Unit of Competencies Prepare Materials and Tools

LO. 1 LO. 2 LO.3


NAME OF TRAINEES
A1 A2 A3 A4 A5 A6 A7

4
5

10

11

12

13
14

15

16

17

18

19

20

21

22
23

24

25

Prepare Materials and Tools


LO. 1 Identify Materials
A1. List materials as per job requirements/Self-Check
A2. Identify tools and accessories according to job requirements/Self-Check
LO. 2 Request Materials
A3. Request materials and tools needed according to the list prepared/Self-check
A4. Provide substitue materials and tools/Self-check
LO. 3 Receive and Inspect Materials
A5. Inspect materials and tools issued as per quantity and specification/Self-check
A6. Check tools, accessories and materials for damages/Self-check
A7. Set aside materials and tools to appropriate location/Self-check

Observe Procedures, Specifications and Manuals of Instructions


LO. 1 Identify and Access Specification/Manuals
A8. Identify and access appropriate manuals/Self-check
A9. Check and identify version and date of manuals/Self-check
LO. 2 Interpret Manuals
A10. Locate relevant sections, chapters of specifications/ manuals/Self-check
A11. Interpret information and procedure in the manual/Self-check
LO. 3 Apply Informations in Manual
A12. Interpret manual according to job requirements/Self-check
A13. Identify correctly work steps/Self-check
A14. Apply manual data according to the given task/Self-check
A15. Interpret all correct sequencing and adjustments contained on the manual/Self-check
LO. 4 Store Manuals
A16. Store appropriately manual or specification/Self-check
Training Duration: _________________________
R
Observe Procedures, Specifications and Perform Mensurations an
Manuals of Instructions
LO. 1 LO. 2 LO. 3 LO. 4 LO. 1 L
A8 A9 A10 A11 A12 A13 A14 A15 A16 A17 A18 A19 A20 A21 A22
Perform Mensurations and Calculations
LO. 1 Select Measuring Instruments
A17. Identify, classify and interpret component to be measured
A18. Select measuring tools as per job requirements

A19. Use alternative measuring tools


LO.2 Carry out measurements and calculations
A20. Obtain accurate measurements to job requirements
A21. Use alternative measuring tools
A22. Perform calculation needed to complete work tasks using the fo
process of addition (+), subtraction (-), multiplication (x) a

A23. Use calculations involving fractions, percentages and mixed num


A24. Self-check numerical computation and correct for accuracy
A25. Read electrical instruments scale
A26. Apply Ohms Law and Power Law
A27. Measure electrical quantities acoording to given electrical conn

Perform Basic Benchwork


LO. 1 Prepare Materials, Tools and Equipment
A28. Interpret work plan to determine job requirements
A29. Identify and prepare materials, tools and equipment
A30. Check materials according to the required specifications
A31. Perform cutting, squaring, reaming, flaring, swaging and bendin
LO. 2 Lay-out and mark dimensions/features on workplace
A32. Select metallic and non-metallic materials
A33. Mark dimensions according to job specifications and within the
A34. Check dimensions against the actual work plan
LO. 3 Perform required benchwork
A35. Follow work instructions to ensure work safety
A36. Apply appropriate PPE and safety procedures
A37. Perform drilling
Date Started: ___________
ACHIEVEMENT CHA
Refrigeration and Air Conditioning Servicing NC I (Dom
ons and Calculations Perform Basic Benchwork
LO. 2 LO. 1 LO. 2 LO. 3
A23 A24 A25 A26 A27 A28 A29 A30 A31 A32 A33 A34 A35 A36 A37
A38. Perform tube processing according to
A39. Clean and clear worksite of all debris
ured
Perform Basic Electrical Works
LO. 1 Prepare electrical tools and test instrumen
A40. Interpret work plan to determine job
A41. Identify and prepare electrical tools a
A42. Check electrical tools and instruments
ing the four basic LO.2 Test power supply and electrical componen
ation (x) and division (/) A43. Test instruments in accordance with P
mixed numbers to complete the task A44. Check power supply and electrical com
racy A45. Identify and record defects of power s
A46. Observe safe working habits
LO. 3 Perform basic electrical repair
ical connections. A47. Follow work instructions to ensure saf
A48. Tighten loose connections in accordan
A49. Test and replace defective electrical co
A50. Clean and in safe state work place in l

Maintain Tools and Equipment


LO. 1 Check condition of tools and equipment
nd bending tubing A51. Identify materials, tools and equipme
A52. Segregate and label non-functional to
A53. Observe safety of tools and equipmen
within the required tolerance A54. Check condition of PPE
LO. 2 Perform basic preventive maintenance
A55. Identify appropriate lubricants
A56. Lubricate tools and equipment
______________ Date Finis
CHART
I (Dom. RAC) Common Competency
Perform Basic Electrical Works Main
O. 3 LO. 1 LO. 2 LO. 3 LO. 1
A38 A39 A40 A41 A42 A43 A44 A45 A46 A47 A48 A49 A50 A51 A52
ording to given plan A57. Check and calibrate mea
ll debris and left in safe state A58. Inspect & replace defecti
A59. Inspect, repair and replac
A60. Clean workplace and in s
struments
mine job requirements Perform Housekeeping and Sa
LO. 1 Sort materials, tools and equip
al tools and instruments
truments A61. Classify materials, tools a
omponents A62. Designate appropriate ar
ce with PEC LO. 2 Clean workplace area, materia
trical components A63. Clean workplace areas, m
f power supply and electrical components A64. Practice safe state of wor
LO. 3 Systematize dispensing and re

A65. Request/borrow and retu


nsure safety work A66. Fill-up completely and fil
accordance with PEC A67. Request exact quantity o
ectrical components in accordance with PEC LO. 4 Identify and minimize/ elimina
place in line with OHSA regulations A68. Follow workplace proced
A69. Display safety signs and h
A70. Use equipment and safet
pment A71. Keep clean work areas, fr
equipment LO. 5 Respond and record accidents
ctional tools and equipment A72. Identify workplace accide
quipment A73. Carry out correctly workp
A74. Coordinate medical assis
ance A75. Maintain records of accid
LO. 6 Follow basic security
A76. Follow security policies
A77. Report security related e
Finished: ____________________
Maintain Tools and Equipment Perform Housekee
LO. 1 LO. 2 LO. 1 LO. 2 LO. 3
A53 A54 A55 A56 A57 A58 A59 A60 A61 A62 A63 A64 A65 A66 A67
rate measuring instruments
e defective instruments, equipment & accessories
nd replace tools every after use
e and in safe state in line with OHSA regulations

g and Safety Practices


and equipment

ls, tools and equipment according to its kinds


opriate areas for materials, tools and equipment
, materials, tools and equipment
e areas, materials, tools and equipment as per company practices
te of workplace
ng and retrieval of materials, tools and equipment

w and return materials. Tools and equipment


ly and file forms used
uantity of consumable materials
e/ eliminate hazards
e procedures for dealing with emergencies
gns and hazard warnings and observe at all times
and safety devices/PPE
k areas, free from obstacles and emergency exits are kept clear at all times
accidents
ace accidents
tly workplace emergency first-aid procedures
ical assistance with concerned personnel
s of accident/incident

policies
related events on the relevant forms
VERGEL P. SORIANO
Trainer
Housekeeping and Safety Practices
LO. 4 LO. 5 LO. 6
A68 A69 A70 A71 A72 A73 A74 A75 A76 A77
Unit of Competencies Install Dom. RAC Unit
LO. 1
NAME OF TRAINEES
A1 A2 A3 A4 A5 A6 A7

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
Install Dom. RAC Units
LO. 1 Perform Cavity Works
A1. Identify and interpret mechanical and electrical symbols
A2. Identify and select tools, instruments, equipment & materials
A3. Prepare dimensions of cavity of work instructions
A4. Perform boring and cutting of cavity
A5. Perform leveling/finishing of cavity
A6. Select and use proper PPE
A7. Perform 5's
LO. 2 Install Electrical Circuit
A8. Survey location of power circuit
A9. Lay-out electrical circuit
A10. Select wiring method in accordance with PEC
A11. Prepare electrical wiring materials
A12. Install electrical wiring (PSC, CSCR, CSIR & RSIR)
A13. Perform power, circuit terminator
A14. Test installed power circuit
LO. 3 Install Aircon Unit/Domestic Refrigeration
A15. Prepare unit equipment, tools, and components
A16. Level and position unit inline with manufacturer’s instruction.
A17. Apply sealant to ensure an airtight seal around the unit
A18. Install condensate drain
A19. Select electrical tools and instruments to job requirements
A20. Test unit in line with manufacturers instruction
A21. Clean worksite and keep in safe state

Training Duration: _________________________


Refri
Install Dom. RAC Units Service an
LO. 2 LO. 3 LO. 1 LO. 2
A8 A9 A10 A11 A12 A13 A14 A15 A16 A17 A18 A19 A20 A21 A22 A23 A24 A25 A26 A27 A28 A29
Service and Maintain Dom. RAC Units Troublesh
LO. 1 Clean / Replace Air Filter LO. 1 Plan
A22. Identify and remove parts/components of window type air-conditioning and Refrigeration
A23. Clean parts/components of window type air-conditioning and refrigeration
A24. Check air filter for damage in line with standard operating procedures
A25. Return air filter to aircon unit's cover
LO. 2 Clean/Repair Evaporator and Condenser LO.2 Troub
A26. Use high pressure washer in cleaning evaporator/condensing coil
A27. Select proper tools in dismantling the evaporator/condensing unit
A28. Use cleaning agent or non-corrosive chemical in cleaning and maintaining
evaporator/condensing coil, plates and fins
A29. Repair evaporator/condenser coils fins for damage
LO. 3 Maintain Motor and Blades LO. 3 Troub
A30. Check fan motor shaft blade in line with normal operation and rotation
A31. Lubricate fan motor with no spillage in line with maintenance procedures
A32. Clean parts/components in accordance with standard procedures
A33. Demonstrate safety regulations in compliance with applicable to work site operations
A34. Select appropriate processes, tools and equipment
A35. Follow service and maintenance procedures in accordance with manufacturer's manual
LO. 4 Service Refrigerant Circuit LO.4 Test U
A36. Perform flushing
A37. Assemble and perform vacuuming
A38. Perform recharging and observation
A39. Clean worksite and keep in safe state
LO. 5 Service Electrical Control Wiring
A40. Use correct instrument power supply and diagnosing electrical control
A41. Check and inspect all controls/wiring as per schematic diagram
A42. Check/diagnose and repair loose connections/wiring and defects
A43. Use effective communication with others to ensure safe and effective
work operations

Date Started: _____________________


ACHIEVEMENT CHART
Refrigeration and Air Conditioning Servicing NC I (Dom. RAC) Core Compe
vice and Maintain Dom. RAC Units Troubleshoot Do
LO. 3 LO. 4 LO. 5 LO. 1 LO. 2
A30 A31 A32 A33 A34 A35 A36 A37 A38 A39 A40 A41 A42 A43 A44 A45 A46 A47 A48 A49 A50 A51
oubleshoot Dom. RAC System Recover and R
O. 1 Plan and Prepare for Troubleshooting LO.1 Assess Unit
A44. Read and interpret appropriate wiring diagrams, charts and manuals for A62. Expla
trouble shooting A63. Expla
A45. Select and prepare appropriate materials, tools and equipment A64. Discu
A46. Explain properly manufacturer’s nameplate rating A65. Asses
O.2 Troubleshoot and Repair Electrical System LO. 2 Set-up Equ
A47. Test/check Motor comp, fan motor, thermostat, capacitors, selector switch, oveload protector and relay A66. Identi
A48. Diagnose and identify components faults and problems A67. Expla
A49. Undertake remedial action on the identified faults and problems A68. Set-up
A50. Apply properly HVAC code of practice and safety guidelines A69. Identi
A51. Accomplish complete report on troubleshooting and repair A70. Weigh
O. 3 Troubleshoot and Repair Mechanical System LO. 3 Perform Re
A52. Explain refrigeration mechanical system & cycle A71. Prepa
A53. Familiar mechanical parts A72. Expla
A54. Perform troubleshoot and repair procedures in accordance to work instructions A73. Perfo
A55. Perform operating procedures in accordance to unit manual procedures A74. Perfo
A56. Apply Code of practice in troubleshooting mechanical system A75. Apply
A76. Apply
O.4 Test Unit Performance
A57. Explain pressure and temperature relationship
A58. Test ACU pressure and temperature
A59. Perform operating procedures in accordance to unit manual procedures
A60. Accomplish worksheet
A61. Apply Code of Practice in testing

Prepared

Date Finished: ____________________


ompetency
hoot Dom. RAC Systems Recover/Recycle Refrigerant on Dom. RAC
LO.3 LO.4 LO. 1 LO. 2 LO. 3
A52 A53 A54 A55 A56 A57 A58 A59 A60 A61 A62 A63 A64 A65 A66 A67 A68 A69 A70 A71 A72 A73
er and Recycle Refrigerant on Dom. RAC System Repair/Retrofit
sess Unit fo Recovery/Recycling LO. 1 Assess Unit
62. Explain prevention of ozone layer depletion and CFC/ODS release. A77. Explain
63. Explain Montreal Protocol. A78. Explain
64. Discuss effects of ODS emission. A79. Explain
65. Assess unit for recovery/recycling. A80. Assess
t-up Equipment for Recovery/Recycling LO. 2 Repair/Rep
66. Identify parts and accessories of recovery/recycling equipment. A81. Check,
67. Explain uses and functions of parts and accessories of R/R equipment A82. Repair
68. Set-up R/R equipment and accessories A83. Test re
69. Identify refrigerants to be recovered A84. Observ
70. Weigh and label recovered refrigerant in the recovery cylinder. LO.3 Perform Ret
rform Refrigerant Recovery/Recycling A85. Select
71. Prepare T/E & S/M for recovery/ recycling A86. Select
72. Explain operation of R/R equipment A87. Perfor
73. Perform refrigerant recovery/recycling A88. Observ
74. Perform optimum refrigerant recovery in the system A89. Practic
75. Apply safety measures in recovery/recycling of refrigerants
76. Apply housekeeping
LO. 4 Test Operati
A90. Observ
A91. Analyz

A92. Apply

A93. Test re

repared By:

VERGEL P. SORIANO
Trainer
RAC Repair/Retrofitt Dom. RAC Systems
LO. 3 LO. 1 LO. 2 LO. 3 LO. 4
A74 A75 A76 A77 A78 A79 A80 A81 A82 A83 A84 A86 A87 A88 A89 A90 A91 A92 A93 A94
/Retrofit Dom. RAC
ssess Unit for Repair/retrofitting
77. Explain advantages and disadvantages of retrofitting
78. Explain retrofitting process
79. Explain importance of retrofitting
80. Assess unit for retrofitting
epair/Replace Defective Components of Dom. RAC Systems
81. Check, inspect and identify faults
82. Repair/replace defective parts in accordance with the specification
83. Test repaired/replaced components
84. Observe safe working practice in repairing/replacing defective components
rform Retrofitting Process
85. Select alternative refrigerants and lubricants.
86. Select system components and accessories according to specification
87. Perform retrofitting
88. Observe safety measure in retrofitting
89. Practice proper housekeeping
st Operating Performance of Retrofitted System
90. Observe operating pressures, current and temperature of retrofitted system
91. Analyze and interpret recorded data according to manufacturer’s recommended
operating performance
92. Apply necessary adjustment of controls and devices on pressures, current
and temperature
93. Test repaired unit

You might also like