Method Statement For Random Rubble Masonry Work
Method Statement For Random Rubble Masonry Work
Method Statement For Random Rubble Masonry Work
Signature
Date
Reviewed by Approved
Construction Manager by Project Director
Name
Signature
Date
1.0 INTRODUCTION
This document outlines the general work involved for the random rubble masonry works.
1. Trowels
2. Mortar mixers
Machine
Operators
Project Site Assistant
Engineer Supervisor Helpers
Manager I Manager Engineer
Labourers
A. Markings
After finishing the site preparation, require locations for RR masonry walls will be marked by
doing a setting out.
B. Trench excavation and ground preparation
After doing the initial setting out work trench excavation shall be carried out. The required
working space shall be decided considering the depth and the width of the RR masonry wall.
Bed preparation is done by compacting the loose soil in the trench, once the excavation is
finished.
C. Lean concrete
Once the bed preparation is done lean concrete shall be laid to a given thickness.
D. RR Masonry wall
RR masonry works will be started and continue up to the bottom of tie beam level or
DPC level as per the drawings. Mix proportions will be done according to the specification.
7.0 DRAWINGS
Shop drawings are prepared for RR masonry work to identify the correct locations,.
Apart from the RR masonry walls in the buildings the retaining walls in sloped lands, boundary
walls in sloped lands can be properly drawn for easy reference at the site.