DIMENSI

B
h5
Dimensi
h6
h1
h2 H = 230.00 cm
A = 25.00 cm
B = 80.00 cm
C = 70.00 cm
A h1 = 13.00 cm
H
h2 = 12.00 cm
h3 = 25.00 cm

h3 h4 = 25.00 cm
h5 = 8.00 cm
h4 h6 = 7.00 cm

C
BENTANG GIRDER

Lbr = 50 m

L = 50.8 m

Segmental/Monolith ? segmental
Composite / Non Composite Komposit
Panjang Girder L br = 50.8 m
Span Netto Clear Span Ln = 50.0 m
jarak antar girder s = 2 m
Tebal diaphragm = 20 cm

Tebal slab/Slab Thickness = 25 cm


Tebal RC Plate = 7 cm

Jumlah segmen = 7
Jumlah Diaphragm = 6

Jika PCI Segmental, maka pembagian segmennya adalah


Segment 1 = 7.543 m
Segment 2 = 7.143 m
Segment 3 = 7.143 m
Segment 4 = 7.143 m
Segment 5 = 7.143 m
Segment 6 = 7.143 m
Segment 7 = 7.543 m
Segment 8 = m
Segment 9 = m
Segment 10 = m
50.800 m

MATERIALS

11/1/2017 Input 1 - 16
PCI h230 length 50.8 ctc 200-0-6.xlsx

Jacking Force = 75.00 % UTS.


concrete strength at stressing : = 100.00 % Fc'
Jenis End Block (Double/Single) = Single Angkur Hidup- hidup

Concrete Grade
I Girder cube strength, f cu = 700 Kg/cm2
Slab cube strength, f cu = 350 Kg/cm2

f 'c = = 58.1 Mpa

Steel Grade
d< 13 mm, BJTP 24 fy = 2400 Kg/cm2
d >= 13 mm, BJTD 40 fy = 4000 Kg/cm2
Modulus of elasticity, Es = 2100000 Kg/cm2

Prestressing steel
Uncoated stress-relieved seven wire strand. Grade-270 - ASTM A416. Low-Relaxation.
Nominal diameter = 15.2 mm.
Nominal area = 138.7 mm2.
Modulus of elastisity E ps = 1970000.0 Kg/cm2
Breaking Load = 26.5 ton. 26.57492355

REFERENSI AND PERATURAN BEBAN YANG DIPAKAI

SNI Pembebanan 2004


Bridge Management System (BMS Indonesia-Australia)

TEGANGAN IJIN

Concrete grade : PCI Girder Slab


cube strength f cu = 700 Kg/cm2 350 Kg/cm2
cylinder strength fc' = 624.7 Kg/cm2 291 Kg/cm2
Modulus of elasticity Ec = 4.37E+05 Kg/cm2 2.99E+05 Kg/m2
Unit weight gc = 2500 kg/m3 2500 Kg/cm3

At transfer condition
at stressing : 100.00 % f c '. = 624.7 Kg/cm2 291.3 Kg/cm2
Compressive 0.60 f ci ' = 374.8 Kg/cm2 174.8 Kg/cm2
Tensile stress : -0.80 SQRT (f ci ' ) = -20.0 Kg/cm2 -13.7 Kg/cm2

At service condition
at service fc' = 624.7 Kg/cm2 291.3 Kg/cm2
Compressive 0.45 fc' = 281.1 Kg/cm2 131.1 Kg/cm2
Tensile stress : -1.60 SQRT ( f c ' ) = -40.0 Kg/cm2 -27.3 Kg/cm2

nc = 4.50 ( Ratio of E ps / E c )
n pi = 6.60 ( Ratio of E ps / E ci )
n = 0.68 ( Ratio of E slab / Ec )

CONCRETE PARAMETER

Precast I Komposit
b ef : 141.42 cm
h : 230.00 cm 255.00 cm

11/1/2017 Input 2 - 16
PCI h230 length 50.8 ctc 200-0-6.xlsx

Ac : 8,755.50 cm2 12,291.03 cm2


Y top : 118.22 cm 105.62 cm
Y bottom : 111.78 cm 149.38
Ix: (Momen inertia) 54,412,924 cm4 97,634,188 cm4
W top composite - cm3 924,395.97 cm3
W top precast : 460,261.55 cm3 1,211,050.13 cm3
W bottom : 486,793.47 cm3 653,593.69 cm3

11/1/2017 Input 3 - 16
PCI h230 length 50.8 ctc 200-0-6.xlsx

ARRANGEMENT KABEL

No tendon Dist( TtoT) space Y Dia space X END DUCT VSL n Strand
Edge Mid Sc5 - Edge Mid Dia ( "G") DEGREES 12.7 Dia("G")
Tendon 1 0.00 0.00 0.00 0.00 0.00 0.00 Sc5-3 39
Tendon 2 40.00 190.00 40.00 14.00 0.00 9.00 0.063 Sc5-7 51
Tendon 3 40.00 150.00 26.00 14.00 0.00 0.00 0.084 Sc5-12 63
Tendon 4 40.00 110.00 12.00 18.00 0.00 0.00 0.084 Sc5-19 84
Tendon 5 40.00 70.00 12.00 19.00 0.00 -15.00 0.084 Sc5-22 90
Tendon 6 30.00 30.00 12.00 19.00 0.00 15.00 0.084 Sc5-27 96
102.86 19.00 84.00 Installed = 70.00 Strand Sc5-31 105

2
PERSAMAAN X TENDON

A B C Cable length
Tendon 1 0.19 -9.76 150.00 5084.04 cm
2
Tendon 2 0.15 -7.72 110.00 5082.52 cm Y= Ax + Bx+ C
Tendon 3 0.09 -4.57 70.00 5080.88 cm
Tendon 4 0.03 -1.42 30.00 5080.09 cm

LAYOUT KABEL

Tendon 1 150.00 148.54 95.75 57.00 33.75 26.00 33.75 57.00 95.20 148.54 150.00
Tendon 2 110.00 108.85 67.13 36.50 18.13 12.00 18.13 36.50 66.69 108.85 110.00
Tendon 3 70.00 69.32 44.63 26.50 15.63 12.00 15.63 26.50 44.37 69.32 70.00
Tendon 4 30.00 29.79 22.13 16.50 13.13 12.00 13.13 16.50 22.05 29.79 30.00
x 0.00 0.15 6.35 12.70 19.05 25.40 31.75 38.10 44.38 50.65 50.80

Tendon Layout
Tendon 1
225.0
200.0
175.0
From Bottom of Girder

150.0 Tendon 2
125.0
100.0
y (cm)

75.0
50.0 Tendon 3
25.0
0.0
0.00 5.00 10.00 15.00 20.00 25.00 30.00 35.00 40.00 45.00 50.00
Tendon 4
L (cm)

11/1/2017 Cable Layout 4 - 16


PCI h230 length 50.8 ctc 200-0-6.xlsx

PEMBEBANAN

Beban Mati
a Beban Sendiri I Girder
q sw = Ac x gc = 2.19 ton/m.
M sw = (qbs x L^2)/8 = 684.02 ton-m. at x= 350.49 ton-m.

b Beban Slab
tebal, t = 0.25 m.
q ts = s.t.gc = 1.25 ton/m.
M ts = (qtsxL^2)/8 = 390.63 ton-m. at x= 200.16 ton-m.

c. Rc Plate
tebal t = 0.07 m.
q ds = s.t.gc = 0.24 ton/m.
M ds = (qdsxL^2)/8 = 74.38 ton-m. at x= 38.11 ton-m.

d. Diafragm
Pd = 1.55 ton const.for formula = 0.75
Md = 58.28 ton m at x= 29.86 Ton m inner diaf. = 6.00
qd = 0.19 ton/m.

e Trotoar + Railing
qt = (total) = 0.00 ton/m.
Mt = (qt x L^2)/8 = 0.00 ton-m. at x= 0.00 ton-m.

f Trotoar Live load


q tl = (total) = 0.00 ton/m.
M tl = (qtl x L^2)/8 = 0.00 ton-m. at x= 0.00 ton-m.

Superimpossed Dead Load

Asphalt
Tebal t = 0.10 m.
g as = 2.20 Ton/m3.
q as = s x t x gas = 0.440 ton/m.
M as = (qas x L^2)/8 = 137.50 ton-m. at x= 70.45 ton-m.

Live load

For calculation of strength of girders, should use "D" Load.


Line load, P = 4.90 ton/m 1 SNI 2008
or Pg = 9.80 ton per girder.
DLA = 0.40 K = 1.40

Uniformly distributed load : " UDL "


L < 30.0 m, pr = 0.90 ton/m 2 SNI 2008
L > 30.0 m, pr = 2.7x(0.5+15/L)
pr for L = 50.00 m = 0.72 ton/m 2
= 1.440 ton/m per girder.

For moment calculation reduct. Fact a = 1.00


" UDL " p = a . pr = 1.44 ton/m per balok.
" KEL " P = a . K . Pg = 13.72 ton per balok.

11/1/2017 Loads 5 - 16
PCI h230 length 50.8 ctc 200-0-6.xlsx

MLL = = 621.50 ton-m. at x= 318.45 ton-m.

For shear calculation


p = a . pr = 1.44 ton/m per girder.
P = a . K . Pg = 13.72 ton per girder.

Momen SERVICE at x LOAD ULTIMATE ult at x


(ton-m) (ton-m) FACTOR (ton-m)
due to beam selfw't M sw = 684.02 350.49 1.30 889.23 455.64
due to slab selfw't, M ts = 390.63 200.16 1.30 507.81 260.20
due to deck plate, M ds = 74.38 38.11 1.30 96.69 49.54
due to diafragm, Md = 58.28 29.86 1.30 75.76 38.82
due to trotoal +railing, Mt = 0.00 0.00 1.30 0.00 0.00
due to trotoar live load, M tl = 0.00 0.00 1.80 0.00 0.00
due to asphalt pav., M as = 137.50 70.45 2.00 275.00 140.91
due to live load, M LL = 621.50 318.45 1.80 1118.70 573.22
Moment total, M and Mult, respectively = 1966.30 1007.53 2963.19 1518.33

ANALYSIS

Prestressing force

Cg s
ep
Cg c
e

cgc Y1 (cm) : 111.78 111.78


cgs Yp (cm) : 111.78 111.78

Eccentricity at mid of girder = 19.00 cm.


Eccentricity, e = 92.78 cm. ep = 0.00

Initial condition at the middle of span


Top fiber :
s t = P i /A c - P i .e/W t + M sw /W t => -20.00 ____> Pi <= 1930.00 ton. ..... (1)

Bottom fiber:
s b = P i /A c + P i .e/W b - M sw /W b <= 374.83 ____> Pi <= 1690.73 ton. ..... (2)

From (1) dan (2) obtained Pi <= 1690.73 ton. ..... (3)

Final condition at the middle of span


Top fiber :
s t = P e /A c - (P e .e-M sw )/W tp + (M LL+ M SDL )/W tc => 281.12 ____> Pe => 502.045 ton. ..... (4)

Bottom fiber:
s b = Pe/Acp + (P e .e-M sw )/W bp - (M LL +M SDL )/W bc => -39.99 ____> Pe => 1,063.46 ton. ..... (5)

From (4) and (5) obtained Pe => 1063.46 ton. ..... (6)

11/1/2017 Loads 6 - 16
PCI h230 length 50.8 ctc 200-0-6.xlsx

Asumsi Jumlah strand dipasang

Long term losses are assumed = 20.00 %.


Diperkirakan dibutuhkan strand = 72.00 strands
Jumlah strand dipasang = 84.00 strands

Type angker dipakai Single Angkur Hidup- hidup


JACKING FORCE = 75.00 % UTS.
then, PJF = 1669.50 ton.

Cara penarikan
Pi /Pe = 1.59 > 1.20 single stage.

11/1/2017 Loads 7 - 16
PCI h230 length 50.8 ctc 200-0-6.xlsx

PRESTRESS LOSSES

Short term losses

Friction at anchor and jack


Pjf = 1669.50 Ton
Loss for VSL system, dfa =d fa = 3 %.
Force at anchor, Pa P=a = (1-dfa) . PJF = 1619.415 ton.

Firction due to curvature and wooble effect

Px = Pa.e^(-mu(alpha+beta.lx)) Angkur yang dipakai Angkur Hidup- hidup


where
Px = prestress force at x from anchor.
mu = Coeff f/ friction between duct & strand, mu = 0.22
alpha = number of curvature angle until x.
beta = coefficient for wobble effect, used beta = 0.0030

(middle of span)
L2 = 25.400 m.
alpha = 0.073 rad.
P2 = 1567.148 ton.
(beamTitik-
end)
L3 = 50.800 m. L3
alpha = 0.146 rad. alpha
P3 = 1516.569 ton. P3

Draw-in

Draw-in influence distance at cable, 0.169 Angkur Hidup- hidup


xd = SQR(dr . Ep . Ap / m) 695.539
where :
dr draw-in occurred of used system, (VSL Sys. ) = 0.01 m.
Ep Elasticity of prestressing steel Ep = 1970000.00 Kg/cm2.
Ap total area of used strands, namely = 116.51 cm2.
m inclination of force = 2(Pa - P2)/Lb = 2057.74 kg/m.
Then, obtained xd = 25.87 m.
Hence,
P1 = 1512.95 ton.
P2 = 1565.22 ton.
P3 = 1516.57 ton.
Pave = 1514.32 ton.
T2pi = 12997.56 Kg/cm2.

Elastic shortening of concrete


dT pe = n.T st /2
i = (I/A c )^0.5 = 78.83 cm.
Ke = (A p /A c ) (1+e^2/i^2) = 0.03
n = E p /E c = 4.50
dT pe ' = n.K e .T pi /(1+n.K e ) = 1625.56 Kg/cm2.

Due to selfweight of beam;


M = 684.02 ton-m.
dTpe = ((dTpe')-(n.M.y/I))/2 = 550.13 Kg/cm2.

11/1/2017 Losses 8 - 16
PCI h230 length 50.8 ctc 200-0-6.xlsx

P2i = P2 - Ap.(dTpe) = 1501.12 ton.

Long term losses

Shrinkage

dT sh = E p .E b .k e .k h .k p
Theoritical thickness of beam = 330 mm.
From Australian Standard 1481-1978 determined;
Ep = 1.97E+06 Kg/cm2.
Eb = 4.00E-04 for humidity = 70.0 %.
ke = 0.649
kh = 0.920 for stressing after = 14.0 days
kp = 100/(100+20.r) where r = percentage of rebar.
rebar chosen, diameter 3 = 13 mm.
number = 22 nos
hence, r = 0.33 %.
kp = 0.937
dT sh = 440.8 Kg/cm2.

Creep

dTc = k c .k d .k e .k h .E p .T ci /E c

where;
kc = 1.10 for humidity = 70.0 %.
kd = 1.2 for stressing after = 14.0 days
ke = 0.649
kh = 0.919506509
Ep = 1.97E+06 Kg/cm2.
Ec = 4.37E+05 Kg/cm2.
T ci = 237.5 Kg/cm2.

dT c = 842.5 Kg/cm2.

Relaxation of strand

dT r = Fr.R.Tpi.(1-2.(dTsh+dTc)/Tpi)
Pi = 1501.120861 ton.
67.4 % UTS --> Fr = 1.8718

For low-relaxation strand, pure relaxation


R = 2.5 %.
T pi = 12884.3 Kg/cm2.
dT sh +dT c = 1283.3 Kg/cm2.

dT r = 482.8 Kg/cm2.

Resume of prestress force in beam

After short term losses;


P1 = 1448.854 ton.
P2 = 1501.121 ton. P i max = 1690.731 ton.

11/1/2017 Losses 9 - 16
PCI h230 length 50.8 ctc 200-0-6.xlsx

P3 = 1452.474 ton.

Total long term losses;


dT t = dTsh + dTc + dTr = 1766.147 Kg/cm2.

P1 = 1243.084 ton.
P2 = 1295.351 ton. P e required = 1063.458 ton.
P3 = 1246.704 ton.

STRESSES AT CRITICAL SECTIONS

AT THE MIDDLE OF SPAN

Stresses Allowable Control


Immediately after transfer;
Top fiber 17.47 Kg/cm2. -20.00 Kg/cm2. OK !
Bottom fiber 317.03 Kg/cm2. 374.83 Kg/cm2. OK !

At service condition;
Slab top fiber 82.11 Kg/cm2. 131.07 Kg/cm2. OK !
Beam top fiber 211.81 Kg/cm2. 281.12 Kg/cm2. OK !
Bottom fiber 30.69 Kg/cm2. 0.00 Kg/cm2. OK !

AT SUPPORT

Stresses Allowable Control


Immediately after transfer;
Top fiber 184.96 Kg/cm2. -20.00 Kg/cm2. OK !
Bottom fiber 184.96 Kg/cm2. 374.83 Kg/cm2. OK !

At service condition;
Top fiber 131.76 Kg/cm2. 281.12 Kg/cm2. OK !
Bottom fiber 131.76 Kg/cm2. 0.00 Kg/cm2. OK !

Elongation of cables due to stressing

Force diagram at stressing;


P JF = 1669.500 ton. L jack = 0.75 m.
P1 = 1619.415 ton.
P2 = 1567.148 ton. L2 = 25.4 m.
P3 = 1516.569 ton. L3 = 25.4 m.

Elongation of cable is obtained by formula:


dL i = (P i x L i ) / (E p x A p ) Hence, dL 1 = 5.5 mm.
dL 2 = 176.3 mm.
dL 3 = 176.3 mm.
Total elongation of cable is = 358.1 mm.

Ulimate capacity calculation

Ultimate moment 2963.19 ton-m.


A pt = 116.51 cm2.

11/1/2017 Losses 10 - 16
PCI h230 length 50.8 ctc 200-0-6.xlsx

fp = 19000.00 Kg/cm2.
f e min = 10669.52 Kg/cm2.
0.5*f p = 9500.00 Kg/cm2.
fe min > 0.5*fp OK!

s pu = f p *(1-k 1 *k 2 /j)
k1 = 0.4
k2 = 1/(bef*dp*fc')*{Apt*fp + (Ast - Asc)/fsy} = 0.22

0.85 - 0.007*(fc'-28) = 0.84


j = 0.84
s = 16979.91 Kg/cm2.
T = 1978.29 ton.

C = T T = j * k ud * b ef * f c '

a = j * k ud = 48.15 cm.
a, max = 25.00 cm.

Strength reduc. factor, f = 0.9


M n = T * (dp - a/2) = 4192.46 ton-m.
M cr =Z b *(f cf ' + P/A g )+P*e = 1219.67 ton-m.
M uk = fM n = 3773.22 ton-m.

Muk > Mu and Muk > 1.2*Mcr ===> OK !!! Rebar not considered yet

SHEAR CALCULATIONS

At section with distance from support, d = 2.36 m.

bv = 16.10 cm.
0.8h = 184.00 cm.
bw = 25.00 cm

Shear Moment
(ton) (ton-m)
- Due to selfweight of beam 50.43 125.114
- Due to selfweight of slab 28.80 71.449
- Due to SDL 16.40 44.255
- Due to live load :
- Load P : 6.86 16.190
- Load p : 33.18 82.309

- Factor for dead load = 1.3


- Factor for SDL = 2
- Factor for live load = 2

- ULTIMATE LOAD : 215.873 541.040

vu = Vu/(bv *d ) = 56.81 Kg/cm2.

Maximum concrete shear strength

Vc = 0.2 * fc' * bv * d + Pv

11/1/2017 Losses 11 - 16
PCI h230 length 50.8 ctc 200-0-6.xlsx

Pv = dy/dx * Pe = 83,555.12 kg.


Vc = = 525,068.64 kg.

Flexural shear cracking strength

V c = b 1 * b 2 * b 3 * b v * d * {(A st +A pt )*f c '/(b v *d)}^(1/3) + V 0 +P v

b1 = 1.10
b2 = 1.00
b3 = 1.00
A st = 0.00

s cp ,f = P e *e x /W b + P e /A c = 132.880 Kg/cm2.
M0 = Z * T cp,f = 868495.712 kg-m.
V 0 = M 0 /(M'/V') = 346525.887 kg.
Vc = 539240.595 kg.

Cracking shear strength at web

Vc = Vt + Pv
Vt = 0.3*((fc')^0.5 + fpc)*bv *d = 207,017.29 kg.
Vc = Vt + Pv = 290,572.41 kg.
V c , min = 290,572.41 kg..

v s = v u /0.7 - v c = 4.69 Kg/cm2.

stirrups space, s = Av *fy/(vs*bv )


Bjtp-24 Bjtp-24 Bjtp-24 Bjtd-40 Bjtd-40
d- 8 10 13 13 16 mm.
Av = 1.005 1.570 2.653 2.653 4.019 cm2.
s max = 31.94 49.91 84.35 140.58 212.95 cm.

CONTROL TO POINT LOAD T

TRUCK LOAD = 5.00 Ton 11.25 Ton 11.25 Ton = 27.50 Ton

DLA = 0.3
4.9 11.0 11.0 (ton).

21.0 4.0 5.0 20.0 (m).

50.0 m.
12.699 Ton 14.11 Ton

M mid = 298 ton-m.


Stresses due to point load;

11/1/2017 Losses 12 - 16
PCI h230 length 50.8 ctc 200-0-6.xlsx

Slab top fiber = 47.1 Kg/cm2. OK !


Beam top fiber = 185.1 Kg/cm2. OK !
Bottom fiber = 80.2 Kg/cm2. OK !

DEFLECTION CONTROL AT THE MIDDLE OF SPAN (" -"=Turun, "+"=naik )

Deflection due to selfweight


Y = - 5/384 x q x L^4 / EI -7.5 cm.
Deflection due to SDL
Y = - 5/384 x qDL x L^4 / EI - 1/48 x Pd x L^3 / EI -1.7 cm.
Deflection due to T
Y = (appropriated formula) -1.6 cm.
Deflection due to live load
Y = - 5/384 x p x L^4 / EI - 1/48 x P x L^3 / EI -3.6 cm.
Deflection due to effective prestress force
Y = 5/384 x (8xPxe/L^2) x L^4 / EI +13.1 cm.

RESUME

Prestress force:
Pi = 1501.12 ton, or 67.44 % UTS.
Pe = 1295.35 ton, or 58.19 % UTS.
P JF = 1669.50 ton, or 75.00 % UTS.
Elongation of strand due to stressing = 358.10 mm.

Deflection ; Short term Long term


Due to SW+SDL+T) = -10.7 -19.9 cm.
Due to SW+SDL+LL = -12.7 -21.9 cm.
Due to SW+SDL+T+PT = 2.4 -6.8 cm.
Due to SW+SDL+LL+PT = 0.4 -8.7 cm.
Due to live load only -3.6 OK ! cm.
Allowable defl.=L/ = -6.3 CHECKED cm.

ROTATION AT SUPPORT
At service condition: 1DL+1LL+1PT
R= 0.008385 rad

VERTICAL REACTION AT SUPPORT


DL = 109.231 t SW = 55.597 t
LL = 43.436 t
1DL+1.5LL, Vu = 174.385 t Þ Bearing: (appropriated bearing)

11/1/2017 Losses 13 - 16
PCI h230 length 50.8 ctc 200-0-6.xlsx

GAYA DALAM GELEGAR JEMBATAN AKIBAT GARIS PENGARUH

L Bentang = 50.800 m
Bentang bersih = 50.000 m

Qgdl = 2.189 Ton/m Akibat b.s. Pracetak


Qdl = 2.114 Ton/m Akibat b.s. pelat+aspal+diafragma+parapet
Qll = 1.440 Ton/m Akibat beban hidup
Pll = 13.720 Ton Akibat beban garis

GARIS PENGARUH LINTANG PADA GELEGAR GARIS PENGARUH MOMEN PADA GELEGAR

No. Potongan Vgdl Vqdl Vqll Vpll Vu Mgdl Mqdl Mqll Mpll Mu
Ton Ton Ton Ton Ton Ton.m Ton.m Ton.m Ton.m Ton.m
1 -0.40 0.00 0.00 0.00 0.00 0.00
2 0.00 54.72 52.86 36.00 13.72 247.59 0.00 0.00 0.00 0.00 0.00
3 2.50 49.25 47.58 32.40 13.03 224.31 129.96 125.55 85.50 32.59 588.02
4 5.00 43.78 42.29 28.80 12.35 201.04 246.25 237.88 162.00 61.74 1114.14
5 7.50 38.31 37.00 25.20 11.66 177.77 348.85 337.00 229.50 87.47 1578.36
6 10.00 32.83 31.72 21.60 10.98 154.50 437.78 422.90 288.00 109.76 1980.69
7 12.50 27.36 26.43 18.00 10.29 131.22 513.02 495.58 337.50 128.63 2321.12
8 15.00 21.89 21.14 14.40 9.60 107.95 574.58 555.05 378.00 144.06 2599.65
9 17.50 16.42 15.86 10.80 8.92 84.68 622.46 601.31 409.50 156.07 2816.29
10 20.00 10.94 10.57 7.20 8.23 61.41 656.66 634.34 432.00 164.64 2971.03
11 22.50 5.47 5.29 3.60 7.55 38.14 677.18 654.17 445.50 169.79 3063.87
12 25.00 0.00 0.00 0.00 6.86 14.86 684.02 660.78 450.00 171.50 3094.82

1 Vu = 1.3 ( V dl + 5/3 * Vll ) 6 Vu = Vu / O * d * bw


2 Mu = 1.3 ( M dl + 5/3 * Mll ) 7 Vu - Vc = Vu - Vc yang diambil
3 dp ( tidak kurang dari 0.8 h) 8 Jarak S = As*fy / { (Vu - Vc ) * bw }
4 Vu x dp / Mu ( <= 1.0 ) 9 S max = 80 * As * fy * d * V bw/d / (Aps * fpu)
5 Vc = 0,16 fc' + 49 Vu*dp / Mu 10 S max = ( As * fy ) / ( 3,5154 * bw )
Vc yang diambil = ( antara Vmax & Vmin ) 11 S yang dipakai

11/1/2017 Reinforcement 14 - 16
PCI h230 length 50.8 ctc 200-0-6.xlsx

PENGECEKAN PERHITUNGAN PENULANGAN GESER GIRDER I

Penulangan Geser : ( ACI 318 - 2002 )


d = 0,8 * h = 184.000 Cm
F = 0.850
bw = 25.00 Cm
Tu = (20.00) Kg/cm2
Vmin = 0,53 * V fc' = 13.247 Kg/cm2
Vmax = 1.30 * V fc' = 32.492 Kg/cm2
fy = 4,000.0 Kg/cm2
fpu = 26,500.0 Kg/cm2
Aps = 1.387 cm2

As = 1/4 *P * D^2 = 2.65 cm2 D - 1.3 cm

No Uraian Pot 1 Pot 2 Pot 3 Pot 4 Pot 5 Pot 6 Pot 7 Pot 8 Pot 9 Pot 10 Pot 11 Pot 12
1 Vu 0 247,586 224,313 201,041 177,769 154,497 131,225 107,952 84,680 61,408 38,136 14,863
2 Mu 0 0 588,016 1,114,136 1,578,359 1,980,686 2,321,116 2,599,650 2,816,287 2,971,028 3,063,873 3,094,821
3 dp 1.84 1.84 1.84 1.84 1.84 1.84 1.84 1.84 1.84 1.84 1.84 1.84
4 Vu*dp/Mu 1.0000 1.0000 0.7019 0.3320 0.2072 0.1435 0.1040 0.0764 0.0553 0.0380 0.0229 0.0088
5 vc 53.00 53.00 38.39 20.27 14.15 11.03 9.10 7.74 6.71 5.86 5.12 4.43
6 vc ambil 32.49 32.49 32.49 20.27 14.15 13.25 13.25 13.25 13.25 13.25 13.25 13.25
7 vu 0.00 63.32 57.37 51.42 45.47 39.51 33.56 27.61 21.66 15.71 9.75 3.80
8 vu - vc(ambil ) (32.49) 30.83 24.88 31.15 31.31 26.27 20.31 14.36 8.41 2.46 (3.49) (9.45)
9 Jarak s (13.07) 13.78 17.07 13.64 13.57 16.17 20.91 29.57 50.50 172.77 (121.58) (44.97)
10 s max 1,567.52 1,567.52 1,567.52 1,567.52 1,567.52 1,567.52 1,567.52 1,567.52 1,567.52 1,567.52 1,567.52 1,567.52
11 s max 120.82 120.82 120.82 120.82 120.82 120.82 120.82 120.82 120.82 120.82 120.82 120.82
12 dihitung jarak (13.07) 13.78 17.07 13.64 13.57 16.17 20.91 29.57 50.50 120.82 (121.58) (44.97)
13 Dipakai jarak 10.00 10.00 10.00 15.00 15.00 15.00 20.00 25.00 25.00 25.00 25.00 25.00
Jarak Pot.( m ) -0.400 0.000 2.500 5.000 7.500 10.000 12.500 15.000 17.500 20.000 22.500 25.000

11/1/2017 Reinforcement 15 - 16
PCI h230 length 50.8 ctc 200-0-6.xlsx

TULANGAN LONGITUDINAL
Batasan yang dipakai untuk menentukan tulangan longitudinal adalah sbb :

1 Batas Tulangan Tarik


As tarik = 0,004* A, dimana A = luas penampang antara serat tarik dengan cgc
A = ( C*Ya ) + ( C - A ) * h3 + ( C-A ) * 1/2 * h4 = 4,481.96 cm2
As tarik = 0,004* A = 17.927825 cm2
Jika tulangan dibagi merata, maka total tulangan longitudinal :
As = (Ag / A )* As tarik = 35.022 cm2
2 Batas tulangan susut : As = 0,25 % * Ag = 21.89 cm2
3 Batas maksimum jarak tulangan : S max = 3 * bw = 75 cm
Maka digunakan tul. longitudinal : 1.0 D 13.0 132.786 cm2 > 35.022 cm2 OK ! !

DESAIN END BLOCK

Penarikan kabel ( jacking Forse) dianggap maksimum 80 % ):


P = 80 %*Strand*0,9871*18700 = 1,757,827.68 Kg

Sumbu ( X - X ) : Fx = 0,3 * Px * ( 1 - a/b ) = 460,375.07 Kg


Sumbu ( Y - Y ) : Fy = 0,3 * Px * ( 1 - a/b ) = 469,110.71 Kg
F yang di pakai = 469,110.71 Kg.

Dimensi ' Brusting Steel ' yang dipakai : BJTD 4,000.0 Kg/cm2
As = ( F / (0.87*fy) ) = 102.03 cm2

Dipakai Tulangan Dia = D - 13 As = 1.33 cm2


Jumlah 77 As Tot = 102.25 cm2 > 102.03 cm2 OK ! !

Jadi dipakai Brusting Steel : 77 D 13 Satu Layer


39 D 13 Dua Layer
19 D 13 Empat Layer

Jadi dipakai Brusting Steel 19 D 13 Satu Layer


Per Anchorage 10 D 13 Dua Layer
5 D 13 Empat Layer

11/1/2017 Reinforcement 16 - 16