You are on page 1of 22

Moving Load Analysis

of Box Girder
Using SAP2000
SAP2000 Tutorial Example ACECOMS, AIT

Moving Load Analysis


of Box Girder
Using SAP2000

Table of Content
Objective ...................................................................................................................................................... 3

Problem ........................................................................................................................................................ 3

Material .................................................................................................................................................... 3

Plan and Elevation View .......................................................................................................................... 3

Sections .................................................................................................................................................... 3

Step-by-Step Solution................................................................................................................................... 4

Start modeling by template....................................................................................................................... 4

Modify Structure ...................................................................................................................................... 5

Define Material Properties ....................................................................................................................... 8

Define Frame Section Properties.............................................................................................................. 9

Assign Frame Sections ........................................................................................................................... 11

Define Lanes and Vehicles ..................................................................................................................... 13

Define Moving Load Cases .................................................................................................................... 17

Set Analysis Options and Start Analysis ................................................................................................ 18

View Results........................................................................................................................................... 20

Moving Load Analysis of Box Girder 2/ 22


SAP2000 Tutorial Example ACECOMS, AIT

Objective
To demonstrate and practice step-by-step on the modeling, moving load analysis

Problem
Plot influence line for vertical displacement at point A in Lane 1and plot moving
load M33 moment for bridge as shown below for worst case of HS20-44 truck
load and HS20-44L lane load applied to each lane simultaneously.

Material
SteelEc = 5,000 ksi

Poissons Ratio = 0.2

Plan and Elevation View

6'
Lane 2 Centerline
Frame Elements
Centerline
Lane 1 Centerline

6'
50'
20'

100' 100' 100'

Sections
Box Girder

A = 35 ft2
I = 500 ft4
AShear = 12 ft2

Column

A = 40 ft2
I = 400 ft4
AShear = 30 ft2

Moving Load Analysis of Box Girder 3/ 22


SAP2000 Tutorial Example ACECOMS, AIT

Step-by-Step Solution
Start modeling by template

Step 1-1: Start up screen of SAP2000, click on or go to File > New Model.
Select working unit = “Kip, ft, F” and select “Portal Frame”.

Step 1-2: Enter “Portal Frame” parameters as shown in above figure and click OK.

Moving Load Analysis of Box Girder 4/ 22


SAP2000 Tutorial Example ACECOMS, AIT

Step 1-3: Back to main screen, showing structure in “3D view” (left window) and “X-
Z Plane” view (right window). Close “3D view” window to enlarge “X-Z Plane” by
clicking at top-right of “3D View” window.

Modify Structure

Step 2-1 (Display Joint & Frame Labels): Click on or go to View > Set Display
Options, check the “Labels” box in “Joints” and “Frames/Cables” and click “OK”.

Moving Load Analysis of Box Girder 5/ 22


SAP2000 Tutorial Example ACECOMS, AIT

Step 2-2 (Delete Columns at both ends):Select Frame 1 and 4 by clicking on


them one by one and press “Delete” button in keyboard.

Step 2-3 (Assign Restraints): Select Joint 2 and 8. Click on or go to Assign >
Joint > Restraints, click on Hinge support button and click “OK”.

Moving Load Analysis of Box Girder 6/ 22


SAP2000 Tutorial Example ACECOMS, AIT

Step 2-4 (Move Joint 5): Click on Joint 5 and go to Edit > Move. Specify Delta Z =
“20” (ft) and click “OK”.

Step 2-5 (Divide Frame 5, 6 and 7): Select Frame 5, 6 and 7 by drawing selection
rectangular to cover all of them. Go to Edit > Divide Frame, enter Divide into “2”
Frames and click “OK”.

Moving Load Analysis of Box Girder 7/ 22


SAP2000 Tutorial Example ACECOMS, AIT

Define Material Properties

Step 3-1 (Change Working Unit): Select “Kip, in ,F” from drop-down menu at the
bottom-right of screen.

Step 3-2 (Define Concrete Material): Click on or go to Define > Materials.


Select “CONC” and click on “Modify/Show Material”, enter “5000” (ksi) and click
“OK” 2 times.

Moving Load Analysis of Box Girder 8/ 22


SAP2000 Tutorial Example ACECOMS, AIT

Define Frame Section Properties

Step 4-1(Change Working Unit): Select “Kip, ft ,F” from drop-down menu at the
bottom-right of screen.

Step 4-2 (Define Column Section): Click on or go to Define > Frame/Cable


Sections. Select “Add General” from second drop-down menu and click on “Add
New Property”

Moving Load Analysis of Box Girder 9/ 22


SAP2000 Tutorial Example ACECOMS, AIT

Step 4-3 (Define Column Section): Enter section property as shown above figure
and click “OK”.

Step 4-4 (Define Column Section): Enter Section Name = “COLUMN”, select
Material = “CONC” and click “OK”.

Moving Load Analysis of Box Girder 10/ 22


SAP2000 Tutorial Example ACECOMS, AIT

Step 4-5 (Define Girder Section): Repeat Step 4-2 to Step 4-5 to define
”BOXGIRDER” section property.

Step 4-6: Back to “Frame Properties” dialog shows “BOXGIRDER” and “COLUMN”
section have been added in the list and click “OK”.

Assign Frame Sections

Step 5-1 (Select Girders): Draw selection rectangular to cover frame 8 to 13.
Selection Status at the bottom-left of screen shows “7 Points, 6 Lines Selected”.

Moving Load Analysis of Box Girder 11/ 22


SAP2000 Tutorial Example ACECOMS, AIT

Step 5-2 (Assign Girder Sections): Click on or go to Assign > Frame/Cable >
Sections, select “BOXGIRDER” and click “OK”.

Step 5-3 (Select Columns): Change back to undeformed mode by clicking on or


from Display > Show Undeformed Shape. Click on frame 2 and 3 one by one.

Moving Load Analysis of Box Girder 12/ 22


SAP2000 Tutorial Example ACECOMS, AIT

Step 5-4 (Assign Columns): Click on or go to Assign > Frame/Cable >


Sections, select “COLUMN” and click “OK”.

Define Lanes and Vehicles

Step 6-1 (Define Lane 1): Click on or go to Define > Bridge Loads > Lanes
and click “Add New Lane”. Enter Frame = “8”, Eccentricity = “-6” and click on
“Add”. Repeat this step to define eccentricity = “-6” to frame 9 to 13 and click “OK”.

Moving Load Analysis of Box Girder 13/ 22


SAP2000 Tutorial Example ACECOMS, AIT

Step 6-2 (Define Lane 2): Back to “Define Bridge Lanes” dialog and click “Add New
Lane”. Enter Frame = “8”, Eccentricity = “6” and click on “Add”. Repeat this step to
define eccentricity = “6” to frame 9 to 13 and click “OK” 2 times.

Step 6-3 (Select Vehicles): Click on or go to Define > Bridge Loads >
Vehicles, select “Add Standard Vehicle” and click on “Add Vehicle”.

Step 6-4 (Select Vehicles): Select Vehicle Type = “HSn-44”, enter Scale Factor =
“20” and click “OK”.

Moving Load Analysis of Box Girder 14/ 22


SAP2000 Tutorial Example ACECOMS, AIT

Step 6-5 (Select Vehicles): Back to “Define Vehicles” dialog, click on “Add
Vehicle”. Select Vehicle Type = “HSn-44L”, enter Scale Factor = “20” and click
“OK” .

Step 6-6 (Select Vehicles): Back to “Define Vehicles” dialog shows 2 vehicle types
have been added in list. Click on “OK” to finish this step.

Moving Load Analysis of Box Girder 15/ 22


SAP2000 Tutorial Example ACECOMS, AIT

Step 6-7 (Define Vehicle Classes): Click on or go to Define > Bridge Loads >
Vehicle Classes, select “Add new Class”. Select “HSn441”, enter Scale Factor =
“1” and click “Add”. Select “HSn442”, enter Scale Factor = “1” and click “Add”. Click
“OK” 2 times.

Step 6-8 (Define Bridge Response): Click on or go to Define > Bridge Loads
> Bridge Responses, select all response results, select Method of Calculation =
“Exact”. Click “OK”.

Moving Load Analysis of Box Girder 16/ 22


SAP2000 Tutorial Example ACECOMS, AIT

Define Moving Load Cases

Step 7-1: Click on or go to Define > Analysis Cases. Click on “Add New Case”.

Step 7-2: Specify parameters shown in above figure and click “OK”

Moving Load Analysis of Box Girder 17/ 22


SAP2000 Tutorial Example ACECOMS, AIT

Set Analysis Options and Start Analysis

Step 8-1 (Set Analysis Options): Go to Analysis > Set Analysis Options. Select
“XZ Plane” and click “OK”.

Step 8-2: Click on or go to Analysis > Run Analysis. Select “MODAL” case and
click on “Run/Do Not Run Case” (not required in this example). Click on “Run Now”.

Moving Load Analysis of Box Girder 18/ 22


SAP2000 Tutorial Example ACECOMS, AIT

Step 8-3: After analysis is complete, check error messages in analysis window. If
no error report, click on “OK” to finish analysis step.

Step 8-4: Click on to change back to undeformed mode.

Moving Load Analysis of Box Girder 19/ 22


SAP2000 Tutorial Example ACECOMS, AIT

View Results

Step 9-1 (View Influence Line): Go to Display > Show Influence Lines > Joints.
Specify “LANE1”, Joint ID = “10” (middle of bridge), Vector Type = “Displacement”
and Component = “U3”. Click “Tables” to view in tabular form or click on “OK” to
view influence line in diagram.

Moving Load Analysis of Box Girder 20/ 22


SAP2000 Tutorial Example ACECOMS, AIT

Step 9-2 (View Moment 3-3 Diagram): Click on or go to Display > Show
Forces/Stresses > Frames/Cables. Specify parameters as shown in above figure
and click “OK”.

Step 9-3 (View Moment 3-3 Diagram): Click on or go to Display > Show
Forces/Stresses > Frames/Cables. Specify parameters as shown in above figure
and click “OK”.

Moving Load Analysis of Box Girder 21/ 22


SAP2000 Tutorial Example ACECOMS, AIT

Step 9-4 (View Moment 3-3 Diagram): Force diagram in each frame can be
displayed by right-mouse clicking. When move mouse over particular diagram,
distance and force value will be displayed at the bottom of diagram.

Moving Load Analysis of Box Girder 22/ 22