You are on page 1of 3

New No:37 / Old No:19

Apparswamy Koil Street,


Mylapore, Chennai 600004
 : +91 7299477608
 : mekhridzz@gmail.com

18th January 2019

To

THE HOD

VELAGAPUDI RAMAKRISHNA SIDDHARTHA

ENGINEERING COLLEGE, KANURU

VIJAYAWADA

Dear Sir

Ref: VRSEC/EEE/POWER SYSTEMS LAB/18-19

Mail Sub: Panel Commissioning/Training Completed – 50% Balance Payment Request – Reg,

dated 7th January 2018 by email from hodeee@vrsiddhartha.ac.in

With regard to your queries raised in the communication mentioned in reference, Mekhridzz has

worked out the best possible solution to ensure your satisfaction.

Solution 1: Requirement of Three phase fault simulator & Relay co-ordination kit

We are proposing another panel with two more phases. In this manner, the existing panel
(already supplied on 30th November 2018) can be utilized as a ‘three phase Transmission Line
model‘ in conjunction with the proposed panel. In this manner, the user will have the advantage
of using multiple experiments as three single phase or as one three phase.

The proposed panel General Arrangement (GA) is attached (Figure 1) for your reference. Kindly
verify & confirm to proceed with manufacturing

Mekhridzz Private Limited (OPC)


CIN: U74999TN2016OPC112066
New No:37 / Old No:19
Apparswamy Koil Street,
Mylapore, Chennai 600004
 : +91 7299477608
 : mekhridzz@gmail.com

Fig. 1: Proposed 2-phase panel

When the panels are used together as a 3 phase transmission line model, the user will be free to
choose any type of fault simulation such as L-G, L-L, L-L-L, L-L-L-G and the current during this
fault can also be routed through the relay provided in the panel to visualize the fault. By the use
of external resistor, the fault magnitude can be varied to a certain extent (limited to 2A), as the
supplied simulator is a scaled down model of a 100kM three phase transmission line. This is
also designed as a universal model where any external relay can be used to analyse the fault
parameters for future study purpose.
With regard to the isolation transformer, the cost for the same was not considered in the PO or
in the offer provided. The materials mentioned in the PO are final as the cost is considered only
for those mentioned in it and not for the list mentioned in the enquiry email. If you need an
isolation transformer, we can provide the offer for the same and additional charges would be
applicable.

Solution 2: Training

Dr K N Dinesh Babu will be visiting the college for providing hands on training

Mekhridzz Private Limited (OPC)


CIN: U74999TN2016OPC112066
New No:37 / Old No:19
Apparswamy Koil Street,
Mylapore, Chennai 600004
 : +91 7299477608
 : mekhridzz@gmail.com

Solution 3: Reference on the Design of Transmission line model parameters

The supplied model is a scaled down model with a current limitation of 2A. The circuit also has
an MCB with a rating of 2A for electrical system protection. The design calculations of the
system which include the RLC values will be shared during the training which will detail the
conversion of 3 phase 100 km transmission line model to a scale down model.

Note: The system has a 2A protection device and hence the effect of saturation is defeated.
Moreover, the inductor value is 30mH and it is not practically possible to have air core inductor
for this value due to technical constrains such as size & space

Solution 4 : Transformer Differential relay / Numerical Over Current relay

Mekhridzz has supplied a 3 phase reputed make numerical relay from a reputed Global leader in
Relay manufacturing (Schneider Electric), which is in line with the latest technology adapted for
high impedance transformer differential protection. Over Current relays are used for high
impedance transformer differential protection and it is also to be noted that the conventional
static / electromechanical relay is outdated and it is no more used in Industries.
We would like to bring to your notice that Mekhridzz has been into this business out of passion
to form a bridge between Academics and Industry. We would like you to acknowledge the point
that we supplied a 100km Transmission line model with a universal design considering that any
relay can be connected to this system to monitor the current and voltage and with this
provision, the design can be made adaptable to other type of systems which can be integrated
with this system. We welcome new suggestions in improving the design but at the same time,
the new ideas are limited to the PO value which has several other expenses during the business
process as we have 18% GST to be paid for the total value of PO, consultation charges for all the
Industrial professionals behind the design and commissioning & Training Activities. Dr K N
Dinesh Babu and several other Industrial professionals who are working in reputed MNC
organizations in power systems are providing consultancy services and Mekhridzz need to
provide consultation charges on per day basis for their time which would not be directly visible
in the expense that we have provided, but we hope that the same quality would be witnessed
when they provide training to your team.
In consideration to all the above aspects, and the suggested solution, we would like to get a
confirmation from your end on the acceptance which will enable us to proceed further towards
to next step on this project.

Best Regards

Business Head

Mekhridzz Private Limited (OPC)


CIN: U74999TN2016OPC112066