A. Short term Power Supply Plan ( 1.

5 Years PPA)
1. Available Power Set
 GE Mobil TM 2500 3 Units, Total Gross Capacity 96 MW (32 MW x 3 units)
 Or GE Fr 6 B 2 Units, Total Gross Capacity 120 MW ( 60MW x 2 Units) ~ 240 MW(60MW x 4 Units)
Both above units are available now.
 On land basis can use LNG and Diesel(Duel fuel)
So, we will bring this power set immediately then set to connect to Main Grid within 1 week.
 Delivery to Sri Lanka: 1~2 Months after signing PPA
 First fuel by Diesel until we deliver small scale of LNG FSRU which we owned 2 units in Indonesia within 4
Months after sign PPA.
 Location of 120MW ~ 240 MW CCPP could be in Keranitissa Or Kerawalapitiya and Delivery LNG by LNG tank
Trailer(50 CBM/unit)
Or 120 MW Power Plant & LNG FSRU could be located in Hambantota Port.

2. Term & Conditions of PPA


 Signing PPA with CEB for 1.5 Years
 PPA Tariff is 16.5 cent/kwh for the initial 6 months during use Diesel as a fuel.
 PPA Tariff will be reduce to 13.5 Cent/kwh after 5 Months Once we deliver LNG as a Main fuel.
 Take or Pay is 80% of total Gross Capacity.
 We will full responsible to supply LNG with our owned Investment and technology after 5 months.
 CEB must provide location of Jetty where LNG FSRU could be berth.
150 ~ 200 Mtr length / Draft 8 Mtr of Wharf Either at Colombo Port or Hambantota Port.

3. Consortium member
Korea South East Power Co., in behalf of Korea Electricity Co.,

JSK 26K FSRU Project in Bali GE Fr 6 B 2 / MPP(GE Mobil TM 2500) Ready Stock

LNG Supply Route


B. Long term Power Supply Plan ( Bss on 15 ~ 20 Years PPA)

1. Available Power Set


 300 MW Floating BMPP(Barge Mounted Power Plant
– Combined Cycle Gas)
 Floating basis can use LNG and Diesel(Duel fuel)
 Delivery to Sri Lanka: 12~14 Months after signing
PPA
 Location of 300 MW Floating BMPP could be in
Colombo Port Or Hambantota Port.

<Picture of BMPP>
2. Term & Conditions of PPA
 Signing PPA with CEB for 15 ~ 20 Years
 Delivery shall be within 12 ~ 14 Months after signing PPA
 PPA tariff is 11.5 cent/kwh with Take or Pay 80%
 We will full responsible to supply LNG with our owned Investment and technology
 CEB must provide location of Jetty where LNG FSRU could be berth.
150 ~ 200 Mtr length of Wharf either at Colombo Port Or Hambantota Port.

3. Consortium member
 Korea South East Power Co., in behalf of Korea Electricity Co.,

4. General Figure & Capacity of 300 MW LNG Floating Power Plant


Power Generation System LNG Containment System
316 MW(Gross) total power (ISO condition) Type IMO Type-C Tank
4 off . 54.8 MW, Gas Turbine Generator Capacity 2 x 10,000 m3
2 off . 48.4 MW, Steam Turbine Generator Normal Pressure 106-300kPa Gauge
4 off. HRSG, Dual Pressure, once through type Air Temperature max +45oC
3 off . 9.9 MW, Essential generator, dual fuel Air Temperature min -10oC
1 off . 0.6 MW, Emergency generator Boil Off Rate for BMCCPP 0.25%/day

Power Distribution System LNG Loading System


4 off . Transformer, 220 kV/6.6 kV/ 690 V/ 440 V 1 off. Manifold, 2 Liquid lines, 1 Vapor line
4 off . Transformer, 440 V/ 220 V LNG Loading :
2 off . Unit Aux. Transformer 11kV/ 6.6 kV Cryogenic hose System (OFE)
Switchboard for CCPP
Switchboard for HV/LV Gas Supply Machinery
Gas insulated switchgear and breaker bays
6 off. LNG feed Pump 2 off BOG Pre-Heater
3 off BOG Compressor 2 off. Glycol Water Heater
Principal Particular 2 off LNG Forcing Vaporizer 2 off Sea Water Feed Pump
Length Overall 200 m 2 off. Glycol Pump
Breath 55 m 1 off. Flow Metter & Gas Chromatograph
Depth 15.5 m
Draught 7.5 m Material Handling System
LNG tanks 20,000 m3
1 off 2.0 MT , fixed Jib
2 off 3.0 MT, fixed Jib, single jib
Accommodation 8 off. Fender
26 cabins, Control room, office, Mess room
Changing room etc.