You are on page 1of 4

TECHNICAL PARTICULAR AND GUARANTEE

PEKERJAAN RELOKASI T. 38 DAN T.39 PADA SPAN T.37 - T. 38 - T. 39 - T. 40 SUTT 70 KV JATIRANGGON - KOSAMBI TERKAIT PROYEK PEMBANGUNAN JALAN TOL CIMANGGIS - CIBITUNG

TPG03 : INSULATOR STRING SET


NO. DESCRIPTION UNIT REQUIRED PROPOSED AND GUARANTEE REFRENCES
A INSULATOR & JUMPER STRING SET FOR TWIN CONDUCTOR
1 Manufacturer
Insulator String Set Single, Double
2 Number Of String And Dies Per String: Tension set
For Heavy Pollution (U 210BP) Unit N/A, 2 x 12
3 Length Of String When Stretched mm N/A, To be submitted
4 Overall Creepage Distance mm N/A, To be submitted
5 Net weight of one set kg N/A, To be submitted
6 Ultimate Breaking Strenght Of String kN N/A, 2 x 120
7 Withstand voltage without arcing horn :
- Wet power - frequency withstand voltage test kV N/A, To be submitted
- Wet power - frequency withstand voltage test (1.2 x 50 us) kV N/A, To be submitted
8 Withstand voltage with arcing horn : -
- Wet power - frequency withstand voltage test kV N/A, To be submitted
- Wet power - frequency withstand voltage test (1.2 x 50 us) kV N/A, To be submitted
9 Arcing horn gap (approximately)
- For heavy pollution (U 120 BP) mm N/A, To be submitted
10 Tension clamp
- Manufactures nam - Required
- Material Body - Allumunium Alloy
- Applied conductor - ACSR ostrich
Type of clamp - Pressed
- Number of bolt for schoen jumper Pcs 3
TECHNICAL PARTIC
PEKERJAAN RELOKASI T. 38 DAN T.39 PADA SPAN T.37 - T. 38 - T. 39 - T. 40 SUTT 70 KV JA

TPG03 : INSULATOR STRING SET


NO. DESCRIPTION
B HARDWARES
1 Suspension Clamps
Manufacturer's name
Materials (body)
Type
Applied conductor
Armour rod
Ultimate breaking strength
Slip strength
2 Tension Clamps Compresion Type
Manufacturer's name
Materials :
- Dead end body and jumper connector
- Steel core with clevis
- Bolt
Minimum tensile strength :
- Dead end clamp
- Jumper connector
Ultimate breaking strength
3 Arcing horns
Manufacturer's name
Materials
Insulation
Number of insulators
Horn gap length
Bolt
TECHNICAL PARTICULAR AND GUARANTEE
T. 38 - T. 39 - T. 40 SUTT 70 KV JATIRANGGON - KOSAMBI TERKAIT PROYEK PEMBANGUNAN JALAN TOL CIMANGGIS - CIBITUN

UNIT REQUIRED PROPOSED AND GUARANTEE

Allumunium Alloy
Trunnion

kg
kg

Allumunium Alloy
Galvanized steel
Galvanized steel

kg 8200
kg N/A
kg Submitted routine test document

Galvanized steel
N/A
12
1545
Galvanized steel