ELEMENT 5.19.3
JOB SAFETY PRACTICES
Carry out the induction and Daily Conduct tool box/induction Provide safety induction and tool box in
02 tool box talks at direct sunlight/ noise well ventilated room and prevent from 02
o If the employee is new from nearby noise and direct sunlight.
comer, shall be sent to activity/equipment. Competent person only should give
HSE Office for induction. (Environmental conditions -
safety induction and tool box talk
o Carry out tool box talk on heat, noise)
(supervisor who received safety tool box
every day before Lack of knowledge by the
commencement of the instructor training)
task - 15 minutes. Language barriers If the instructor known only English, ask the
Major/ Medium / Minor participants who knows their language and
Accident. ask them to translate (Multilingual Safety
Heat Illnesses Induction and Tool Box Talk should be given
Fire to employees)
Property Damage
03 Using power hand tools and hand Usage of defective power Visual inspection of activity area and 03
tools for the job (hammer, and hand tools tools should be done before
spanner etc.) Use of single insulted commencement of work.
o Selecting & using electrical cable. Damaged/cracked tools shall
appropriate power/ hand Use of electrical plug immediately be reported to supervisor.
tools according to the without earthing pin. Verification/ Inspection of tools as per
activity Missing of safe guards the tools list.
o Inspection of the tools for Using un-insulated or not Check for inspection "color code’’ of the
defects, insulation and voltage rated tools. current month before use in case of
ergonomic conditions. Major / Medium / Minor power tools.
Accident e.g. Electric Shock, Competent person shall only use
Electrocution, Cut Injury powered hand tools.
The mentioned hazards may Use insulated/ voltage rated tools only
lead to Major/Medium/Minor while involving with live equipment.
accident. Always use power tools with double
insulated power cable and three pin plug
(plug with earthing pin)
04 Leveling the surface of wall/ floor Usage of defective power Obtain work permit from authorized 04
o Select the and hand tools issuer.
tool/equipment for the Heavy dust during Reduce accumulation of dust by
Page 2 of 12 Rev.2 [08-April-2019] Projects Business Unit
PROJECT NAME: AL AFLAJ S/S 8766
ELEMENT 5.19.3
JOB SAFETY PRACTICES
o Use scaffold or ladder if Bursting/slipping of hoses. Safe guard must be available and do
required Ignition sources alternate yourself in the spray painting
o Place the spray machine Inhaling fume during machine and the spray holder.
in required location painting Hoses must be routed properly and
o Select the paint and pour Spill of paint eye and body
access should be free from materials.
into the spray machine Closed room (confined
o Apply the spray paint Use proper electrical connection, naked
space) lack of ventilation
wherever required. plug-in are strictly prohibited. Do not
Fall from height while
have any unauthorized joints on
working on scaffold/ ladder
extension codes.
/ edge of the wall due to
Visual inspection should be done for
uninspected, work
spray machine and hoses before each
without safety harness or
task perform.
not hooking/ inadequate
If damage/crack immediately report to
anchorage point
supervisor.
Slip, trip and fall due to
Verification/ Inspection of tools as per
hose in the access way.
the tools list.
incompetent person
Use only color coded
involving in the activity
machine/equipments/ tools, this can be
Painting spills on ground
Manual handling done by competent person only. Do not
Heat stress, Heat cramps due leave the cable at ground or open to the
to working under direct traffic.
sunlight Manual handling procedure must be
followed. Adequate interval and rest by
changing the worker should be given for
those who involving
Reduce accumulation of fume by
vacuum provision of Local Exhaust
Ventilation (LEV) must be in place for
removing the fume and maintain proper
ventilation.
precautionary measures.
06 Loading ,Unloading & Damage to the property or All lifting tools & tackles shall be 06
Transportation (Shifting of person injury due using inspected visually for safe use.
materials from site store to work defective tools/ tackles These shall again be verified before
place - Platform materials ) (Accessories) start of job to ensure safety.
o Get permission from Boom truck / pick up vans Lifting load shall be secured with rope
authorized department not inspected periodically. and guide rope shall be provided to
(safety documents) and Incompetent person prevent swinging.
security guard for (including operators) Supervisor shall ensure that no person
entering the boom truck/ involving is coming / standing in the working
pick up van Outrigger (Boom truck) not area.
o Guiding the boom truck/ fully extended - collapse Ensure that vehicles like trucks, pick up
Pick up van. Contact with live parts due vans used for transportation are in good
o Parking in unloading area to lifting near work live condition.
(boom truck outriggers lines. Ensure the third party certification of
extend and make stable) Hit by vehicle movement - boom truck and the operator.
o Barricading the area
missing reversing alarm, Use tool bag to carry tools.
o Selecting & using
signal man/Flag man. Use hand gloves for handling the
appropriate equipment
Major/Medium/Minor material.
for unloading & shifting
Accidents Ensure that there are no obstacles or
materials from unloading
open pits on the way
location to work location
area. • Ensure long items are carried
horizontally only to avoid contact with
existing live parts
Damaged tools / tackles must be removed
from the place and tagged as "Do not use"
and send to repair.
07 Work Environment Slip, trip & Fall Use appropriate goggles (if work at 07
o Lighting Poor Illumination outside the building use shaded
o Ventilation Working under direct goggles, inside the building use white
o welfare facilities sunlight and poor goggles)
heat ventilation Work should not be carried out during
Inadequate welfare bad light and under poor visibility.
facilities (drinking water, Ensure the adequacy of illumination.
toilet and lunch room Provide adequate drinking water
Major/ Minor Injury Heat
(either by thermo cooler or water
stress, cramps
bottles)
Eye Strain
Toilet facility must be provided if not
Hygienic Disorder
permanent not available provide
mobile toilets.
No outdoor activity should be
performed (direct sunlight) during 12
pm to 3 pm from 15th June to 15th
September.
Drinking water should be available
with disposable glass in work area.
Provision of rest area at job site to be
provided.
Heat Stress index shall be used to
assess the humidity and temperature
and it will be communicated with
employees.
During extreme temperature work
rotation shall be implemented.
Heat stress training will be conducted at site
during execution of work to notify all
employees working at site with
precautionary measures.
08 Emergency • Unaware about emergency The injured person should be given First 08