INTRODUCTION
is want install pipe line in His own farm located in bedag Tal: miraj ,Dist : Sangli
for the purpose of cultivations of various traditional crops . ex grapes and sugarcane
he has good knowledge farming and cash crops , due to lack of water system he facing some issue
related with farming so she decided to install his own pipeline through 2 boar wells to well and from
well to land and leveling of land .
Address- AT GAT NO : 1858 &2346 ,A/P BEDAG TAL: MIRAJ DIST : SANGLI
If he get finance from bank he will easily achieve the target as per enclosed projection.
I t is assumed that entre amount of term loan is utilized throught the year
OMKAR D. PATIL
B.E.(CIVIL)
MOB : 08668680181
Gender : male
Address- AT GAT NO : 1858 &2346 ,A/P BEDAG TAL: MIRAJ DIST : SANGLI
Mobile no : 9112626767
OMKAR D. PATIL
B.E.(CIVIL)
MOB : 08668680181
NAME OF THE WORK : PIPE LINE WORK & LEVLLING WORK AT GAT NO : 1858
&2346 BEDAG TAL: MIRAJ DIST : SANGLI
IN WORDS : NINE LAKH FORTY ONE THOUSAND FIVE HUNDRED FORTY RUPEES
& TWENTY FIVE PAISA ONLY
OMKAR D. PATIL
B.E.(CIVIL)
MOB : 08668680181
1. SAILENT FEATURES
Name of work : PIPE LINE WORK & LEVLLING WORK AT GAT NO : 1858 &2346 BEDAG TAL:
MIRAJ DIST : SANGLI
Toluka : MIRAJ
District: Sangli
Cropping pattern :
a) Khariff : 1 ACRS
b) Rabbi : 2 ACRS
Q = 0.78 D2 x 3.281
𝟎.𝟑𝟎
D =
𝟑.𝟐𝟖𝟏 𝒙 𝟎.𝟕𝟖𝟓
D2 = 0.11
D = 0.34 feet
Say 4” inches
So provide 4” dia. (100 mm) P.V.C pipe for rising main line.
HORSE POWER CALCULATION
6. Head calculation :
𝑄 𝑥 𝐷𝑦𝑛𝑎𝑚𝑖𝑐 ℎ𝑒𝑎𝑑
H.P = 75 𝑥 0.75
5.23 𝑥 100
H.P = (efficiency = 0.75%)
75 𝑥 0.75
= 9.3 H.P
Say 10 H.P
TOTAL 941,540.25
IN WORDS: NINE LAKHS FORTY ONE THOUSAND AND FIVE HUNDRED FORTY RUPEES