You are on page 1of 21

Project History - TÜV NORD Group

Project Country Client Date of Activity In countries Comments


completion

Manufacturer Certification Indonesia PT Gunawan Dianjaya 2016 Certification Audit Indonesia


PED & AD Merkblatt W0/ Steel
TRD 100

Third Party Inspection Canada Thorburn Flex Inc. 2016 Shop Inspection Indonesia

Manufacturer Certification Indonesia PT Siemens Indonesia 2015 Certification Audit Indonesia


AD 2000 Merkblatt-HP0 &
DIN EN ISO 3834

Third Party Inspection Korea Hyundai Heavy 2015 Shop Inspection Indonesia
Industries

Visual Inspection Indonesia ThyssenKrupp Mannex 2015 Visual Inspection Indonesia


Asia Pte Ltd

Non-Destructive Indonesia PT OKI Pulp & Paper 2015 Radiography Test Indonesia
Examination Package #1: Mills
Recovery Boiler (PT OKI
PULP & PAPER MILLS)
Project Management Indonesia PT Pertamina 2014-2015 Inspection Indonesia
Consultant (PMC) Gas
Pipeline
Shipment Inspection Indonesia PT Classic Exportindo 2014 Shipment Inspection (Including Indonesia
Testing – Report of Analysis)

Radiography Test Indonesia PT Wilmar 2014 Radiography Test Indonesia

reflisE.doc 1
Abt.: SEP-E
Project History - TÜV NORD Group
Radiography Test & Indonesia PT Dharma Pratama 2014 Radiography Test Indonesia
Ultrasonic Test Sejati

NDE Works for Piping Indonesia PT Tripartra Engineers 2014 NDE Indonesia
Installation (Senoro & Constructions
Proyek)

Radiography Test Indonesia Arun NGL 2014 Radiography Test Indonesia

Radiography Test Indonesia PLTU Sumsel V – PT. 2014 Radiography Test Indonesia
PLN (Persero)

Radiography Test Indonesia PT Zug Industry 2014 Radiography Test Indonesia


Indonesia

Witness The Welder Indonesia Air Product Asia 2014 Witness The Welder Indonesia
Performance Qualification Performance Qualification
Test 9WPQT) Test 9WPQT)
Third Party Inspection Indonesia PT Yasulor Indonesia 2014 Cargo Lift Indonesia
Services (L’OREAL) (Equipment/Tools
Inspection)
Third Party Inspection Indonesia PT Platindo Cipta Raya 2014 Fabrication of 6 (six) Unit Indonesia
Services Atlantic Filter

Plant Machine Safety Indonesia PT Robert Bosch 2014 Workshop Inspection of Indonesia
Inspection Automotive New Machinery

Third Party Inspection Indonesia Guntner Indonesia Pte 2014 Final Inspection before Indonesia In cooperation with
Services Ltd Shipment TUV Malaysia

Second Party Inspection Indonesia PT Modern Putra 2014 Analysis of Fryer Utilities Indonesia
for Fryer Indonesia After Installation

Witness Test 2x10MVA Indonesia PT Schneider 2013 Witness Test Indonesia In cooperation with
Transformer Indonesia TUV Malaysia

reflisE.doc 2
Abt.: SEP-E
Project History - TÜV NORD Group
Project Pre-Qualification Indonesia PT Vale Indonesia 2013 Review Existing Pre- Indonesia
Support qualification and Provide
option, Develop New Pre-
qualification System
Third Party Insepction Indonesia PLTU Rote 2 x 3 MW , 2012 Shop Inspection China In cooperation with
Services PT. PLN (Persero) TUV China

NDT Inspection Indonesia PT. Prakarsa 2012 Provision NDT services : Indonesia
Langgeng Maju Radiography Testing
Bersama
Daily Contract Indonesia PT Tetra Pak 2012 Technical assistance of Indonesia
Stainless Equipment developing of Quality Plan
Fame Shaking Bed
CCPP Mittelsburen Germany SW B 2012 Inspection befor operation Germany
Monthly Contract Indonesia PLTU Kariangau 2 x 2012 Shop Inspection China In cooperation with
100 MW , PT. PLN TUV China
(Persero)
NDT Inspection Indonesia PT. Supra Bakti 2012 Provision NDT services : Indonesia
Mandiri Radiography Testing ;
Magnetic Particle Inspection ;
Penetrant Testing
Suzlon Component Indonesia Exelon W ind, LLC 2012 W ind Tower Component Indonesia In cooperation with
Inspections Inspection TUV USA
Third Party Insepction Indonesia PLTU Malinau 2 x 3 2011 Shop Inspection Indonesia & China In cooperation with
Services MW , PT. PLN TUV China
(Persero)
Third Party Insepction Malaysia Jimah Energy Venture 2011 Sewerage Vacumn Tank Malaysia
Services sdn bhd
Third Party Inspection Indonesia PT Areva T&D 2011 CoC and SAT for HV 6.6 kV Abu Dhabi, United In cooperation with
Switchgear Arab Emirates TUV Middle East
Third Party Insepction Indonesia PLTU Berau 2 x 7 2011 Shop Inspection Indonesia & China In cooperation with
Services MW , PT PLN TUV China
(Persero)

reflisE.doc 3
Abt.: SEP-E
Project History - TÜV NORD Group

Project Country Client Date of Activity In countries Comments


completion

CCPP Lingen Germany RW E Power Plant 2010 Consulting for Functional Germany
876MW Safety Assessment
Third Party Insepction Indonesia PLTU BIMA 2 x 10 2010 Shop Inspection China In cooperation with
Services MW , PT PLN TUV China
(Persero)

CCPP Braunschweig Germany Stadtwerke 2010 PED Conformity Assessment Germany East
Braunschweing Europe
Bertsch 76.5Mwel / 65
MW th
Third Party Insepction Malaysia Kapar Energy Venture 2010 Condition and Assessment of Malaysia
Services sdn bhd Boiler Unit 6 including
pressure vessel and piping
systems
Third Party Insepction Indonesia PT Korosi Specindo 2010 Inspection & Testing of Indonesia
Services Corrosion Probe System
Audit in Gas Oman Oman Gas Company 2009 Audit in Gas Compression Oman
Compression Stations Stations
CCPP Hannover Germany Stadtwerke Hannover 2009 PED Conformity Assessment Germany East
Standardkessel 130 Europe
MW
Welder Qualification and Indonesia PT Siemens Indonesia 2008 Witness, Review and Approval Indonesia
Certification

WPS (Welding Procedure Indonesia PT Siemens Indonesia 2008 Testing, NDT, Mechanical Test, Indonesia
Specificatioon) and PQR Verification

C10 Project Spain REPSOL YPF 2008-2011 Inspection and quality control Spain
(Cartagena) in construction. extension of
the refinery of Cartagena

Third Party Insepction W orldwide Borouge 2007 - 2010 New Petrochemical factory W orldwide
Services Borouge 2 in Ruwais - Source
procurements
reflisE.doc 4
Abt.: SEP-E
Project History - TÜV NORD Group
New building Germany E.ON Kraftwerke 2009 Shop and site inspection Germany
Power plant
Datteln

reflisE.doc 5
Abt.: SEP-E
Project History - TÜV NORD Group

Project Country Client Date of Activity In countries Comments


completion

HP-pipelines Germany Hitachi Power Europe 2009 Conformity assessment Germany


Power plant Shop and site inspection
W alsum

NPP EMBALSE - Argentina Ansaldo Nucleare 2009 Plant inspection, evaluation of Argentina Started in 2008
Nuclear Power Plant life of parts and components
of nuclear plant.

Annual Contract Spain REPSOL YPF 2007-2009 Technical assistance of Spain


inspection of different projects
(e.g. C.I. of Petronor MUSKIZ,
T-19, t-59)
Shutdowns Spain PETROMED. 1990-2009 Official inspection and NDT in Spain
(Castellón) a refinery
Annual Maintinance Spain REPSOL QUÍMICA 1983-2009 Inspection services and Non Spain
Contract (Tarragona) Destructive Testing
GUJARAT VAPODARA India Dresser Rand 2009 Shop and site inspection, Italy In cooperation with
– Refinery - Three phase dielctric and type tests TUV India
synchronous motor
Heat exchangers Germany Total France 2009 Shop and site inspections, Italy Started in 2008
TOTAL Refinery pressure tests, mechanical
Mitteldeutschland tests
Gmbh
Double gates valves Switzerland Nord Stream AG 2009 Inspections, pressure tests, Italy In cooperation with
NORD STREAM NDT tests, mechanical tests TUV NORD Systems
PROJECT
Pipeline
ASME Stamp Turkey, Master Enerji, 2009
Certification Bulgaria Klimatek, Toros
Inşaat, Santek
Spherical vessels Turkey Tekfen 2009 Shop inspection Sudan

reflisE.doc 6
Abt.: SEP-E
Project History - TÜV NORD Group

Project Country Client Date of Activity In countries Comments


completion

LPG Vessels Turkey Tekfen 2009 Shop inspection Sudan

Heat Exchanges Turkey Tekfen 2009 Shop inspection Turkey

Vesels (Natural gas AD DEMİREL Turkey 2009 Shop inspection Turkey


separator)

In Service Brunei Total Exploration 2009 Fitness Inspection Malaysia


Lifting and Hoisting Megalift Sdn Bhd
Equipments Jasra Sdn Bhd
In Service Malaysia Dayang Enterprise 2009 Fitness Inspection Malaysia
Lifting and Hoisting Petra Resources S/B
Equipments (ESP) Esprat Sdn Bhd
Mega Slings Services 1997 -
Present
New builidng Malaysia Scomi Oil Tools 2009 Design, shop and site Malaysia
Offshore Containers inspection
W elding control and Spain ENAGAS 2008 W elding control Spain “Conexión con
supervision of tests at Francia”, “Madrid-
pipelines Sevilla”, “Tarifa-
Cordoba-Badajoz”,
“Huelva-Sevilla-
Madrid”

HP-pipelines Germany Babcock Borsig 2008 Conformity assessment Germany


Power plant Services
Moorburg

HP-pipelines Germany Babcock Borsig 2008 Conformity assessment Germany


Power plant Services
Boxberg

reflisE.doc 7
Abt.: SEP-E
Project History - TÜV NORD Group

Project Country Client Date of Activity In countries Comments


completion

HP-pipelines Germany Babcock Borsig 2008 Conformity assessment Germany


Power plant Services
Maasvlakte

HP-pipelines Germany Babcock Borsig 2008 Conformity assessment Germany


Power plant Services
Staudinger

HP-pipelines Germany Babcock Borsig 2008 Conformity assessment Germany


Power plant Services
Scholven

Kavernenspeicher Germany Essent Nuon 2008 Licence procedure Germany


Essent – Nuon Netherlands Shop and site inspection Netherlands
Pressure test
Final certification

Pipeline Germany Ruhrgas 2008 Shop and site inspection Germany


Lauterbach – Scheidt

Propylene – Pipeline Germany Evonik / GPDC 2008 Shop and site inspection Germany
Ruhr area

Steam turbine generator Saudi arabia SAUDI 2008 Shop inspections, pressure Italy In cooperation with
METHANOL & CO FORMALDEHYDE tests, running tests and TUV India
PLANT CHEMICAL Co. Ltd. expediting
( SFCCL) Saudi Arabia
/ Larsen & Toubro

reflisE.doc 8
Abt.: SEP-E
Project History - TÜV NORD Group

Project Country Client Date of Activity In countries Comments


completion

Expansion joints Romania Ansaldo Nucleare 2008 Design approval, inspections, Italy
CERNAVODA UNIT 1 NDT tests
Filters, Vessels Italy PALL EUROPE Ltd. 2008 Shop inspections, visual and Italy In cooperation with
BP AMEC PETROPLUS dimensional checks, pressure TUV UK
test, documents review
Third Party inspection of Sumito /Japan NPCC 2008 - ADMA OPCP IGD roject. Full
CS Pipes Ongoing stage and Final Inspection of
CS Pipes
New Building Germany Teupan 2008 Quality Assurance and Malaysia
Crawler Arm Quality Inspection

New Building Singapore Chevron 2008 Experditing and Quality Malaysia


Pressure Vessels Inspection
Project Prequalification Indonesia PT. International 2007 Preparing concept and Indonesia
Consultant for Local Nickel Indonesia Tbk definition of specialization and
Contractor (Contract No. (PT. INCO) classification of cotractor
00001127)
RZR Herten Germany Fisia Babcock 2007 Conformity assessment Germany

Annual Maintinance Spain REPSOL PETROLEO, 1980-2007 Official inspection and NDT in Spain
Contract (La Coruña, S.A. refineries
Tarragona,
Cartagena,
Puertollano)
Power plant Germany Mark E 2007 Heat technology Germany
Elverlingsen examination

OMV-compressor Austria MAN Turbo 2007 Guarantee examination Austria


station

GuD – power plant Iran Fa. Mapna 2007 Guarantee examination Iran
International

reflisE.doc 9
Abt.: SEP-E
Project History - TÜV NORD Group

Project Country Client Date of Activity In countries Comments


completion

Pipes, Fitting, Butterfly Thailand ABB PS&S till August 2007 Inspections, welding process Italy Started in 2006
valves, Ball valves, Gate 2006, then THAI OIL review, construction phases
valves, Globe valves, starting from and NDT witnessing, Hydro
Safety valves, Pressure November 2006 test witnessing and
vessels, Emergency expediting.
diesel generator
THAI OIL CDU-3
Revamp Project
Heat exchangers, urea Italy Urea Casale 2007 Inspections, welding process Italy In cooperation with
strippers, carbanmate review, construction phases TUV India
condensers and NDT witnessing, Hydro
HP CARBANMATE test witnessing
CONDENSER –
SECONDARY
REFORMER VESSEL
Risk Based Inspection Das island ADGAS 2007 Risk Based Inspection UAE
Implementation ADGAS Implementation ADGAS - Das
- Das Island Island
Heat exchangers, pre- Italy Urea casale 2007 Inspections, welding process Italy
heater review, construction phases
NEW SYNLOOP and NDT witnessing, Hydro
ECONOMIZER BWF test witnessing
PRE-HEATER

Valves, Safety valves, Romania Ansaldo Nucleare 2007 Shop inspections, material Italy Started in 2004
Pumps, Pressure approval, NDt tests
Vessels, Chillers,
Thermometer,
Expansion joint, air
dryers
CERNAVODA UNIT 2
ADGAS Power System W orld W ide ADGAS 2007 Third Party Inspection W olrd W orld W ide
Upgrade (PSU) Projects wide

reflisE.doc 10
Abt.: SEP-E
Project History - TÜV NORD Group

Project Country Client Date of Activity In countries Comments


completion

Kavernenspeicher Epe Germany Nuon-NL 2006 Licence procedure Germany


Nuon Netherlands Tebodin-NL Shop and site inspection Netherlands
New erection Pressure test
Final certification

VESSEL N. E1-179 China VRV FOR 2006 NDT and metallurgical China In cooperation with
PETROCHINA inspections Foster W heeler
LIAOYANG International
PETROCHEMICAL
COMPANY
Kavernenspeicher Epe Germany Essent-NL 2005 Licence procedure
Essent Netherlands Shop and site inspection
New erection Pressure test
Final certification

Propylene-Pipeline Germany / EPDC 2005 Shop and site inspection, Germany /


Netherlands consultancy, authority Netherlands
Engineering

Power plant Germany RW E 2005 Shop and site inspection Germany


Niederaußem

GuD-plant Germany Stadtwerke Münster 2005 Shop and site inspection Germany
HKW -Hafen

Firing Block 3 Germany Thyssen Krupp Stahl 2005 Shop and site inspection Germany
AG

reflisE.doc 11
Abt.: SEP-E
Project History - TÜV NORD Group

Project Country Client Date of Activity In countries Comments


completion

Supplies of flanges, Greece TECHNIP 2005 Expediting and Shop Italy Started in 2004
globe valve, actuated inspections
gate valves
MOTOR OIL HELLAS
REFINERY
EXPANSION 2005
SPECS.
Ball valves Saudi arabia TECHNIP/ARAMCO 2005 Expediting and shop Italy Started in 2004
DHT Complex Riyadh inspections
Control valves, Italy FOSTER W HEELER 2005 Shop inspections Italy
centrifugal pumps,
potabilization package,
compressed air
package, injection
package, analysing
system
COMBINED CYCLE
CENTRAL 400 MW
TEVEROLA
Pipeline Natural Germany RW E 2005 Licence procedure Germany
gas Pressure Check of pipeline
increase components

reflisE.doc 12
Abt.: SEP-E
Project History - TÜV NORD Group

Project Country Client Date of Activity In countries Comments


completion

Power transformers Italy FOSTER W HEELER 2005 Shop inspections Italy


WIND POWER
STATION
VALLESACCARDA
Power transformers, Qatar TECHNIP 2005 Shop inspections Italy
Valves, Fittings.
ORYX GTL Project
Cooling water air cooler, U.A.E. ADGAS 2005 Shop inspections Italy In cooperation with
local control cabin, RW TUV Abu Dhabi
valves
POWER SYSTEM
UPGRADE PROJECT
Actuated sub-sea ball Egypt VETCO GRAY for 2005 Shop inspections Italy
valves, sub-sea gear PETROBEL
box, check valves
TEMSAH 2
DEVELOPMENT
Globe valves, gate U.A.E. TECHNIP for ADCO 2005 Expediting and shop Italy Started in 2004
valves, deluge valves, inspections
flanges, ball valves,
fittings
NORTH EAST BAB
(NEB) PHASE 1
DEVELOPMENT
PROJECT
Flanges, barred tees, top U.A.E. TECHNIP for ADCO 2005 Expediting and shop Italy Started in 2004
entry ball valves, inspections
insulation joints
NORTH EAST BAB
(NEB) PHASE 1
DEVELOPMENT
PROJECT

reflisE.doc 13
Abt.: SEP-E
Project History - TÜV NORD Group

Project Country Client Date of Activity In countries Comments


completion

De-hydratation column, Algeria ABB PS & S for 2005 Expediting and shop Italy Started in 2004
safety relief valves, SONATRACH inspections
cables, traps, valves,
electric motors,
compressors, air
coolers, air dryers,
pressure vessels, pipes
PROJET DE
TRAITEMENT D’HUILE
DE CHAMPS
Pipes, Fitting, Butterfly Kazakistan ABB PS&S for AGIP 2005 Expediting and shop Italy
valves, Ball valves, Gate K.C.O. inspections
valves, Globe valves,
Safety valves, Pressure
vessels, Emergency
diesel generator, Flame
arrestors, UPS and
batteries, MCC panel,
HV transformer, MV
transformer, HV-MV-LV
cables, HV bus ducts,
Fuel gas electric heater,
Cathodic protection
system, HVAC system,
steel structures,
insulation panel,
Junction box, Flow
transmitter, LMS & DMS
system.
KASHAGAN
BARGE 8

reflisE.doc 14
Abt.: SEP-E
Project History - TÜV NORD Group

Project Country Client Date of Activity In countries Comments


completion

Surge Vessel's Pressure U.A.E U.A.E 2005 Surge Vessel's Pressure U.A.E
Safety Valves, Safety Valves, Calibration,
Calibration, Certification Certification as per ISO 9001
as per ISO 9001 at Abu at Abu Dhabi, W R & Al Ain
Dhabi, W R & Al Ain Pumping Stations.
Pumping Stations

Valves, compressors, THAILAND ABB PS & S for 2005 Expediting and shop Italy Started in 2004
inlet filters, gas coolers DOURSCH CONSULT inspections
BVW 7, SAIYOK
COMPRESSOR
STATION
Valves, tanks, isolation Algeria ABB PS & S for 2004 Shop inspections Italy
joints, panels SONATRACH
BANALISATION LIGNE
36
Chalk filtration system Italy ENELPOW ER 2004 Expediting and shop Italy Started in 2003
BRINDISI SUD inspections
DESULPHURATION
PLANT
Supplies of continuous Saudi arabia TECHNIP/ARAMCO 2004 Expediting and shop Italy Started in 2003
blow down valves, inspections
intermittent blow down
valves, stop check
valves
SULFUR RECOVERY
PLANT FOR RIYADH
REFINERY
Reactor Greece HELLENIC 2004 Shop inspections Italy In cooperation with
ULSADO UNIT – PETROLEUM S.A. TUV Hellas – Started
REACTOR R-1901 in 2003
Gate, globe, ball and Korea SAMSUNG 2004 Shop inspections Italy In cooperation with
check valves RW TUV KOREA
SC-0952 IOCL LAP

reflisE.doc 15
Abt.: SEP-E
Project History - TÜV NORD Group

Project Country Client Date of Activity In countries Comments


completion

Regenerator Super India LARSEN & TUBRO 2004 Shop inspections Italy In cooperation with
heater, skids, safety for INDIA OIL Co. TUV India
valves, Control valves.
DHDT/MSQ
UPGRADATION
Actuated sub-sea ball Lybia SAIPEM U.K. for AGIP 2004 Shop inspections Italy Started in 2003
valves, hydraulic Lybia.
actuator, sub-sea gear
box, flanges, fittings.
BAHR ESSALAM
In Service Malaysia Nippon Oil Exploration 2004 - Fitness Inspection Malaysia
Lifting and Hoisting Present
Equipments
Third Party Inspection / India UNIBETON 2004 - Third Party Inspection / India, Pakistan
Certification for Quality & Present Certification for Quality &
Quantity Quantity - In India and
Pakistan
Power plant Spain Lurgi 2004 Shop and site inspection Germany
(Steam generator) Energie und Inspection of plant Poland
Entsorgung Components Spain

Third Party Inspection Abu Dhabi ADGAS 2004 Carry out inspection & QA/QC Abu Dhabi
Services for METITO on behalf of ADGAS and
RO Units contract No. monitoring the Quality of
CON-MAC-006-2002 METITO'S Sub Contractor.
Assessment of piping Germany Infracor 2003 Fit For Purpose study Germany DN 200
Data Assessment of piping data MOP 97 bar
Fg 101 Pressure test

Kavernenspeicher Epe Germany Thyssengas 2003 Licence procedure Germany


Extension Shop and site inspection
Pressure test
Final certification

reflisE.doc 16
Abt.: SEP-E
Project History - TÜV NORD Group

Project Country Client Date of Activity In countries Comments


completion

Fit For Purpose study Germany Infracor 2003 – 1999 Fit For Purpose study Germany DN 100/150
Fg 38 Assessment of piping data MOP 73/100 bar
Pressure test

Power plant Germany RW E 2003 Shop and site inspection Germany 260 MW
Hamborn Design approval

Inspection / Certification Dubai Siemens, ENOC 2003 Inspection and Certification of Dubai
Processing CO. L/P compressor module for
Siemens, Pinspong, Sweden.
Fertilizer Kuwait PIC Petrochemical 2003 Controlling and preparation Kuwait
plants Industries Company of inspection and monitoring
(K..S.C.) procedures

Annual Maintinance Spain ENFERSA, 1990-2000 NDT and reglamentory Spain


Contract (Puertollano, inspections in the factories of
Cartagena) ENFERSA

reflisE.doc 17
Abt.: SEP-E
Project History - TÜV NORD Group

Project Country Client Date of Activity In countries Comments


completion

Cylinders, tanks, aid ALGERIA ABB PS & S for 2003 Shop inspections Italy
vehicles, motors SONATRACH
HASSI
BERKINE/NEZLA
Pumps, cylinders, ALGERIA ABB PS & S for 2003 Shop inspections Italy
motors, valves, tanks, SONATRACH
filters, cables,
transformers, vehicles,
inverters, vessels,
electrical panels,
ambulances
OLEODUC HEH
SKIKDA STATION DE
POMPAGE SP1, SP2,
SP3 BIS
Isolation joints, traps, ALGERIA ABB PS & S for 2003 Shop inspections Italy
security valves, valves AMERADA HESS
TROIS GASODUCTS A (GEA) Ltd.
EL GASSI
Kavernenspeicher Epe Germany Thyssengas 2002 Licence procedure Germany
Gas dry plant Shop and site inspection
Pressure test
Final certification

reflisE.doc 18
Abt.: SEP-E
Project History - TÜV NORD Group

Project Country Client Date of Activity In countries Comments


completion

Electrical panels, ALGERIA ABB PS & S for 2003 Shop inspections Italy
electrical transformers, SONATRACH
fiscal measurements, aid
vehicles, tanks,
ambulances, cylinders
GAZODUCT PEDRO
DURAN FARELL
STATION DE
COMPRESSION NO 3

Pipeline Germany TENP 2002 Site inspection Germany DN 1000


Natural gas Pressure test PN 70
Bocholtz - 14 km
Stolberg

Pipeline Natural Germany W ingas 2002 Licence procedure Germany DN 900


gas Pressure Tests of pipeline PN 90
increase components

Nuclear power plant India NPC India 2001 Production inspection Spain
Kaiga 1 and 2 Final certification
Valves

Pipeline Germany Stadtwerke Essen 2001 Licence procedure Germany DN 1400


High pressure system Shop and site inspection PN 100
Including compressor Pressure test 3,4 km
3
station Final certification V=600 000 Nm

Carpet Recycling plant Germany Polyamid2000 AG 2001 Final certification Germany 120 000 t/a
Used carpets

reflisE.doc 19
Abt.: SEP-E
Project History - TÜV NORD Group

Project Country Client Date of Activity In countries Comments


completion
3
Pipeline Natural gas Germany Thyssengas 2001 Licence procedure Germany 270 000 m /h
Compressor station Shop and site inspection
Hünxe Pressure test
Extension Final certification

Ball valves, globe valves, SAUDI ARABIA NPCC for ADMA 2001 Shop inspections Italy In cooperation with
flanges, barred tees, OPCO RW TUV Abu Dhabi
fittings, pig launcher and
receiver
Replacement of
24”water injection trunk
line between
USSC-US20A
Pipeline Greece DEPA in progress Tests of pipeline Belgium
Natural gas (since 1993) components Germany
Athen - Bulgarien Shop and site inspection Greece
Italy
Refinery Germany VEBA Öl AG Since 1960 Examination of steam boilers, Germany Consecutive quality
Germany until now pressure vessels, pipings control
Ruhrraffinerie

Underground natural gas Germany Ruhrgas AG 1985-1992 Tests of pipeline Germany DN 250 / 400
Storage Epe components PN 200
Station and area Shop and site inspection 25 km
pipelines

Maintenance, W ED Abu Dhabi Babcock/W ED 1987-1994 Shop and site inspection Abu Dhabi

NH3 storage Libya NAPETCO 1987 Safety audit / shut down Libya
Marsa el Brega, Libya inspection

reflisE.doc 20
Abt.: SEP-E
Project History - TÜV NORD Group

Project Country Client Date of Activity In countries Comments


completion

Refinery including Greece Hellenic Aspropyrgas 1986 Safety audit / in-service Greece
LPG storage (4 spheres) Athens, Greece inspection

Refinery Germany VEBA Öl AG Since 1960 Examination of steam boilers, Germany Consecutive quality
Germany until now pressure vessels, pipings control
Ruhrraffinerie

In Service Malaysia Sarawak Shell 1998 - Fitness Inspection Malaysia


Lifting and Hoisting Berhard Present
Equipments Petronas Carigali)
In Service Malaysia Sarawak Shell 1999 - Fitness Inspection Malaysia
Fired and Unfired Berhard Present
Pressure Vessels Petronas Carigali
Nippon Oil Exploration
CB&I Lummus s.r.o. Czech Republic Hydrocracker 2010 Conformity assessment Croatia
complex- INA Rijeka
Refinery
OTF Contracting Co. Hungary Sulphur Recovery 2010 Conformity assessment Croatia
Unit- INA Rijeka
Refinery
Y.W . Galil engineering Israel Isomerisation&NHT 2010 Conformity assessment Croatia
Ltd. Unit- INA Sisak
Refinery
TECHNIP KTI S.p.A. Italy Hydrogen production 2010 Conformity assessment Croatia
unit- INA Rijeka
Refinery