You are on page 1of 8

DRAWING

INITIATION DATE PROJECT INSPECTION DATE RFI TIME


NO
S.N PO-NO/WBS-NO QC/DISCIPLINE

DRAWING
INITIATION DATE PROJECT INSPECTION DATE RFI TIME
NO
S.N PO-NO/WBS-NO QC/DISCIPLINE
DRAWING
INITIATION DATE PROJECT INSPECTION DATE RFI TIME
NO
S.N PO-NO/WBS-NO QC/DISCIPLINE

DRAWING
INITIATION DATE PROJECT INSPECTION DATE RFI TIME
NO
S.N PO-NO/WBS-NO QC/DISCIPLINE

6510890909/1
Ramesh 6/6/2019 HWYH-1164 Various 6/9/2019 9.00AM
1-18000-8754 Gas Well

4
RFI FOR INITIATE
ACTIVITY
JOB DESCRIPTION NO SATIP SAIC

CONTRACTOR REPLY FOR RE-SCHEDULE


ACTIVITY
JOB DESCRIPTION NO SATIP SAIC
CONTRACTOR REPLY FOR CANCEL
ACTIVITY
JOB DESCRIPTION NO SATIP SAIC

CONTRACTOR REPLY FOR FINISHED ACTIVITY


ACTIVITY
JOB DESCRIPTION NO SATIP SAIC

Installation of Epoxy Coated Steel Bars, Embedded Items and


Form Closure Inspection FOR 8" Thrust anchor foundation-01 no 3.3 Q-001-02 Q-1013
@ HWYH -1164 Gas Well (11-1800-8753) (MBTC CIVIL
INSPECTOR : RAMESH ) MB-HW1164-CF-023
INITIATE
LOCATION PID(USER ID) PMT(USER ID) RFI REFERENCE NO REPLY

FOR RE-SCHEDULE
LOCATION PID(USER ID) PMT(USER ID) RFI REFERENCE NO REPLY
PLY FOR CANCEL
LOCATION PID(USER ID) PMT(USER ID) RFI REFERENCE NO REPLY

OR FINISHED ACTIVITY
LOCATION PID(USER ID) PMT(USER ID) RFI REFERENCE NO REPLY

8" Thrust Inspection carried


MB-HW1164-CF-
anchor SHAHID IMRAN
(MUHAMMSI)
Ali Biladi
(albiaa0b) 023
out and found
foundation.
acceptable