Professional Documents
Culture Documents
DOC00
Revision E
Activity/Task
Shuttering for GT foundations / GT
concerned and
Foundation plate
its location
Minimum (at
Required level
start and end of Permanent Other:
of Supervision:
task)
Likelihood (L): Probability of the undesired event to happen (shall consider the frequency and Severity (S): Importance of harm, damage or impact caused by the event.
duration of exposure and the potential for the undesired event to happen).
Definition Severity Definition
Value
Value
Negligible the occurrence is extremely unlikely to happen and has never Minor None or very limited consequences on people (e.g. first aid injury), property (e.g. scratch on equipment
(1) happened according to our knowledge (1) painting) or the environment (e.g. small quantity of biodegradable waste dispersed)
Low the occurrence is unlikely to happen in the foreseeable future but Moderate Injury requiring medical treatment without lost work days, reversible environmental negative impact or
(2) has already been experienced (2) property damage / business interruption below 50 k€ of cost involved
Moderate the occurrence is predictable to happen in the mid-term High Lost Time Injuries, with full recovery, or reversible environmental negative impact or property
(3) (3) damage/business interruption below 200 k€ of cost involved
High the occurrence is predictable to happen in the short term Major Severe Accident as per Alstom e-book definition
(4) (4)
Definite the occurrence is certain and immediate. Catastrophic Potential for several fatalities (or other type of severe accident)
(5) (5)
APPROVED BY
Page 1 of 5
HSE RISK ASSESSMENT FORM
DOC00
Revision E
Activity Hazard Risk and Existing Control Measures (L) (S) (RR) Additional Control Measures (L) (S) (RR) Check
step affected
Persons
Permit to Violation of Persons in work Supervisor to obtain required Permit to 3 2 6 Periodic examination of the 2 1 2
work Permit to Work area Work & shall be available at site at all work permit by the safety
Procedure times. supervisor
Supervisor/Foreman to conduct toolbox
talk and discuss about the hazards
involved in the job as per RA.
Personnel are
not medically fit
& aware of the
hazards of
working at
height,
Personnel are
not provided
with adequate
fall protection
arrangements,
Overhead
power lines,
Severe/advers
e weather
Working Persons in work Understood the Lock Out / Tag Out 4 3 12 2 1 2
electrical on area Procedure.
equipment - Only Trained & Qualified Electricians
Electrical shall inspect and test equipment for
Shock or defects, prior to startup of the
Possible Death equipment.
due to: A Preventive Maintenance Schedule
-Damaged or shall be implemented for regular
Inadequate inspection and repairs to Electrical
Insulation on equipment.
Wiring When measuring 440 Voltages or
Inadequate Higher or High Levels of Amperage,
Over Current Two Electricians will always work
Protection on together in the “buddy – system.”
Electrical Working on “LIVE ELECTRICAL
Equipment EQUIPMENT” is strictly PROHIBITED.
Inadequate Only Trained & Qualified Electricians
Grounding shall inspect and test equipment for
Loose defects prior to startup of the
Contacts and equipment.
Connectors Electrical systems shall be tested prior
Poor to all work commencement, to ensure
Maintenance that the systems have been de-
and Testing energized or properly isolated.
Program
Electrical
Burns due to:
direct result of
electrical
shock, causing
severe deep
burns,
Personal Injury
or Fatality,
Damage to
Equipment on