BIM review 19 Jan 2016 for Submitted Model

Current IFC – Latest Bulletin

MTB_BuCP_ML_ARC-GLA_AG-INF_400-SDR_r00-151221_Arch02
Arch 02 Metal Cladding

AL GHURAIR S/C

TCAJV BIM 19 Jan 2016

BIM – PROJECT CONTROLS DEP.- TCAJV MTB PROJECT 2013 ©


• MTB_BuCP_ML_ARC-GLA_AG-INF_400-SDR_r00-151221_Arch02

 For Geometry.

 Model is matching with KPF model & RFI’s 4271/4309

 Joint between the Metal cladding & buttress cladding to be


25 mm as per A23-630

BIM – PROJECT CONTROLS DEP.- TCAJV MTB PROJECT 2013 ©


• MTB_BuCP_ML_ARC-GLA_AG-INF_400-SDR_r00-151221_Arch02

 For Panels.

 Number of panels for each zone are matching with A22-403.

 Joints between the panels are matching with the IFC design.

BIM – PROJECT CONTROLS DEP.- TCAJV MTB PROJECT 2013 ©


• MTB_BuCP_ML_ARC-GLA_AG-INF_400-SDR_r00-151221_Arch02

 For Fixation details.


 There are many cases regarding the fixation with the existing cleats.
- Brackets to follow existed cleats / Missing fixation plate

BIM – PROJECT CONTROLS DEP.- TCAJV MTB PROJECT 2013 ©


• MTB_BuCP_ML_ARC-GLA_AG-INF_400-SDR_r00-151221_Arch02

 For Fixation details.


 There are many cases regarding the fixation with the existing cleats.
- Location for holes to be checked with exact location of the cleats.
- Missing brackets

BIM – PROJECT CONTROLS DEP.- TCAJV MTB PROJECT 2013 ©


• MTB_BuCP_ML_ARC-GLA_AG-INF_400-SDR_r00-151221_Arch02

 For Fixation details.


 There are many cases regarding the fixation with the existing cleats.
- Mismatching between fixation detail between shop drawing & model

BIM – PROJECT CONTROLS DEP.- TCAJV MTB PROJECT 2013 ©


• MTB_BuCP_ML_ARC-GLA_AG-INF_400-SDR_r00-151221_Arch02

 For Fixation details.

- Clashes with steel structure & brackets adjustment.


• At transition area as snapshots below

BIM – PROJECT CONTROLS DEP.- TCAJV MTB PROJECT 2013 ©


• MTB_BuCP_ML_ARC-GLA_AG-INF_400-SDR_r00-151221_Arch02

 For Fixation details.

- Clashes with steel structure / Overlapped with the steel cleats

BIM – PROJECT CONTROLS DEP.- TCAJV MTB PROJECT 2013 ©


• MTB_BuCP_ML_ARC-GLA_AG-INF_400-SDR_r00-151221_Arch02

 For Fixation details.

- Clashes with steel structure.

- Sub-Frame that holding panel, clashes


with the steel racking columns.

BIM – PROJECT CONTROLS DEP.- TCAJV MTB PROJECT 2013 ©


• MTB_BuCP_ML_ARC-GLA_AG-INF_400-SDR_r00-151221_Arch02

 For Fixation details.

- Clashes between brackets & steel Cleats

BIM – PROJECT CONTROLS DEP.- TCAJV MTB PROJECT 2013 ©


• MTB_BuCP_ML_ARC-GLA_AG-INF_400-SDR_r00-151221_Arch02
 General comments due to fixation details:
• As per the model, fixation detail is as per the typical detail that mentioned in shop
drawing 401-AG-A-08-20-0.00-ST41-SD-003, the concept of fixation detail is working,
however it should be adjustable as per the cleats location “bracket & plate
dimension to not be fixed” in order to avoid; any clash with the cleats or any gaping
between these brackets and the cleats
• In some area brackets area far away from the cleats, another sub frame can be
provided in such cases.
• Where there is steel connection; two cleats have been produced instead of one”.
• For transition area, most of the brackets are clashing with the steel structure, new
concept should be provided.

BIM – PROJECT CONTROLS DEP.- TCAJV MTB PROJECT 2013 ©


Conclusion:

• Model is matching -as geometry- with KPF latest Model & RFI 4271/4309.
• Model is approved for the panels arrangement .
• All panel are clear, nothing to be revised.
• Model & shop drawing to match each other as shop drawing to be extracted from Model.
• All Fixation detail to be coordinated with steel structure as per the previous comments.
• All fixation brackets to be adjusted with the existing cleats as per the previous comments.
• Approval is subject for Panelization only & fixation details where noted to be revised accordingly.
• Further coordination to be done for the holes of the chandelier struts & smoke detector cameras as well.