Function/Project
Person Involved/In- Estimated Source of
Title Objectives Strategies Time Frame Expected Output
Charged Fund Needed Fund

To Construct Drainage Flood free


cover along the corridor To construct steel grills Principal classrooms and
Drainage Cover of Bldg. 8 or Gov. Ben Dy to cover the drainage SDRRM February – May covered drainage
32, 500 MOOE
Building to prevent using 2” Flat Bar and 2” Coordinator 2018 for the safety of
clogging and accidents Angular Bar TVL Teachers the student passing
among students the corridors

To construct a concrete
Principal
To Construct concrete access ramp for PWD
Construction of SDRRM May – June
PWD Ramp connecting and a 2” G.I pipe for 15, 000 MOOE Available access
PWD Ramp Coordinator 2018
Bldg. 8 and Bldg. 9 steel railing and ramp for PWD
TVL Teachers
concreting