o Proposal done last March 20, 2019 o Coordinated with OPC about the existing turnover sheet o For final form - Bid Evaluation Process Standard (ON-GOING) o For creation of initial draft - SMKL Works (ON-GOING) o Coordinated with NAI with regards to contractor problems o Properly monitored with supporting pictures o Every Wednesday Site Visit for Progress Monitoring - SM Sorsogon (FOR INITIAL) o Date of Start – May 2019 o Updates on Permits – Received last March 26, 2019 o Approved Schedule - - SM Tuguegarao (FOR INITIAL) o Date of Start – Q1 2019 o Updates on Permits – Received last March 25, 2019 o Approved Schedule – - SM Fairview Tenant Balance Works o All balance works are done. - Guidelines in Creation and Processing of Synopsis - Retail Affiliates (ON-GOING) o EDD Procurement and EDD Controllership are also involved o Draft done last March 28, 2019 o Submitted to NSG for review o For Test Run
Operations Group (TSB)
- Guidelines in Creation and Processing of Synopsis (ON-GOING)
o EDD Procurement and EDD Controllership are also involved o First presented to them last February 28, 2019 o Presented the 2019 version of Synopsis last March 21, 2019 o Test Run of the Guideline: March 22, 2019 – March 30, 2019 o For Final Revision after the test run - Cost Per CFM Standard for Tenant (ON-GOING) o Initiated by Bene when he was still in Operations o In coordination with Operations Group o For final draft - Per Linear Meter Cost for Pipes (ON-GOING) o Initiated by Bene when he was still in Operations o In coordination with Operations Group o For final draft - Per Square Meter Cost for Ducts (ON-GOING) o Initiated by Bene when he was still in Operations o In coordination with Operations Group o For final draft
Design Group (FGH)
- LEED Certification of Selected Malls (ON-GOING)
o Meeting done last March 13, 2019 o For submission of requirements for evaluations of Malls (Expected to be received: March 27, 2019) o Second Meeting done last March 27, 2019: Was not informed about the meeting - Glass Patch Fitting Specs (ON-GOING) o Coordinated with Design Systems Group last March 22, 2019 o Currently under study according to Ms. Steph - Guidelines in Creation and Processing of Synopsis (ON-GOING) o EDD Procurement and EDD Controllership are also involved o Draft done last March 28, 2019 o Submitted to NSG for review o For Test Run
Support Group
- RCPO Procedure o To be coordinated with Procurement Group