You are on page 1of 5

KOLEJ VOKASIONAL KUALA KRAI

JABATAN TEKNOLOGI KEJURUTERAAN AWAM

PERANCANGAN KURSUS
COURSE OUTLINE

MAKLUMAT KURSUS (COURSE INFORMATION)

SEMESTER/SESI (SEMESTER/SESSION) : SEMESTER 1 / SESSION 2017/2018

KOD KURSUS (COURSE CODE) : WTP 7013

NAMA KURSUS (NAME OF COURSE) : MANAGEMENT OF CIVIL


ENGINEERING WORKS

BEBAN AKADEMIK PELAJAR (STUDENT ACADEMIC LOAD) :

Kategori Aktiviti Aktiviti Pembelajaran Jumlah Jam/Semester


(Category of Activities) (Learning Activity) (Total Hours/Semester)
Kuliah (Lecture) 25
Pembelajaran berbantu Tutorial/Amali (Tutorial/Practical) 28
(Guided learning) Aktiviti pembelajaran bertumpukan pelajar
3
(Student centered learning activities)
Persediaan untuk tugasan/projek
28
(Preparation for assignments/projects)
Pembelajaran kendiri Pembelajaran kendiri/ulangkaji
25
(Self learning) (Independent study/revision)
Persediaan bagi penilaian
5.5
(Preparation for assessment)
Penilaian berterusan
1.5
Penilaian rasmi (Continuous assessments)
(Formal assessments) Menduduki peperiksaan akhir
4
(Final examination sitting)
JUMLAH JAM BELAJAR (JJB)
120
TOTAL STUDENT LEARNING TIME (SLT)

Kursus Pra-syarat (Pre-requisite Course) : None

Nama Pensyarah (Name of Lecturer) : 1. AIDI ALFATAH BIN YAHYA


2. HASLILI BT CHE HARUN

Disediakan oleh (Prepared by): Disahkan oleh (Approved by):


NOR HARZAR BIN ABD GHANI AMIR BIN ISMAIL

Tandatangan (Signature): Tandatangan (Signature):

Nama (Name): Nama (Name):


Course Coordinator Head of Department
Tarikh (Date): Tarikh (Date):
1 JANUARI 2017 1 JANUARI 2017
MATLAMAT (GOALS):

The course helps students to acquire skills, knowledge and the right attitude in monitoring civil engineering
works, namely, earthworks, drainage works, road works, traffic management, water reticulation work,
wastewater engineering works, and monitor river protection works.

SINOPSIS (SYNOPSIS):

The course helps students to acquire skills, knowledge and right attitude in monitoring civil engineering works,
namely, earthworks, drainage works, road works, traffic management, water reticulation work, wastewater
engineering works and monitor river protection works. In order to achieve the outcomes for this module,
knowledge in the relevant industry legislation and standards and the ability to search information on
construction need and ability to communicate well with clients are required.

HASIL PEMBELAJARAN (LEARNING OUTCOMES):

Upon completion of the course, students will be able to:


1. Identify civil engineering works monitoring assessment based on Master Work Programme (C1, PLO3)
2. Establish civil engineering works monitoring based on Master Work Programme (P2, PLO2)
3. Manage civil engineering works based on Master Work Programme (A4, PLO5)

ISI KANDUNGAN (CONTENT):

MINGGU KANDUNGAN PENTAKSIRAN


(WEEK) (CONTENT) (ASSESSMENT)
1–2 1.0 PROJECT CONTROL (4 HOURS)
1.1 Project Monitoring System
1.2 Progress Report Quiz
1.3 Time Performance
1.4 Project Controlling

3–4 2.0 EARTHWORK MANAGEMENT (4 HOURS)


2.1 Work Schedule Based on Contract Document
2.2 Actual Work Progress
2.3 Site Evaluation of Work Done Test
2.4 Progress Assessment Document in Monitoring
Earthworks
2.5 Progress Assessment Submission to Superior

5 3.0 DRAINAGE WORKS MONITORING (2 HOURS)


3.1 Work Schedule
3.2 Actual Work Progress
Practical
3.3 Site Verification of Work Done
3.4 Progress Assessment
3.5 Progress Assessment Submission to Superior

6–7 4.0 ROADWORK MONITORING (4 HOURS)


4.1 Work Schedule
4.2 Actual Work Progress
Practical
4.3 Site Verification of Work Done
4.4 Progress Assessment
4.5 Progress Assessment Submission to Superior

8–9 5.0 TRAFFIC MANAGEMENT MONITORING (4 HOURS)


5.1 Work Schedule
5.2 Actual Work Progress
Assignment
5.3 Site Verification of Work Done
5.4 Progress Assessment
5.5 Progress Assessment Submission to Superior
10 – 11 6.0 WATER RETICULATION WORKS MONITORING
(4 HOURS)
6.1 Work Schedule
6.2 Actual Work Progress Group Project
6.3 Site Verification of Work Done
6.4 Progress Assessment
6.5 Progress Assessment Submission to Superior

12 – 13 7.0 WASTEWATER WORKS MONITORING (4 HOURS)


7.1 Work Schedule
7.2 Actual Work Progress
7.3 Site Verification of Work Done Group Project
7.4 Progress Assessment
7.5 Progress Assessment Submission to Superior

14 8.0 RIVER PROTECTION WORKS MONITORING


(2 HOURS)
8.1 Work Schedule
8.2 Actual Work Progress
Group Project
8.3 Site Verification of Work Done
8.4 Progress Assessment
8.5 Progress Assessment Submission to Superior

15 STUDY WEEK

16 FINAL EXAM

17 FINAL EXAM

AMALI (PRACTICAL):

1. Work Scheduling
2. Progress Assessment
3. Works Monitoring
PENILAIAN (ASSESSMENT):

1. Penilaian Berterusan (Continuous Assessment) : 60 %


2. Peperiksaan Akhir Amali (Practical Examination) : 30 %
3. Peperiksaan Akhir (Final Examination) : 10 %
Jumlah (Total) : 100 %

Assessment Specifications Table (AST):


ASSESSMENT METHODS FOR
COURSEWORK (CA)

ASSESSMENT METHODS
CLO FOR
COURSEWORK (CA)

QUIZ

ASSIGNMENTINDIVIDUAL

PROJECT
PRACTICAL WORK
CONTEXT

TEST
CLO1

CLO2

CLO3
*(1) *(1) *(1) *(1) *(1)
5% 25% 30% 20% 30%
1.1 Perform project control
√ √

1.2 Conduct earthwork management √ √


1.3 Conduct drainage works monitoring √ √
1.4 Conduct roadwork monitoring √ √
1.5 Conduct traffic management
√ √
monitoring
1.6 Conduct water reticulation works
√ √
monitoring
1.7 Conduct waste water works
√ √
monitoring
1.8 Conduct river protection works
√ √
monitoring
Remark:
1. Suggested time for
 Quiz : 15 minutes
 Test (Theory) : 45 – 60 minutes
 Test (Practical) : 60 – 90 minuts
 Individual assignment: 1 week
 Project : 3 weeks

2. 40 Notional hours is equivalent to 1 credit.


RUJUKAN (REFERENCES):

1. Ismail Osman Hakim. Undang–Undang Bangunan Untuk Pembangunan Perumahan. Universiti Tun
Hussein Onn Malaysia.
2. Misnan M Saidin, M Yusof Zakaria, Mohamed A,Hakim & Dalib A Rahman. Pengurusan Keselamatan
Projek Pembinaan. Universiti Teknologi Malaysia.
3. Misnan M Saidin, Mohamed A,Hakim &, Abdullah Mat Naim. Pengurusan Projek Pembinaan. Universiti
Teknologi Malaysia.
4. Salleh Nurul Azita & Hussin Abd Aziz. Penggunaan Alat Keselamatan di Tapak Bina. Dewan Bahasa
Pustaka.
5. International Law Book Services Wisma ILBS, Uniform Building By Laws 1984 [G.N.5178/85](2013).
International Law Book Services Wisma ILBS.
6. Hussin A Aziz (2008). Aspek Undang-Undang Dalam Pengurusan Projek Pembinaan. Universiti Sains
Malaysia.
7. Mohd Majid Amran (2009). Pengenalan Kontrak Binaan Reka dan Bina. Dewan Bahasa Pustaka.
8. Construction Technology. Pearson Prentice Hall.
9. J.I.W. Bentley (Penterjemah Abdul Hakim Mohammed) (1990). Penenderan dan Penganggaran Binaan.
Universiti Teknologi Malaysia.
10. Ministry of Education Malaysia

KEHADIRAN/PERATURAN SEMASA KULIAH (LECTURE ATTENDANCE/REGULATION):


1. Pelajar mesti hadir tidak kurang dari 80% masa pertemuan yang ditentukan bagi sesuatu kursus.
Students must attend lectures not less than 80% of the contact hours for every course.

2. Pelajar yang tidak memenuhi perkara (1) di atas tidak dibenarkan menghadiri kuliah dan menduduki
sebarang bentuk penilaian selanjutnya. Markah sifar (0) akan diberikan kepada pelajar yang gagal
memenuhi perkara (1).
Students who do not fulfill (1) will not be allowed to attend further lectures and sit for any further
examination. Zero mark (0) will be given to students who fail to comply with (1).

3. Pelajar perlu mengikut dan patuh kepada peraturan berpakaian yang berkuatkuasa dan menjaga disiplin
diri masing-masing untuk mengelakkan dari tindakan tatatertib diambil terhadap pelajar.
Students must obey all rules and regulations of the university and must discipline themselves in order
to avoid any disciplinary actions against them.

4. Pelajar perlu mematuhi peraturan keselamatan semasa proses pembelajaran dan pengajaran.
Student must obey safety regulations during learning and teaching process.