Contents…..
Objective
Company Profile
Basic Theories
Distribution Transformer
Recommendations
3 1/2/2015
Objectives…..
4 1/2/2015
Company Profile….
Name: Navana Electronics Limited
Dhaka-1212
5 1/2/2015
Contd.
Products:
6 1/2/2015
Contd.
Products:
Transformer
8 1/2/2015
Working Principle of Transformer….
9 1/2/2015
Distribution Transformer…..
• Used for distribution of electrical energy
10 1/2/2015
Oil immersed distribution Transformer….
11 1/2/2015
Manufacturing of 3-Phase Distribution
Transformer
12 1/2/2015
13 1/2/2015
Active Part :
The ferromagnetic core
and windings
14 1/2/2015
Transformer manufacturing procedures….
15 1/2/2015
Core material…. …
The mostly used core material
is CRGO-Cold Rolled Grain
Oriented steel sheets of 3% of
Silicon
16 1/2/2015
Core Cutting….
17 1/2/2015
Core Jointing on Channel….
18 1/2/2015
Placing laminated sheets by hand or
hammer manually
19 1/2/2015
Covering copper wire with Insulating Tape…..
20 1/2/2015
Low Voltage Windings…..
Finishing End
22 1/2/2015
High Voltage Windings….
Horizontal machine is used to prepare the
HV winding
23 1/2/2015
High Voltage Windings…..
24 1/2/2015
Contd.
Insulation between two layers :
Insulation between
two layers of DPC
paper
25 1/2/2015
Core-Coil Assembly…..
Cotton tape
Press board
limb .
28 1/2/2015
Contd.
Isolating HV from LV winding:
29 1/2/2015
Contd.
30 1/2/2015
Contd.
Placement of HV Winding:
31 1/2/2015
Contd.
Inserting the Upper Yoke:
34 1/2/2015
Vector grouping.....
The vector grouping in NEL is Dyn 11:
35 1/2/2015
Tap Changer…..
Tapping is terminated just
bellow oil level
Tap Changer
External handle
External Handle
Taping is done on HV winding
36 1/2/2015
pe
Taping Wires
Connected to HV
Changer coils
37 1/2/2015
Moisture Control…..
The whole active part of the transformer
insulation
38 1/2/2015
The Tank…..
39 1/2/2015
Functions of Transformer Tank...
40 1/2/2015
Radiator….
41 1/2/2015
Inserting The Active Part Into The Tank…..
press board
42 1/2/2015
Bushings….
Conductor
43 1/2/2015
Conservator….
Providing adequate space for
expansion of oil inside the tank
44 1/2/2015
Filling Oil…..
45 1/2/2015
Function of Transformer Oil….
46 1/2/2015
46
QC Tests….
Insulation test
Ratio test
47 1/2/2015
48 1/2/2015
Rating Plate
49 1/2/2015
Ready to Delivery
50 1/2/2015
Recommendation…..
NEL should cut the core sheets as angular core cutting and arrange
Relay that protects the transformer all the time and increase its life
time.
51 1/2/2015
Contd.
Elaboration of My Recommendations:
52 1/2/2015
53 1/2/2015
54 1/2/2015