You are on page 1of 82

DAFTAR HARGA UPAH & BAHAN KAB.

PEGAF (MINYAMBOW)
TAHUN ANGGARAN 2019
(Harga Tidak Termaksud (PPN)

USULAN
No. URAIAN / NAMA / JENIS BARANG SATUAN
HARGA SATUAN
2019 ( Rp )
a b c d

A. UPAH
4 Mandor OH 161,500
10 Pekerja OH 118,750
11 Tukang OH 142,500
12 Kepala Tukang OH 152,000

B. MATERIAL/BAHAN
a Bahan Batu
1 Batu Kali m3 617,500
2 Batu Tela bh 7,125
3 Batu Pecah 2-3 cm m3 3,489,115

b Bahan Pasir
1 Pasir Pasang ( Lokal ) m3 665,000
2 Pasir Beton/Cor (Manokwari ) m3 2,375,000
3 Pasir Plester ( Manokwari ) m3 2,375,000
4 Pasir Urug m3 617,500

c Bahan Tanah Timbunan


1 Tanah Timbun Biasa/ Urug m3 142,500

d Bahan Semen
1 Semen 50 Kg Zak 280,250
2 Semen Putih Kg 8,835

e Bahan Penutup Lantai


1 Keramik Motif 40 x 40 m2 172,900
2 Tegel Abu -abu 20 x 20 m2 113,335
3 Keramik Dinding 20 x 25 Dus 125,400

d Bahan Kayu
1 Balok Kayu Besi 10 x 10 m3 7,800,000
2 Balok Kayu Besi 5 x 10 m3 7,800,000
3 Balok Kayu Matoa 5 x 10 m3 5,500,000
4 Balok Kayu Matoa 5 x 5 m3 5,625,000
5 Papan Kayu Besi 3 x 30 x 4 m3 8,150,000
6 Papan Kayu Matoa 2 x 20 x 4 m3 5,750,000
7 Tripleks 4mm Lbr 128,250
8 List Kayu Profil m1 85,500

e Bahan Atap
1 Seng Gelombang Bjls 0.30 Warna Lbr 95,000
2 Seng Plat Bjls 0.30 m1 29,165

f Bahan Pengunci & Penggantung


1 Kunci Tanam Kualitas Baik Set 351,500
2 Engsel Pintu Kuningan Solid psg 57,950
3 Engsel Jendela Nylon psg 26,125
4 Kait Angin / Hak Angin psg 25,270
5 Grendel Jendela (klip) Bh 18,478

g Bahan Paku & Baut


1 Paku Tripleks Kg 20,900
2 Paku Seng Kg 21,850
3 Paku Campur Kg 20,900

f Besi Beton
1 Besi Diameter 8 Btg 75,525
2 Besi Diameter 10 Btg 114,285
3 Besi Diameter 12 Btg 164,160
4 Besi Diameter 16 Btg 269,876
5 Kawat Ikat Kg 19,665

g Bahan Cat
1 Cat Tembok Merk Dullux Kg 66,500
2 Plamir Kg 13,110
3 Cat Dasar 46,075
4 Cat Kayu Glotekx 900grm Kg 46,360
5 Thiner Kg 20,140
6 Amplas Bh 8,360
7 Kuas Rool Bh 18,050
8 Kuas 2" Bh 9,025
9 Minyak Bekisting Ltr 15,000
10 Lem Kayu Kg

h Bahan Intalasi Listrik


1 Lampu Down Light Sedang Set
2 Lampu Philps 18 watt Bh
3 Fiting Tanam Bh
4 Saklar Ganda Bh
5 Saklar Tunggal Bh
6 Stop Kontak Bh
7 Box Sekrin Bh
8 Limit Bh
9 Kabel 2.5mm Eksternal Rool
10 Pipa union 5/8'' Btg

i Bahan Pipa
F (MINYAMBOW)

N)

HARGA
SATUAN KET
2019 ( Rp )
e f

161,500
118,750
142,500
152,000

617,500
7,125
3,489,115

665,000
2,375,000
2,375,000
617,500

142,500

280,250 5,605
8,835

172,900
113,335
125,400
7,800,000
7,800,000
5,500,000
5,625,000
8,150,000
5,750,000
128,250
85,500

95,000
29,165

351,500
57,950 28,975
26,125 13,063
25,270 12,635
18,478

20,900
21,850
20,900

75,525 15,933.54 4.74


114,285 15,443.92 7.4
164,160 15,342.06 10.7
269,876 14,204.00 19
19,665

66,500
13,110
46,075
46,360
20,140
8,360
18,050
9,025
15,000
-

-
-
-
-
-
-
-
-
- 0
-
A.2.2.1 HARGA SATUAN PEKERJAAN PERSIAPAN
SNI TAHUN 2013
A. 2.2.1.3. Pembersihan 1m2 lapangan dan peralatan

No Uraian Kode SatuanKoefisien

A TENAGA
Pekerja L.01 OH 0.100
Mandor L.04 OH 0.050
JUMLAH TENAGA KERJA
B BAHAN
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit (Contoh 10 %) 15% x D
F Harga Satuan Pekerjaan (E)

A. 2.2.1.4. Pengukuran dan pemasangan 1 m’ Bouwplank

No Uraian Kode SatuanKoefisien

A TENAGA
Pekerja L.01 OH 0.100
Tukang Kayu L.02 OH 0.100
Kepala Tukang L.03 OH 0.010
Mandor L.04 OH 0.005
JUMLAH TENAGA KERJA
B BAHAN
Kayu 5/10 m3 0.120
Paku biasa 2” – 5” Kg 0.020
Kayu papan 2.5/20 m3 0.007

JUMLAH HARGA BAHAN


C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit (Contoh 10 %) 15% x D
F Harga Satuan Pekerjaan (E)
A.2.3.1 HARGA SATUAN PEKERJAAN TANAH

A.2.3.1.1. Penggalian 1 m3 tanah biasa sedalam 1 m

No Uraian Kode SatuanKoefisien

A TENAGA
Pekerja L.01 OH 0.750
Mandor L.04 OH 0.025
JUMLAH TENAGA KERJA
B BAHAN
JUMLAH HARGA BAHAN
C PERALATAN
excavator OH
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit (Contoh 10 %) 15% x D
F Harga Satuan Pekerjaan (E)

Pemasangan 1 m3 pondasi batu belah campuran 1SP : 4PP

No Uraian Kode SatuanKoefisien

A TENAGA
Pekerja L.01 OH 1.500
Tukang Batu L.02 OH 0.750
Kepala Tukang L.03 OH 0.075
Mandor L.04 OH 0.075
JUMLAH TENAGA KERJA
B BAHAN
Batu Kali m3 0.120
Semen Portlan Kg 163.000
Pasir Pasang m3 0.520
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit (Contoh 10 %) 15% x D
F Harga Satuan Pekerjaan (E)
Pemasangan 1 m3 batu kosong (anstamping)

No Uraian Kode SatuanKoefisien

A TENAGA
Pekerja L.01 OH 0.780
Tukang Batu L.02 OH 0.390
Kepala Tukang L.03 OH 0.039
Mandor L.04 OH 0.039
JUMLAH TENAGA KERJA
B BAHAN
Batu kali m3 1.200
Pasir urug m3 0.432
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit (Contoh 10 %) 15% x D
F Harga Satuan Pekerjaan (E)

Pengurugan kembali 1 m3 galian tanah

Pengurugan kembali 1 m3 galian dihitung dari 1/3 kali dari koefisien pekerjaan galian

No Uraian Kode SatuanKoefisien

A TENAGA
Pekerja L.01 OH 0.500
Mandor L.04 OH 0.050
JUMLAH TENAGA KERJA
B BAHAN
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit (Contoh 10 %) 15% x D
F Harga Satuan Pekerjaan (E)
Pemadatan tanah 1 m3 tanah ( per 20 cm)

No Uraian Kode SatuanKoefisien

A TENAGA
Pekerja L.01 OH 0.500
Mandor L.04 OH 0.050
JUMLAH TENAGA KERJA
B BAHAN
Tanah Timbun m3 0.450
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit (Contoh 10 %) 15% x D
F Harga Satuan Pekerjaan (E)

A.2.3.1.11. Pengurugan 1 m3 dengan pasir urug

No Uraian Kode SatuanKoefisien

A TENAGA
Pekerja L.01 OH 0.300
Mandor L.04 OH 0.010
JUMLAH TENAGA KERJA
B BAHAN
Pasir urug m3 1.200
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit (Contoh 10 %) 15% x D
F Harga Satuan Pekerjaan (E)
ANALISA HARGA SATUAN PEKERJAAN BETON :

1 m3 Beton untuk Lantai Kerja ( bedding )

No Uraian SatuanKoefisien
A. TENAGA
1 Pekerja OH 1.200
2 Tukang batu OH 0.200
3 Kepala Tukang OH 0.020
4 Mandor OH 0.060

B. BAHAN
PC Semen Kg ###
PB Pasir Beton M3 0.638
KR Koral M3 0.761
Air Liter ###

C. PERALATAN

D Jumlah harga tenaga, bahan dan peralatan ( A + B + C )


E Overhead & profit ( 15 % x D )
F Harga satuan pekerjaan ( D + E )

Membuat 1 m3 sloof beton bertulang (200 kg besi + bekisting)

No Uraian Kode SatuanKoefisien

A TENAGA
Pekerja L.01 OH 5.650
Tukang Batu L.02 OH 0.275
Tukang Kayu L.03 OH 1.560
Tukang Besi L.04 OH 1.400
Kepala Tukang L.05 OH 0.323
Mandor L.06 OH 0.283
JUMLAH TENAGA KERJA
B BAHAN
Kayu kelas II m3 0.270
Paku 5 – 12 cm kg 2.000
Minyak bekisting Liter 0.600
Besi beton polos kg 210.000
Kawat beton kg 3.000
Semen Portland kg 336.000
Pasir Beton m3
0.540
Batu Pecah 2-3 m3 0.810
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit (Contoh 10 %) 15% x D
F Harga Satuan Pekerjaan (E)
Membuat 1 m3 balok beton bertulang (200 kg besi + bekisting)

No Uraian Kode SatuanKoefisien

A TENAGA
Pekerja L.01 OH 6.350
Tukang Batu L.02 OH 0.275
Tukang Kayu L.03 OH 1.650
Tukang Besi L.04 OH 1.400
Kepala Tukang L.05 OH 0.333
Mandor L.06 OH 0.318
JUMLAH TENAGA KERJA
B BAHAN
Kayu kelas II m3 0.320
Paku 5 – 12 cm kg 3.200
Minyak bekisting Liter 1.600
Besi beton polos kg 210.000
Kawat beton kg 3.000
Semen Portland kg 336.000
Pasir Beton m3 0.540
Batu Pecah 2-3 m3 0.810
Tripleks Lbr 0.140
Dolken kayu φ(8-10) cm, panj4 m Batang 16.000
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit (Contoh 10 %) 15% x D
F Harga Satuan Pekerjaan (E)

Membuat 1 m3 kolom beton bertulang

No Uraian Kode SatuanKoefisien

A TENAGA
Pekerja L.01 OH 6.350
Tukang Batu L.02 OH 0.275
Tukang Kayu L.03 OH 1.650
Tukang Besi L.04 OH 1.400
Kepala Tukang L.05 OH 0.333
Mandor L.06 OH 0.318
JUMLAH TENAGA KERJA
B BAHAN
Kayu kelas II m3 0.320
Paku 5 – 12 cm kg 3.400
Minyak bekisting Liter 2.300
Besi beton polos kg 240.000
Kawat beton kg 3.000
Semen Portland kg 320.000
Pasir Beton m3 0.540
Batu Pecah 2-3 m3 0.820
Tripleks Lbr 0.160
Dolken kayu φ(8-10) cm, panj4 m Batang 16.000
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit (Contoh 10 %) 15% x D
F Harga Satuan Pekerjaan (E)
Membuat 1 m3 plat beton bertulang

No Uraian Kode SatuanKoefisien

A TENAGA
Pekerja L.01 OH 6.350
Tukang Batu L.02 OH 0.275
Tukang Kayu L.03 OH 1.650
Tukang Besi L.04 OH 1.400
Kepala Tukang L.05 OH 0.333
Mandor L.06 OH 0.318
JUMLAH TENAGA KERJA
B BAHAN
Kayu kelas II m3 0.212
Paku 5 – 12 cm kg 2.300
Minyak bekisting Liter 2.100
Besi beton polos kg 230.000
Kawat beton kg 3.500
Semen Portland kg 240.000
Pasir Beton m3 0.540
Kerikil m3 0.820
Tripleks Lbr 0.180
Dolken kayu φ(8-10) cm, panj4 m Batang 16.000
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit (Contoh 10 %) 15% x D
F Harga Satuan Pekerjaan (E)

Pek Selasar Lantai 1 m3, Camp. 1SP : 3PP

No Uraian Kode SatuanKoefisien

A TENAGA
Pekerja L.01 OH 0.300
Tukang Batu L.02 OH 0.150
Kepala tukang L.03 OH 0.015
Mandor L.04 OH 0.015
JUMLAH TENAGA KERJA
B BAHAN
1. PC Kg 12.000
2. PP m3 1.200
JUMLAH HARGA BAHAN
C PERALATAN
Molen 0,35 m3 hari 0.2
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit (Contoh 10 %) 15% x D
F Harga Satuan Pekerjaan (E)
PEKERJAAN BATU, DINDING & PLESTERAN

Pemasangan 1m2 dinding bata Telah (7x14x26) cm tebal 1/2 batu campuran 1SP :4PP

No Uraian Kode SatuanKoefisien

A TENAGA
Pekerja L.01 OH 0.030
Tukang Batu L.02 OH 0.100
Kepala tukang L.03 OH 0.010
Mandor L.04 OH 0.015
JUMLAH TENAGA KERJA
B BAHAN
Bata Tela Bh 10.420
Semen Portlan Kg 1.150
Pasir Pasang m3 0.043
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit (Contoh 10 %) 15% x D
F Harga Satuan Pekerjaan (E)

Pemasangan 1 m2 plesteran 1SP : 3PP tebal 15mm.

No Uraian Kode SatuanKoefisien

A
TENAGA
Pekerja L.01 OH 0.300
Tukang Batu L.02 OH 0.150
Kepala tukang L.03 OH 0.015
Mandor L.04 OH 0.015
JUMLAH TENAGA KERJA
B
BAHAN
1. PC Kg 10.224
2. PP m3 0.020
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C)
E Overhead & Profit (Contoh 10 %) 15% x D
F Harga Satuan Pekerjaan (E)
PEKERJAAN PINTU DAN JENDELA

Pembuatan dan pemasangan 1 m3 kusen pintu dan kusen jendela, kayu kelas I

No Uraian Kode SatuanKoefisien

A TENAGA
Pekerja L.01 OH 7.000
Tukang Kayu L.02 OH 21.000
Kepala tukang L.03 OH 2.100
Mandor L.04 OH 0.350
JUMLAH TENAGA KERJA
B BAHAN
Balok kayu kls I m3 1.200
Paku 10 cm Kg 1.250
Lem kayu Kg 1.000
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit (Contoh 10 %) 15% x D
F Harga Satuan Pekerjaan (E)

Pembuatan dan pemasangan 1 m2 daun pintu panel, kayu kelas I atau II

No Uraian Kode SatuanKoefisien

A TENAGA
Pekerja L.01 OH 1.000
Tukang Kayu L.02 OH 3.000
Kepala tukang L.03 OH 0.300
Mandor L.04 OH 0.050
JUMLAH TENAGA KERJA
B BAHAN
Papan kayu m3 0.075
Lem kayu Kg 0.500
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit (Contoh 10 %) 15% x D
F Harga Satuan Pekerjaan (E)
Pembuatan dan pemasangan 1 m2 daun jendela panel, kayu kelas I atau II

No Uraian Kode SatuanKoefisien

A TENAGA
Pekerja L.01 OH 1.000
Tukang Kayu L.02 OH 3.000
Kepala tukang L.03 OH 0.300
Mandor L.04 OH 0.050
JUMLAH TENAGA KERJA
B BAHAN
Papan kayu m3 0.040
Lem kayu Kg 0.500
Kaca ryben m² 0.750
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit (Contoh 10 %) 15% x D
F Harga Satuan Pekerjaan (E)

PEKERJAAN LANTAI

1 m2 Pasang Penutup Lantai Keramik uk. 40 x 40

No Uraian SatuanKoefisien
A. TENAGA
1 Pekerja OH 0.700
2 Tukang batu OH 0.350
3 Kepala Tukang OH 0.035
4 Mandor OH 0.035

B. BAHAN
1 PC Semen Kg 10.400
2 Semen Warna Kg 1.620
3 Pasir Pasang M3 0.045
4 Keramik anti selip uk. 40 x 40 M2 1.000

C. PERALATAN

D Jumlah harga tenaga, bahan dan peralatan ( A + B + C )


E Overhead & profit ( 15 % x D )
F Harga satuan pekerjaan ( D + E )

1 m2 Pasang Penutup Lantai keramik 20 x 20

No Uraian SatuanKoefisien
A. TENAGA
1 Pekerja OH 0.700
2 Tukang batu OH 0.350
3 Kepala Tukang OH 0.035
4 Mandor OH 0.035

B. BAHAN
1 PC Semen Kg 10.400
2 Semen Warna Kg 1.620
3 Pasir Pasang M3 0.045
4 Keramik 20 x 20 M2 1.060

C. PERALATAN

D Jumlah harga tenaga, bahan dan peralatan ( A + B + C )


E Overhead & profit ( 15 % x D )
F Harga satuan pekerjaan ( D + E )

1 m2 Pasang Penutup Dinding keramik 20 x 25

No Uraian SatuanKoefisien
A. TENAGA
1 Pekerja OH 0.900
2 Tukang batu OH 0.450
3 Kepala Tukang OH 0.045
4 Mandor OH 0.045

B. BAHAN
1 PC Semen Kg 9.300
2 Semen Warna Kg 2.750
3 Pasir Pasang M3 0.018
4 Keramik 20 x 25 M2 1.325

C. PERALATAN
D Jumlah harga tenaga, bahan dan peralatan ( A + B + C )
E Overhead & profit ( 15 % x D )
F Harga satuan pekerjaan ( D + E )

PEKERJAAN ATAP

Pemasangan 1 m3 konstruksi kuda-kuda expose, kayu kelas I

No Uraian Kode SatuanKoefisien

A TENAGA
Pekerja L.01 OH 4.000
Tukang Kayu L.02 OH 12.000
Kepala tukang L.03 OH 1.200
Mandor L.04 OH 0.200
JUMLAH TENAGA KERJA
B BAHAN
Balok kayu m3 1.100
Besi strip tebal 5mm Kg 15.000
Paku 12 cm Kg 5.600
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit (Contoh 10 %) 15% x D
F Harga Satuan Pekerjaan (E)

Pemasangan 1 m3 konstruksi gordeng, kayu kelas I

No Uraian Kode SatuanKoefisien

A TENAGA
Pekerja L.01 OH 6.700
Tukang Kayu L.02 OH 20.100
Kepala tukang L.03 OH 2.010
Mandor L.04 OH 0.335
JUMLAH TENAGA KERJA
B BAHAN
Balok kayu m3 1.100
Paku 12 cm Kg 3.000
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit (Contoh 10 %) 15% x D
F Harga Satuan Pekerjaan (E)

Pemasangan 1 m’ lisplank ukuran (3 x 20) cm, kayu kelas I atau kelas II

No Uraian Kode SatuanKoefisien

A TENAGA
Pekerja L.01 OH 0.100
Tukang Kayu L.02 OH 0.200
Kepala tukang L.03 OH 0.020
Mandor L.04 OH 0.005
JUMLAH TENAGA KERJA
B BAHAN
Papan kayu m3 0.011
Paku 5 dan 7 cm Kg 0.100
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit (Contoh 10 %) 15% x D
F Harga Satuan Pekerjaan (E)

Pemasangan 1 m2 atap seng gelombang

No Uraian Kode SatuanKoefisien

A TENAGA
Pekerja L.01 OH 0.120
Tukang Kayu L.02 OH 0.060
Kepala tukang L.03 OH 0.006
Mandor L.04 OH 0.006
JUMLAH TENAGA KERJA
B BAHAN
Atap Gelombang Lbr 0.700
Paku Seng Kg 0.200
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit (Contoh 10 %) 15% x D
F Harga Satuan Pekerjaan (E)

Pemasangan 1 m’nok atap seng

No Uraian Kode SatuanKoefisien

A TENAGA
Pekerja L.01 OH 0.150
Tukang Kayu L.02 OH 0.070
Kepala tukang L.03 OH 0.007
Mandor L.04 OH 0.006
JUMLAH TENAGA KERJA
B BAHAN
Seng Plat Lbr 0.300
Paku Seng Kg 0.040
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit (Contoh 10 %) 15% x D
F Harga Satuan Pekerjaan (E)

PEKERJAAN PLAFOND

Pemasangan 1 m2 rangka langit-langit (50 x 100 )

No Uraian Kode SatuanKoefisien

A TENAGA
Pekerja L.01 OH 0.150
Tukang Kayu L.02 OH 0.300
Kepala tukang L.03 OH 0.030
Mandor L.04 OH 0.075
JUMLAH TENAGA KERJA
B BAHAN
Kaso - kaso 5 x 5 cm Lembar 0.015
Paku 7cm - 10 cm Kg 0.200
Tripleks Lembar 0.375
Paku tripleks 4mm Kg 0.030
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit (Contoh 10 %) 15% x D
F Harga Satuan Pekerjaan (E)

Pemasangan 1 m' list langit-langit kayu profil

No Uraian Kode SatuanKoefisien

A TENAGA
Pekerja L.01 OH 0.050
Tukang Kayu L.02 OH 0.050
Kepala tukang L.03 OH 0.003
Mandor L.04 OH 0.003
JUMLAH TENAGA KERJA
B BAHAN
List kayu profil M 1.050
Paku Kg 0.01
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit (Contoh 10 %) 15% x D
F Harga Satuan Pekerjaan (E)

PEKERJAAN PENGGANTUNG DAN PENGUNCI

Pemasangan 1 buah kunci tanam biasa

No Uraian Kode SatuanKoefisien

A TENAGA
Pekerja L.01 OH 0.010
Tukang Kayu L.02 OH 0.500
Kepala tukang L.03 OH 0.050
Mandor L.04 OH 0.005
JUMLAH TENAGA KERJA
B BAHAN
Err:509 Bh 1.000
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit (Contoh 10 %) 15% x D
F Harga Satuan Pekerjaan (E)

Pemasangan 1 buah engsel pintu

No Uraian Kode SatuanKoefisien

A TENAGA
Pekerja L.01 OH 0.015
Tukang Kayu L.02 OH 0.150
Kepala tukang L.03 OH 0.015
Mandor L.04 OH 0.001
JUMLAH TENAGA KERJA
B BAHAN
Engsel pintu Bh 1.000
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit (Contoh 10 %) 15% x D
F Harga Satuan Pekerjaan (E)

Pemasangan 1 buah engsel jendela kupu-kupu

No Uraian Kode SatuanKoefisien

A TENAGA
Pekerja L.01 OH 0.010
Tukang Kayu L.02 OH 0.100
Kepala tukang L.03 OH 0.010
Mandor L.04 OH 0.001
JUMLAH TENAGA KERJA
B BAHAN
Engsel Jendela Bh 1.000
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit (Contoh 10 %) 15% x D
F Harga Satuan Pekerjaan (E)
Pemasangan 1 buah Grendel Jendela

No Uraian Kode SatuanKoefisien

A TENAGA
Pekerja L.01 OH 0.150
Tukang Kayu L.02 OH 0.150
Kepala tukang L.03 OH 0.015
Mandor L.04 OH 0.008
JUMLAH TENAGA KERJA
B BAHAN
Grandel Jendela ( Kilip ) Bh 1.000
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit (Contoh 10 %) 15% x D
F Harga Satuan Pekerjaan (E)

Pemasangan 1 buah kait angin

No Uraian Kode SatuanKoefisien

A TENAGA
Pekerja L.01 OH 0.150
Tukang Kayu L.02 OH 0.150
Kepala tukang L.03 OH 0.015
Mandor L.04 OH 0.008
JUMLAH TENAGA KERJA
B BAHAN
Kait angin Bh 1.000
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C)
E Overhead & Profit (Contoh 10 %) 15% x D
F Harga Satuan Pekerjaan (E)

PEKERJAAN ELEKTRIKAL
1 Titik instalasi lampu

No Uraian Kode SatuanKoefisien

A TENAGA
Pekerja L.01 OH 0.300
Tukang Listrik L.02 OH 0.300
Kepala tukang L.03 OH 0.0300
Mandor L.04 OH 0.015
JUMLAH TENAGA KERJA
B BAHAN
Kabelnya 2.5 mm External M' 4.476
Pipa Union 5/8" M' 1.000
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit (Contoh 10 %) 15% x D
F Harga Satuan Pekerjaan (E)

Pasangan stop kontak

No Uraian Kode SatuanKoefisien

A TENAGA
Pekerja L.01 OH 0.065
Tukang Listrik L.02 OH 0.083
Kepala tukang L.03 OH 0.030
Mandor L.04 OH 0.015
JUMLAH TENAGA KERJA
B BAHAN
Stop Kontak M' 1.000
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit (Contoh 10 %) 15% x D
F Harga Satuan Pekerjaan (E)

Pasangan saklar Tunggal

No Uraian Kode SatuanKoefisien


No Uraian Kode SatuanKoefisien

A TENAGA
Pekerja L.01 OH 0.065
Tukang Listrik L.02 OH 0.083
Kepala tukang L.03 OH 0.030
Mandor L.04 OH 0.015
JUMLAH TENAGA KERJA
B BAHAN
saklar ganda M' 1.000
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit (Contoh 10 %) 15% x D
F Harga Satuan Pekerjaan (E)

Pasangan saklar ganda

No Uraian Kode SatuanKoefisien

A TENAGA
Pekerja L.01 OH 0.065
Tukang Listrik L.02 OH 0.083
Kepala tukang L.03 OH 0.030
Mandor L.04 OH 0.015
JUMLAH TENAGA KERJA
B BAHAN
saklar ganda M' 1.000
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit (Contoh 10 %) 15% x D
F Harga Satuan Pekerjaan (E)

Pasangan Lampu Philips 18 watt + cassing

No Uraian Kode SatuanKoefisien

A TENAGA
Pekerja L.01 OH 0.065
Tukang Listrik L.02 OH 0.083
Kepala tukang L.03 OH 0.030
Mandor L.04 OH 0.015
JUMLAH TENAGA KERJA
B BAHAN
Lampu SL 18 watt M' 1.000
Cassing 1.000
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit (Contoh 10 %) 15% x D
F Harga Satuan Pekerjaan (E)

1 Titik Box Panel

No Uraian Kode SatuanKoefisien

A TENAGA
Pekerja L.01 OH 0.250
Tukang Listrik L.02 OH 0.500
Kepala tukang L.03 OH 0.030
Mandor L.04 OH 0.010
JUMLAH TENAGA KERJA
B BAHAN
Box Panel Bh 1.000
Kabel NYA 2.5 M' 10.000
Isolasi Bh 0.500
Pipa Instalasi M' 4.000
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit (Contoh 10 %) 15% x D
F Harga Satuan Pekerjaan (E)

PEKERJAAN ACIAN & PENGECATAN

m2 Pengecatan bidang kayu baru (1 lapis plamuur, 1 lapis cat dasar, 2 lapis cat penutup

No Uraian Kode SatuanKoefisien

A TENAGA
Pekerja L.01 OH 0.070
Tukang cat L 02 OH 0.105
Kepala tukang L.03 OH 0.004
Mandor L.04 OH 0.003
JUMLAH TENAGA KERJA
B BAHAN
Cat menie Kg 0.200
Plamuur Kg 0.150
Cat dasar Kg 0.170
Cat penutup Kg 0.350
Kuas Bh 0.010
Pengencer Kg 0.030
Ampelas Lbr 0.200
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit (Contoh 10 %) 15% x D
F Harga Satuan Pekerjaan (E)

m2 Pengecatan bidang Tripleks baru ( 1 lapis cat dasar, 2 lapis cat penutup)

No Uraian Kode SatuanKoefisien

A TENAGA
Pekerja L.01 OH 0.070
Tukang cat L 02 OH 0.105
Kepala tukang L.03 OH 0.006
Mandor L.04 OH 0.003
JUMLAH TENAGA KERJA
B BAHAN
Cat menie Kg 0.200
Plamuur Kg 0.150
Cat dasar Kg 0.170
Cat penutup Kg 0.350
Kuas Bh 0.010
Pengencer Kg 0.030
Ampelas Lbr 0.200
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit (Contoh 10 %) 15% x D
F Harga Satuan Pekerjaan (E)
Pengecatan 1 m2 tembok baru ( 1lapis plamuur, 1 lapis cat dasar, 2 lapis cat penutup)

No Uraian Kode SatuanKoefisien

A TENAGA
Pekerja L.01 OH 0.020
Tukang cat L 02 OH 0.063
Kepala tukang L.03 OH 0.006
Mandor L.04 OH 0.003
JUMLAH TENAGA KERJA
B BAHAN
Plamur Kg 0.100
Cat dasar Kg 0.100
Cat penutup Kg 0.260
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit (Contoh 10 %) 15% x D
F Harga Satuan Pekerjaan (E)

Pemasangan 1 m2 acian.

No Uraian Kode SatuanKoefisien

A TENAGA
Pekerja L.01 OH 0.200
Tukang Batu L.02 OH 0.100
Kepala tukang L.03 OH 0.010
Mandor L.04 OH 0.010
JUMLAH TENAGA KERJA
B BAHAN
Semen PC Kg 3.250
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit (Contoh 10 %) 15% x D
F Harga Satuan Pekerjaan (E)
RJAAN PERSIAPAN
13
gan dan peralatan

Harga Satuan Jumlah Harga


(Rp) (Rp)

118,750.00 11,875.00
161,500.00 8,075.00
JUMLAH TENAGA KERJA 19,950.00

JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT


19,950.00
2,992.50
22,942.50

gan 1 m’ Bouwplank

Harga Satuan Jumlah Harga


(Rp) (Rp)

118,750.00 11,875.00
142,500.00 14,250.00
152,000.00 1,520.00
161,500.00 807.50
JUMLAH TENAGA KERJA 28,452.50

5,500,000.00 660,000.00
20,900.00 418.00
5,750,000.00 40,250.00

JUMLAH HARGA BAHAN 700,668.00

JUMLAH HARGA ALAT


729,120.50
109,368.08
838,488.58
RJAAN TANAH

asa sedalam 1 m

Harga Satuan Jumlah Harga


(Rp) (Rp)

118,750.00 89,062.50
161,500.00 4,037.50
JUMLAH TENAGA KERJA 93,100.00

JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT


93,100.00
13,965.00
107,065.00

campuran 1SP : 4PP

Harga Satuan Jumlah Harga


(Rp) (Rp)

118,750.00 178,125.00
142,500.00 106,875.00
152,000.00 11,400.00
161,500.00 12,112.50
JUMLAH TENAGA KERJA 308,512.50

617,500.00 74,100.00
5,605.00 913,615.00
665,000.00 345,800.00
JUMLAH HARGA BAHAN ###

JUMLAH HARGA ALAT


###
246,304.13
###
(anstamping)

Harga Satuan Jumlah Harga


(Rp) (Rp)

118,750.00 92,625.00
142,500.00 55,575.00
152,000.00 5,928.00
161,500.00 6,298.50
JUMLAH TENAGA KERJA 160,426.50

617,500.00 741,000.00
617,500.00 266,760.00
JUMLAH HARGA BAHAN ###

JUMLAH HARGA ALAT


###
175,227.98
###

lian tanah

ali dari koefisien pekerjaan galian


Harga Satuan Jumlah Harga
(Rp) (Rp)

118,750.00 59,375.00
161,500.00 8,075.00
JUMLAH TENAGA KERJA 67,450.00

JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT


67,450.00
10,117.50
77,567.50
( per 20 cm)

Harga Satuan Jumlah Harga


(Rp) (Rp)

118,750.00 59,375.00
161,500.00 8,075.00
JUMLAH TENAGA KERJA 67,450.00

142,500.00 64,125.00
JUMLAH HARGA BAHAN 64,125.00

JUMLAH HARGA ALAT


131,575.00
19,736.25
151,311.25

gan pasir urug

Harga Satuan Jumlah Harga


(Rp) (Rp)

118,750.00 35,625.00
161,500.00 1,615.00
JUMLAH TENAGA KERJA 37,240.00

617,500.00 741,000.00
JUMLAH HARGA BAHAN 741,000.00

JUMLAH HARGA ALAT


778,240.00
116,736.00
894,976.00
ERJAAN BETON :

( bedding )
Harga Jumlah
Satuan Harga

118,750.00 142,500.00
142,500.00 28,500.00
152,000.00 3,040.00
161,500.00 9,690.00

5,605.00 ###
### ###
### ###
7,000.00 ###

peralatan ( A + B + C ) ###
ad & profit ( 15 % x D ) ###
pekerjaan ( D + E ) ###

00 kg besi + bekisting)

Harga Satuan Jumlah Harga


(Rp) (Rp)

118,750.00 670,937.50
142,500.00 39,187.50
142,500.00 222,300.00
142,500.00 199,500.00
152,000.00 49,096.00
161,500.00 45,704.50
JUMLAH TENAGA KERJA ###

5,625,000.00 1,518,750.00
20,900.00 41,800.00
15,000.00 9,000.00
14,204.00 2,982,840.00
= #VALUE!
-
-
-
JUMLAH HARGA BAHAN #VALUE!

JUMLAH HARGA ALAT


#VALUE!
#VALUE!
#VALUE!
00 kg besi + bekisting)

Harga Satuan Jumlah Harga


(Rp) (Rp)

118,750.00 754,062.50
142,500.00 39,187.50
142,500.00 235,125.00
142,500.00 199,500.00
152,000.00 50,616.00
161,500.00 51,357.00
JUMLAH TENAGA KERJA ###

5,625,000.00 1,800,000.00
20,900.00 66,880.00
15,000.00 24,000.00
14,204.00 2,982,840.00
= #VALUE!
- -
- -
- -
- -
- -
JUMLAH HARGA BAHAN #VALUE!

JUMLAH HARGA ALAT


#VALUE!
#VALUE!
#VALUE!

bertulang

Harga Satuan Jumlah Harga


(Rp) (Rp)

118,750.00 754,062.50
142,500.00 39,187.50
142,500.00 235,125.00
142,500.00 199,500.00
152,000.00 50,616.00
161,500.00 51,357.00
JUMLAH TENAGA KERJA ###

5,625,000.00 1,800,000.00
20,900.00 71,060.00
15,000.00 34,500.00
14,204.00 3,408,960.00
19,665.00 58,995.00
5,605.00 1,793,600.00
2,375,000.00 1,282,500.00
3,489,115.00 2,861,074.30
128,250.00 20,520.00
30,000.00 480,000.00
JUMLAH HARGA BAHAN ###

JUMLAH HARGA ALAT


###
###
###
bertulang

Harga Satuan Jumlah Harga


(Rp) (Rp)

118,750.00 754,062.50
142,500.00 39,187.50
142,500.00 235,125.00
142,500.00 199,500.00
152,000.00 50,616.00
161,500.00 51,357.00
JUMLAH TENAGA KERJA ###

5,625,000.00 1,192,500.00
20,900.00 48,070.00
15,000.00 31,500.00
14,204.00 3,266,920.00
19,665.00 68,827.50
5,605.00 1,345,200.00
2,375,000.00 1,282,500.00
3,489,115.00 2,861,074.30
128,250.00 23,085.00
30,000.00 480,000.00
JUMLAH HARGA BAHAN ###

JUMLAH HARGA ALAT


###
###
###

p. 1SP : 3PP

Harga Satuan Jumlah Harga


(Rp) (Rp)

118,750.00 35,625.00
142,500.00 21,375.00
152,000.00 2,280.00
161,500.00 2,422.50
JUMLAH TENAGA KERJA 61,702.50

5,605.00 67,260.00
2,375,000.00 2,850,000.00
JUMLAH HARGA BAHAN ###

-
JUMLAH HARGA ALAT
###
446,844.38
###
& PLESTERAN

tebal 1/2 batu campuran 1SP :4PP

Harga Satuan Jumlah Harga


(Rp) (Rp)

118,750.00 3,562.50
142,500.00 14,250.00
152,000.00 1,520.00
161,500.00 2,422.50
JUMLAH TENAGA KERJA 21,755.00

7,125.00 74,242.50
5,605.00 6,445.75
665,000.00 28,595.00
JUMLAH HARGA BAHAN 109,283.25

JUMLAH HARGA ALAT


131,038.25
19,655.74
150,693.99

3PP tebal 15mm.

Harga Satuan Jumlah Harga


(Rp) (Rp)

118,750.00 35,625.00
142,500.00 21,375.00
152,000.00 2,280.00
161,500.00 2,422.50
JUMLAH TENAGA KERJA 61,702.50

-
-
JUMLAH HARGA BAHAN -

JUMLAH HARGA ALAT


61,702.50
9,255.38
70,957.88
JENDELA

dan kusen jendela, kayu kelas I

Harga Satuan Jumlah Harga


(Rp) (Rp)

118,750.00 831,250.00
142,500.00 2,992,500.00
152,000.00 319,200.00
161,500.00 56,525.00
JUMLAH TENAGA KERJA ###

-
-
-
JUMLAH HARGA BAHAN -

JUMLAH HARGA ALAT


###
629,921.25
###

u panel, kayu kelas I atau II

Harga Satuan Jumlah Harga


(Rp) (Rp)

118,750.00 118,750.00
142,500.00 427,500.00
152,000.00 45,600.00
161,500.00 8,075.00
JUMLAH TENAGA KERJA 599,925.00

-
-
JUMLAH HARGA BAHAN -

JUMLAH HARGA ALAT


599,925.00
89,988.75
689,913.75
la panel, kayu kelas I atau II

Harga Satuan Jumlah Harga


(Rp) (Rp)

118,750.00 118,750.00
142,500.00 427,500.00
152,000.00 45,600.00
161,500.00 8,075.00
JUMLAH TENAGA KERJA 599,925.00

-
-
-
JUMLAH HARGA BAHAN -

JUMLAH HARGA ALAT


599,925.00
89,988.75
689,913.75

AI

mik uk. 40 x 40
Harga Jumlah
Satuan Harga

118,750.00 83,125.00
142,500.00 49,875.00
152,000.00 5,320.00
161,500.00 5,652.50

-
-
-
-

peralatan ( A + B + C ) 143,972.50
ad & profit ( 15 % x D ) 21,595.88
pekerjaan ( D + E ) ###

ramik 20 x 20
Harga Jumlah
Satuan Harga

118,750.00 83,125.00
142,500.00 49,875.00
152,000.00 5,320.00
161,500.00 5,652.50

-
-
-
-

peralatan ( A + B + C ) 143,972.50
ad & profit ( 15 % x D ) 21,595.88
pekerjaan ( D + E ) ###

eramik 20 x 25
Harga Jumlah
Satuan Harga

118,750.00 106,875.00
142,500.00 64,125.00
152,000.00 6,840.00
161,500.00 7,267.50

-
-
-
-
peralatan ( A + B + C ) 185,107.50
ad & profit ( 15 % x D ) 27,766.13
pekerjaan ( D + E ) ###

a expose, kayu kelas I

Harga Satuan Jumlah Harga


(Rp) (Rp)

118,750.00 475,000.00
142,500.00 1,710,000.00
152,000.00 182,400.00
161,500.00 32,300.00
JUMLAH TENAGA KERJA ###

-
-
-
JUMLAH HARGA BAHAN -

JUMLAH HARGA ALAT


###
359,955.00
###

eng, kayu kelas I

Harga Satuan Jumlah Harga


(Rp) (Rp)

118,750.00 795,625.00
142,500.00 2,864,250.00
152,000.00 305,520.00
161,500.00 54,102.50
JUMLAH TENAGA KERJA ###

-
-
JUMLAH HARGA BAHAN -
JUMLAH HARGA ALAT
###
602,924.63
###

m, kayu kelas I atau kelas II

Harga Satuan Jumlah Harga


(Rp) (Rp)

118,750.00 11,875.00
142,500.00 28,500.00
152,000.00 3,040.00
161,500.00 807.50
JUMLAH TENAGA KERJA 44,222.50

-
-
JUMLAH HARGA BAHAN -

JUMLAH HARGA ALAT


44,222.50
6,633.38
50,855.88

gelombang

Harga Satuan Jumlah Harga


(Rp) (Rp)

118,750.00 14,250.00
142,500.00 8,550.00
152,000.00 912.00
161,500.00 969.00
JUMLAH TENAGA KERJA 24,681.00

-
-
JUMLAH HARGA BAHAN -

JUMLAH HARGA ALAT


24,681.00
3,702.15
28,383.15

p seng

Harga Satuan Jumlah Harga


(Rp) (Rp)

118,750.00 17,812.50
142,500.00 9,975.00
152,000.00 1,064.00
161,500.00 969.00
JUMLAH TENAGA KERJA 29,820.50

-
-
JUMLAH HARGA BAHAN -

JUMLAH HARGA ALAT


29,820.50
4,473.08
34,293.58

ND

angit (50 x 100 )

Harga Satuan Jumlah Harga


(Rp) (Rp)

118,750.00 17,812.50
142,500.00 42,750.00
152,000.00 4,560.00
161,500.00 12,112.50
JUMLAH TENAGA KERJA 77,235.00

-
-
-
-
JUMLAH HARGA BAHAN -
JUMLAH HARGA ALAT
77,235.00
11,585.25
88,820.25

git kayu profil

Harga Satuan Jumlah Harga


(Rp) (Rp)

118,750.00 5,937.50
142,500.00 7,125.00
152,000.00 456.00
161,500.00 484.50
JUMLAH TENAGA KERJA 14,003.00

-
-
JUMLAH HARGA BAHAN -

JUMLAH HARGA ALAT


14,003.00
2,100.45
16,103.45

AN PENGUNCI

nam biasa

Harga Satuan Jumlah Harga


(Rp) (Rp)

118,750.00 1,187.50
142,500.00 71,250.00
152,000.00 7,600.00
161,500.00 807.50
JUMLAH TENAGA KERJA 80,845.00

-
JUMLAH HARGA BAHAN -

JUMLAH HARGA ALAT


80,845.00
12,126.75
92,971.75

el pintu

Harga Satuan Jumlah Harga


(Rp) (Rp)

118,750.00 1,781.25
142,500.00 21,375.00
152,000.00 2,280.00
161,500.00 129.20
JUMLAH TENAGA KERJA 25,565.45

-
JUMLAH HARGA BAHAN -

JUMLAH HARGA ALAT


25,565.45
3,834.82
29,400.27

ela kupu-kupu

Harga Satuan Jumlah Harga


(Rp) (Rp)

118,750.00 1,187.50
142,500.00 14,250.00
152,000.00 1,520.00
161,500.00 80.75
JUMLAH TENAGA KERJA 17,038.25

-
JUMLAH HARGA BAHAN -

JUMLAH HARGA ALAT


17,038.25
2,555.74
19,593.99
el Jendela

Harga Satuan Jumlah Harga


(Rp) (Rp)

118,750.00 17,812.50
142,500.00 21,375.00
152,000.00 2,280.00
161,500.00 1,292.00
JUMLAH TENAGA KERJA 42,759.50

-
JUMLAH HARGA BAHAN -

JUMLAH HARGA ALAT


42,759.50
6,413.93
49,173.43

angin

Harga Satuan Jumlah Harga


(Rp) (Rp)

118,750.00 17,812.50
142,500.00 21,375.00
152,000.00 2,280.00
161,500.00 1,292.00
JUMLAH TENAGA KERJA 42,759.50

Err:509
JUMLAH HARGA BAHAN -

JUMLAH HARGA ALAT


42,759.50
6,413.93
49,173.43

IKAL
u

Harga Satuan Jumlah Harga


(Rp) (Rp)

118,750.00 35,625.00
142,500.00 42,750.00
152,000.00 4,560.00
161,500.00 2,422.50
JUMLAH TENAGA KERJA 85,357.50

-
-
JUMLAH HARGA BAHAN -

JUMLAH HARGA ALAT


85,357.50
12,803.63
98,161.13

ak

Harga Satuan Jumlah Harga


(Rp) (Rp)

118,750.00 7,718.75
142,500.00 11,827.50
152,000.00 4,560.00
161,500.00 2,422.50
JUMLAH TENAGA KERJA 26,528.75

-
JUMLAH HARGA BAHAN -

JUMLAH HARGA ALAT


26,528.75
3,979.31
30,508.06

gal

Harga Satuan Jumlah Harga


(Rp) (Rp)

118,750.00 7,718.75
142,500.00 11,827.50
152,000.00 4,560.00
161,500.00 2,422.50
JUMLAH TENAGA KERJA 26,528.75

-
JUMLAH HARGA BAHAN -

JUMLAH HARGA ALAT


26,528.75
3,979.31
30,508.06

da

Harga Satuan Jumlah Harga


(Rp) (Rp)

118,750.00 7,718.75
142,500.00 11,827.50
152,000.00 4,560.00
161,500.00 2,422.50
JUMLAH TENAGA KERJA 26,528.75

-
JUMLAH HARGA BAHAN -

JUMLAH HARGA ALAT


26,528.75
3,979.31
30,508.06

tt + cassing

Harga Satuan Jumlah Harga


(Rp) (Rp)

118,750.00 7,718.75
142,500.00 11,827.50
152,000.00 4,560.00
161,500.00 2,422.50
JUMLAH TENAGA KERJA 26,528.75

JUMLAH HARGA BAHAN -

JUMLAH HARGA ALAT


26,528.75
3,979.31
30,508.06

Harga Satuan Jumlah Harga


(Rp) (Rp)

118,750.00 29,687.50
142,500.00 71,250.00
152,000.00 4,560.00
161,500.00 1,615.00
JUMLAH TENAGA KERJA 107,112.50

JUMLAH HARGA BAHAN -

JUMLAH HARGA ALAT


107,112.50
16,066.88
123,179.38

GECATAN

lapis cat dasar, 2 lapis cat penutup)

Harga Satuan Jumlah Harga


(Rp) (Rp)
118,750.00 8,312.50
142,500.00 14,962.50
152,000.00 608.00
161,500.00 484.50
JUMLAH TENAGA KERJA 24,367.50

-
-
-
-
-
-
-
JUMLAH HARGA BAHAN -

JUMLAH HARGA ALAT


24,367.50
3,655.13
28,022.63

at dasar, 2 lapis cat penutup)

Harga Satuan Jumlah Harga


(Rp) (Rp)

118,750.00 8,312.50
142,500.00 14,962.50
152,000.00 912.00
161,500.00 484.50
JUMLAH TENAGA KERJA 24,671.50

-
-
-
-
-
-
-
JUMLAH HARGA BAHAN -

JUMLAH HARGA ALAT


24,671.50
3,700.73
28,372.23
pis cat dasar, 2 lapis cat penutup)

Harga Satuan Jumlah Harga


(Rp) (Rp)

118,750.00 2,375.00
142,500.00 8,977.50
152,000.00 957.60
161,500.00 484.50
JUMLAH TENAGA KERJA 12,794.60

-
-
-
JUMLAH HARGA BAHAN -

JUMLAH HARGA ALAT


12,794.60
1,919.19
14,713.79

ian.

Harga Satuan Jumlah Harga


(Rp) (Rp)

118,750.00 23,750.00
142,500.00 14,250.00
152,000.00 1,520.00
161,500.00 1,615.00
JUMLAH TENAGA KERJA 41,135.00

-
JUMLAH HARGA BAHAN -

JUMLAH HARGA ALAT


41,135.00
6,170.25
47,305.25
RENCANA ANGGARAN BIAYA

PEKERJAAN :
LOKASI :

No. URAIAN PEKERJAAN SAT

1 2 3
A UMUM
I. PEKERJAAN PERSIAPAN
1 Pembersihan Awal M²
2 Pemasangan Bowplank M1
3 Direksi Keet Ls
4 Foto Dokumentasi + Laporan Ls
5 Papan Nama Proyek Ls
6 Listrik & Air Kerja Ls

B PEKERJAAN STRUKTUR DAN ARSITEKTUR


I. PEKERJAAN TANAH DAN PONDASI
1 Galian Tanah Pondasi M³
2 Pas. Pondasi Batu Kali Camp. 1:4 M³
3 Pas. Batu Kosong M³
4 Penimbunan Kembali Hasil Galian M³
5 Penimbunan dan Pemadatan (lantai, dan Teras) M³
6 Urugan Pasir Bawah Pondasi (Telapak dan Menerus) M³
7 Urugan Pasir Bawah Lantai (Dalam, Teras, Tangga dan Altar) M³
8 Cerucuk Ø10Cm Btg

II. PEKERJAAN BETON BERTULANG


1 Sloop 20 x 25 cm K-250 M³
2 Sloop 15 x 20 cm K-250 M³
3 Kolom 30 x 30 cm K-250 (Bangunan dan Pondasi) M³
4 Kolom 25 x 25 cm K-250 M³
5 Kolom Spiral Ø20 cm K-250 M³
6 Kolom 15 x 15 cm K-250 M³
7 Kolom 10 x 10 cm K-250 M³
8 Ring Balok 20 X 25 cm K-250 M³
9 Ring Balok 15 x 20 cm K-250 M³
10 Ring Balok 15 x 15 cm K-250 M³
11 Ring Balok 15 x 12 cm K-250 M³
12 Foot Plat 150 x 150 x 30 Cm K-250 M³
13 Cor Lantai Beton Tumbuk t = 8 cm (Dalam, Luar dan Altar) M³
14 Dak Beton t = 10 Cm K-250 M³
15 Cor Lantai Kerja t = 10 cm K-125 (Pondasi Telapak) M³
16 Profil Dinding M³

III. PEKERJAAN BATU, DINDING & PLESTERAN


1 Pasangan Dinding 1/2 Bt Camp. 1 : 4 M²
2 Pekerjaan Plesteran Dinding 1 : 4 M²

IV. PEKERJAAN PINTU DAN JENDELA


1 Kusen Pintu, Jendela Kayu Dan Ventilasi Kelas I M³
2 Daun Pintu Panel Kayu M²
3 Daun Jendela Panel M²
4 Ventilasi M²
5 Batu Angin Bh

V. PEKERJAAN LANTAI
1 Keramik 40 x 40 (Dalam, Teras, Tangga, dan Altar) M²
2 Keramik 20 x 20 (Kamar Mandi dan WC) M²
3 Keramik Dinding 20x 25 (Kamar Mandi dan WC) M²

VI. PEKERJAAN ATAP


1 Rangka Kuda² Kayu 5/10 Kelas II M³
2 Rangka Gording Kayu 5/10 Kelas II M³
3 Listplank Kayu Kelas I M1
4 Penutup Atap Seng Gelombang Bjls 30 M²
5 Nok / Bubungan M1
VII. PEKERJAAN PLAFOND
1 Rangka Kayu 5 x 5 + plafon Triplex + Penggantung M²
2 List Plafond M1

VIII. PEKERJAAN PENGGANTUNG DAN PENGUNCI


1 Kunci Pintu Bh
2 Engsel Pintu 4" - Stainles Steel Bh
3 Engsel jendela Kupu-kupu Bh
4 Grendel Jendela Bh
5 Kait Angin Bh

IX. PEKERJAAN ELEKTRIKAL


1 Lampu Philips 18 Watt Bh
2 Stop Kontak Bh
3 Saklar Ganda Bh
4 Saklar Tunggal Bh
5 Panel Listrik Bh
6 Instalasi Listrik Ttk
7 Sambungan Baru Ls

X. PEKERJAAN ACIAN & PENGECATAN


1 Acian Dinding M²
2 Pengecatan Dinding M²
3 Pengecatan Kolom Pilar M²
4 Cat Listplank Papan M²
5 Cat Plafond Triplex M²
6 Cat List Plafond M²
7 Cat Kusen Pintu dan Jendela M²
8 Cat Profil Beton M²

XI. PEKERJAAN SANITASI


1 Pemasangan Meteran Air Unit
2 Pemasangan Kran air 1/2" Bh
3 Pipa PVC 1/2" (Air Bersih) M1
4 Pemasangan Kloset Jongkok Bh
5 Pipa PVC Ø 2.5" (Air Kotor) M1
6 Pipa PVC Ø 4" (Air Limbah) M1
7 Floor Drain Bh
8 Pembuatan Bak Bh
9 Sepicktank Unit
XII. PEKERJAAN LAIN - LAIN
1 Pembuatan Altar
- Pas. Batu 1/2 Batu Camp. 1:4 M²
- Timbunan Tanah M³
- Pas. Batu Tangga 1/2 Batu Camp. 1:4 M²
2 Pas. Batu Bata Tangga Keliling 1/2 Batu Camp. 1:4 M²
3 Pas. Batu Bata Penebalan Kolom dan Dincing Camp. 1:4 M²
4 Plesteran Penebalan Kolom dan Dinding Camp. 1:3 M²
5 Pemasangan Salib Pipa Stenless Ø2.5" Ls
6 Pembersihan Akhir Ls

A. TOTAL
N BIAYA

HARGA
VOLUME
SATUAN HARGA
(Rp)
4 5 6

330.00 22,942.50 7,571,025.00


200.00 838,488.58 167,697,715.00
1.00 5,000,000.00 5,000,000.00
1.00 2,000,000.00 2,000,000.00
1.00 500,000.00 500,000.00
1.00 2,000,000.00 2,000,000.00
Jumlah ###

160.27 107,065.00 17,159,628.75


48.15 1,888,331.63 90,923,167.74
22.72 1,343,414.48 30,522,376.87
48.08 77,567.50 3,729,592.78
110.95 151,311.25 16,788,240.42
7.71 894,976.00 6,895,790.08
13.11 894,976.00 11,734,030.34
162.00 50,000.00 8,100,000.00
Jumlah ###
3.50 -
2.22 -
10.13 -
1.50 -
1.00 -
0.77 -
0.01 -
3.50 -
2.01 -
0.23 -
0.07 -
12.15 -
20.98 -
9.08 -
4.05 8,098,418.04 32,798,593.06
0.84 -
Jumlah ###

330.03 -
660.06 -
Jumlah -

0.81 -
15.77 -
19.28 -
4.69 -
12.00 -
Jumlah -

302.62 -
12.96 -
32.40 -
Jumlah -

2.25 -
1.92 -
64.08 -
268.79 -
23.72 -
Jumlah -
235.04 -
183.98 -
Jumlah -

6.00 -
27.00 -
24.00 -
6.00 -
24.00 -
Jumlah -

20.00 -
2.00 -
4.00 -
5.00 -
1.00 -
20.00 -
1.00 -
Jumlah -

660.06 -
660.06 -
31.03 -
19.22 -
235.04 -
9.20 -
32.40 -
19.17 -
Jumlah -

1.00 -
3.00 -
20.00 -
3.00 -
15.00 -
25.00 -
3.00 -
3.00 -
1.00 1,800,000.00 1,800,000.00
Jumlah 1,800,000.00

6.65 -
21.32 151,311.25 3,225,199.29
4.32 -
32.78 -
8.03 -
8.03 -
1.00 1,000,000.00 1,000,000.00
1.00 5,000,000.00 5,000,000.00
Jumlah 9,225,199.29
###
ITEM PANJANG

Pembersihan Awal 22

x
Pemasangan Bowplank 108

Galian Tanah Pondasi


TYPE 1 1.5
TYPE 2 76
TYPE 3 66

Pas. Pondasi Batu Kali Camp. 1:4


TYPE 1 76
TYPE 2 66

Pas. Batu Kosong


TYPE 1 76
TYPE 2 66

Penimbunan dan Pemadatan (lantai, dan Teras) 17.7


5

Urugan Pasir Bawah Pondasi (Telapak dan Menerus)


TELAPAK 1.5
MENERUS 142

Urugan Pasir Bawah Lantai (Dalam, Teras, Tangga dan Altar) 18.5
5.8

Cerucuk Ø10Cm 9

Sloop 20 x 25 cm K-250 70

Sloop 15 x 20 cm K-250 74
Kolom 30 x 30 cm K-250 (Bangunan dan Pondasi)
PONDASI 0.3
K1 0.3

Kolom 25 x 25 cm K-250 0.25

Kolom Spiral Ø20 cm K-250 3.14


pee

Kolom 15 x 15 cm K-250
LANTAI 1 0.15
MENARA 0.15

Kolom 10 x 10 cm K-250 0.1

Ring Balok 20 X 25 cm K-250 70

Ring Balok 15 x 20 cm K-250


lantai 1 52
lantai 2 15

Ring Balok 15 x 15 cm K-250 10

Ring Balok 15 x 12 cm K-250 4

Foot Plat 150 x 150 x 30 Cm K-250 1.5

Cor Lantai Beton Tumbuk t = 8 cm (Dalam, Luar dan Altar) 262.22

Dak Beton t = 10 Cm K-250


samping 16.3
depan 1 3.8
depan 2 1.95
depan 3 1.65

Cor Lantai Kerja t = 10 cm K-125 (Pondasi Telapak) 1.5

Profil Dinding
type 1 7.69
type 2 7.65
Pasangan Dinding 1/2 Bt Camp. 1 : 4 A1
L1 73
L2 61.4262
L3 1
BUKAAN KUSEN 19.0526
PINTU

Kusen Pintu, Jendela Kayu Dan Ventilasi Kelas I


p1 8.84
p2 5.1
p3 5
j1 12.47
j2 4.9
j3 4.96

Daun Pintu Panel Kayu


p1 1.6
p2 2.1
p3 2.1

Daun Jendela Panel


j1 0.7
j2 0.4
j3 0.7

Ventilasi v1
1.1458

Keramik 40 x 40 (Dalam, Teras, Tangga, dan Altar) l1


262.22

Keramik 20 x 20 (Kamar Mandi dan WC) 2

Keramik Dinding 20x 25 (Kamar Mandi dan WC) 7.2

Rangka Kuda² Kayu 5/10 Kelas II


kaki 54.28
t.raja 2.85
skor 18
pengaku 4.02
balok angin 8.42
menara 4.92

Rangka Gording Kayu 5/10 Kelas II


atap 1 17.04
menara 8.84

Listplank Kayu Kelas I p1


30.08

Penutup Atap Seng Gelombang Bjls 30


atap 1 17.2
menara 0.705

Nok / Bubungan
atap 1 17.2
menara 1.63

Rangka Kayu 5 x 5 + plafon Triplex + Penggantung


dalam a 9.55
dalam b 4
samping 2
teras 2
belakang 7.22

List Plafond
dalam a 19.1
dalam b 8
samping 4
teras 4
belakang 14.44

altar
Pas. Batu 1/2 Batu Camp. 1:4 8.86
Timbunan Tanah 3.5
Pas. Batu Tangga 1/2 Batu Camp. 1:4 2.16
Pas. Batu Bata Tangga Keliling 1/2 Batu Camp. 1:4 68.3

Pas. Batu Bata Penebalan Kolom dan Dincing Camp. 1:4


1 1.1
2 7.25

Plesteran Penebalan Kolom dan Dinding Camp. 1:3


1 1.1
2 7.25

Cat Kusen Pintu dan Jendela


p1 8.84
p2 5.1
p3 5
j1 12.47
j2 4.9
j3 4.96

Pengecatan Kolom Pilar


pilar depan 1.365
spiral 0.6283

Cat Profil Beton


type 1 7.69
type 2 7.65
LEBAR TINGGI JUMLAH HASIL

15 330

y
92 200

1.5 2.05 18 83.025


0.8 0.68 41.344
0.8 0.68 35.904
160.273

0.45 0.8 27.36


0.45 0.7 20.79
48.15

0.8 0.2 12.16


0.8 0.2 10.56
22.72

12.7 0.48 107.8992


1.85 0.33 3.0525
110.9517

1.5 0.05 18 2.025


0.8 0.05 5.68
7.705

13.5 0.05 12.4875


2.15 0.05 0.6235
13.111

18 162

0.2 0.25 3.5

0.15 0.2 2.22


0.3 2.25 18 3.645
0.3 4 18 6.48
10.125

0.25 3 8 1.5

0.01 3.2 10 1.0048


r^2

0.15 4 6 0.54
0.15 2.5 4 0.225
0.765

0.1 1.36 1 0.0136

0.2 0.25 3.5

0.15 0.2 1.56


0.15 0.2 0.45
2.01

0.15 0.15 0.225

0.12 0.15 0.072

1.5 0.3 18 12.15

luasan 0.08 20.9776

2.3 0.1 2 7.498


2.5 0.1 0.95
1.85 0.1 0.36075
1.65 0.1 0.27225
9.081

1.5 0.1 18 4.05

0.25 0.1 2 0.3845


0.6 0.1 0.459
0.8435

A2
4 292
13.5 74.9262
2.5 4 10
27.8433 46.8959
JENDELA 330.0303

0.05 0.1 2 0.0884


0.05 0.1 2 0.051
0.05 0.1 3 0.075
0.05 0.1 6 0.3741
0.05 0.1 6 0.147
0.05 0.1 3 0.0744
0.8099

2.5 2 8
0.8 2 3.36
0.7 3 4.41
15.77

1.45 12 12.18
1.95 6 4.68
1.15 3 2.415
19.275

v2 v3
3.1596 0.3834 4.6888

l2 l3
33.65 6.75 302.62

2 0.96 3 12.96

1.5 3 32.4

0.05 0.1 5 1.357


0.05 0.1 5 0.07125
0.05 0.1 5 0.45
0.05 0.1 5 0.1005
0.05 0.1 4 0.1684
0.05 0.1 4 0.0984
2.24555

0.05 0.1 22 1.8744


0.05 0.1 0.0442
1.9186

p2
34 64.08

7.68 2 264.192
1.63 4 4.5966
268.7886

17.2
4 6.52
23.72

12 114.6
9 36
16 2 64
3 6
1 2 14.44
235.04

24 43.1
18 26
32 2 72
6 10
2 2 32.88
183.98

0.75 6.645
8.7 0.7 21.315
1 2 4.32
0.48 32.784

2 2 4.4
0.5 3.625
8.025

2 2 4.4
0.5 3.625
8.025

0.2 2 3.536
0.2 2 2.04
0.2 3 3
0.2 6 14.964
0.2 6 5.88
0.2 3 2.976
32.396

4 2 10.92
3.2 10 20.1056
31.0256

0.6 2 9.228
1.3 9.945
19.173
REKAPITULASI BIAYA

PEKERJAAN :
LOKASI :

No. URAIAN PEKERJAAN

1 2

A UMUM
I. PEKERJAAN PERSIAPAN
B PEKERJAAN STRUKTUR DAN ARSITEKTUR
I. PEKERJAAN TANAH DAN PONDASI
II. PEKERJAAN BETON BERTULANG
III. PEKERJAAN BATU, DINDING & PLESTERAN
IV. PEKERJAAN PINTU DAN JENDELA
V. PEKERJAAN LANTAI
VI. PEKERJAAN ATAP
VII. PEKERJAAN PLAFOND
VIII. PEKERJAAN PENGGANTUNG DAN PENGUNCI
IX. PEKERJAAN ELEKTRIKAL
X. PEKERJAAN ACIAN & PENGECATAN
XI. PEKERJAAN SANITASI
XII. PEKERJAAN LAIN - LAIN

A. TOTAL
B. PAJAK PERTAMBAHAN NILAI ( 10 % )
C. JUMLAH TOTAL BIAYA PEKERJAAN
E NILAI PERENCANAAN (3,90%)
F NILAI PENGAWASAN (2,73%)
G JUMLAH TOTAL ( D + E + F)
D. FAKTOR PEMBULATAN
Terbilang : " Seratus Tujuh Puluh Juta Rupiah "

MENGETAHUI, MENYETUJUI :

……………………………………..
NIP. ………………………………………..
BIAYA

JUMLAH
HARGA
(Rp)
3

184,768,740.00
185,852,826.97
32,798,593.06
-
-
-
-
-
-
-
-
-
1,800,000.00
9,225,199.29

414,445,359.33
41,444,535.93
455,889,895.26
17,779,705.92
12,445,794.14
486,115,395.32
486,100,000.00
uluh Juta Rupiah "

KABUPATEN MANOKWARI, 14 MARET 2019


DIBUAT OLEH :
CONSULTANT PERENCANA
CV. ELGIZER BUILDING CONSULTANT

MARTEN KANDENAPA, ST
DIREKTUR

You might also like