Panjang Lebar

No. Uraian Pekerjaan Jumlah Satuan


(m) (m)
A. PEKERJAAN PERSIAPAN
1 Mobilisasi dan Demobilisasi 1 ls
2 Keamanan 1 ls
3 Direksi Keet dan Gudang 1 ls
4 Listrik Kerja (Supply By Owner) 1 ls
5 Air Kerja (Supply By Owner) 1 ls
B. PEKERJAAN JEMBATAN (CAT WALK)
1 Besi Kanal (UNP 150x75x6.5) 140.25 2618.00 kg
2 Besi Wide Fange (WF 200x100x5.5x8) 10.50 224.00 kg
3 Besi Siku (SIKU 50x50x6) 66.00 300.30 kg
4 Besi Beton (∅12) 660.00 588.50 kg
5 Besi Pipa Hitam (2") 16.00 81.44 kg
6 Besi Pipa Hitam (1 1/2") 145.31 526.02 kg
7 Besi Pelat Hitam (12 mm) 0.33 0.15 32.15 kg
8 Mur dan Baut 42 pcs
Harga
No. Uraian Pekerjaan Volume Satuan Jumlah
Satuan
A. PEKERJAAN PERSIAPAN
1 Mobilisasi dan Demobilisasi 1.00 ls
2 Keamanan 1.00 ls
3 Direksi Keet dan Gudang 1.00 ls
4 Listrik Kerja (Supply By Owner) 1.00 ls
5 Air Kerja (Supply By Owner) 1.00 ls
B. PEKERJAAN JEMBATAN (CAT WALK)
1 Besi Kanal (UNP 15x75x6.5) 2618.00 kg
2 Besi Wide Fange (WF 200x100x5.5) 224.00 kg
3 Besi Siku (SIKU 50x50x6) 300.30 kg
4 Besi Beton (∅12) 588.50 kg
5 Besi Pipa Hitam (1 1/2") 81.44 kg
6 Besi Pipa Hitam (2") 526.02 kg
7 Besi Pelat Hitam (2.6 mm) 32.15 kg
8 Mur dan Baut 42.00 pcs