You are on page 1of 2

DESIGN BY:ENG.S.

RAYAN
CHECKED BY: M.SABRY

Design of formwork :-

Inputs:-
plywood= 18.00 mm E= 112.00 t/cm2
A= 180.00 cm2 F= 140.00 kg/cm2
I= 48.60 cm4
Z= 54.00 cm3
S. timber= (2*4 in) 5.00 * 10.00
A= 50.00 cm2 E= 85000 kg/cm2
I= 416.67 cm4 F= 0.085 t/cm2
Z= 83.33 cm3
M. timber= (3*6 in) 7.50 * 15.00
A= 112.50 cm2
I= 2109.38 cm4
Z= 281.25 cm3
DATA OF CONCRETE:-
ts= 40.00 cm
L.L= 200.00 kg\m2
o.w of shoring= 0.00 kg\m2

outputs:-
w= 1.20 t\m2
Check Plywood :- w= 1.20
ASSUME SPACING = 0.50 m
M=WL2/10 0.03 m.t
Zreq= 21.43 cm3 SAFE 54.00 cm3 L= 0.50
d= 0.0010 m SAFE 0.0015 m
Check Secondary Timber :-
L SECONDRY 1.00 m
w= 0.60 t\m'
M=WL /10 2
0.06 m.t
Zreq= 70.59 cm3 SAFE 83.33 cm3
d= 0.1168 cm SAFE 0.30 cm
Check Main Timber :-
Lwidth of frame= 1.00 m
L main 1.50 m
spacing between frames= 0.75 m
Lspacing 0.88 m
w= 1.05 t\m'
M=WL /10 2
0.24 m.t
Zreq= 277.94 cm3 SAFE 281.25 cm3
d= 0.2045 cm SAFE 0.30 cm
LOAD ON FRAME:-
cross brace= 1.50 m
LOAD ON FRAME= 3.15 t
DESIGN BY:ENG.S.RAYAN
CHECKED BY: M.SABRY

Design of formwork :-

Inputs:-
plywood= 18.00 mm E= 112.00 t/cm2
A= 180.00 cm2 F= 140.00 kg/cm2
I= 48.60 cm4
Z= 54.00 cm3
S. timber= (2*4 in) 5.00 * 10.00
A= 50.00 cm2 E= 85000 kg/cm2
I= 416.67 cm4 F= 0.085 t/cm2
Z= 83.33 cm3
M. timber= (3*6 in) 7.50 * 15.00
A= 112.50 cm2
I= 2109.38 cm4
Z= 281.25 cm3
DATA OF CONCRETE:-
ts= 23.00 cm
L.L= 200.00 kg\m2
o.w of shoring= 0.00 kg\m2

outputs:-
w= 0.78 t\m2
Check Plywood :- w= 0.78
ASSUME SPACING = 0.50 m
M=WL2/10 0.02 m.t
Zreq= 13.84 cm3 SAFE 54.00 cm3 L= 0.50
d= 0.0006 m SAFE 0.0015 m
Check Secondary Timber :-
L SECONDRY 1.00 m
w= 0.39 t\m'
M=WL /10 2
0.04 m.t
Zreq= 45.59 cm3 SAFE 83.33 cm3
d= 0.0755 cm SAFE 0.30 cm
Check Main Timber :-
Lwidth of frame= 1.00 m
L main 1.50 m
spacing between frames= 1.00 m
Lspacing 1.00 m
w= 0.78 t\m'
M=WL /10 2
0.17 m.t
Zreq= 205.15 cm3 SAFE 281.25 cm3
d= 0.1509 cm SAFE 0.30 cm
LOAD ON FRAME:-
cross brace= 1.50 m
LOAD ON FRAME= 2.33 t