A
CROSS BEAM
MAIN BEAM
REBAR STEEL
REACTION PILE A
L2
TEST PILE
L1
SECTION A-A
KONTROL KEKUATAN BALOK UTAMA / CHECK FOR STRENGHT OF THE MAIN BEAM
SECTION DOUBLE WF 1100X750X50X25 mm
tf
h = 1,100.00 mm J = 1,478,766.67 mm4
b1 = 375.00 mm fy = 240.00 Mpa
tw = 22.00 mm h2 fu = 240.00 Mpa
tf = 50.00 mm fr = 70.00 Mpa
tw
h1 = 1,000.00 mm E = 200,000.00 Mpa
h
A = 1,940.00 cm² υ = 0.3
h1 Sx =
h2 = 52.50 mm 45,189.39 cm3
b = 750.00 mm Zx = 45,424.95 cm3
Ix = 2,485,416.67 cm4 Iy = 594,010 cm4
G = 76,923.08 Mpa ry = 17.50 cm
W = 18,274.80 kg/12m b1 X1 = 3,264.17 Mpa
2 2
Iw = 1.8E+15 mm6 b X2 = 0.1910 mm /N
Proyek /Project : Pengujian Tiang kapasitas 640 Ton /Test Pile 640 Ton Capacity Tanggal / Date : September 10, 2019
Rekanan / Client : PT Wika Waktu / Time : 0:12:44
Pekerjaan /Job Title : Perhitungan struktur / Structure Calculation Perencana / Design By :
No. Pekerjaan / Job No. : 01/LT-BPP/IX/2019 Diperiksa /Checked By :
Page: 2
Mementukan Momen Plastis untuk Penampang Kompak / Determine The Plastic Momen of Compact Section
Mn = Fy Zx
= 10,901,988,000.00 N.mm
My = Fy Sx
= 10,845,454,545.45 N.mm ---->
1.5 My = 16,268,181,818.18 N.mm => Mn <1.5My --> Aman / Safe
4 Kontrol kuat nominal lentur penampang dengan pengaruh tekuk lateral/ Check the Nominal Flexural Strenght of section due to the lateral buckling
Cek Panjang Bentang / Check for The length of Span
Proyek /Project : Pengujian Tiang kapasitas 640 Ton /Test Pile 640 Ton Capacity Tanggal / Date : September 10, 2019
Rekanan / Client : PT Wika Waktu / Time : 0:12:44
Pekerjaan /Job Title : Perhitungan struktur / Structure Calculation Perencana / Design By :
No. Pekerjaan / Job No. : 01/LT-BPP/IX/2019 Diperiksa /Checked By :
Page: 3
Menentukan Momen Batas Tekuk / Determine the Limit of The Buckling Momen
Mr = Sx * ( fy - fr ) = 7,682,196,969.70 N.mm
Mementukan Momen Plastis / Determine The Plastic Momen
Mp = Fy. Zx = 10,901,988,000.00 N.mm
Mementukan Momen Leleh ( My ) / Determine The Yield Momen ( My ) Hasil Analisa / Result of Analysis:
My = Fy. Sx = 10,845,454,545.45 N.mm Mp < 1.5My
Syarat : 1.5 My > Mp / Check For 1.5 My > Mp SNI Baja 2002 Page 35 Momen Leleh masih dalam batas yang diijinkan
1.5My = 16,268,181,818.18 N.mm Yield Moment Allowed
Menentukan Mmax, MB, MC, MA/ Determine for Mmax, MB, MC, MA
Asumsi Tumpuan Sendi Rol/ Supported by Fixed support
MA = MC = - kg.cm
Mmax = MB = 1/8 *q * L^2 + 1/4 P L = 40,000,000.00 kg cm
Cb = 12.5 * Mu /( 2.5*Mu + 3*MA + 4*MB + 3*MC ) = 1.92
Mementukan Kuat Lentur Penampang untuk Bentang menengah / Determine The Flexural Strenght of Section in middle Span
21,652,707,719.10 N.mm
Mn = Cb * [ Mr + ( Mp - Mr ) * ( Lr - L ) / ( Lr - Lp ) ]
=
Besarnya momen diambil yang terkecil / Take the smaller value = 10,901,988,000.00 N.mm
= 109,019,880.00 kg.cm
Kontrol kuat geser nominal balok tanpa pengaku ( SNI 2002 Hal 42 )/ Check the Nominal Shear Strenght of the unbraced beam ( SNI 2002 page 42 )
Ketebalan minimum pelat badan tanpa adanya pengaku/ The minimum thickness for unbraced web :
h / fw < 6.36/√ E/fy h/ tw = 50 6.36 √ E/fy = 183.6
Vu = Dmax = 320,000.00 kg
Vn = 0.6 Fy Aw = 27,936,000 N Hasil Analisa / Result of Analysis:
ø for Shear = 0.90 Vu < øVn
ø Vn = 25,142,400 N Struktur Mampu menahan Geser
= 2,514,240 kg Structure Safe in Shear
PT BERDIKARI PONDASI PERKASA Rev :
ENGINEERING DEPARTMENT 0
Proyek /Project : Pengujian Tiang kapasitas 640 Ton /Test Pile 640 Ton Capacity Tanggal / Date : September 10, 2019
Rekanan / Client : PT Wika Waktu / Time : 0:12:44
Pekerjaan /Job Title : Perhitungan struktur / Structure Calculation Perencana / Design By :
No. Pekerjaan / Job No. : 01/LT-BPP/IX/2019 Diperiksa /Checked By :
Page: 4
Analisa Kekuatan Balok Melintang Sebelum Jack Bekerja / Check for Strenght of Cross Beam Before Loading
SECTION WF 1000 x 300 x25 x 50 mm tf
h = 1,000.00 mm J = 1,562,833.33 mm4
b = 300.00 mm fy = 300.00 Mpa
tw = 25.00 mm tw fu = 370.00 Mpa
h2
tf = 50.00 mm fr = 70.00 Mpa
h1 = 900.00 mm E = 200,000.00 Mpa
A = 235.50 cm² υ = 0.30
h2 = 500.00 mm h h1 Sx = 16,587.50 cm3
Zx = 13,656.25 cm3
Ix = 829,375.00 cm4 Iy = 57,370 cm4
G = 76,923.08 Mpa ry = 3.75 cm
W = 2,218.41 kg/12m X1 = 3,185.14 Mpa
Iw = 1.4E+14 mm6 X2 = 0.0190 mm2/N2
b
Momen Maksimum akibat beban merata / The Maximum moment due to distributed load
Mq = 1 / 8 * P * L = 20,000,000 kg.cm
Proyek /Project : Pengujian Tiang kapasitas 640 Ton /Test Pile 640 Ton Capacity Tanggal / Date : September 10, 2019
Rekanan / Client : PT Wika Waktu / Time : 0:12:44
Pekerjaan /Job Title : Perhitungan struktur / Structure Calculation Perencana / Design By :
No. Pekerjaan / Job No. : 01/LT-BPP/IX/2019 Diperiksa /Checked By :
Page: 5
Mementukan Momen Plastis untuk Penampang Kompak / Determine The Plastic Momen of Compact Section
Mn = Fy Zx
= 0.00 N.mm
My = Fy Sx
= 4,976,250,000.00 N.mm
1.5 My = 7,464,375,000.00 N.mm => Mn <1.5My --> Aman / Safe
4 Kontrol kuat nominal lentur penampang dengan pengaruh tekuk lateral/ Check the Nominal Flexural Strenght of section due to the lateral buckling
Cek Panjang Bentang / Check for The length of Span
Menentukan Momen Batas Tekuk / Determine the Limit of The Buckling Momen
Mr = Sx * ( fy - fr ) = 3,815,125,000.00 N.mm
Mementukan Momen Plastis / Determine The Plastic Momen
Mp = Fy. Zx = 4,096,875,000.00 N.mm
Mementukan Momen Leleh ( My ) / Determine The Yield Momen ( My ) Hasil Analisa / Result of Analysis:
My = Fy. Sx = 4,976,250,000.00 N.mm Mp < 1.5My
Syarat : 1.5 My > Mp / Check For 1.5 My > Mp SNI Baja 2002 Page 35 Momen Leleh masih dalam batas yang diijinkan
1.5My = 7,464,375,000.00 N.mm Yield Moment Allowed
Menentukan Mmax, MB, MC, MA/ Determine for Mmax, MB, MC, MA
Asumsi Tumpuan Jepit - Jepit / Supported by Fixed Support
MA = MC = - kg.cm
Mmax = MB = 1/8 P L = 20,000,000.00 kg cm
Cb = 12.5 * Mu /( 2.5*Mu + 3*MA + 4*MB + 3*MC ) = 1.92
Mementukan Kuat Lentur Penampang untuk Bentang menengah / Determine The Flexural Strenght of Section in middle Span
Mn = Cb * [ Mr + ( Mp - Mr ) * ( Lr - L ) / ( Lr - Lp ) ] = 7,590,054,742.38 N.mm
PT BERDIKARI PONDASI PERKASA Rev :
ENGINEERING DEPARTMENT 0
Proyek /Project : Pengujian Tiang kapasitas 640 Ton /Test Pile 640 Ton Capacity Tanggal / Date : September 10, 2019
Rekanan / Client : PT Wika Waktu / Time : 0:12:44
Pekerjaan /Job Title : Perhitungan struktur / Structure Calculation Perencana / Design By :
No. Pekerjaan / Job No. : 01/LT-BPP/IX/2019 Diperiksa /Checked By :
Page : 6
Besarnya momen diambil yang terkecil / Take the smaller value = 4,096,875,000.00 N.mm
= 40,968,750.00 kg.cm
Kontrol kuat geser nominal ( SNI 2002 Hal 45 )/ Check the Nominal Shear Strenght ( SNI 2002 page 45 )
Ketebalan minimum pelat badan tanpa adanya pengaku/ The minimum thickness for unbraced web :
h / fw < 1,1 /√ ( knE/fy ) h/ tw = 40
kn = 5 + 5 /( a/h)^2
asumsi tanpa stiffener sehingga jarak stiffener ( a = 0 )
kn = 5 + 5 /( a/h)^2 = 5.00
1.1√ (kn E/fy) = 71.00
Vu = Dmax = 160,000.00 kg
Vn = 0.9 Aw Kn E / ( h/tw)^2 = 4,088,541.67 N Hasil Analisa / Result of Analysis:
40,885,416.7 kg/cm2 Vu> øVn
ø for Shear = 0.90 Struktur Mampu menahan Geser
ø Vn = 36,796,875.0 kg Structure Safe in Shear