILOSOPHY OF Sheet 29 Of 71
CHECKED MS/NH COAL HANDLING SYSTEM FOR NLC TUTICORIN-TPP
PROJECT NLC TUTICORIN TPP-CHP
L&T O9113-M-BM-CS-DB-0097
DOC
NO
LARSEN & TOUBRO LIMITED TIR1-EPC-CHP-DM-W-0097
APML
DATED 30.11.2010
ECC DIVISION
REV NO: A
1) DPS will energize at preset pressure and will command to sequential controller for solenoid
valve (24 V DC) energization.
2) After air purging in sequence of solenoid valves through sequential controller with pre set
pause and on time the DPS will be de-energized at fixed differential set pressure.
3) Sequential controller will not provide output to solenoid valve if air pressure at compressed
airline will be low from the desired pressure as per preset pressure of Pressure Switch. In that
case the whole system will be shut down immediately.
4) ZSS of the system will show rotation of rotating part of the RAV during running
condition. If any RAV of cyclone, Bag filter fail to run then the whole system will be shut down
immediately.
OPERATIONAL LOGIC FOR BAG FILTER & CYCLONE OF DE SYSTEM FOR JUNCTION HOUSE –
5 to 9 & 11 to 15
DOCUMENT TITLE
PREPARED GSRK/ARUN
OPERATION & CONTROL PHILOSOPHY OF Sheet 30 Of 71
CHECKED MS/NH COAL HANDLING SYSTEM FOR NLC TUTICORIN-TPP
PROJECT NLC TUTICORIN TPP-CHP
L&T O9113-M-BM-CS-DB-0097
DOC
NO
LARSEN & TOUBRO LIMITED TIR1-EPC-CHP-DM-W-0097
APML
DATED 30.11.2010
ECC DIVISION
REV NO: A
pause and on time the DPS will be de-energized at fixed differential set pressure.
3) Sequential controller will not provided out put to solenoid valve if air pressure at compressed
air line will be low from the desired pressure as per preset pressure of Pressure Switch. In that
case the whole system will be shut down immediately.
4) ZSS of the system will show rotation of rotating part of the RAV during running
condition. If any RAV of cyclone, Bag filter fail to run then the whole system will be shut down
immediately.
OPERATIONAL LOGIC FOR BAG FILTER & CYCLONE OF DE SYSTEM FOR JUNCTION HOUSE –
10 &16
The following sequence to be maintained for start the equipments
1) Start Screw conveyors of bag filter & cyclone outlet
2) Start RAV of Cyclone & bag Filter
3) Power to sequential controller
4) Start Centrifugal Fan Motor
5) Open motorized damper of fan inlet
The equipment will be interlocked with following instruments for smooth operation of DE system
1) DPS will energize at pre set pressure and will command to sequential controller for solenoid
valve (24 V DC) energization.
2) After air purging in sequence of solenoid valves through sequential controller with pre set
pause and on time the DPS will be de-energized at fixed differential set pressure.
3) Sequential controller will not provided out put to solenoid valve if air pressure at compressed
air line will be low from the desired pressure as per preset pressure of Pressure Switch. In that
case the whole system will be shut down immediately.
4) ZSS of the system will show rotation of rotating part of the RAV during running
condition. If any RAV of cyclone, Bag filter fail to run then the whole system will be shut down
DOCUMENT TITLE
PREPARED GSRK/ARUN
OPERATION & CONTROL PHILOSOPHY OF Sheet 31 Of 71
CHECKED MS/NH COAL HANDLING SYSTEM FOR NLC TUTICORIN-TPP
PROJECT NLC TUTICORIN TPP-CHP
L&T O9113-M-BM-CS-DB-0097
DOC
NO
LARSEN & TOUBRO LIMITED TIR1-EPC-CHP-DM-W-0097
APML
DATED 30.11.2010
ECC DIVISION
REV NO: A
immediately
OPERATIONAL LOGIC FOR BAG FILTER & CYCLONE OF DE SYSTEM FOR CRUSHER HOUSE
The following sequence to be maintained for start the equipments
1) Open Slide gate at bottom of screw conv. depends on conv. running of 11A/11B/23A/23B.
2) Start Screw conveyors of bag filter & cyclone outlet
3) Start RAV of Cyclone & bag Filter
4) Power to sequential controller
5) Open motorized damper on line as per followings when stream – 1 & stream -2 (conv.BCN-
10B & conv.BCN-10C running)
Motorized Damper no. 15 & 16 will open & Motorized Damper 17 will close.
Motorized Damper no. 11/12 will open when RSC will discharge material on BCN-11A/B.
Motorized Damper no.13 &14 will open
Motorized Damper no.9/10 will open when RSC will discharge material on BF- 1/2..
Motorized Damper no. 7/8 will open when SC-2 will discharge material on BF-1/2.
Motorized Damper no.5 & 6 will open when BF-1/2 will discharge material .
Motorized Damper no.3/4 will open as per Flap gate position of BF-2 discharge to conv.
BCN- 23A/B.
Motorized Damper no. 1/2 will open as per Flap gate position of BF-1 discharge to conv.
BCN- 23A/B.
Open motorized damper on line as per followings when stream – 2 ( conveyor BCN-10A in
running condition )
Motorized Damper no. 17 will open and Motorized Damper no. 15 & 16 will close. All other
dampers will close.
The schematic is enclosed
6) Start Centrifugal Fan Motor
7) Open motorized damper of fan inlet
DOCUMENT TITLE
PREPARED GSRK/ARUN
OPERATION & CONTROL PHILOSOPHY OF Sheet 32 Of 71
CHECKED MS/NH COAL HANDLING SYSTEM FOR NLC TUTICORIN-TPP
PROJECT NLC TUTICORIN TPP-CHP
L&T O9113-M-BM-CS-DB-0097
DOC
NO
LARSEN & TOUBRO LIMITED TIR1-EPC-CHP-DM-W-0097
APML
DATED 30.11.2010
ECC DIVISION
REV NO: A
The equipment will be interlocked with following instruments for smooth operation of DE system
1) DPS will energize at pre set pressure and will command to sequential controller for solenoid
valve (24 V DC) energization.
2) After air purging in sequence of solenoid valves through sequential controller with pre set
pause and on time the DPS will be de-energized at fixed differential set pressure.
3) Sequential controller will not provided out put to solenoid valve if air pressure at compressed
air line will be low from the desired pressure as per preset pressure of Pressure Switch. In that
case the whole system will be shut down immediately.
4) ZSS of the system will show rotation of rotating part of the RAV during running
condition. If any RAV of cyclone, Bag filter fail to run then the whole system will be shut down
immediately.
DOCUMENT TITLE
PREPARED GSRK/ARUN
OPERATION & CONTROL PHILOSOPHY OF Sheet 33 Of 71
CHECKED MS/NH COAL HANDLING SYSTEM FOR NLC TUTICORIN-TPP
PROJECT NLC TUTICORIN TPP-CHP
L&T O9113-M-BM-CS-DB-0097
DOC
NO
LARSEN & TOUBRO LIMITED TIR1-EPC-CHP-DM-W-0097
APML
DATED 30.11.2010
ECC DIVISION
REV NO: A
DOCUMENT TITLE
PREPARED GSRK/ARUN
OPERATION & CONTROL PHILOSOPHY OF Sheet 34 Of 71
CHECKED MS/NH COAL HANDLING SYSTEM FOR NLC TUTICORIN-TPP
PROJECT NLC TUTICORIN TPP-CHP
L&T O9113-M-BM-CS-DB-0097
DOC
NO
LARSEN & TOUBRO LIMITED TIR1-EPC-CHP-DM-W-0097
APML
DATED 30.11.2010
ECC DIVISION
REV NO: A
DOCUMENT TITLE
PREPARED GSRK/ARUN
OPERATION & CONTROL PHILOSOPHY OF Sheet 35 Of 71
CHECKED MS/NH COAL HANDLING SYSTEM FOR NLC TUTICORIN-TPP
PROJECT NLC TUTICORIN TPP-CHP
L&T O9113-M-BM-CS-DB-0097
DOC
NO
LARSEN & TOUBRO LIMITED TIR1-EPC-CHP-DM-W-0097
APML
DATED 30.11.2010
ECC DIVISION
REV NO: A
DOCUMENT TITLE
PREPARED GSRK/ARUN
OPERATION & CONTROL PHILOSOPHY OF Sheet 36 Of 71
CHECKED MS/NH COAL HANDLING SYSTEM FOR NLC TUTICORIN-TPP
PROJECT NLC TUTICORIN TPP-CHP
L&T O9113-M-BM-CS-DB-0097
DOC
NO
LARSEN & TOUBRO LIMITED TIR1-EPC-CHP-DM-W-0097
APML
DATED 30.11.2010
ECC DIVISION
REV NO: A
Air Conditioning system is generally provided for the treatment of air so as to control, simultaneously,
its temperature, humidity, cleanliness and distribution to meet the comfort requirements of occupants,
of the conditioned space. Air Conditioning system consists of hermetic compressor (scroll/rotary type),
direct expansion multi row deep cooling coil of copper having mechanically bonded aluminum fins
complete with refrigerant distributor & thermostatic expansion valve, v-belt driven (in case of Packaged
Air Conditioning system) evaporator with air blower (s) suitable for external static pressure.
All air conditioning systems will have local start/stop facility (wherever required).
4. Main CHP Control Room cum RIO room in MCC-2, Near Crusher House
DOCUMENT TITLE
PREPARED GSRK/ARUN
OPERATION & CONTROL PHILOSOPHY OF Sheet 37 Of 71
CHECKED MS/NH COAL HANDLING SYSTEM FOR NLC TUTICORIN-TPP
PROJECT NLC TUTICORIN TPP-CHP
L&T O9113-M-BM-CS-DB-0097
DOC
NO
LARSEN & TOUBRO LIMITED TIR1-EPC-CHP-DM-W-0097
APML
DATED 30.11.2010
ECC DIVISION
REV NO: A
No.
1. RIO Room in MCC-1 (On wall)
System Stop: When system stop command is given, first all feeding equipment (Like Stacker
Reclaimer) will stop &after some time delay all equipments will stop sequentially.
Emergency Stop: In case of emergency stop PB pressed all drives shall be stopped immediately.
Fire Protection: In case of fire detection all drives shall be stopped immediately.
5.0.1 CONVEYOR
When start command to conveyor is given first the command will go to start respective Oil circulating
pump for scoop coupling of conveyor and release the brake (simultaneously), after releasing the brake
command will go to conveyor main motor, after starting main motor, command will go to engage (OUT)
scoop through actuator for scoop coupling of conveyor. If off command is given to conveyor, first the
scoop will get dis-engaged then brake is applied after which main motor stops and finally oil circulating
pump stops.
DOCUMENT TITLE
PREPARED GSRK/ARUN
OPERATION & CONTROL PHILOSOPHY OF Sheet 38 Of 71
CHECKED MS/NH COAL HANDLING SYSTEM FOR NLC TUTICORIN-TPP
PROJECT NLC TUTICORIN TPP-CHP
L&T O9113-M-BM-CS-DB-0097
DOC
NO
LARSEN & TOUBRO LIMITED TIR1-EPC-CHP-DM-W-0097
APML
DATED 30.11.2010
ECC DIVISION
REV NO: A
Trip conditions (conveyor will trip if any of the given below are available):
DOCUMENT TITLE
PREPARED GSRK/ARUN
OPERATION & CONTROL PHILOSOPHY OF Sheet 39 Of 71
CHECKED MS/NH COAL HANDLING SYSTEM FOR NLC TUTICORIN-TPP
PROJECT NLC TUTICORIN TPP-CHP
L&T O9113-M-BM-CS-DB-0097
DOC
NO
LARSEN & TOUBRO LIMITED TIR1-EPC-CHP-DM-W-0097
APML
DATED 30.11.2010
ECC DIVISION
REV NO: A
DOCUMENT TITLE
PREPARED GSRK/ARUN
OPERATION & CONTROL PHILOSOPHY OF Sheet 40 Of 71
CHECKED MS/NH COAL HANDLING SYSTEM FOR NLC TUTICORIN-TPP
PROJECT NLC TUTICORIN TPP-CHP
L&T O9113-M-BM-CS-DB-0097
DOC
NO
LARSEN & TOUBRO LIMITED TIR1-EPC-CHP-DM-W-0097
APML
DATED 30.11.2010
ECC DIVISION
REV NO: A
the same conveyor only if the same upstream conveyor not running (if applicable according to
Down stream Feeders)
Local Stop Not Pressed /Reset.
Trip command from machines (Stacker Reclaimer, Travelling Tripper) to respective conveyors.
• Applicable for Conv. 19 & 21 - Trip Command from Stacker
Cum Reclaimer-1 & Stacker Cum Reclaimer-2 respectively.
• Applicable for Conv. 11/13/15/17 - Trip Command from Travelling
Tripper-TTR1, TTR2, TTR3 & TTR4 respectively.
Trip conditions (actuator for scoop coupling of conveyor will IN (dis-engage) scoop if any of the
condition will be present):
Any of the CBS (chute block switch) is operated.
PCS (Pull cord switch) is operated.
BSS (Belt sway switch) is operated.
ZSS (Zero speed switch) is operated with on delay of 60 sec.
Oil circulating pump OFF.
Respective conveyor main motor is OFF.
Succeeding conveyor main motor off or scoop coupling dis-engaged and running
conveyor feeding to that conveyor.
Electrical trip conditions are present
ILMS cleated belt or under current trip. (if applicable)
Metal is detected (if applicable)
More than one flap gate are positioned to same conveyor & more than one upstream
conveyor running.
5.0.2 CRUSHER:
DOCUMENT TITLE
PREPARED GSRK/ARUN
OPERATION & CONTROL PHILOSOPHY OF Sheet 41 Of 71
CHECKED MS/NH COAL HANDLING SYSTEM FOR NLC TUTICORIN-TPP
PROJECT NLC TUTICORIN TPP-CHP
L&T O9113-M-BM-CS-DB-0097
DOC
NO
LARSEN & TOUBRO LIMITED TIR1-EPC-CHP-DM-W-0097
APML
DATED 30.11.2010
ECC DIVISION
REV NO: A
When start command to crusher is given first the command will go to start respective oil circulating
pump for scoop coupling of crusher then that command will go to crusher main motor, after starting
main motor, command will go to engage (OUT) scoop through actuator for scoop coupling of crusher.
Main Crusher Motor:
There are no auto-on and auto-off commands for crusher (except sequence start/stop commands).
Permissive conditions (crusher can be started automatically or manually when all the conditions given
below are available)
All winding temperature less than 120 deg C.
Bearing temperature (DE and NDE) less than 70 deg C.
Actuator scoop coupling is IN position (dis-engaged position).
Electrical conditions are healthy.
Local Stop Not Pressed /Reset.
Hydraulic door closed.
Trip conditions (Crusher will trip if any of the given below are available):
Any winding temperature is more than 130 deg C.
Any bearing temperature (DE and NDE) is more than 80 deg C.
Electrical trip conditions are present.
DOCUMENT TITLE
PREPARED GSRK/ARUN
OPERATION & CONTROL PHILOSOPHY OF Sheet 42 Of 71
CHECKED MS/NH COAL HANDLING SYSTEM FOR NLC TUTICORIN-TPP
PROJECT NLC TUTICORIN TPP-CHP
L&T O9113-M-BM-CS-DB-0097
DOC
NO
LARSEN & TOUBRO LIMITED TIR1-EPC-CHP-DM-W-0097
APML
DATED 30.11.2010
ECC DIVISION
REV NO: A
DOCUMENT TITLE
PREPARED GSRK/ARUN
OPERATION & CONTROL PHILOSOPHY OF Sheet 43 Of 71
CHECKED MS/NH COAL HANDLING SYSTEM FOR NLC TUTICORIN-TPP
PROJECT NLC TUTICORIN TPP-CHP
L&T O9113-M-BM-CS-DB-0097
DOC
NO
LARSEN & TOUBRO LIMITED TIR1-EPC-CHP-DM-W-0097
APML
DATED 30.11.2010
ECC DIVISION
REV NO: A
Trip conditions (actuator for fluid coupling of crusher will be IN (dis-engage) if any of the condition will
be present):
Any of the CBS (chute block switch) is operated.
Crusher ZSS (Zero speed switch) is operated with on delay of 60 sec.
Oil circulating pump OFF.
Respective crusher main motor is OFF.
Electrical trip conditions are present.
Respective Down stream feeder, i.e. BF/SC/RSC, is OFF.
Respective Crusher Vibration Trip.
Hydraulic door open.
DOCUMENT TITLE
PREPARED GSRK/ARUN
OPERATION & CONTROL PHILOSOPHY OF Sheet 44 Of 71
CHECKED MS/NH COAL HANDLING SYSTEM FOR NLC TUTICORIN-TPP
PROJECT NLC TUTICORIN TPP-CHP
L&T O9113-M-BM-CS-DB-0097
DOC
NO
LARSEN & TOUBRO LIMITED TIR1-EPC-CHP-DM-W-0097
APML
DATED 30.11.2010
ECC DIVISION
REV NO: A
DOCUMENT TITLE
PREPARED GSRK/ARUN
OPERATION & CONTROL PHILOSOPHY OF Sheet 45 Of 71
CHECKED MS/NH COAL HANDLING SYSTEM FOR NLC TUTICORIN-TPP
PROJECT NLC TUTICORIN TPP-CHP
L&T O9113-M-BM-CS-DB-0097
DOC
NO
LARSEN & TOUBRO LIMITED TIR1-EPC-CHP-DM-W-0097
APML
DATED 30.11.2010
ECC DIVISION
REV NO: A
Feeding conveyor “OFF FEEDBACK” will be permissive for forward and reverse direction ( Not
applicable for bunker flap gate from FG-30 to FG-41 for BU-1,2&3 and FG-52 to FG-59 for BU-
4&5).Flap gate can be changed (FG-30 to FG-41 for BU-1,2&3 and FG-52 to FG-59 for BU-4&5) only
when succeeding conveyor running.
5.0.9 FLOW DIVIDER (FD)
There is no Auto ON/OFF Conditions.
Permissive conditions:
Feeding Conveyor/Equipment “OFF FEEDBACK” will be permissive for forward and reverse directions.
5.0.10 ROLLER SCREEN
There is no Auto ON/OFF Conditions.
Permissive conditions:
Electrical conditions are healthy.
Local stop not pressed / Reset condition.
Respective Crusher ON
Respective BF/SC/RSC is ON
CBS (chute block switch) is not operated.
Trip conditions:
Electrical trip conditions are present.
Respective Crusher OFF
Respective BF/SC/RSC is OFF
CBS (chute block switch) operated.
5.0.14 UTILITY PUMP’S (SWP, PWP, THP, WTP, WTDP, DSP, DFP):
When running pump trips standby pump starts automatically.
Electrical Condition: Same as LT drive.
Permissive conditions:
Electrical conditions are healthy.
DOCUMENT TITLE
PREPARED GSRK/ARUN
OPERATION & CONTROL PHILOSOPHY OF Sheet 46 Of 71
CHECKED MS/NH COAL HANDLING SYSTEM FOR NLC TUTICORIN-TPP
PROJECT NLC TUTICORIN TPP-CHP
L&T O9113-M-BM-CS-DB-0097
DOC
NO
LARSEN & TOUBRO LIMITED TIR1-EPC-CHP-DM-W-0097
APML
DATED 30.11.2010
ECC DIVISION
REV NO: A
DOCUMENT TITLE
PREPARED GSRK/ARUN
OPERATION & CONTROL PHILOSOPHY OF Sheet 47 Of 71
CHECKED MS/NH COAL HANDLING SYSTEM FOR NLC TUTICORIN-TPP
PROJECT NLC TUTICORIN TPP-CHP
L&T O9113-M-BM-CS-DB-0097
DOC
NO
LARSEN & TOUBRO LIMITED TIR1-EPC-CHP-DM-W-0097
APML
DATED 30.11.2010
ECC DIVISION
REV NO: A
CONV. 20 A
4 OR CONV. 21 (STACKING) IS RUNNING
CONV. 20 B
DOCUMENT TITLE
PREPARED GSRK/ARUN
OPERATION & CONTROL PHILOSOPHY OF Sheet 48 Of 71
CHECKED MS/NH COAL HANDLING SYSTEM FOR NLC TUTICORIN-TPP
PROJECT NLC TUTICORIN TPP-CHP
L&T O9113-M-BM-CS-DB-0097
DOC
NO
LARSEN & TOUBRO LIMITED TIR1-EPC-CHP-DM-W-0097
APML
DATED 30.11.2010
ECC DIVISION
REV NO: A
DOCUMENT TITLE
PREPARED GSRK/ARUN
OPERATION & CONTROL PHILOSOPHY OF Sheet 49 Of 71
CHECKED MS/NH COAL HANDLING SYSTEM FOR NLC TUTICORIN-TPP
PROJECT NLC TUTICORIN TPP-CHP
L&T O9113-M-BM-CS-DB-0097
DOC
NO
LARSEN & TOUBRO LIMITED TIR1-EPC-CHP-DM-W-0097
APML
DATED 30.11.2010
ECC DIVISION
REV NO: A
DOCUMENT TITLE
PREPARED GSRK/ARUN
OPERATION & CONTROL PHILOSOPHY OF Sheet 50 Of 71
CHECKED MS/NH COAL HANDLING SYSTEM FOR NLC TUTICORIN-TPP
PROJECT NLC TUTICORIN TPP-CHP
L&T O9113-M-BM-CS-DB-0097
DOC
NO
LARSEN & TOUBRO LIMITED TIR1-EPC-CHP-DM-W-0097
APML
DATED 30.11.2010
ECC DIVISION
REV NO: A
ON.
OR
CONV. 3 B2 IS RUNNING AND FLAP GATE FG-1A IS
POSITIONED (POS-2) TO FEED CONV. 3 B2 AND MD-4 IS
ON.
DOCUMENT TITLE
PREPARED GSRK/ARUN
OPERATION & CONTROL PHILOSOPHY OF Sheet 51 Of 71
CHECKED MS/NH COAL HANDLING SYSTEM FOR NLC TUTICORIN-TPP
PROJECT NLC TUTICORIN TPP-CHP
L&T O9113-M-BM-CS-DB-0097
DOC
NO
LARSEN & TOUBRO LIMITED TIR1-EPC-CHP-DM-W-0097
APML
DATED 30.11.2010
ECC DIVISION
REV NO: A
6.0.2 PATH- II: SHIP UNLOADERS TO BUNKER UNITS VIA CRUSHER HOUSE WITHOUT
STACKING
1 TTR-4
BUNKERS OF BUNKER UNIT BU-4 ARE NOT FULL
7 CONV. 15
BUNKERS OF BUNKER UNIT BU-3 IS NOT FULL (AND)
DOCUMENT TITLE
PREPARED GSRK/ARUN
OPERATION & CONTROL PHILOSOPHY OF Sheet 52 Of 71
CHECKED MS/NH COAL HANDLING SYSTEM FOR NLC TUTICORIN-TPP
PROJECT NLC TUTICORIN TPP-CHP
L&T O9113-M-BM-CS-DB-0097
DOC
NO
LARSEN & TOUBRO LIMITED TIR1-EPC-CHP-DM-W-0097
APML
DATED 30.11.2010
ECC DIVISION
REV NO: A
DOCUMENT TITLE
PREPARED GSRK/ARUN
OPERATION & CONTROL PHILOSOPHY OF Sheet 53 Of 71
CHECKED MS/NH COAL HANDLING SYSTEM FOR NLC TUTICORIN-TPP
PROJECT NLC TUTICORIN TPP-CHP
L&T O9113-M-BM-CS-DB-0097
DOC
NO
LARSEN & TOUBRO LIMITED TIR1-EPC-CHP-DM-W-0097
APML
DATED 30.11.2010
ECC DIVISION
REV NO: A
DOCUMENT TITLE
PREPARED GSRK/ARUN
OPERATION & CONTROL PHILOSOPHY OF Sheet 54 Of 71
CHECKED MS/NH COAL HANDLING SYSTEM FOR NLC TUTICORIN-TPP
PROJECT NLC TUTICORIN TPP-CHP
L&T O9113-M-BM-CS-DB-0097
DOC
NO
LARSEN & TOUBRO LIMITED TIR1-EPC-CHP-DM-W-0097
APML
DATED 30.11.2010
ECC DIVISION
REV NO: A
DOCUMENT TITLE
PREPARED GSRK/ARUN
OPERATION & CONTROL PHILOSOPHY OF Sheet 55 Of 71
CHECKED MS/NH COAL HANDLING SYSTEM FOR NLC TUTICORIN-TPP
PROJECT NLC TUTICORIN TPP-CHP
L&T O9113-M-BM-CS-DB-0097
DOC
NO
LARSEN & TOUBRO LIMITED TIR1-EPC-CHP-DM-W-0097
APML
DATED 30.11.2010
ECC DIVISION
REV NO: A
OR
ROLLER SCREEN 1 & CRUSHER 1 ARE IN OPERATION AND
FLAP GATE FG -5 IS POSITIONED (POS-2) TO FEED ROLLER
SCREEN AND CONV. 6 A IS RUNNING.
CONV. 5 A IS RUNNING AND FLAP GATE FG-3 IS
POSITIONED (POS-1) TO FEED CONV. 5 A AND ILMS-3 & MD-
5 ARE ON.
25 CONV. 4 A OR
CONV. 5 B IS RUNNING AND FLAP GATE FG-3 IS
POSITIONED (POS-2) TO FEED CONV. 5 B AND ILMS-4 & MD-
6 ARE ON.
DOCUMENT TITLE
PREPARED GSRK/ARUN
OPERATION & CONTROL PHILOSOPHY OF Sheet 56 Of 71
CHECKED MS/NH COAL HANDLING SYSTEM FOR NLC TUTICORIN-TPP
PROJECT NLC TUTICORIN TPP-CHP
L&T O9113-M-BM-CS-DB-0097
DOC
NO
LARSEN & TOUBRO LIMITED TIR1-EPC-CHP-DM-W-0097
APML
DATED 30.11.2010
ECC DIVISION
REV NO: A
OR
CONV. 4 B IS RUNNING AND FLAP GATE FG-2B IS
POSITIONED (POS-2) TO FEED CONV. 4 A.
DOCUMENT TITLE
PREPARED GSRK/ARUN
OPERATION & CONTROL PHILOSOPHY OF Sheet 57 Of 71
CHECKED MS/NH COAL HANDLING SYSTEM FOR NLC TUTICORIN-TPP
PROJECT NLC TUTICORIN TPP-CHP
L&T O9113-M-BM-CS-DB-0097
DOC
NO
LARSEN & TOUBRO LIMITED TIR1-EPC-CHP-DM-W-0097
APML
DATED 30.11.2010
ECC DIVISION
REV NO: A
PATH- III: SHIP UNLOADERS TO BUNKER UNITS VIA CRUSHER HOUSE WITH
6.0.3
STACKING
1 TTR-4 BUNKERS OF BUNKER UNIT BU-4 ARE NOT FULL
BUNKERS OF BUNKER UNIT BU-4 IS NOT FULL (AND)
2 CONV. 17 TRAVELLING TRIPPER TTR-4 IS RUNNING AND FLAP GATE
FG-25 OR 26 IS POSITIONED (POS1/2) TO FEED BU-4
CONV. 16 A
3 OR CONV. 17 IS RUNNING
CONV. 16 B
CONV. 16 A IS RUNNING AND FLAP GATE FG-21 IS
POSITIONED (POS 1) TO FEED CONV. 16 A.
4 CONV. 14 A OR
CONV. 15 IS RUNNING AND FLAP GATE FG-21 IS
POSITIONED (POS 2) TO FEED CONV. 15.
CONV. 16 B IS RUNNING AND FLAP GATE FG-22 IS
POSITIONED (POS 1) TO FEED CONV. 16 B.
5 CONV. 14 B OR
CONV. 15 IS RUNNING AND FLAP GATE FG-22 IS
POSITIONED (POS 2) TO FEED CONV. 15.
6 TTR-3 BUNKERS OF BUNKER UNIT BU-3 ARE NOT FULL
DOCUMENT TITLE
PREPARED GSRK/ARUN
OPERATION & CONTROL PHILOSOPHY OF Sheet 58 Of 71
CHECKED MS/NH COAL HANDLING SYSTEM FOR NLC TUTICORIN-TPP
PROJECT NLC TUTICORIN TPP-CHP
L&T O9113-M-BM-CS-DB-0097
DOC
NO
LARSEN & TOUBRO LIMITED TIR1-EPC-CHP-DM-W-0097
APML
DATED 30.11.2010
ECC DIVISION
REV NO: A
10 TTR-2
BUNKERS OF BUNKER UNIT BU-2 ARE NOT FULL
DOCUMENT TITLE
PREPARED GSRK/ARUN
OPERATION & CONTROL PHILOSOPHY OF Sheet 59 Of 71
CHECKED MS/NH COAL HANDLING SYSTEM FOR NLC TUTICORIN-TPP
PROJECT NLC TUTICORIN TPP-CHP
L&T O9113-M-BM-CS-DB-0097
DOC
NO
LARSEN & TOUBRO LIMITED TIR1-EPC-CHP-DM-W-0097
APML
DATED 30.11.2010
ECC DIVISION
REV NO: A
DOCUMENT TITLE
PREPARED GSRK/ARUN
OPERATION & CONTROL PHILOSOPHY OF Sheet 60 Of 71
CHECKED MS/NH COAL HANDLING SYSTEM FOR NLC TUTICORIN-TPP
PROJECT NLC TUTICORIN TPP-CHP
L&T O9113-M-BM-CS-DB-0097
DOC
NO
LARSEN & TOUBRO LIMITED TIR1-EPC-CHP-DM-W-0097
APML
DATED 30.11.2010
ECC DIVISION
REV NO: A
DOCUMENT TITLE
PREPARED GSRK/ARUN
OPERATION & CONTROL PHILOSOPHY OF Sheet 61 Of 71
CHECKED MS/NH COAL HANDLING SYSTEM FOR NLC TUTICORIN-TPP
PROJECT NLC TUTICORIN TPP-CHP
L&T O9113-M-BM-CS-DB-0097
DOC
NO
LARSEN & TOUBRO LIMITED TIR1-EPC-CHP-DM-W-0097
APML
DATED 30.11.2010
ECC DIVISION
REV NO: A
CONV. 20 A
25 OR CONV. 21 (STACKING) IS RUNNING
CONV. 20 B
DOCUMENT TITLE
PREPARED GSRK/ARUN
OPERATION & CONTROL PHILOSOPHY OF Sheet 62 Of 71
CHECKED MS/NH COAL HANDLING SYSTEM FOR NLC TUTICORIN-TPP
PROJECT NLC TUTICORIN TPP-CHP
L&T O9113-M-BM-CS-DB-0097
DOC
NO
LARSEN & TOUBRO LIMITED TIR1-EPC-CHP-DM-W-0097
APML
DATED 30.11.2010
ECC DIVISION
REV NO: A
DOCUMENT TITLE
PREPARED GSRK/ARUN
OPERATION & CONTROL PHILOSOPHY OF Sheet 63 Of 71
CHECKED MS/NH COAL HANDLING SYSTEM FOR NLC TUTICORIN-TPP
PROJECT NLC TUTICORIN TPP-CHP
L&T O9113-M-BM-CS-DB-0097
DOC
NO
LARSEN & TOUBRO LIMITED TIR1-EPC-CHP-DM-W-0097
APML
DATED 30.11.2010
ECC DIVISION
REV NO: A
OR
CONV. 4 B IS RUNNING AND FLAP GATE FG-2B IS
POSITIONED (POS-2) TO FEED CONV. 4 A.
CONV. 3 A2 IS RUNNING AND FLAP GATE FG-1A IS
POSITIONED (POS-1) TO FEED CONV. 3 A2 AND MD-3 IS ON.
OR
34 CONV. 3 A1
CONV. 3 B2 IS RUNNING AND FLAP GATE FG-1A IS
POSITIONED (POS-2) TO FEED CONV. 3 B2 AND MD-4 IS ON.
DOCUMENT TITLE
PREPARED GSRK/ARUN
OPERATION & CONTROL PHILOSOPHY OF Sheet 64 Of 71
CHECKED MS/NH COAL HANDLING SYSTEM FOR NLC TUTICORIN-TPP
PROJECT NLC TUTICORIN TPP-CHP
L&T O9113-M-BM-CS-DB-0097
DOC
NO
LARSEN & TOUBRO LIMITED TIR1-EPC-CHP-DM-W-0097
APML
DATED 30.11.2010
ECC DIVISION
REV NO: A
DOCUMENT TITLE
PREPARED GSRK/ARUN
OPERATION & CONTROL PHILOSOPHY OF Sheet 65 Of 71
CHECKED MS/NH COAL HANDLING SYSTEM FOR NLC TUTICORIN-TPP
PROJECT NLC TUTICORIN TPP-CHP
L&T O9113-M-BM-CS-DB-0097
DOC
NO
LARSEN & TOUBRO LIMITED TIR1-EPC-CHP-DM-W-0097
APML
DATED 30.11.2010
ECC DIVISION
REV NO: A
DOCUMENT TITLE
PREPARED GSRK/ARUN
OPERATION & CONTROL PHILOSOPHY OF Sheet 66 Of 71
CHECKED MS/NH COAL HANDLING SYSTEM FOR NLC TUTICORIN-TPP
PROJECT NLC TUTICORIN TPP-CHP
L&T O9113-M-BM-CS-DB-0097
DOC
NO
LARSEN & TOUBRO LIMITED TIR1-EPC-CHP-DM-W-0097
APML
DATED 30.11.2010
ECC DIVISION
REV NO: A
DOCUMENT TITLE
PREPARED GSRK/ARUN
OPERATION & CONTROL PHILOSOPHY OF Sheet 67 Of 71
CHECKED MS/NH COAL HANDLING SYSTEM FOR NLC TUTICORIN-TPP
PROJECT NLC TUTICORIN TPP-CHP
L&T O9113-M-BM-CS-DB-0097
DOC
NO
LARSEN & TOUBRO LIMITED TIR1-EPC-CHP-DM-W-0097
APML
DATED 30.11.2010
ECC DIVISION
REV NO: A
OR
SR 2 RECLAIMER IS RUNNING & CONV. 22 B IS RUNNING
AND FLAP GATE FG-30 IS POSITIONED (POS 2) TO FEED
CONV. 22 B.
DOCUMENT TITLE
PREPARED GSRK/ARUN
OPERATION & CONTROL PHILOSOPHY OF Sheet 68 Of 71
CHECKED MS/NH COAL HANDLING SYSTEM FOR NLC TUTICORIN-TPP
PROJECT NLC TUTICORIN TPP-CHP
L&T O9113-M-BM-CS-DB-0097
DOC
NO
LARSEN & TOUBRO LIMITED TIR1-EPC-CHP-DM-W-0097
APML
DATED 30.11.2010
ECC DIVISION
REV NO: A
DOCUMENT TITLE
PREPARED GSRK/ARUN
OPERATION & CONTROL PHILOSOPHY OF Sheet 69 Of 71
CHECKED MS/NH COAL HANDLING SYSTEM FOR NLC TUTICORIN-TPP
PROJECT NLC TUTICORIN TPP-CHP
L&T O9113-M-BM-CS-DB-0097
DOC
NO
LARSEN & TOUBRO LIMITED TIR1-EPC-CHP-DM-W-0097
APML
DATED 30.11.2010
ECC DIVISION
REV NO: A
At the time of fault, the faulty conveyor / equipment as well as the preceding conveyors / equipment in
the interlock sequence, will stop except HT motors will continue to run for process fault. In case of
motor fault, the HT motor will trip but the succeeding conveyors / equipment will continue to run. The
status indication against the preceding conveyors / equipment will start slow blinking while the faulty
conveyor / equipment will be fast blinking.
Start command will not be indicated alarm is acknowledged after clearance of fault.
The sequence of operation of the annunciation system will be as follows:
DOCUMENT TITLE
PREPARED GSRK/ARUN
OPERATION & CONTROL PHILOSOPHY OF Sheet 70 Of 71
CHECKED MS/NH COAL HANDLING SYSTEM FOR NLC TUTICORIN-TPP
PROJECT NLC TUTICORIN TPP-CHP
L&T O9113-M-BM-CS-DB-0097
DOC
NO
LARSEN & TOUBRO LIMITED TIR1-EPC-CHP-DM-W-0097
APML
DATED 30.11.2010
ECC DIVISION
REV NO: A
DOCUMENT TITLE
PREPARED GSRK/ARUN
OPERATION & CONTROL PHILOSOPHY OF Sheet 71 Of 71
CHECKED MS/NH COAL HANDLING SYSTEM FOR NLC TUTICORIN-TPP